For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Electrical and Electronics
Opening Date28 Jun 2024
Closing Date5 Jul 2024
Tender Amount₹ 75,35,998 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Electrification arrangements to 2BHK works at Kaisernagar;S&F MS Security Fencing Mesh (2"X2")

24

2192

52608

... More
Electrification arrangements to 2BHK works at Kaisernagar;S&Spreading of 20mm HBG Metal

5.91

1543

9119.13

... More
Electrification arrangements to 2BHK works at Kaisernagar;S&Filling with Borrowed Gravel

111.54

480

53539.2

... More
Electrification arrangements to 2BHK works at Kaisernagar;PCC with 20mm Metal (1:2:4)

0.5

6449

3224.5

... More
Electrification arrangements to 2BHK works at Kaisernagar;CRS Masonary CM(1:6) 2nd Sort

28.51

4925

140411.75

... More
Electrification arrangements to 2BHK works at Kaisernagar;PCC with 40mm Metal (1:4:8)

1.51

4706

7106.06

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavation in Ordinary Soil

7.78

437

3399.86

... More
Electrification arrangements to 2BHK works at Kaisernagar;Hire-JCB to Level & Clear the Site

8

893

7144

... More
Electrification arrangements to 2BHK works at Kaisernagar;Labour for Fixing of all types of clamps

15

65

975

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS MS Channel,Angles,Flats&Rod

1.47

185

271.95

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS MS Channel,Angles,Flats&Rods

1.47

221

324.87

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS - PVC Control Cb 4, 10C

550

-

82.5

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS-PVC Control Cb 4, 10C

550

1

550

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS 11 KV AB SWCH Con 200/400 A

2

80

160

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS 11 KV AB SWCH Con 200/400 A

2

80

160

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS 11 KV VCBs&Panel boards

1

1024

1024

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS11 KV VCBs&Panel boards

1

1024

1024

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS RSJoists150 x150 mm/RailPol

3

107

321

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS RSJoists150 x 150 mm/RailPole

3

176

528

... More
Electrification arrangements to 2BHK works at Kaisernagar;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*) Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

2.97

482

1431.54

... More
Electrification arrangements to 2BHK works at Kaisernagar;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*)Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

2.97

1293

3840.21

... More
Electrification arrangements to 2BHK works at Kaisernagar;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

2.97

851

2527.47

... More
Electrification arrangements to 2BHK works at Kaisernagar;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

2.97

2181

6477.57

... More
Electrification arrangements to 2BHK works at Kaisernagar;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

3

142

426

... More
Electrification arrangements to 2BHK works at Kaisernagar;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

3

143

431.25

... More
Electrification arrangements to 2BHK works at Kaisernagar;Laying of earth mat including excavation of trenches of depth 600mm,welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.Connecting with GI Wire No.8 (Labour)

10

14

140

... More
Electrification arrangements to 2BHK works at Kaisernagar;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

4

386

1544

... More
Electrification arrangements to 2BHK works at Kaisernagar;Connection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

9

224

2016

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials - MS Bolts & Nuts,Washers etc.,

45

91

4106.25

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials - GI Bolts & Nuts,Washers etc.,

25

117

2937.5

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of Alluminum PT clamps conforming to A6 of IS 617, with hot dip galvanised bolts and nuts suitable for single zebra / Panther

3

368

1104

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of Alluminum alloy T clamps conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

12

299

3588

... More
Electrification arrangements to 2BHK works at Kaisernagar;Hoisting of Insulators and hardware, stretching the conductor and stringing of 11 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 3.5mt)

3

507

1521

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of Tension Hardware 3 Bolted for single Zebra/panther with 150 mm spacing

3

2055

6165

... More
Electrification arrangements to 2BHK works at Kaisernagar;Fixing of I-bolts

3

20

60

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of various Clamps Supply of I-Bolts Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy Supply of I Bolts

3

294

882

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of Danger boards with clamps

1

116

116

... More
Electrification arrangements to 2BHK works at Kaisernagar;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

1.62

6450

10449

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials - GI Wire No 8 incl mat

10

105

1050

... More
Electrification arrangements to 2BHK works at Kaisernagar;Mass Concreting for pole Coping of 1.5'x1.5'x1 with 1:8 slope Using form boxes (0.031Cumt.)

