Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Civil And Construction
Opening Date18 Jun 2024
Closing Date8 Jul 2024
Tender Amount₹ 77,07,191 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Providing contour surveying maps with total station including preparation of boundary and contour levels with 4 No.s hard copies and soft copies complete for finished items of work as directed by the Engineer in charge of the work.

2

5150

10300

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and spreading of LDPE Sheet 500Micron including cost and conveyance of all materials , labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

769.09

95

73063.55

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S&Fixing of barbed wire 8 straight strands and 2 cross strands including cost & conveyance of all materials,labour charges etc complete for finished item of work.

360

252

90720

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S&Fixing of R.C.C fencing poles of size 0.115x0.115x2.7 mts in pits of size 0.5x0.5x0.5 m and refilled with P.C.C(1:4:8) using 20 mm HBG metal including cost & conveyance of all materials,labour chargesv etc complete for finished item of work.

240

1411

338640

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and spreading of stone dust including cost and conveyance of all materials , labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

53.84

1052

56639.68

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and Fixing of Substation name board of size 5'x3' iron sheet with angle frame and channel supports of size 75x40mm, 8' height including concreting of channel supports and painting with enamel paint complete.

1

4326

4326

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of flange clamps including cost of all materials complete for finished item of work as directed by the engineer-in-charge.

2

175

350

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of D.O.L Starter 250V, 1 phase,50Hz with no volt coil and over load protection including cost and conveyance of all materials labour charges etc complete for finished item of work as directed by the engineer-in-charge.

1

1403

1403

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of 3 Core 2.5 Sqmm Flat Copper cable of ISI for Submersible Motors of makes Finolex / Polycab / Gold Medal / Million / Payal / Power Flex / Fortune Art

175

106

18550

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of 2HP/Multi stage submercible motor pumpset of approved make(Texmo or equivalent type)including cost and conveyance of all materials etc. complete for finished item of work as directed by the engineer-in-charge.

1

33214

33214

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of HDPE pipe 40mm dia of 6Kg/cm2 including cost and conveyance of all materials labour charges etc complete for finished item of work as directed by the engineer-in-charge.

135

205

27675

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of 160mm dia PVC casing of A class 6Kg point pressure including cost and conveyance of all materials labour charges etc complete for finished item of work as directed by the engineer-in-charge.

18

787

14166

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Drilling of 165mm dia bore well with power rig from ground level in all stratas as directed by the engineer-in-charge including cost and conveyance of all materials labour charges etc complete for finished item of work. c)120m to 150m

30

394

11820

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Drilling of 165mm dia bore well with power rig from ground level in all stratas as directed by the engineer-in-charge including cost and conveyance of all materials labour charges etc complete for finished item of work. b)90m to 120m

30

369

11070

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Drilling of 165mm dia bore well with power rig from ground level in all stratas as directed by the engineer-in-charge including cost and conveyance of all materials labour charges etc complete for finished item of work. a)0-90m

90

305

27450

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Geophysical investigation charges

1

2500

2500

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of P V C chairs of Neelkamal of approved quality & make including cost and conveyance complete for finished item of work and as directed by the engineer-in-charge.

4

1100

4400

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of 'S' type chair with arms teakwood frame with seat back 's' type on G.I pipe including cost and conveyance complete for finished item of work and as directed by the engineer-in-charge.

1

3700

3700

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of steel table of size 4'x2.5'x30" with 18 mm plywood fixed with rubber beeding with drawers on right side with automatic locking arrangements etc complete for finished item of work and as directed by the engineer-in-charge.

1

4200

4200

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Providing and placing on Terrace polyetheylene water storage tank with double layer approved brand and manufacture with cover complete for finished item of work and as directed by the engineer-in-charge.

500

9

4500

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of 12.7mm bib tap Indian make including labour charges complete for finished item of work and as directed by the engineer-in-charge.

3

261

783

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of 25mm dia. GM Ball valve including labour charges complete for finished item of work and as directed by the engineer-in-charge.

2

449

898

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of 20mm dia. GM Ball valve including labour charges complete for finished item of work and as directed by the engineer-in-charge.

