Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Opening Date3 Oct 2020
Closing Date19 Oct 2020
Tender Amount₹ 31,68,990 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of LT Single phase cross arms

10

-

10

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of LT Metal parts-Bag of 100nos

1.5

-

52.5

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of LT Metal parts-Bag of 100nos

1.5

-

78

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of LT Shackles

3

-

63

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of LT Shackles

3

-

78.75

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of LT pin insulators

9

-

162

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of LT pin insulators

9

-

236.25

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of M.S.Channels, Angles, Flats & Rods etc

3

-

555

... More
Shiftin of lines Gopanpally thanda to Kollur;Transport of steel including line materials such as cross arms, clamps, hardware >20 & <30Km

3

-

1506

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of M.S.Channels, Angles, Flats & Rods etc

3

-

663

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-loading of Conductor drums

3

-

291

... More
Shiftin of lines Gopanpally thanda to Kollur;Transport of Conductor Drum, VCBs >20 & <30Km

3

-

10857

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of Conductor drums

3

-

606

... More
Shiftin of lines Gopanpally thanda to Kollur;Removing and Reconnection of LT Services

510

-

22440

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of GI Bolts & Nuts etc

70

-

6580

... More
Shiftin of lines Gopanpally thanda to Kollur;Sub Transport of 9.1M PSCC pole upto Workspot upto 10KM

10

-

3630

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of 11KV 34/55 sqmm SC

2.5

-

8497.5

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of 8.0M PSCC pole

29

-

12963

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of 9.1M PSCC pole

3

-

2535

... More
Shiftin of lines Gopanpally thanda to Kollur;Restringing of AB cable 3x70 + 1x16 + 1x50

0.15

-

1051.5

... More
Shiftin of lines Gopanpally thanda to Kollur;Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

2.6

-

1253.2

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc

2.6

-

3361.8

... More
Shiftin of lines Gopanpally thanda to Kollur;Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

2.6

-

2212.6

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

2.6

-

5670.6

... More
Shiftin of lines Gopanpally thanda to Kollur;Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RS Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection

2.6

-

17815.2

... More
Shiftin of lines Gopanpally thanda to Kollur;Paving of the LT 3-Ph 5W 55 sqmm AAA conductor and stringing duly arranging temporary guys, tensioning, sagging of conductor maintaing the ground clearences as per IE rules1956, pin binding, strain insulator binding and giving jumpers Etc.(5 Conductors)

3.5

-

34969.55

... More
Shiftin of lines Gopanpally thanda to Kollur;Formation of LT Single circuit cut points (Vertical/Horizantal) including fixing of LT KV Cross arms,clamps, strain insulators sets complete with hardware and stays (Bows and Eye-bolts), Excluding the cost of pit Excavation and pole erection.

18

-

16884

... More
Shiftin of lines Gopanpally thanda to Kollur;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. 0.54x8=3.24Cumt

3.24

-

16718.4

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of 9.1M PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

6

-

9726

... More
Shiftin of lines Gopanpally thanda to Kollur;Excavation of 9.1Mtrs PSCC Pole Pits of size 0.6 M x 0.9 M x 1.5 M In Hard gravel Hard Murram, Disintegrated Rock, Hard rock not Requiring blasting.

6

-

5795.88

... More
Shiftin of lines Gopanpally thanda to Kollur;Earth work excavation of pits in hard murram/rock boulders

19.01

-

22809.6

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of material for extension of 3Mtrs M+3 Galvanized Tower

4

-

19680

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of M+3 Galvanized Tower (as per DATA-VII)

4

-

253236

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of material for extension of 3Mtrs M+3 Galvanized Tower

4

-

103560

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of M+3 Galvanized Tower (as per DATA-VII)

4

-

510800

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of PVC Cable 75 to 120 Sqmm

600

-

600

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of PVC Cable 75 to 120 Sqmm

600

-

600

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of 11KV AB Switch 200/400 Conventional type

3

-

240

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of 11KV AB Switch 200/400 Conventional type

3

-

240

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of three Ph. LT Trivetor Meter with Box

5

-

75

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of three Ph. LT Trivetor Meter with Box

5

-

75

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of 11 KV HG Fuse set

7

-

126

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of 11 KV HG Fuse set

7

-

126

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of 11 KV AB Switch Tilting type

7

-

560

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of 11 KV AB Switch Tilting type

7

-

560

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of 11KV Metal parts

132

-

6336

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of 11KV Metal parts

132

-

6336

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of 33 & 11 KV Disc insulators

132

-

242.88

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of 33 & 11 KV Disc insulators

132

-

242.88

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of 11KV pin insulators/Post type insulators/ Solid core insulators

270

-

283.5

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of 11KV pin insulators/Post type insulators/ Solid core insulators

270

-

283.5

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-Loading of M.S.Channels, Angles, Flats & Rods etc

3.5

-

647.5

... More
Shiftin of lines Gopanpally thanda to Kollur;Transport of steel including line materials such as cross arms, clamps, hardware >20 & <30Km

3.5

-

1757

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of M.S.Channels, Angles, Flats & Rods etc

3.5

-

773.5

... More
Shiftin of lines Gopanpally thanda to Kollur;Un-loading of Conductor drums

