Telangana State Southern Power Distribution Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
364746Bid Award Id
ViewTender No
T-68/2022-23 of SE/OP/SIDDIPETTender Authority
Telangana State Southern Power Distribution Company Limited ViewPurchaser Address
-Website
http://https://www.tssouthernpower.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Shifting of 33KV and 11KV Lines;Earth work excavation in hard rock boulders less than 3 cum size by using chijlling,benching,wedging and boring in rock complete for finished item of work
9.5
-
12278.75
... More
Shifting of 33KV and 11KV Lines;S-Mat. for Extn of M+3 Tower by 3M GALV
2
-
57041.28
... More
Shifting of 33KV and 11KV Lines;Erect- M+3 Tower GALV
2
-
129152
... More
Shifting of 33KV and 11KV Lines;S-M+3 Tower GALV
2
-
281348.6
... More
Shifting of 33KV and 11KV Lines;Paint-Structure/DTR Code & Locaiton Name
4
-
440
... More
Shifting of 33KV and 11KV Lines;Numbering of poles incl. cost of paint
72
-
2304
... More
Shifting of 33KV and 11KV Lines;Conveyance of men and materials
0.32
-
5344
... More
Shifting of 33KV and 11KV Lines;ERECTION OF EQUIPMENT Substations Erection of 11 KVAB Switch including alignment and earthing
1
-
2078
... More
Shifting of 33KV and 11KV Lines;Formation of (Vertical/ Horizontal) Cut point for 11 KV line excluding pole erection and stays
5
-
6615
... More
Shifting of 33KV and 11KV Lines;Formation-H/V Cut Point LT 3ph 4w/l
3
-
2250
... More
Shifting of 33KV and 11KV Lines;Erection of the main and auxiliary structures etc., excluding bolts and nuts.
4
-
9655
... More
Shifting of 33KV and 11KV Lines;Fixing of LT open wiring set
4
-
1500
... More
Shifting of 33KV and 11KV Lines;Supply of LT Open wiring set
4
-
4500
... More
Shifting of 33KV and 11KV Lines;S-GI Bolts & Nuts,Washers etc.,
80
-
9400
... More
Shifting of 33KV and 11KV Lines;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud
9
-
10890
... More
Shifting of 33KV and 11KV Lines;S-CI Pipe earthing 50mm dia 2m long
9
-
21969
... More
Shifting of 33KV and 11KV Lines;Erection of 11 KV 200/400 A TT Type AB Switch with transportation and required bolts and nuts
4
-
7111.76
... More
Shifting of 33KV and 11KV Lines;Laying of UG Cable Erection of DTRs Three phase**In city 30% extra as erection of DTRs requiring crane to save time
4
-
4470.4
... More
Shifting of 33KV and 11KV Lines;S-Earthing GI flat 25x3 mm incl material
50
-
5250
... More
Shifting of 33KV and 11KV Lines;ERECTION OF EQUIPMENT Substations Erection of 11 KV HG Fuse set including earthing
4
-
2904
... More
Shifting of 33KV and 11KV Lines;Dismantling of 100 Sqmm conductor SC
0.1
-
811.25
... More
Shifting of 33KV and 11KV Lines;ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side
0.1
-
1235.3
... More
Shifting of 33KV and 11KV Lines;Laying of UG Cable Stringing of AB cable LT 3x16 + 25 Sqmm
0.1
-
354.29
... More
Shifting of 33KV and 11KV Lines;ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side
3.85
-
32712.95
... More
Shifting of 33KV and 11KV Lines;ERECTION OF LINES :Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling
10
-
5949.5
... More
Shifting of 33KV and 11KV Lines;Excavation of Stay pits of size 0.45x 0.45x1.34M for burying Anchor rods with the anchor plates for Stay sets including dewatering,shoring & shuttering wherever necessary and back filling (after bury of anchor rods with anchor plate and concreting the sa:i) In all soils except hard morum gravel, hard disintegrated rock and hard rock
10
-
3460
... More
Shifting of 33KV and 11KV Lines;CIVIL WORKS :Excavation of pits in all soils except hard rock requiring blasting. 0.6 M x 0.9 M x 1.5 M
5
-
1960
... More
Shifting of 33KV and 11KV Lines;CIVIL WORKS :Excavation of pits in all soils except hard rock requiring blasting.0.92 M x 0.92M x 2.3M (3.0" x 3.0" x 7.6")
52
-
42965
... More
Shifting of 33KV and 11KV Lines;CIVIL WORKS : Excavation of pits in hard rock requiring blasting.0.92 M x 0.92M x 2.3M (3.0" x 3.0" x 7.6")
10
-
17675
... More
Shifting of 33KV and 11KV Lines;CIVIL WORKS : Excavation of pits in hard rock requiring blasting. 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")
2
-
1990
... More
Shifting of 33KV and 11KV Lines;CIVIL WORKS :Excavation of pits in all soils except hard rock requiring blasting. 0.75 M x 0.9 M x 1.95 M
8
-
4860
... More
Shifting of 33KV and 11KV Lines;Sub Transportation of 8 Mts PSCC Poles to location from road side.
5
-
1331
... More
Shifting of 33KV and 11KV Lines;Sub Transportation of 9.1 Mts PSCC Poles to location from road side.
10
-
3993
... More
Shifting of 33KV and 11KV Lines;SubTrnsprt 11M PSCC Pole incl. L&UL<10KM
62
-
26257
... More
Shifting of 33KV and 11KV Lines;Erec of 9.1 Mts PSCC poles for stuts
5
-
10540
... More
Shifting of 33KV and 11KV Lines;Erection of 8.0Mts PSCC Poles for stuts
5
-
5815
... More
Shifting of 33KV and 11KV Lines;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex
5
-
10540
... More
Shifting of 33KV and 11KV Lines;Errection of 11 M long PSCC pole
62
-
253183.2
... More
Shifting of 33KV and 11KV Lines;Dimantle-11KV HG Fuse Set incl earthing
4
-
1386
... More
Shifting of 33KV and 11KV Lines;Dismantle-11KV AB Switch TT Type
4
-
3489.12
... More
Shifting of 33KV and 11KV Lines;Dismantle-CRS DTR Plinth
1
-
2500
... More
Shifting of 33KV and 11KV Lines;Dismantle-3Ph DTR upto 160KVA
4
-
3824
... More
Shifting of 33KV and 11KV Lines;Dismantling of 11kV 34/ 55 Sqmm SC
3.85
-
17013.15
... More
Shifting of 33KV and 11KV Lines;Dismantle-9.1 M long PSCC pole
7
-
6244.7
... More
Shifting of 33KV and 11KV Lines;Dismantle-8.0 m long PSCC pole
60
-
29502