2

319

638

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of 15mm dia. GM Ball valve including labour charges complete for finished item of work and as directed by the engineer-in-charge.

18

221

3978

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) c) 28.60mm OD Pipe - SDR 11

60

241

14460

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) b) 22.20mm OD Pipe - SDR 11

130

201

26130

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Construction of soak pit with 4' dia RCM rings upto a depth of 6' including cost and conveyance of all materials as directed by the engineer-in-charge.

1

2950

2950

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and Fixing 4" dia PVC cowl including labour charges etc. complete for finished item of work.

1

20

20

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and Fixing 4" dia 3M Single socket PVC pipe including labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

8

412

3296

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S&Fixing 150mm x 100mm SWG gully traps Ist class grating & constg brick masonry in CM (1:6) prop inter mediate chamber and fitted with CI frame etc complete.

1

722

722

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply,fixing 90mm dia. PVC Door Bend including cost etc. complete for finished item of work and as directed by the engineer-in-charge.

2

123

246

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply,fixing 90mm dia. PVC Plain Bend including cost etc. complete for finished item of work and as directed by the engineer-in-charge.

2

96

192

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and Fixing 4" PVC floor trap including labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

1

259

259

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of 580mm x 440mm long Orissa pan of Parry, Neycer or Hindhusthan, make with 'P' or 'S' trap etc complete for finished item of work and as directed by the engineer-in-charge.

1

2101

2101

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of ceramic tiles fantacy for dadoing including cost and conveyance of all materials,labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

10.1

734

7413.4

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and Fixing of 48" ceiling fan of bajaj make(or equivalent make) including cost material,labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

2

3205

6410

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and run of No8 SWG copper wire for earthingincluding cost material,labour charges etc. complete for finished item of work and as directed by the engineer-in-charge

15

132

1980

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Providing independent earthing for main switches,IC cutouts and motors using 40mm. Dia. B-class G.I.Pipe of 2.5' length duly providing 12mm. Dia. 6No. Holes and required bolts,nuts and washers,including filling with equal preparation of salt and charcoal in layers and labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

1

3783

3783

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;SPN Distribution board with IP-20 protection suitable for single phase 40A DP Isolator/ELCB/RCCB as incomer and 10kA-6-32A SP MCBs 4Nos as out going MCBs in sheet steel enclosure including connections and cost of all material labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

1

4026

4026

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and run of 2 of 36/0.3 (2.5sqmm) pvc insulated flexible copper cable in the existing metalic/non-metalic conduit pipe.

25

90

2250

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and run of 2 of 14/.3mm(1.00Sqmm) pvc insulated flexible copper cable in the existing metalic/non-metalic conduit pipe.

15

45

675

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of patty type tube light fitting with 4' 0" - 40W tube light,40W copper choke,starter,labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

3

751

2253

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of slanting holders with 100W bulb with all connections and labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

4

113

452

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of 16A 3pin Modular type plug socket and 16A Modular type fuse unit and 16A switch control.

2

339

678

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of 6A 3/2 pin Modular type plug socket with 6A Modular type marked switch control on a common board with earth continuity including wire leads earth connections along with all labour charges etc. complete

2

455

910

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Wiring with 2X1.0 Sqm(14/.3mm) PVC insulated flexiable copper cable in the existing metalic/Non metalic conduit pipe with 6A mini modular SP switch, mounted on metalic box covereds with appropriate front plate modules etc ceiling rose including cot and conveyance of all mateials, labour charges complete for light points, bell points and fan points in non residential builsing except circuit moving finished in all types masonary as directed by department.

12

524

6288

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing 25mm dia 1.5mm thick recessed( concealed) PVC pipe alog with reinforcement to be laid in slab including No 14 SWG GI wire for earth contunity, cost of pipe, binding wire and all labour charges etc complete

25

88

2200

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing 25mm dia 1.5mm thick recessed( concealed) PVC pipe alnog with reinforcement to be laid in slab including No 14 SWG GI wire for earth contunity, cost of pipe, binding wire and all labour charges etc complete

25

99

2475

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Painting with lovely cem three coats including cost and conveyance of all materials , labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

320.4

69

22107.6

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Painting to External Faces of walls(outside) in all floors as specified with two coats of APEX or equivalent quality paint of approved colour make and shade over one coat of white cement primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work .

