Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Civil And Construction
Building Construction
Opening Date18 Dec 2024
Closing Date27 Dec 2024
Tender Amount₹ 23,88,427 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of new Yalal section office;Supply Featherlite "Tycoon" High Back with soft padded fixed arms, gaslift, tilt locking mechanism, nylon base, pu pp arm rest including all operational, incidental, conveyance and labour charges etc. complete for the finished item of work

1

15200

15200

... More
Construction of new Yalal section office;Table with top made from 25mm thick IS 12823 Plain Particle Board Post-formed with colour laminate on top side and backup laminate on bottom side. All other panels made with 18mm thick IS 12823 Pre-laminated Particle board with all exposed edges duly edge banded using PVC Tape with EVA hot melt glue at 200?c , on State-of-The-art ?through feed? Edge banding machine. The table is assembled/ fitted together using necessary hardware such as Chip Board Screws, Dowels, Steel drawer slides, Handles and Locks.Size of Table Top : 1200 x 600 x 25mm thick Height of Table : 750mm 3-Drawers on one side lockable with multi lockFoot rest- Independent type made out of Pre-laminated board, all exposed edges duly edge-banded.Accessories: 3-Drawers on one side lockable with multi lockFoot rest- Independent type made out of Pre-laminated board, all exposed edges duly edge-banded.

2

8190

16380

... More
Construction of new Yalal section office;Table with top made from 25mm thick IS 12823 Plain Particle Board Post-formed with colour laminate on top side and backup laminate on bottom side. All other panels made with 18mm thick IS 12823 Pre-laminated Particle board with all exposed edges duly edge banded using PVC Tape with EVA hot melt glue at 200?c , on State-of-The-art ?through feed? Edge banding machine. The table is assembled/ fitted together using necessary hardware such as Chip Board Screws, Dowels, Steel drawer slides, Handles and Locks. Size of Table Top : 1500 x 900 x 25mm thick Height of Table : 750mm 3-Drawers on one side lockable with multi lockFoot rest - Independent type made out of Pre-laminated board, all exposed edges duly edge-banded. Accessories: 3-Drawers on one side lockable with multi lockFoot rest- Independent type made out of Pre- laminated board, all exposed edges duly edge-banded.

1

12810

12810

... More
Construction of new Yalal section office;Supply & Fixing of 6U Wall Mount Network Rack with Accessories of make Valrack/Bestnet Complete for finished item of work

1

6388

6388

... More
Construction of new Yalal section office;Supply and laying of LAN Cable cat - 6 UTP cable of Make: D Link / AMP / Molex / Legrand / Krone.

75

34

2550

... More
Construction of new Yalal section office;Supply & Fixing of 7 feet length moulded patch cord of makes D Link / AMP / Molex /Legrand / Krone including all operational, incidental and labour charges etc. complete for the finished item of work

4

230

920

... More
Construction of new Yalal section office;Supply of Cat 6 RJ-45 information outlets including duel face plate of makes D Link / AMP / Molex / Legrand / Krone.

4

469

1876

... More
Construction of new Yalal section office;Supply and fixing of 8 Port switches of D link / AMP / Krone / Legrand make including all operational, incidental and labour charges etc. complete for the finished item of work

1

1383

1383

... More
Construction of new Yalal section office;const. of 4' dia & 5' Ht. Soak Pit. including all operational, incidental and labour charges etc. complete for the finished item of work

2

2950

5900

... More
Construction of new Yalal section office;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm including all operational, incidental and labour charges etc. complete for the finished item of work

2

544

1088

... More
Construction of new Yalal section office;Supply & fixing 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including all operational, incidental and labour charges etc. complete for the finished item of work

2

31

62

... More
Construction of new Yalal section office;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but with NECESSARY fittings & base support for tanks including all operational, incidental and labour charges etc. complete for the finished item of work

1000

9

9000

... More
Construction of new Yalal section office;S&F 12.7 mm N.P bib tap Indian make 400 grams Seiko/ Senior/ Nice including all operational, incidental and labour charges etc. complete for the finished item of work

4

261

1044

... More
Construction of new Yalal section office;S&F 12.7 mm NP stop cock Indian make 400 grams Seiko/ Senior/ Nice including all operational, incidental and labour charges etc. complete for the finished item of work

4

645

2580

... More
Construction of new Yalal section office;Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock including all operational, incidental and labour charges etc. complete for the finished item of work

2

1455

2910

... More
Construction of new Yalal section office;Supply & fixing of PVC low level system parry ware, slim line with internal components & short bend: 10 Litres capacity Dual Flush including all operational, incidental and labour charges etc. complete for the finished item of work