0.09

3893

362.05

... More
Electrification arrangements to 2BHK works at Kaisernagar;Welding charges Arc Welding 25mm thickness

30

7

210

... More
Electrification arrangements to 2BHK works at Kaisernagar;Laying of earth mat including excavation of trenches of depth 600mm,welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.75x 8mm MS Flat / GI Flat.

25.53

65

1659.45

... More
Electrification arrangements to 2BHK works at Kaisernagar;Fabrication and connecting to risers from earth mat to structures, equipment,marshalling boxes, electrical panels, PLCC panels, fencing posts etc.M.S./ G.I. Flat 50x6mm / 50 x 8 mm ( Above ground)

125

41

5125

... More
Electrification arrangements to 2BHK works at Kaisernagar;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 20 Km and upto 30 Km with Lorry for each trip

1

3619

3619

... More
Electrification arrangements to 2BHK works at Kaisernagar;Transport of steel including line materials such as cross arms,clamps, hardware, cable (loose) and other line materials (Including loading and unloading)Above 20 KM and upto 30 KM

2.97

517

1535.49

... More
Electrification arrangements to 2BHK works at Kaisernagar;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

2.97

3426

10175.22

... More
Electrification arrangements to 2BHK works at Kaisernagar;Cable terminations to the switch gear marshalling boxes/panel terminal blocks/control and relay panels LT AC panel including providing suitable ferrules and lugs as per specification (including cost of ferrules, lugs and glands)

120

27

3240

... More
Electrification arrangements to 2BHK works at Kaisernagar;Control Cable Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends .

550

19

10450

... More
Electrification arrangements to 2BHK works at Kaisernagar;Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.(3 Conductors)

20

321

6425

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV three phase PTs

1

800

800

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials - Earthing GI flat 25x3 mm incl material

40

105

4200

... More
Electrification arrangements to 2BHK works at Kaisernagar;Providing of earthing with excavation of earth pit (0.6x0.6x2.4 Mts.) duly filling with bentonite, earth ,running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

4

1210

4840

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials iii)Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication

4

3486

13944

... More
Electrification arrangements to 2BHK works at Kaisernagar;Dismantling of all types of 33 kV AB switches

1

1256

1256.25

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of AB Switch and aligment complete Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

3

2078

6234

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

3

810

2430

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV VCB with Control Panel

1

5556

5556.8

... More
Electrification arrangements to 2BHK works at Kaisernagar;Con of Plinth for 11kv VCB 1.8x1.8x0.75m

1

26086

26086

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavate of Pit for 33KV VCB

3.89

331

1286.93

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation R.S. Joists 150 x 150 mm

3

1818

5455.83

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of Control panel

16

1800

28800

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of Control Panel with busbars with required MCCBs including complete wiring

16

18000

288000

... More
Electrification arrangements to 2BHK works at Kaisernagar;Laying of the cable along the footpath through 225mm dia GI pipe for 33KV, 150mm dia GI pipe for 11KV (excluding the cost of GI pipe) - 2nd Cable in Excavated Trench

1680

204

342888

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of LED fixture set of (LUMINAIRE MAKE: PHILIPS /OSRAM/GE/VENTURE /CROMPTON/BAJAJ/VIN/WIPRO/JAGUAR/KESELEC/HAVELLS/HPL/SURYA/SYSKA. LED MAKE: PHILIPS LUMILEDS/CREE/NICHIA/OSRAM/SUMSANG/LG LEDs) make with minimum 120 Lm/W Lumens Output, 105 V to 295 V Voltage range, more than 0.94 Power factor, Pressure Die cast Alluminium housing, Powder coated/ anodized finishing, toughed glass lamp cover, IP65 ingress protection, less than 25% THD, minimum 70% electronic efficiency, minimum 140 degrees along the road & 80 degrees across the road beam angle, 4500 to 6500K Color temperature, very low mercury 6.4mg max, Life more than 50,000 burning hours, maximum 20% depreciation during life, Fully cut off control of distribution, Electronic Ballast driver type, minimum 10KV Surge withstand capacity, Poly carbonate reflector/ Poly Carbonate Lens secondary optics, suitable for fixing to existing poles in the Substations, with five years warranty-90W LED fixture set

40

8200

328000

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS 3PLTTriv meter with PVC box

8

15

120

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS 3PLTTriv meter with PVC box

8

15

120

... More
Electrification arrangements to 2BHK works at Kaisernagar;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 30 Km and upto 50 Km with Lorry for each trip

1

4287

4287

... More
Electrification arrangements to 2BHK works at Kaisernagar;UnLOADING of LINE MATERIALS - load-LT XLPE UG Cable all size