166.7

188

31339.6

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Painting in all floors as specified with two coats of PlasticEmulsion of approved colour make and shade over one coat of white primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work .

126.5

114

14421

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of MS gates of approved design including cost and conveyance of all materials,fabrication charges etc complete for finished item of work.

9.8

4503

44129.4

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of fencing of welded wire mesh (1" x 2") with support channels of 75x 35mm and angles around of 30x30x3 mm including cost and conveyance of all materials ,fabrication charges,painting charges etc. complete for finished item of work and as directed by the engineer-in-charge.

109.93

2013

221289.09

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and spreading of 20 mm machine crushed metal including cost and conveyance of all materials , labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

57.28

1832

104936.96

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;PCC(1:2:4) using 10 to 12 mm aggregate with morter of 50:50 river sand and robo sand including cost and conveyance of all materials labour charges etc. complete for finishhed iitem of work and as directed by the engineer-in-charge.

10.46

5693

59548.78

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;PCC(1:3:6) using40 mm aggregate with morter of 50:50 river sand and robo sand including cost and conveyance of all materials labour charges etc. complete for finishhed iitem of work and as directed by the engineer-in-charge.

43.2

4580

197856

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Providing skirting with tandoor blue slabs 20mm thick of approved colour, quality and approved size over a bed of cement mortar 1:3 with morter of 50:50 river sand and robo sand 20mm thick including cost of all materials, with all leads and lifts jointing and pointing with cement, labour etc, complete for finished item of work.

5.1

708

3610.8

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Flooring with double machine polished and hand cut Tandur blue stone 20mm thick of approved colour, quality and approved size over a bed of cement mortar 1:3 with morter of 50:50 river sand and robo sand 20mm thick including cost of all materials, with all leads and lifts jointing and pointing with cement, labour etc, complete for finished item of work.

39

644

25116

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supplying and fixing of MS safety grill with peripheral frame of ISA 25x25x4mm and horizontal & vertical 8mm square rods and including cost and coveyance of all mateirals with all leads and lifts, labour charges, painting charges complete for finished item of work

5.95

2491

14821.45

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and Fixing of Aluminium sliding windows with fixed glass panels using aluminium sections 62x32x1.2mm providing 5mm plain glass fixed to frame with beading gasket and glazing clips with all accessories,locking arrangements including cost and conveyance of all materials,labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

5.95

3389

20164.55

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and fixing of doors with the frames of the door shall be made well seasoned mt wood of cross section 90x65mm. The shutter shall be made laminated flushed door on both sides.Frame shall be painted with two coats of synthetic enamel paint of approved color over one coat of primer with alluminium/poweder coated hardware fittings .i.e. 3 no 100mm hinges, 1 no door stoper, 1 no 250mm aldrops. 1 no 150 mm tower bolt,250mm latch, 2 no 125mm door handlers, including cost and conveyance of the meterials, fixig, labour carges, tools, handles,locking arrangementts and other fixtures & fittings for finished item work as directed by the Engineer - in- charge.

6

6881

41286

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Providing impervious coat over RCC roof slab surfaces to requried slopes with 20mm thick in CM 1:3 pro with morter of 50:50 river sand and robo sand mixed with approvaled brand of water proffing compound as the raet of 1 kg per bag of cement inclding cost and conveyance of all materials, water, all labour charges, chemicals, curing for specifed number of days , rounding off junctions of wall and slab, all leads, lifts, heights, levels and floors etc., complete as directed by the Engineer - in - charge for finished item of work.

51.6

422

21775.2

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Raised pointing in CM(1:3) with morter of 50:50 river sand and robo sand including curing, cost and conveyance of all materials and labour charges for complete item of work.

