Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Electrical and Electronics
Electrical Works
Opening Date18 Dec 2024
Closing Date27 Dec 2024
Tender Amount₹ 39,45,141 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply & fixing of batten holder /slanting holder in lieu of ceiling rose of light point complete with all connection and all labour charges with 40W bulb (for new installation).

6

141

846

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for mains including all labour charges complete.

50

103

5150

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply and run of 2 of 22/0.3mm (1.5 sq.mm) (FR) P.V.C. insulated flexible copper cable in existing pipe for mains including all labour charges complete.

50

75

3750

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply & fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads,earth connection along with all labour charges etc., complete

4

166

664

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Painting to new walls with 2 coats of ACE paint external grade of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls as directed by Engineer incharge of the work.

289.87

154

44639.98

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply and fabrication of beams,chanales and angles including labour charges complete for the finished item of work.

1096.32

119

130462.08

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls as directed by Engineer incharge of the work

156.16

146

22799.36

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Carting away of excavated soils Complete for finished item of work

50.69

270

13686.3

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply and fixing of MS GATE with redoxide and 2 Coats of Anamil paint Complete finished item of work as directed by Engineer - in-charge

10.15

5299

53784.85

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply & Spreading of 20mm HBG Metal including cost and conveyance of all materials, labour charges all leads and lifts, etc, complete for finished item of work as directed by Engineer incharge of the work.

1.9

1543

2931.7

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Plain Cement contrete (1:3:6) Nominal Mix using 40 mm metal using concrete mixer including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including Seigniorage changes, sales & other taxes on all materials including alol operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete.

21.26

5496

116844.96

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Plain Cement contrete (1:2:4) Nominal Mix using 20 mm metal using concrete mixer including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including Seigniorage changes, sales & other taxes on all materials including alol operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete.

11.75

6449

75775.75

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Flooring with polished shahabad stones 20 mmthick set over base coat of CM (1:3) over already laid CC bed /RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dresing of flooring stones etc., complete for finished item of work .

35.01

641

22441.41

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16 mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., complete for finished item of work as directed by Engineer incharge of the work.

14.26

520

7415.2

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Coursed rubble stone masonry 2nd sort with hard granite stones in cement mortar (1:6) for basement, including cost and conveyance of all materials, labour charges, curing, all leads and lifts, etc, complete for finished item of work as directed by Engineer incharge of the work.

6.42

4925

31618.5

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Drilling of holes 25mm dia in hard granite or sheet rock with Pneumatic compressor and grouting holes with neat cement slurry excluding cost of steel including labour charges etc complete for finished item of work and as directed by engineer in charge.

180

144

25920

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Earth Work Mass Excavation in Hard rock with Blasting prohibited complete for finished item of work as directed by the engineer-incharge.

101.74

1440

146505.6

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Dismantling of Unreinforced Cement Concrete upto 15 Cm thickness work including stacking of serviceable materials and disposal of unserviceable materials with 100 metres lead etc complete finished item of the work.

5.25

1889

9917.25

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Dismantling of Brick work including stacking of serviceable materials and disposal of unserviceable materials with 100 metres lead etc complete finished item of the work.

3.04

315

957.6

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Dismantling of Reinforced Cement Concrete including stacking of serviceable materials and disposal of unserviceable materials with 100 metres lead etc complet finished item of the work

1.65

3342

5514.3

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

3

146

439.89

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Painting of feeder name on support including cost of paint

10

53

530

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

3

142

426

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of GI wire No 8

1.5

105

157.5

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply and painting of Black to all earth Flat

208

55

11440

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of 33 KV AB Switch including alignment and earthing

3

4500

13500

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

5

1234

6171

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

5

386

1930

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication

5

3486

17430

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of Alluminum alloy T clamps conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating

12

299

3588

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of Tension Hardware 3 Bolted for single Zebra/panther with 150 mm spacing.

