Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Opening Date10 Jan 2025
Closing Soon20 Jan 2025
Tender Amount₹ 37,78,315 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
providing of 1No. additional 8 MVA PTR;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Box pole 12 Mtr

6

3901

23408.22

... More
providing of 1No. additional 8 MVA PTR;Alligning the Main/Aux. structures.

1.5

1470

2205

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

1.5

482

723

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

1.5

1293

1939.5

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

1.5

851

1276.5

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

1.5

2181

3271.5

... More
providing of 1No. additional 8 MVA PTR;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc.- 8.0 m long PSCC pole

3

501

1504.59

... More
providing of 1No. additional 8 MVA PTR;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc.Dism of 9.1M PSCC Pole

2

948

1896.18

... More
providing of 1No. additional 8 MVA PTR;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc. 11 Mtrs PSCC poles

1

1896

1896.18

... More
providing of 1No. additional 8 MVA PTR;LT Lines - Dismantling of 11KV 34/55 sqmm SC

0.36

4500

1620

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of R.S. Joists 175 x 85 mm

6

50

300

... More
providing of 1No. additional 8 MVA PTR;LOADING of R.S. Joists 175 x 85 mm

6

76

456

... More
providing of 1No. additional 8 MVA PTR;Erection of Assemble Kit for 'T' Branche

3

1800

5400

... More
providing of 1No. additional 8 MVA PTR;Supply and erection of T-Branch kit

3

3215

9645

... More
providing of 1No. additional 8 MVA PTR;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading )Upto 10 KM

1.6

339

543.46

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Above 30 Km and upto 50 Km with Lorry for each trip

1

4372

4372.74

... More
providing of 1No. additional 8 MVA PTR;Supply and Erection of I Hook and Suspension Hook Erection of I Hook

20

55

1100

... More
providing of 1No. additional 8 MVA PTR;Supply and Erection of I Hook and Suspension Hook Supply of I Hook

20

158

3160

... More
providing of 1No. additional 8 MVA PTR;Straight through joints of AB cable (each lead)Supply and ere Straight line Asmbly kits

10

1661

16610

... More
providing of 1No. additional 8 MVA PTR;Straight through joints of AB cable (each lead)Supply and ere Angle line Asmbly kits

10

2124

21240

... More
providing of 1No. additional 8 MVA PTR;End Termination of AB cable (each lead):120 Sqmm to 185 Sqmm

6

800

4800

... More
providing of 1No. additional 8 MVA PTR;End Termination of AB cable (each lead):Supply of 11KV 3x185+70sq.mm/3x70+70sq.mm/3x35+35sq.mm AB cable end Kits

6

950

5700

... More
providing of 1No. additional 8 MVA PTR;Stringing of HT AB Cable with GI Metal Parts HT AB Cable 11 KV 3x185+70 Sqmm

0.45

41876

18844.25

... More
providing of 1No. additional 8 MVA PTR;Fabrication of materials including 2 coats of Red oxide painting Back clamps with 50 x 6 mm MS Flat

8

15

120

... More
providing of 1No. additional 8 MVA PTR;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

3

928

2784

... More
providing of 1No. additional 8 MVA PTR;Supply of 120 Sqmm Aluminium lugs

12

12

150.24

... More
providing of 1No. additional 8 MVA PTR;Supply of earthing pipe with materials Supply of MS bolts & nuts and washers etc of all sizes

20

91

1825

... More
providing of 1No. additional 8 MVA PTR;Cutting charges for MS Sections MS Channel 75 x 40 mm

6

9

54

... More
providing of 1No. additional 8 MVA PTR;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation RS Joists 150x75/175 x 85 mm

3

1934

5802

... More
providing of 1No. additional 8 MVA PTR;Supply of earthing pipe with materials Supply of GI Bolts & Nuts etc

12

117

1410

... More
providing of 1No. additional 8 MVA PTR;Painting of feeder name on support including cost of paint

4

53

212

... More
providing of 1No. additional 8 MVA PTR;Supply of RCC cable Joint markers/ Cable route markers of size 700 X 240 X 75 mm duly engraving with 5 mm thick letters , CPDCL 33000/11000 Cable/Cable joint fixing the 300mm below ground level and 400mm above ground level confirming to IS 5820 2001

10

484

4840

... More
providing of 1No. additional 8 MVA PTR;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

2

386

772

... More
providing of 1No. additional 8 MVA PTR;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

2

1234

2468.4

... More
providing of 1No. additional 8 MVA PTR;Supply of CI eath pipe with 80mm dia,2.0 M Length

2

2789

5578

... More
providing of 1No. additional 8 MVA PTR;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

0.17

3426

582.42

... More
providing of 1No. additional 8 MVA PTR;Mass Concreting for pole Coping of 1.5'x1.5'x1 with 1:8 slope Using form boxes (0.031Cumt.)