2

1679

3358

... More
Construction of new Yalal section office;Supplying and Fixing best Indian make plastic seat and lid for European water closets withrubber or plastic Buffers as per IS 2548-1996 including all operational, incidental and labour charges etc. complete for the finished item of work

2

1235

2470

... More
Construction of new Yalal section office;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap including all operational, incidental and labour charges etc. complete for the finished item of work

2

1873

3746

... More
Construction of new Yalal section office;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work

3

4448

13344

... More
Construction of new Yalal section office;S&F of 4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including all operational, incidental and labour charges etc. complete for the finished item of work

2

129

258

... More
Construction of new Yalal section office;S&F of Floor Trap (Bell Mouth ) 110 mm - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including all operational, incidental and labour charges etc. complete for the finished item of work

2

259

518

... More
Construction of new Yalal section office;S&F of 110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including all operational, incidental and labour charges etc. complete for the finished item of work

4

123

492

... More
Construction of new Yalal section office;S&F of 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including all operational, incidental and labour charges etc. complete for the finished item of work

4

96

384

... More
Construction of new Yalal section office;Supply and Fixing of 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar or any ISI Brand including all operational, incidental and labour charges etc. complete for the finished item of work

15

412

6180

... More
Construction of new Yalal section office;S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type -25 mm NB Size including all operational, incidental and labour charges etc. complete for the finished item of work

2

449

898

... More
Construction of new Yalal section office;S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type -20 mm NB Size including all operational, incidental and labour charges etc. complete for the finished item of work

2

319

638

... More
Construction of new Yalal section office;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) 28.60mm OD Pipe - SDR 11 including all operational, incidental and labour charges etc. complete for the finished item of work

60

241

14460

... More
Construction of new Yalal section office;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) 22.20mm OD Pipe - SDR 11 including all operational, incidental and labour charges etc. complete for the finished item of work

20

201

4020

... More
Construction of new Yalal section office;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) 15.90mm OD Pipe - SDR 11 including all operational, incidental and labour charges etc. complete for the finished item of work

3

166

498

... More
Construction of new Yalal section office;Providing independent EARTHING by excavating a trench to a depth of 2.1M in all solid,as per size specified in the Data,using 40mm dia 'B' class GI pipe of2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of salt and Charcoal in layers and all labour charges etc., compiete for small quarters.

1

3783

3783

... More
Construction of new Yalal section office;Supply and erecting Electronic Regulator for ceiling fans 900/1200/1400mmsweep complete erected on existing board including all operational, incidental and labour charges etc. complete for the finished item of worK

4

581

2324

... More
Construction of new Yalal section office;Supply and Fixing of 1200mm (48'') sweep 230v,A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standared accessories including all operational, incidental and labour charges etc. complete for the finished item of worK

4

3205

12820

... More
Construction of new Yalal section office;Supply and fixing of batten holder /slanting holder in lieu of ceiling rose of light point complete with all connection and all labour charges with 40W bulb (for new installation)

6

113

678

... More
Construction of new Yalal section office;Supply & Fixing 1 No. 40W patty type tubelight including cost of all accessories and labour charges etc., Complete for the finished item of work

10

751

7510

... More
Construction of new Yalal section office;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circuit Breaker(ELCB)/Residual Current Circute Braker(RCCB)/Double Pole(DP) Isolator as incomer and 10kA SP MCBs as out going including internal connection and labour charges for surface / flush mounting etc Complete. 12 way SPN Distribution board with IP-20 protection suitable for single phase 40A DP Isolator/ELCB/RCCB as incomer and 10kA-6-32A SP MCBs 8Nos as out going

1

5633

5633

... More
Construction of new Yalal section office;Supply and run of 2 of 36/0.3mm (2.5 sq.mm) (FR) P.V.C. insulated flexible copper cable in existing pipe for mains including all labour charges complete.

100

90

9000

... More
Construction of new Yalal section office;Supply and run of 2 of 14/0.3mm (1.0sq.mm) (FR) P.V.C. insulated flexible copper cable in existing pipe for mains including all labour charges complete.

25

45

1125

... More
Construction of new Yalal section office;Wiring with 2 runs of 14/0.3mm (1.0 sq.mm) P.V.C. insulated F.R flexiblecopper cable (ISI MARK) in existing pipe with 6A Modular Switch,control and 3/2 pin sockets fixing on separate board including all labour charges etc., complete

18

455

8190

... More
Construction of new Yalal section office;Wiring with 2 runs of 14/0.3mm (1.0 sq.mm) P.V.C. insulated F.R flexible copper cable (ISI MARK) in existing pipe with 6A Modular Switch,ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell,fan and exhaust fan points in Residential Buildings.

22

524

11528

... More
Construction of new Yalal section office;Supply and fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) Concealed in wall with all required accessories including masonary work and labour charges etc.complete.