239.5

90

21555

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Providing plastering of 20mm thick to all uneven faces of walls and ceiling of superstructure in two coats with base coat in CM 1:6 of 16mm thick with morter of 50:50 river sand and robo sand and top coat in Cm 1:4 4mm thick with dubara sponge finish

414.2

393

162780.6

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

2.3

68150

156745

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Reinforced Cement concerete M20 GRADE Nominal Mix for footings , columns, Beams and Slab using 12mm to 20mm size graded HBG machine crushed metal with morter of 50:50 river sand and robo sand from approvaed quary giving cube crushing strenth of 20 N /sqm and a minimum of 400 kgs of cement for 1 cum of concrete including cost and conveyance charges for cement and all other materials to site, scaffolding charge , seignorage charges, centering, shuttering, machine mixing,laying concrete, curing for specified number of days vibrating etc compaction by pen vibrator or needle vibrator supplemented by hand spreeding rodding and tamping ,all incident and operational charges , all leads and lifts and for all leaving gaps and pockets etc complete, but excuding cost of ssteel and its fabrication , all incidental charges etc .complete for finshed item of work as directed by the Engineer-in-charge . (g) Slab

8.1

10183

82482.3

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Reinforced Cement concerete M20 GRADE Nominal Mix for footings , columns, Beams and Slab using 12mm to 20mm size graded HBG machine crushed metal with morter of 50:50 river sand and robo sand from approvaed quary giving cube crushing strenth of 20 N /sqm and a minimum of 400 kgs of cement for 1 cum of concrete including cost and conveyance charges for cement and all other materials to site, scaffolding charge , seignorage charges, centering, shuttering, machine mixing,laying concrete, curing for specified number of days vibrating etc compaction by pen vibrator or needle vibrator supplemented by hand spreeding rodding and tamping ,all incident and operational charges , all leads and lifts and for all leaving gaps and pockets etc complete, but excuding cost of ssteel and its fabrication , all incidental charges etc .complete for finshed item of work as directed by the Engineer-in-charge . (f) Roof Beams

2.46

10615

26112.9

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Reinforced Cement concerete M20 GRADE Nominal Mix for footings , columns, Beams and Slab using 12mm to 20mm size graded HBG machine crushed metal with morter of 50:50 river sand and robo sand from approvaed quary giving cube crushing strenth of 20 N /sqm and a minimum of 400 kgs of cement for 1 cum of concrete including cost and conveyance charges for cement and all other materials to site, scaffolding charge , seignorage charges, centering, shuttering, machine mixing,laying concrete, curing for specified number of days vibrating etc compaction by pen vibrator or needle vibrator supplemented by hand spreeding rodding and tamping ,all incident and operational charges , all leads and lifts and for all leaving gaps and pockets etc complete, but excuding cost of ssteel and its fabrication , all incidental charges etc .complete for finshed item of work as directed by the Engineer-in-charge . (e) Sunshade

7.56

1143

8641.08

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Reinforced Cement concerete M20 GRADE Nominal Mix for footings , columns, Beams and Slab using 12mm to 20mm size graded HBG machine crushed metal with morter of 50:50 river sand and robo sand from approvaed quary giving cube crushing strenth of 20 N /sqm and a minimum of 400 kgs of cement for 1 cum of concrete including cost and conveyance charges for cement and all other materials to site, scaffolding charge , seignorage charges, centering, shuttering, machine mixing,laying concrete, curing for specified number of days vibrating etc compaction by pen vibrator or needle vibrator supplemented by hand spreeding rodding and tamping ,all incident and operational charges , all leads and lifts and for all leaving gaps and pockets etc complete, but excuding cost of ssteel and its fabrication , all incidental charges etc .complete for finshed item of work as directed by the Engineer-in-charge . (d) Lintels

0.4

11021

4408.4

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Reinforced Cement concerete M20 GRADE Nominal Mix for footings , columns, Beams and Slab using 12mm to 20mm size graded HBG machine crushed metal with morter of 50:50 river sand and robo sand from approvaed quary giving cube crushing strenth of 20 N /sqm and a minimum of 400 kgs of cement for 1 cum of concrete including cost and conveyance charges for cement and all other materials to site, scaffolding charge , seignorage charges, centering, shuttering, machine mixing,laying concrete, curing for specified number of days vibrating etc compaction by pen vibrator or needle vibrator supplemented by hand spreeding rodding and tamping ,all incident and operational charges , all leads and lifts and for all leaving gaps and pockets etc complete, but excuding cost of ssteel and its fabrication , all incidental charges etc .complete for finshed item of work as directed by the Engineer-in-charge . (c) Plinth Beams