0.06

3893

233.58

... More
providing of 1No. additional 8 MVA PTR;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

1.88

6579

12368.52

... More
providing of 1No. additional 8 MVA PTR;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Box pole 9/10/11 Mtr

2

2643

5287.66

... More
providing of 1No. additional 8 MVA PTR;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)0.75 M x 0.9 M x 1.95 M

2

990

1981.36

... More
providing of 1No. additional 8 MVA PTR;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

2

1132

2264

... More
providing of 1No. additional 8 MVA PTR;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

4

512

2050.2

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of R.S. Joists 175 x 85 mm

4

50

200

... More
providing of 1No. additional 8 MVA PTR;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading )Above 10 KM and upto 20 KM

1.17

412

482.13

... More
providing of 1No. additional 8 MVA PTR;LOADING of R.S. Joists 175 x 85 mm

4

76

304

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of MS Channel,Angles,Flats&Rod

0.17

185

31.45

... More
providing of 1No. additional 8 MVA PTR;LOADING of MS Channel,Angles,Flats&Rods

0.17

221

37.57

... More
providing of 1No. additional 8 MVA PTR;Raising of double run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)33 KV 3x400 Sqmm Cable

40

323

12954

... More
providing of 1No. additional 8 MVA PTR;Making of Outdoor/Indoor End Termination 33 KV 3x400 Sqmm Cable

4

2764

11059.04

... More
providing of 1No. additional 8 MVA PTR;Cost of Pipes and slabs Supply of 6" B Class GI pipe 5mm thck 20Kg/M

20

1044

20880

... More
providing of 1No. additional 8 MVA PTR;Laying of 2nd cable in excavated trench

180

204

36738

... More
providing of 1No. additional 8 MVA PTR;Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.33 KV 3x400 Sqmm Cable

180

749

134820

... More
providing of 1No. additional 8 MVA PTR;Unloading of 11/33KV XLPE UG Cable all sizes

2

1024

2048

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Upto 10 Km with Lorry for each trip

2

2720

5440.68

... More
providing of 1No. additional 8 MVA PTR;Loading of 11/33KV XLPE UG Cable for all sizes

2

1024

2048

... More
providing of 1No. additional 8 MVA PTR;survey line&cabl inc peg mark&tree clear

0.18

765

137.7

... More
providing of 1No. additional 8 MVA PTR;Earth work excavation of in all soils except hard rock requiring blasting.

26

345

8970

... More
providing of 1No. additional 8 MVA PTR;Fixing of AC/DC Panel and giving Connections to the protection equipment and Metering circuits as per the specification and standards. The 3 1/2 core 25 Sqmm power cable required from distribution box to AC/DC panel in the control room is also to be supply

2

7871

15743.7

... More
providing of 1No. additional 8 MVA PTR;Control Panels Supply of AC Supply panel inluding providing of changeover switch, SFU, metering unit, 32 A three phase MCB, 16 A Single phase MCB complete as per specification.

1

42000

42000

... More
providing of 1No. additional 8 MVA PTR;Control PanelsSupply of DC Annunciation & relay panel for 10 feeder panel including the cost of LED Indiacation lamps, VAA auxilairy relays, Electronic Hooters complete as per specification.

1

42500

42500

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
providing of 1No. additional 8 MVA PTR;Marshalling Box Erection of Marshalling boxes

2

374

749.7

... More
providing of 1No. additional 8 MVA PTR;Marshalling Box Supply of FRP PT Marshalling Box

2

4463

8926

... More
providing of 1No. additional 8 MVA PTR;L-Cable Termination to Switchgear

270

27

7290

... More
providing of 1No. additional 8 MVA PTR;Control CableLaying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends .

1466

27

39582

... More
providing of 1No. additional 8 MVA PTR;Providing of control cable trench as per DATA-XII

80

3148

251840

... More
providing of 1No. additional 8 MVA PTR;UnLoad-LT AB Cb 3x16+25sqmm

3

204

612

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
providing of 1No. additional 8 MVA PTR;Load-LT AB Cb 3x16+25sqmm

3

200

600

... More
providing of 1No. additional 8 MVA PTR;Providing of earthing with various types of earth electrodes Providing of double earthing for neutral with flexible copper jumpers including arrangement by fixing M.S.Channel 100x50mm.

1

1323

1323

... More
providing of 1No. additional 8 MVA PTR;Supply of Copper Flexible jumper with 75 X 8 of length 250 mm at neutral of Power tranformer end and 50 X 6 of length 50mm two Nos at double neutral end duly brasing with flexible jumper of capacity of 5kA/3 sec for power transformer neutral.

1

4725

4725

... More
providing of 1No. additional 8 MVA PTR;Providing of RCC collar to earth pit. Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

24

386

9264

... More
providing of 1No. additional 8 MVA PTR;Providing of Earthing Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

24

1234

29620.8

... More
providing of 1No. additional 8 MVA PTR;Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc. M.S./ G.I. Flat 50x6mm / 50 x 8 mm ( Above ground)

24

3486

83664

... More
providing of 1No. additional 8 MVA PTR;M.S./ G.I. Flat 50x6mm / 50 x 8 mm ( Above ground)

494

41

20254

... More
providing of 1No. additional 8 MVA PTR;Laying of earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication. 75x 8mm MS Flat / GI Flat.

434

65

28210

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of MS Channel,Angles,Flats&Rod

1.3

185

240.5

... More
providing of 1No. additional 8 MVA PTR;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading )Above 10 KM and upto 20 KM

1.3

412

535.7

... More
providing of 1No. additional 8 MVA PTR;LOADING of MS Channel,Angles,Flats&Rods

1.3

221

287.3

... More
providing of 1No. additional 8 MVA PTR;Labour for Fixing of all types of clamps

57

65

3705

... More
providing of 1No. additional 8 MVA PTR;Bus StringingConnection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

45

224

10080

... More
providing of 1No. additional 8 MVA PTR;Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.(3 Conductors)

40

327

13107.2

... More
providing of 1No. additional 8 MVA PTR;Bus Stringing Hoisting of Insulators and hardware, stretching the conductor and stringing of 11 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 3.5mt)

2

507

1014

... More
providing of 1No. additional 8 MVA PTR;Supply of various Clamps Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy conforming to A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring washers conforming to IS 2633-1964, IS 1363-1967, IS1367-1961) ,Supply of Alluminum alloy T clamps conforming to A6 of IS 617,4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

45

299

13455

... More
providing of 1No. additional 8 MVA PTR;Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy conforming to A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring washers conforming to IS 2633-1964, IS 1363-1967, IS1367-1961) , Supply of I Bolts

12

294

3528

... More
providing of 1No. additional 8 MVA PTR;S-Tension HW 3Bolt 1Zebra/Pnthr 150mm

12

2055

24660

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV VCB with Control Panel

5

12000

60000

... More
providing of 1No. additional 8 MVA PTR;Cement concrete 1:3:6 ration with 40 MML HBG metal including the cost of all materials and labour complete 1.8 x 1.8 x 0.75 cum for VCB Plinth

30

5160

154800

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of 11 KV VCBs&Panel boards

5

1044

5222.4

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Above 10 Km and upto 20 Km with Lorry for each trip

3

3299

9899.1

... More
providing of 1No. additional 8 MVA PTR;Loading of 11 KV VCBs along with Panel boards

5

1024

5120

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV LAS line type including earthing

4

505

2020

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV LAS station type including earthing

1

559

559

... More
providing of 1No. additional 8 MVA PTR;Un loading of 11 KV, 10 KA LAs Station type

3

32

96

... More
providing of 1No. additional 8 MVA PTR;Loading of 11 KV, 10 KA LAs Station type

3

32

96

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV three phase PTs

1

800

800

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of 11 KV CT - PT Sets

1

101

101

... More
providing of 1No. additional 8 MVA PTR;Loading of 11 KV CT - PT Sets

1

190

190

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switch and aligment complete Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

2

3200

6400

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switch and aligment complete Ere 11KV 800A double throw AB Switches

10

3500

35000

... More
providing of 1No. additional 8 MVA PTR;Un loading of 11KV AB Switch Conventional type

10

80

800

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading Above 10 Km and upto 20 Km with Lorry for each trip

2

3299

6599.4

... More
providing of 1No. additional 8 MVA PTR;LOADING of 11 KV AB SWCH Con 200/400 A

10

80

800

... More
providing of 1No. additional 8 MVA PTR;Alligning the Main/Aux. structures.