50

99

4950

... More
Construction of new Yalal section office;Supply and fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromiun plated metallic base saddles including all labour charges etc.complete for run of mains.

75

91

6825

... More
Construction of new Yalal section office;Seigniorage Charges - Gravel

89.9

30

2697

... More
Construction of new Yalal section office;Seigniorage Charges - Metal

83.36

97

8127.6

... More
Construction of new Yalal section office;Seigniorage Charges - Metal

32.38

97

3157.05

... More
Construction of new Yalal section office;Seigniorage Charges - Sand

32.38

40

1295.2

... More
Construction of new Yalal section office;Design and submision of 2 sets of structural design drawings with soft copy complete finished item of work as directed by the Engineer in charge of the work.

1285.95

4

5143.8

... More
Construction of new Yalal section office;Painting to new walls with 2 coats of snowcem paint external grade of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work

473.6

188

89036.8

... More
Construction of new Yalal section office;Painting to walls with 2 coats of plastic emulsion paint of interior grade ofapproved brand and shade over a base coat of appropriate primer of approved brand, to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work

290

114

33060

... More
Construction of new Yalal section office;Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixe4d with pigment of matching shade to full depth, including cost of all materials like cement, sand, water and tiles etc., complete for finished item of work

5

715

3575

... More
Construction of new Yalal section office;Flooring with polished shahabad stones 15 to 18mm thick set over base coat of CM (1:8) over already laid CC bed /RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc.,labour charges for dressing of flooringstones etc., complete for finished item of work

33.5

651

21808.5

... More
Construction of new Yalal section office;Providing skirting to internal walls to 15cm height/risers of steps with vitrified tiles length equal to floor tiles, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like marble slab, cement, sand, water etc., complete for finished item of work

5.2

890

4628

... More
Construction of new Yalal section office;Flooring with vitrified tiles 600x600 of 1st quality, set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water and tiles etc., complete for finished item of work

53.3

900

47970

... More
Construction of new Yalal section office;Flooring with decorated white back ground glazed tiles, set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed neatly with white cement paste mixed with pigment of matching shadeto full depth, including cost of all materials like cement, sand, water and tiles etc., complete for finished item of work

20

765

15300

... More
Construction of new Yalal section office;Flooring with cermic tiles of set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water and tiles etc., complete for finished item of work

5

747

3735

... More
Construction of new Yalal section office;Supply and fixing of ms grills of approved design including two coats of synthetic paint over a coat of primer including cost and conveyance of all materials ,labour cahrges etc. complete for the finished item of work

11

2491

27401

... More
Construction of new Yalal section office;Supply and fixing powder coated Aluminimum Anodised Two Track Sliding Windows as per approved drawing with aluminium anodised sections of Series C Jindal sections and outer frame top horizontals & both verticals of 8774 of size 62 x 29.5 mm and bottom horizontal - two track frame of 8773 of size 62 x 29.5 mm, Shutter frame top, bottom and verticals of 8304 of size 50 mm x 20 mm and Weather interlocking frame of 8306 of size 50 x 20 with plain clear float glass 5 mm thick fixed including supply and fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no. of screws, bolts and nuts and includingt labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work

10

3389

33890

... More
Construction of new Yalal section office;Supply and fixing in position of doors with MT Wood Frame with Flush Door Shutter 35mm thick with 9 mm laminate of approved quality and design and fitted with teak wood lippings around duly polished/synthetic enamil paint including all operational, incidental, labour charges etc. complete for finished item of work

12

6881

82572

... More
Construction of new Yalal section office;Providng impervious coat to exposed RCC roof slab surface with CM(1:3), 20 mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., complete for finished item of work Gr.Floor

106.9

434

46394.6

... More
Construction of new Yalal section office;RCM rack 25mm thick in CM (1:3) with rabbit wire mesh & nominal reinforcemet as directed by Engineer-in-change including cost & conveyance of all materials to site, sales & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift changes etc., complete for finished items of work but excluding cost of steel & its fabrication charges,plastering for finished item of work. (APSS No.403 & 903) Ground Floor

20.7

574

11881.8

... More
Construction of new Yalal section office;RCM facia 4cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcemet as directed by Engineer-in-change with dubara sponge finishing, including cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift changes etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903). Ground Floor

22.9

2556

58532.4

... More
Construction of new Yalal section office;Raised pointing with C.M(1:3) to basement including cost & conveyance of all materials,curing labour charges etc complete for finished item of work.

28.8

93

2678.4

... More
Construction of new Yalal section office;Supply and erection of roofing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. , with Regular Range Colours including cost&convayance,fabrication charges etc complete for finished item of work

15.1

551

8320.1

... More
Construction of new Yalal section office;S&F of Mild Steel Tubes&Pipes of all diameters including fabrication & erection and painting all incidental, operational, labour charges such as cutting, bending, placing in position, excluding taxes complete for finished item of work.