6

2055

12330

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of I Hook

6

55

330

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of I Hook

6

158

948

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Hoisting of Insulators and hardware, stretching the conductor and stringing of 33 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 4.5mt)

1

781

781

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Connection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

30

224

6720

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium.

0.75

482

361.5

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

0.75

1293

969.75

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium

0.75

851

638.25

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

0.75

2181

1635.75

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

0.75

3426

2569.5

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Fabrication and connecting of M.S./ G.I. Flat 50x6mm to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.

208

41

8528

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) TRANSPORT OF STEEL 10 TO 20KM

2.05

412

844.76

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;UNLOADING of MS Channel,Angles,Flats&Rod

1.25

185

231.25

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;LOADING of MS Channel,Angles,Flats&Rods

1.25

221

276.25

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Coping & Muffing-Iron Pole

0.06

3893

241.37

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. including cost of cement

2.1

6579

13815.9

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation R.S. Joists 150 x 150 mm

2

1952

3905.22

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;EXCAVATION OF PIT 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M (1.31 cum)

2

629

1259.7

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

2

1132

2264

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;UNLOADING of RSJoists150 x150 mm/RailPol

2

107

214

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;LOADING of RSJoists150 x 150 mm/RailPole

2

176

352

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends

650

27

17550

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Painting of coping with two coats of white cement including cost of paint & conveyance charges for PTR/VCB plinths

1

160

160

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Plastering 2 Coats,20/16mm(1:6)(1:4)

6.4

373

2387.2

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Cement concrete 1:3:6 ration with 40 MML HBG metal including the cost of all materials and labour complete 1.8 x 1.8 x 0.75 cum for VCB Plinth

6

5160

30960

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Excavate-Pit for 33KV VCB

4.8

331

1588.8

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of 33kv CT s

1

1079

1079

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of 33 KV VCB with Control Panel

1

12500

12500

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;UNLOADING of 33 KV AB SWCH Con 400/800 A

3

79

237

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;LOADING of 33 KV AB SWCH Con 400/800 A

3

126

378

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;UNLOADING of 33 KV VCBs&Panel boards

1

1044

1044.48

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;LOADING of 33 KV VCBs&Panel boards

1

1024

1024

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of 33 KV LAS station/Line type including earthing

1

880

880

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Earth work excavation of pits in hard rock requiring blasting.(wherever feasible/ required)

6.16

1012

6232.03

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of 5 Mts RS Joist (Bit) Pole including fixing of Pole Mounted Box

6

1044

6265.38

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Cutting Charges for RS joist 150x150mm

15

48

720

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

2

146

293.26

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

7

512

3587.85

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;LOADING of R.S. Joists 175 x 85 mm

8

76

608

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;UNLOADING of R.S. Joists 175 x 85 mm

8

50

400

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Laying of XLPE UG cable Double Run including excavation of trench of size 600mmwide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road leveland cable separation with machine cut bricks horizontally for every 3 meters ,providing of DWC/GI pipes wherever required depth is not acquired as per theinstructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet3feet depths and filling with sand 250mm above the cable and 50mm below thecable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of leadand lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, In Hard Gravel Sil / BC soil / Red earth / stone and earth mixed with fair boulders /Normal soil/CC 33 KV 3x400 Sqmm Cable

40

749

29960

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Unloading of 11/33KV XLPE UG Cable all sizes

2

1024

2048

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs,control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)-Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Loading of 11/33KV XLPE UG Cable for all sizes

2

1024

2048

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;UNLOADING of 11 KV AB SWCH Con 200/400 A

2

80

160

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;LOADING of 11 KV AB SWCH Con 200/400 A

2

80

160

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of 11KV 800A double throw AB Switches

2

3500

7000

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

2

142

284

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of Earthing GI Wire No 8 incl mat

1

105

105

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Painting of all suppports to a height of 0.3m coping with bituminous paint (black colour) and painting of coping with two coats of white cement (including cost of paint)

7

686

4802

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Coping of 1.5'x1.5'x1 with 1:8 slope Using form boxes (0.031Cumt.)