2

-

194

... More
Shiftin of lines Gopanpally thanda to Kollur;Transport of Conductor Drum, VCBs >20 & <30Km

2

-

7238

... More
Shiftin of lines Gopanpally thanda to Kollur;Loading of Conductor drums

2

-

404

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of GI Bolts & Nuts, Washers etc

95

-

8930

... More
Shiftin of lines Gopanpally thanda to Kollur;Sub Transport of 9.1M PSCC pole upto Workspot upto 10KM

10

-

3630

... More
Shiftin of lines Gopanpally thanda to Kollur;Sub Transport of 11M PSCC pole upto Workspot upto 10KM

85

-

32725

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of 11KV 34/55 sqmm SC

3

-

10197

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of 8.0M PSCC pole

1

-

447

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of 9.1M PSCC pole

71

-

59995

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of RS Joists 175 x 85 mm

8

-

4527.6

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantle of LT distribution box

5

-

2625

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantle of 11KV HG Fuse Set

10

-

3150

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantlingof AB Switches (all types)

10

-

7850

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of 3-Ph 100KVA

3

-

2730

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of 3-Ph DTR upto 63KVA

2

-

1820

... More
Shiftin of lines Gopanpally thanda to Kollur;Dismantling of DTR plinth (Column type)

5

-

7875

... More
Shiftin of lines Gopanpally thanda to Kollur;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth, running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

2

-

2200

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of GI eath pipe with 40 mm dia,3mm thcikness with 2.0 M Length

2

-

1396

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of GI Flat 25X3 mm

30

-

2520

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

2

-

3196.68

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of GI Flat 25X3 mm

125

-

10500

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of LT Lugs

70

-

770

... More
Shiftin of lines Gopanpally thanda to Kollur;Laying of 1Core XLPE 120Sqmm Cable

600

-

12000

... More
Shiftin of lines Gopanpally thanda to Kollur;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth, running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

15

-

16500

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of CI eath pipe with 80mm dia,2.0 M Length

15

-

41835

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of CT meter for LV side of DTR

5

-

4330

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc (Excluding material)

5

-

6210

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of 11 KV HG Fuse set including earthing

7

-

4620

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of 11KV 200A TT type AB Switch including fixing of cross angles and alignment complete

7

-

9831.78

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of 63,75 & 100 KVA DTR's including loading and Unloading DTR on the Structure/Plinth etc

5

-

9530

... More
Shiftin of lines Gopanpally thanda to Kollur;Construction of RCC Column type DTR Plinth of size 1'X1'X13',topslab 5'x9'x9" & beam size 5'X9'X9"

5

-

128250

... More
Shiftin of lines Gopanpally thanda to Kollur;Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

3

-

1446

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc

3

-

3879

... More
Shiftin of lines Gopanpally thanda to Kollur;Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

3

-

2553

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

3

-

6543

... More
Shiftin of lines Gopanpally thanda to Kollur;Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RS Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection

3

-

20556

... More
Shiftin of lines Gopanpally thanda to Kollur;Paving of the 100 sqmm AAA conductor and stringing duly arranging temporary guys, tensioning, sagging of conductor maintaing the ground clearences as per IE rules1956, pin binding, strain insulator binding and giving jumpers Etc.(3 Conductors)

3.7

-

50264.5

... More
Shiftin of lines Gopanpally thanda to Kollur;Formation of Cut point for 11 KV Single Circuit line excluding pole erection and stays

22

-

24618

... More
Shiftin of lines Gopanpally thanda to Kollur;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. 0.54x10=5.4Cumt

5.4

-

27864

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of 9.1M PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

10

-

16210

... More
Shiftin of lines Gopanpally thanda to Kollur;Excavation of 9.1Mtrs PSCC Pole Pits of size 0.6 M x 0.9 M x 1.5 M hard rock not requiring blasting. (In hard murram / rock boulders)

10

-

9659.8

... More
Shiftin of lines Gopanpally thanda to Kollur;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. 1.05x85=89.25Cumt

89.25

-

460530

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of 11M PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

85

-

287385

... More
Shiftin of lines Gopanpally thanda to Kollur;Excavation of 11Mtrs PSCC Pole Pits of size 0.76 M x 0.76M x 1.83M in hard rock not requiring blasting. (In hard murram / rock boulders)

35

-

44100

... More
Shiftin of lines Gopanpally thanda to Kollur;Excavation of 11Mtrs PSCC Pole Pits of size 0.76 M x 0.76M x 1.83M in all soils except hard rock requiring blasting

50

-

18850

... More
Shiftin of lines Gopanpally thanda to Kollur;Earth work excavation of pits in hard murram/rock boulders

28.51

-

34214.4

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of material for extension of 3Mtrs M+3 Galvanized Tower

6

-

29520

... More
Shiftin of lines Gopanpally thanda to Kollur;Erection of M+3 Galvanized Tower (as per DATA-VII)

6

-

379854

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of material for extension of 3Mtrs M+3 Galvanized Tower

6

-

155340

... More
Shiftin of lines Gopanpally thanda to Kollur;Supply of M+3 Galvanized Tower (as per DATA-VII)

6

-

766200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.