6

260

1560

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS - LT XLPE UG Cable for all size

6

500

3000

... More
Electrification arrangements to 2BHK works at Kaisernagar;Making of Outdoor/Indoor End Termination Supply of 31/2x185Sqmm UG O/D end term kits

30

550

16500

... More
Electrification arrangements to 2BHK works at Kaisernagar;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

16

386

6176

... More
Electrification arrangements to 2BHK works at Kaisernagar;UG Cables Joints : Making of Straight through joints Supply & fixing of Cable jointing kit

32

825

26400

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of CT operated meters for LV side of Distribution Transformers Erection & commissioning of CT meter along with box on LV side of DTRs including cable connections from Transformer LV to Distribution box via CT meters box

8

900

7200

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply & erection of CT metering Panel including complete wiring

8

3500

28000

... More
Electrification arrangements to 2BHK works at Kaisernagar;Cost of Pipes and slabs supply of 4" DWC pipe

100

759

75900

... More
Electrification arrangements to 2BHK works at Kaisernagar;Cost of Pipes and slabs Supply of 150 mm Hume pipe of class NP3 with compresive strength of 35N/mm2 for 28 days curing,barewall thickness of 30mm,1.25kG linear/meter and withstanding capability of 22.50KN/linear meter as per IS 458-1993.

500

303

151500

... More
Electrification arrangements to 2BHK works at Kaisernagar;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth ,running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

16

1100

17600

... More
Electrification arrangements to 2BHK works at Kaisernagar;Formation of Cut points Formation of Cut point for LT line excluding pole erection and stays for 3/4/5 wire

4

983

3932

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum

40

679

27160

... More
Electrification arrangements to 2BHK works at Kaisernagar;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

4.32

6450

27864

... More
Electrification arrangements to 2BHK works at Kaisernagar;Stringing of LT AB Cable LT AB cable 3x70 + 1x16 + 1x50

1.03

8450

8686.6

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation 9.1 M long PSCC pole

40

2400

96000

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials CI eath pipe with 80mm dia,2.0 M Length

16

2789

44624

... More
Electrification arrangements to 2BHK works at Kaisernagar;S&E-3Ph MtringPanel 14g with accessories

36

3500

126000

... More
Electrification arrangements to 2BHK works at Kaisernagar;Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth,levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs. - LT 3 1/2 x 185 Sqmm Cable

1680

521

876153.6

... More
Electrification arrangements to 2BHK works at Kaisernagar;Raising of double run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe) LT 3 1/2 x 185 Sqmm Cable

150

157

23550

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials - Supply of GI Flat 25X3 mm

160

84

13440

... More
Electrification arrangements to 2BHK works at Kaisernagar;S&E-1Ph MtringPanel 14g with accessories

756

2000

1512000

... More
Electrification arrangements to 2BHK works at Kaisernagar;Making of Outdoor/Indoor End Termination LT 3 1/2 x 185 Sqmm Cable

30

826

24780

... More
Electrification arrangements to 2BHK works at Kaisernagar;Earth work excavation of in all soils except hard rock requiring blasting.

9.5

345

3278.88

... More
Electrification arrangements to 2BHK works at Kaisernagar;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading)8 Mtrs long PSCC Poles

10

271

2715.2

... More
Electrification arrangements to 2BHK works at Kaisernagar;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading)11 Mtrs long PSCC Poles

9

431

3887.73

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavation of pits in all soils except hard rock requiring blasting 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0") 1.05 cum

9

700

6300

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation 11 Mtrs PSCC poles

9

4336

39031.65

... More
Electrification arrangements to 2BHK works at Kaisernagar;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.55 Sqmm Single Circuit (3 Conductors)

0.53

9454

4992.14

... More
Electrification arrangements to 2BHK works at Kaisernagar;S&R 25x6mm GI Strip for Earthing

10

110

1100

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of AB Switch and aligment complete Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

1

2078

2078

... More
Electrification arrangements to 2BHK works at Kaisernagar;Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming 11 KV and LT

3

480

1440

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavation of Stay pits of size 0.45x0.45x1.34 Mts' for burying the anchor rod with anchor plateof stay sets including dewatering,shoring, shuttering wherever necessary and back filling the pit (after erection and concreting the same whever is necessary) with the excavated earth/extra earth/excavated rock bits any and leveling the site with out any lead.In all soils except Hard gravel Hard Murram, Disintegrated Rock, Hard rock Requiring blasting.

