Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Civil And Construction
Civil Works Others
Opening Date19 Jun 2024
Closing Date10 Jul 2024
Tender Amount₹ 18,30,577 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of compound wall at RR Stores;S&Fixing of Galvanised barbed wire (1 horizontal strand only) including cost & conveyance of all materials,labour charges etc complete for finished item of work.

1000

-

15000

... More
Construction of compound wall at RR Stores;S&F of Structural steel including fabrication & erection and painting all incidental, operational, labour charges such as cutting, bending, placing in position, excluding taxes complete for finished item of work.

268.2

-

33256.8

... More
Construction of compound wall at RR Stores;Painting with lovely sem including cost &conveyance of all materials labour charges etc complete for finished item of work.

312.32

-

25922.56

... More
Construction of compound wall at RR Stores;Painting with ACE exterior emulsion paint two coats over a coat of primer of approved color & make including cost &conveyance of all materials labour charges etc complete for finished item of work.

592.62

-

139265.7

... More
Construction of compound wall at RR Stores;Raised pointing with C.M(1:3) to basement including cost & conveyance of all materials,curing labour charges etc complete for finished item of work.

312.32

-

37790.72

... More
Construction of compound wall at RR Stores;Plastering with CM (1:5) 16 mm thick & 2nd coat in CM(1:4) 4 mm thick total 20mm thick including cost & conveyance of all materials, curing, scaffolding, all labour charges etc complete for finished item of work.

592.62

-

320014.8

... More
Construction of compound wall at RR Stores;Brick masonry in C.M(1:6) using well burnt country made 2nd class bricks including cost & conveyance of all materials, curing labour charges etc complete for finished item of work.

62.93

-

522444.86

... More
Construction of compound wall at RR Stores;Providing and laying plain Cement concrete of 1:2:4 for levelling course using 20mm size hard broaken Granite stone including cost and conveyance of all materials, all labour charges, etc complete for finished item of work.

6.7

-

43134.6

... More
Construction of compound wall at RR Stores;CRS masonry in 1:6 using Hard Granite Stones including cost and conveyance of all materials, labour charges etc .complete for finished item of work as directed by the Engineer - in - charge.

99.9

-

514684.8

... More
Construction of compound wall at RR Stores;Providing and laying plain Cement concrete of 1:4:8 for levelling course using 40mm size hard broaken Granite stone including cost and conveyance of all materials, all labour charges, etc complete for finished item of work.

13.73

-

68965.79

... More
Construction of compound wall at RR Stores;Earth Work Mass Excavation to a depth as directed, in soils such as Mixture of Gravel and Soft Disintegrated Rock like Shales, Ordinary Gravel, Stoney Earth and Earth Mixed with Fair Sized Boulders complete as directed by the engineer-incharge.

96.08

-

44581.12

... More
Construction of compound wall at RR Stores;Engaging Mazdoor including cost and conveyance of all materials, all labour charges, etc complete for finished item of work.

36

-

26208

... More
Construction of compound wall at RR Stores;Hiring of JCB including cost and conveyance, all labour charges, etc complete for finished item of work.

24

-

22080



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.