0.22

3893

844.78

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. including cost of cement

4.29

6579

28223.91

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Box pole 9/10/11 Mtr

1

2643

2643.83

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M

1

990

990.68

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Cable terminations to the switch gear marshalling boxes/panel terminal blocks/control and relay panels LT AC panel including providing suitable ferrules and lugs as per specification (including cost of ferrules, lugs and glands)

75

27

2025

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends

400

27

10800

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Making 33 KV 3x400 Sqmm Cable Out Door/Indoor end termination

4

2764

11059.04

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Installation of 33KV 1x630Sqmm OD Unit End Termination

8

4000

32000

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of 33KV 1x630Sqmm OD Unit End Termination

8

4200

33600

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Raising of Single Run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe) 33 KV 3x400 Sqmm Cable

30

135

4069.8

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Laying of 2nd cable in excavated trench

40

204

8164

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Laying of XLPE UG cable including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs. In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders /Normal soil / CC/BT Road 33 KV 3x400 Sqmm Cable

10

572

5721

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Raising of Single Run 33KV 1x630sqmm UG Cable on Support

80

133

10640

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Laying of 4No's single core 630 sqmm UG cable (Single Circuit with one spare cable) including excavation of trench of size 0.7 Mtrs width and 1.2 Mtrs depth from road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.Lay-4 SC 33KV 630sqmm UG Cb HG/BC/RE/NS

50

2463

123165

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Providing of double earthing for neutral with flexible copper jumpers including arrangement by fixing M.S.Channel 100x50mm.

1

1323

1323

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of Copper Flexible jumper with 75 X 8 of length 250 mm at neutral of Power tranformer end and 50 X 6 of length 50mm two Nos at double neutral end duly brasing with flexible jumper of capacity of 5kA/3 sec for power transformer neutral

1

4725

4725

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Paint-Black to all Earth Flat incl. Pain

83

55

4565

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of GI Bolts & Nuts,Washers etc.,

50

117

5875

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Fabrication and connecting of M.S./ G.I. Flat 50x6mm to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.

83

41

3403

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Laying of MS Flats /GI Flats 75x 8mm earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment andconnecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes including fabrication

160

65

10400

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

12

386

4632

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

12

1234

14810.4

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication

12

3486

41832

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Painting of Name Plates for any equipment

10

122

1220

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium.

4.49

482

2161.77

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

4.49

1293

5799.11

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium

4.49

851

3816.74

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

4.49

2181

9781.78

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Alligning the Main and Auxiliary structures such as RS joist, M.S.Angles, Plates, Channels, Structure to zero level duly leveling in prefabricated MS frames with Hydraulic jacks before galvanising/ fabrication..

1.41

1470

2072.7

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

0.54

3426

1832.91

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) TRANSPORT OF STEEL 10 TO 20KM

4.49

412

1848.18

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;UNLOADING of MS Channel,Angles,Flats&Rod

1.49

185

274.73

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;LOADING of MS Channel,Angles,Flats&Rods

1.49

221

328.19

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;UNLOADING of RSJoists150 x150 mm/RailPol

2

107

214

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;LOADING of RSJoists150 x 150 mm/RailPole

2

176

352

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Supply & Erection of 11KV Indoor VCB

9

271000

2439000

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Erection of 12.5 MVA PTR.

1

51818

51818

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;UNLOADING of 12.5 MVA PTR

1

12044

12044.93

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;Transport of 12.5 MVA Power transformers (0 to 100 KM) from one place to another place in GHMC Area.(excluding of loading & unloading )

1

27431

27431

... More
Erection of 1No 12.5MVA additional PTR along with switchgear at 33/11kV Raheja Mindspace SS;LOADING of 12.5 MVA PTR

1

12044

12044.93



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.