3

346

1038

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS R.S. Joists 175 x 85 mm

16

50

800

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS R.S. Joists 175 x 85 mm

16

76

1216

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS-11/33KV XLPE UG Cable all sizes

1

1024

1024

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS - 11KV/33KV XLPE UG Cable for all sizes

1

1024

1024

... More
Electrification arrangements to 2BHK works at Kaisernagar;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading)9.1 Mtrs long PSCC Poles

110

363

39930

... More
Electrification arrangements to 2BHK works at Kaisernagar;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 30 KM and upto 50 KM

5.2

576

2995.2

... More
Electrification arrangements to 2BHK works at Kaisernagar;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 30 Km and upto 50 Km with Lorry for each trip

5

4287

21435

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS 11 KV AB Cable (XLPE) 3 Core upto 500 Mts. Drum (including Accessories )

7

438

3066

... More
Electrification arrangements to 2BHK works at Kaisernagar;UNLOADING of LINE MATERIALS LT Cable /AB Cable (XLPE) Single core Drum (including Accessories) for all size

1

260

260

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS 11 KV AB Cable (XLPE) 3 Core upto 500 Mts. Drum (including Accessories )

7

584

4088

... More
Electrification arrangements to 2BHK works at Kaisernagar;LOADING of LINE MATERIALS LT Cable /AB Cable (XLPE) Single core Drum (including Accessories) for all size

1

500

500

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply and Erection of I Hook and Suspension Hook Erection of Suspension Clamp Assemb &Eye hook-L

6

8

48

... More
Electrification arrangements to 2BHK works at Kaisernagar;Cutting charges for MS Sections MS Angle of all sizes

200

7

1400

... More
Electrification arrangements to 2BHK works at Kaisernagar;Fabrication of materials including 2 coats of Red oxide painting 1.07 mt. V. Cross arms with 75 x 40 mm MS Channel

160

110

17600

... More
Electrification arrangements to 2BHK works at Kaisernagar;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCCcollar of 0.60 M dia X 0.50 M height

24

386

9264

... More
Electrification arrangements to 2BHK works at Kaisernagar;Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming 11 KV and LT

3

480

1440

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavation of Stay pits of size 0.45x0.45x1.34 Mts' for burying the anchor rod with anchor plateof stay sets including dewatering,shoring, shuttering wherever necessary and back filling the pit (after erection and concreting the same whever is necessary) with the excavated earth/extra earth/excavated rock bits any and leveling the site with out any lead.In all soils except Hard gravel Hard Murram, Disintegrated Rock, Hard rock Requiring blasting.

3

346

1038

... More
Electrification arrangements to 2BHK works at Kaisernagar;Fix-GPRS Modem & Sim Card

15

300

4500

... More
Electrification arrangements to 2BHK works at Kaisernagar;Laying of earth mat including excavation of trenches of depth 600mm,welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.Connecting with GI Wire No.8 (Labour)

80

14

1120

... More
Electrification arrangements to 2BHK works at Kaisernagar;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

16

402

6432

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Box pole 9/10/11 Mtr

8

2300

18400

... More
Electrification arrangements to 2BHK works at Kaisernagar;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

16

845

13520

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of Extension of 3Mtrs for M+3

2

5450

10900

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of Extension of 3Mtrs for M+3 Supply of material for Extension of 3Mtrs for M+3

2

20800

41600

... More
Electrification arrangements to 2BHK works at Kaisernagar;Galvanized Supply of material for Extension of 3Mtrs for M+3

2

26408

52816

... More
Electrification arrangements to 2BHK works at Kaisernagar;Galvanized Supply of -M+3 Tower GALV

2

130254

260508

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply and Erection of I Hook and Suspension Hook -Erection of I Hook

140

55

7700

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply and Erection of I Hook and Suspension Hook -Supply of I Hook

140

158

22120

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials - Supply of GI Flat 25X3 mm

80

84

6720

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum

118

679

80122

... More
Electrification arrangements to 2BHK works at Kaisernagar;Making of Outdoor/Indoor End Termination 11 KV 3x300 Sqmm Cable

4

2021

8084

... More
Electrification arrangements to 2BHK works at Kaisernagar;Making of Straight through joints 11 KV 3x300 Sqmm Cable