53.2

122

6490.4

... More
Construction of new Yalal section office;Plastering of 20mm thick to all uneven faces of walls of superstructure in two coats with base coat in CM 1:5 of 16mm thick and top coat in CM 1:3 4mm thick with dubara sponge finish including cost and conveyance of all materials, water, all labour charges, curing for specified number of days, cutting grooves, all leads, lifts and scaffolding charges,all incidental charges etc. complete for finished item of work and as directed by the Engineer - in - charge. First Floor

80.2

409

32801.8

... More
Construction of new Yalal section office;Plastering of 20mm thick to all uneven faces of walls of superstructure in two coats with base coat in CM 1:5 of 16mm thick and top coat in CM 1:3 4mm thick with dubara sponge finish including cost and conveyance of all materials, water, all labour charges, curing for specified number of days, cutting grooves, all leads, lifts and scaffolding charges,all incidental charges etc. complete for finished item of work and as directed by the Engineer - in - charge. Ground Floor

610.4

405

247212

... More
Construction of new Yalal section office;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying excluding taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

4.05

72352

293025.6

... More
Construction of new Yalal section office;Reinforced Brick Masonary walls of 11.5cm in CM (1:6) using 2nd bricks having a crushing strength of not less than 35.00Kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc, complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509 - Ground Floor

81.9

880

72072

... More
Construction of new Yalal section office;Brick masonry in cement mortar (1:6) for superstructure using well burnt country made second class bricks of approved quality including cost and conveyance of all materials curing, scaffolding with all leads and lifts etc., complete for finished item of work - First Floor

7.9

7656

60482.4

... More
Construction of new Yalal section office;Brick masonry in cement mortar (1:6) for superstructure using well burnt country made second class bricks of approved quality including cost and conveyance of all materials curing, scaffolding with all leads and lifts etc., complete for finished item of work - Ground Floor

32.5

7476

242970

... More
Construction of new Yalal section office;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work - Roof Slab Ground floor

16.4

10234

167837.6

... More
Construction of new Yalal section office;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work - Sunshade Ground floor

5.4

1147

6193.8

... More
Construction of new Yalal section office;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work - Lintel Ground floor

1.4

11072

15500.8

... More
Construction of new Yalal section office;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work - Roof beam Ground floor

5.3

10666

56529.8

... More
Construction of new Yalal section office;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work - Plinth Beam

4.7

10659

50097.3

... More
Construction of new Yalal section office;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work - Column Ground floor

4.2

10929

45901.8

... More
Construction of new Yalal section office;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work - Footing

8.6

8345

71767

... More
Construction of new Yalal section office;Filling with gravel in basement with 150mm thick layers incldg cost & conveyance all materials watering,consolidation etc complete for finished item of work.

89.9

471

42342.9

... More
Construction of new Yalal section office;C.R.S Masonry in C.M(1:6) using HBG stone including cost & conveyance of all materials labour charges,curing,all leads lifts etc., complete for finished item of work.

27.1

4175

113142.5

... More
Construction of new Yalal section office;Laying Plain C.C(1:2:4) nominal mix using 20 mm HBG metal incldg cost & conveyance of all materialsmixing,curing,all labour charges,etc comp for finished item of work..

1

5744

5744

... More
Construction of new Yalal section office;Laying Plain C.C (1:4:8) using 40 mm HBG metal including cost & conveyance of all materials labour charges,curing,allleads lifts etc., complete for finished item of work.

17.5

4329

75757.5

... More
Construction of new Yalal section office;Filling with already available Earthwork in basement with 150mm thick layers incldg cost & conveyance all materials watering,consolidation etc complete for finished item of work.

21.9

27

591.3

... More
Construction of new Yalal section office;Earth Work Mass Excavation to a depth as directed, in soils such as Mixture of Gravel and Soft Disintegrated Rock like Shales, Ordinary Gravel, Stoney Earth and Earth Mixed with Fair Sized Boulders and in all conditions such as dry, wet, slurry etc.and in dense or hard soils, disposal and depositing of excavated soil with intial lead of 10 mt and intial lift of 2m or as directed, including cost and conveyance of all materials, ramping and lifting of materials, and labour charges, hire charges of machinery, tools & plants, bailing of water ( either sub soil water, stoMts water, rain water, surface water or of any kind) if any at any stage of work until all works below ground level is finished to the satisfaction ,and from work such as shoring, timbering, strutting with required supports etc. for the work and removal of form work after completion of work etc all complete as directed by the engineer-incharge.

62.9

331

20819.9

... More
Construction of new Yalal section office;Hiring of JCB to clear and level the site including labour and material charges

6

893

5358



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.