3.75

1470

5512.5

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. (*) Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium

3.75

482

1807.5

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., mplete.(*)Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

3.75

1293

4848.75

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium

3.75

851

3191.25

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete.Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

3.75

2181

8178.75

... More
providing of 1No. additional 8 MVA PTR;Fabrication & erection of Channels,Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

3.75

6852

25695

... More
providing of 1No. additional 8 MVA PTR;Un loading of M.S.Channels, Angles, Flats & Rods etc.,

3.75

185

693.75

... More
providing of 1No. additional 8 MVA PTR;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

3.75

412

1545.3

... More
providing of 1No. additional 8 MVA PTR;Loading of M.S.Channels, Angles, Flats & Rods etc.,

3.75

221

828.75

... More
providing of 1No. additional 8 MVA PTR;Painting of poles Paint of coping with 2 coats of white cement incl cost of paints etc.

17

48

816

... More
providing of 1No. additional 8 MVA PTR;Plastering 2 Coats,20/16mm(1:6)(1:4)

9.82

373

3662.86

... More
providing of 1No. additional 8 MVA PTR;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

18.87

6579

124145.73

... More
providing of 1No. additional 8 MVA PTR;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation R.S. Joists 150 x 150 mm

17

1952

33194.37

... More
providing of 1No. additional 8 MVA PTR;Alligning the Main/Aux. structures.

7.3

1470

10731

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. (*) Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium .

7.3

482

3518.6

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. (*)Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

7.3

1293

9438.9

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium

7.3

851

6212.3

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete.Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

7.3

2181

15921.3

... More
providing of 1No. additional 8 MVA PTR;Fabrication & erection of Channels, Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

7.3

6852

50019.6

... More
providing of 1No. additional 8 MVA PTR;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

17

928

15776

... More
providing of 1No. additional 8 MVA PTR;Un loading of R.S. Joists 150 x 150mm / Rail poles

17

107

1819

... More
providing of 1No. additional 8 MVA PTR;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

7.3

412

3008.18

... More
providing of 1No. additional 8 MVA PTR;Loading of R.S. Joists 150 x 150mm / Rail poles

17

176

2992

... More
providing of 1No. additional 8 MVA PTR;Seigniorage Charges - Gravel

558.9

30

16767

... More
providing of 1No. additional 8 MVA PTR;Seigniorage Charges - Metal

177.62

97

17317.95

... More
providing of 1No. additional 8 MVA PTR;Seigniorage Charges for M-Sand

19.12

97

1864.2

... More
providing of 1No. additional 8 MVA PTR;Seigniorage Charges - Sand

19.12

40

764.8

... More
providing of 1No. additional 8 MVA PTR;S&F-15mm Bib Tap 400gm Full turn

10

298

2980

... More
providing of 1No. additional 8 MVA PTR;S&F-25mm GM/Bronze Ball Valve

2

466

932

... More
providing of 1No. additional 8 MVA PTR;S&F 28.60mm OD CPVC Pipe-SDR 11

45

410

18450

... More
providing of 1No. additional 8 MVA PTR;S&F 22.20mm OD CPVC Pipe-SDR 11

75

313

23475

... More
providing of 1No. additional 8 MVA PTR;S&F 15.90mm OD CPVC Pipe-SDR 11

6

239

1434

... More
providing of 1No. additional 8 MVA PTR;Painting with SuryaCem of 3 Coat

87

85

7395

... More
providing of 1No. additional 8 MVA PTR;Paint-PlasticEmulsn2Coat+Primer-ExtrnlGF

9.9

245

2425.5

... More
providing of 1No. additional 8 MVA PTR;Painting with OBD 2Coats+Primer

61.78

146

9019.88

... More
providing of 1No. additional 8 MVA PTR;S&F MT Wood Frame & Door-Laminate