4

3176

12704

... More
Electrification arrangements to 2BHK works at Kaisernagar;Raising of double run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)-DR 11KV 3x300sqmm UG Cb on support

20

270

5400

... More
Electrification arrangements to 2BHK works at Kaisernagar;Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth,levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs. 11 KV 3x300 Sqmm Cable

230

1239

285163.2

... More
Electrification arrangements to 2BHK works at Kaisernagar;End Termination of AB cable (each lead): Supply of 11KV 5+70sq.mm/3x70+70sq.mm/3x35+35sq.mm AB cable end Kits

42

950

39900

... More
Electrification arrangements to 2BHK works at Kaisernagar;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

9

143

1293.75

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavation of pits in all soils except hard rock requiring blasting 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum

10

474

4740

... More
Electrification arrangements to 2BHK works at Kaisernagar;Laying/ Raising of LT UG cable Laying of 1Core XLPE 120Sqmm Cable

1000

20

20000

... More
Electrification arrangements to 2BHK works at Kaisernagar;Sup Dead End Clamp Assemb & Eye hook-M

6

8220

49320

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of T-Branch kit

22

1634

35948

... More
Electrification arrangements to 2BHK works at Kaisernagar;Errection of 11KV T - Branch kit

22

200

4400

... More
Electrification arrangements to 2BHK works at Kaisernagar;End Termination of AB cable (each lead): 120 Sqmm to 185 Sqmm

42

800

33600

... More
Electrification arrangements to 2BHK works at Kaisernagar;Straight through joints of AB cable (each lead) Supply and ere Angle line Asmbly kits

30

2124

63720

... More
Electrification arrangements to 2BHK works at Kaisernagar;Straight through joints of AB cable (each lead) Supply and ere Straight line Asmbly kits

130

1661

215930

... More
Electrification arrangements to 2BHK works at Kaisernagar;Stringing of HT AB Cable with GI Metal Parts HT AB Cable 11 KV 3x185+70 Sqmm

3.46

35700

123522

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of CT operated meters for LV side of Distribution Transformers Erection & commissioning of CT meter along with box on LV side of DTRs including cable connections from Transformer LV to Distribution box via CT meters box

15

900

13500

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials Supply of GI Bolts & Nuts etc

550

94

51700

... More
Electrification arrangements to 2BHK works at Kaisernagar;Laying of earth mat including excavation of trenches of depth 600mm,welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.Supply of GI Wire No.8 ( material)

88

75

6600

... More
Electrification arrangements to 2BHK works at Kaisernagar;Excavation of earth pit, putting GI pipe with suitable clamp of nominal dia 40mm and 2.0meters long in side the pit including supply and fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit with bentonite & black cotton soil mix for full depth of the pit with alternate layers of of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of bentonite,Black cotton soil, clamps, G.I.Pipe and RCC collars, labour charges for all operational and incidental items of work etc., complete

36

1152

41472

... More
Electrification arrangements to 2BHK works at Kaisernagar;Supply of earthing pipe with materials iii)Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication

24

2789

66936

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc

15

1500

22500

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation 8.0 m long PSCC pole

10

1163

11630

... More
Electrification arrangements to 2BHK works at Kaisernagar;Fabrication of materials including 2 coats of Red oxide painting Back clamps with 50 x 6 mm MS Flat

160

15

2400

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc. 11 KV HG Fuse set including earthing

8

660

5280

... More
Electrification arrangements to 2BHK works at Kaisernagar;Providing of earthing with excavation of earth pit (0.6x0.6x2.4 Mts.) duly filling with bentonite, earth ,running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

24

1100

26400

... More
Electrification arrangements to 2BHK works at Kaisernagar;S&F MS Security Fencing Mesh (2"X2")

128

2192

280576

... More
Electrification arrangements to 2BHK works at Kaisernagar;RCC Column type DTR Plinth of size 1'X1'X13',topslab 5'x9'x9" & beam size 5'X9'X9"

8

24600

196800

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of DTR's including loading and Unloading DTR on the Structure/Plinth etc Erection of 3 Phase DTRs 63,75 & 100 KVA

8

1650

13200

... More
Electrification arrangements to 2BHK works at Kaisernagar;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

59.4

6450

383130

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation 9.1 M long PSCC pole

110

2108

231880

... More
Electrification arrangements to 2BHK works at Kaisernagar;Erection of AB Switch and aligment complete Erection of 11KV 200A TT type AB Switch including fixing of cross angles and alignment complete

8

1777

14223.52



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.