2

7314

14628

... More
providing of 1No. additional 8 MVA PTR;Plastering 20mm (16mm+4mm)GFloor

126.28

520

65665.6

... More
providing of 1No. additional 8 MVA PTR;Brick Masonary in CM(1:6) GFloor

6.17

7209

44479.53

... More
providing of 1No. additional 8 MVA PTR;S&F MS Security Fencing Mesh (2"X2")

121.8

2310

281358

... More
providing of 1No. additional 8 MVA PTR;S&Spreading of 20mm HBG Metal

59.61

1543

91978.23

... More
providing of 1No. additional 8 MVA PTR;Raised Pointing to CRS Masonary CM(1:3)

87

117

10179

... More
providing of 1No. additional 8 MVA PTR;S&Filling with Borrowed Gravel

558.9

480

268272

... More
providing of 1No. additional 8 MVA PTR;PCC with 20mm Metal (1:2:4)

2.61

6449

16831.89

... More
providing of 1No. additional 8 MVA PTR;CRS Masonary CM(1:6) 2nd Sort

94

4925

462950

... More
providing of 1No. additional 8 MVA PTR;PCC with 40mm Metal (1:4:8)

13.62

4706

64095.72

... More
providing of 1No. additional 8 MVA PTR;Excavation in Ordinary Soil

65.25

486

31711.5

... More
providing of 1No. additional 8 MVA PTR;Hire-JCB to Level & Clear the Site

24

2165

51960

... More
providing of 1No. additional 8 MVA PTR;Labour for Fixing of all types of clamps

75

65

4875

... More
providing of 1No. additional 8 MVA PTR;Connection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

30

224

6720

... More
providing of 1No. additional 8 MVA PTR;Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.(3 Conductors)

54

327

17694.72

... More
providing of 1No. additional 8 MVA PTR;Hoisting of Insulators and hardware, stretching the conductor and stringing of 33 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 4.5mt)

6

781

4686

... More
providing of 1No. additional 8 MVA PTR;Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

27

299

8073

... More
providing of 1No. additional 8 MVA PTR;Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy Supply of I Bolts

18

294

5292

... More
providing of 1No. additional 8 MVA PTR;Supply of Tension Hardware 3 Bolted for single Zebra/panther with 150 mm spacing

18

2055

36990

... More
providing of 1No. additional 8 MVA PTR;Extention of 33KV Bay at 132/33KV Sub-station Zebra condutor

0.13

299369

38917.97

... More
providing of 1No. additional 8 MVA PTR;Erection of PTR on constructed plinth Erection of 8 MVA PTR

1

49480

49480.2

... More
providing of 1No. additional 8 MVA PTR;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Rail pole 90 lbs

8

3510

28080

... More
providing of 1No. additional 8 MVA PTR;S/o rail poles 90/105lb (250x2N)

400

47

18908

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of 8 MVA PTR

1

5805

5805.84

... More
providing of 1No. additional 8 MVA PTR;Transport of Power transformers (0 to 100 KM) from one place to another place in GHMC Area.(excluding of loading & unloading )8MVA power transformer

1

21945

21945

... More
providing of 1No. additional 8 MVA PTR;LOADING of 8 MVA PTR

1

5805

5805.84

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 33 KV VCB with Control Panel

1

12500

12500

... More
providing of 1No. additional 8 MVA PTR;Cement concrete with 40MM metal VCB plin

6.29

5160

32466.72

... More
providing of 1No. additional 8 MVA PTR;Earth work excavation of in all soils except hard rock requiring blasting.

6.29

345

2170.74

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of 33 KV VCBs&Panel boards

1

1044

1044.48

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Note: 1). It will be treated as full load of 10 MT and paid for 10 MT.2). For 3 Ton vehicle : 50% of the following rates Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
providing of 1No. additional 8 MVA PTR;LOADING of 33 KV VCBs&Panel boards

1

1024

1024

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 33 KV LAS station/Line type including earthing

1

880

880

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of 33 KV10 KA LAs Station type

3

35

105

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Note: 1). It will be treated as full load of 10 MT and paid for 10 MT.2). For 3 Ton vehicle : 50% of the following rates Above 10 Km and upto 20 Km with Lorry for each trip

3

3299

9899.1

... More
providing of 1No. additional 8 MVA PTR;LOADING of 33 KV10 KA LAs Station type

3

41

123

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 33 KV single phase PTs

1

1079

1079

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of 33/11 KV CTs/ PTs

3

128

384

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Note: 1). It will be treated as full load of 10 MT and paid for 10 MT.2). For 3 Ton vehicle : 50% of the following rates Above 10 Km and upto 20 Km with Lorry for each trip

3

3299

9899.1

... More
providing of 1No. additional 8 MVA PTR;LOADING of 33/11 KV CTs/ PTs

3

165

495

... More
providing of 1No. additional 8 MVA PTR;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

3

146

439.89

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

3

142

426

... More
providing of 1No. additional 8 MVA PTR;Erection of AB Switch and aligment complete Erection of 33 KV AB Switch including alignment and earthing

3

4500

13500

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of 33 KV AB SWCH Con 400/800 A

3

79

237

... More
providing of 1No. additional 8 MVA PTR;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Note: 1). It will be treated as full load of 10 MT and paid for 10 MT.2). For 3 Ton vehicle : 50% of the following rates Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
providing of 1No. additional 8 MVA PTR;LOADING of 33 KV AB SWCH Con 400/800 A

3

126

378

... More
providing of 1No. additional 8 MVA PTR;Alligning the Main/Aux. structures.

2.6

1470

3822

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

2.6

482

1253.2

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*)Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

2.6

1293

3361.8

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

2.6

851

2212.6

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

2.6

2181

5670.6

... More
providing of 1No. additional 8 MVA PTR;Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RSJoist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

2.6

6852

17815.2

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of MS Channel,Angles,Flats&Rod

2.6

185

481

... More
providing of 1No. additional 8 MVA PTR;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 10 KM and upto 20 KM

2.6

412

1071.41

... More
providing of 1No. additional 8 MVA PTR;LOADING of MS Channel,Angles,Flats&Rods

2.6

221

574.6

... More
providing of 1No. additional 8 MVA PTR;Paint of coping with 2 coats of white cement incl cost of paints etc.

4

48

192

... More
providing of 1No. additional 8 MVA PTR;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

2.31

373

861.63

... More
providing of 1No. additional 8 MVA PTR;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

1.66

6579

10921.14

... More
providing of 1No. additional 8 MVA PTR;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Box pole 12 Mtr

4

3901

15605.48

... More
providing of 1No. additional 8 MVA PTR;Alligning the Main/Aux. structures.

1

1470

1470

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

1

482

482

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*)Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

1

1293

1293

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

1

851

851

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

1

2181

2181

... More
providing of 1No. additional 8 MVA PTR;Fabrication of struc.with power drilling

1

6852

6852

... More
providing of 1No. additional 8 MVA PTR;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum

4

793

3172

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of R.S. Joists 175 x 85 mm

4

50

200

... More
providing of 1No. additional 8 MVA PTR;TRANSPORT OF STEEL 10 TO 20KM

1

412

412.08

... More
providing of 1No. additional 8 MVA PTR;LOADING of R.S. Joists 175 x 85 mm

4

76

304

... More
providing of 1No. additional 8 MVA PTR;Paint of coping with 2 coats of white cement incl cost of paints etc.

8

48

384

... More
providing of 1No. additional 8 MVA PTR;Plastering 2 Coats,20/16mm(1:6)(1:4)

4.62

373

1723.26

... More
providing of 1No. additional 8 MVA PTR;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

8.88

6579

58414.94

... More
providing of 1No. additional 8 MVA PTR;Erection of RS Joist 150 x 150 mm

8

1952

15620.88

... More
providing of 1No. additional 8 MVA PTR;Alligning the Main/Aux. structures.

3.2

1470

4704

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

3.2

482

1542.4

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

3.2

1293

4137.6

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

3.2

851

2723.2

... More
providing of 1No. additional 8 MVA PTR;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

3.2

2181

6979.2

... More
providing of 1No. additional 8 MVA PTR;Fabrication of struc.with power drilling

3.2

6852

21926.4

... More
providing of 1No. additional 8 MVA PTR;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

8

928

7424

... More
providing of 1No. additional 8 MVA PTR;UNLOADING of LINE MATERIALS RSJoists150 x150 mm/RailPol

8

107

856

... More
providing of 1No. additional 8 MVA PTR;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 10 KM and upto 20 KM

3.2

412

1318.66

... More
providing of 1No. additional 8 MVA PTR;LOADING of LINE MATERIALS RSJoists150 x 150 mm/RailPole

8

176

1408



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.