1.82

10608

19306.56

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Reinforced Cement concerete M20 GRADE Nominal Mix for footings , columns, Beams and Slab using 12mm to 20mm size graded HBG machine crushed metal with morter of 50:50 river sand and robo sand from approvaed quary giving cube crushing strenth of 20 N /sqm and a minimum of 400 kgs of cement for 1 cum of concrete including cost and conveyance charges for cement and all other materials to site, scaffolding charge , seignorage charges, centering, shuttering, machine mixing,laying concrete, curing for specified number of days vibrating etc compaction by pen vibrator or needle vibrator supplemented by hand spreeding rodding and tamping ,all incident and operational charges , all leads and lifts and for all leaving gaps and pockets etc complete, but excuding cost of ssteel and its fabrication , all incidental charges etc .complete for finshed item of work as directed by the Engineer-in-charge . (b) Columns

3

10878

32634

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Reinforced Cement concerete M20 GRADE Nominal Mix for footings , columns, Beams and Slab using 12mm to 20mm size graded HBG machine crushed metal with morter of 50:50 river sand and robo sand from approvaed quary giving cube crushing strenth of 20 N /sqm and a minimum of 400 kgs of cement for 1 cum of concrete including cost and conveyance charges for cement and all other materials to site, scaffolding charge , seignorage charges, centering, shuttering, machine mixing,laying concrete, curing for specified number of days vibrating etc compaction by pen vibrator or needle vibrator supplemented by hand spreeding rodding and tamping ,all incident and operational charges , all leads and lifts and for all leaving gaps and pockets etc complete, but excuding cost of ssteel and its fabrication , all incidental charges etc .complete for finshed item of work as directed by the Engineer-in-charge . (a) Footings

5.24

8294

43460.56

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supplying and filling with borrowed gravel, watering, ramming, consolidating thoroughly complying with the standard specification including cost and conveyance of all materials, labour charges

1835

441

809235

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Construction of brick masonary in CM(1:6) with morter of 50:50 river sand and robo sand including cost and conveyance of all materials, labour charges etc. complete for finished item of work and as directed by the engineer-in-charge.

23.9

7391

176644.9

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;CRS masonry in CM (1:6) using Hard Granite Stones with morter of 50:50 river sand and robo sand including cost and conveyance of all materials, seignorage charges, labour charge for construction and for dressing stones to required size and shape, dewatering, scaffolding, cutting for all leads and lifts, all incidental charges etc .complete for finished item of work as directed by the Engineer - in - charge.

168.21

4239

713042.19

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;PCC (1:4:8) for levelling course using 40mm size hard broken Granite stone with morter of 50:50 river sand and robo sand including cost and conveyance of all materials, HBG metal for foundations and leveling course and as directed by the Engineer- in - charge etc complete for finished item of work.

22.25

4278

95185.5

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Blasting Hard rock stone labour and material charges etc., complete as directed by the engineer-incharge

13.95

689

9611.55

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Earth Work Mass Excavation in OrdinaryRock Without blasting-upto 3 m depth such as Mixture of Gravel and Soft Disintegrated Rock like Shales, Ordinary Gravel, Stoney Earth and Earth Mixed with Fair Sized Boulders and in all conditions, labour and material charges etc., complete as directed by the engineer-incharge

32.39

473

15320.47

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Earth Work Mass Excavation in ordinary soils such as Mixture of Gravel and Soft Disintegrated Rock like Shales, Ordinary Gravel, Stoney Earth and Earth Mixed with Fair Sized Boulders and in all conditions, labour and material charges etc., complete as directed by the engineer-incharge.

47.53

331

15732.43

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Clearing and levelling the site with the help of Jcb includes all the charges for finished item of work as directed by the Engineer - in - charge

18

893

16074

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;FABRICATION Fabrication of materials LT 3-Phase cross arms with MS angle 50x50x6 mm or 65x65x6 mm.

60

36

2160

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Fab LT 3-Ph cross arms MS angle 50x50x6

25

60

1500

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of Danger boards with clamps

20

116

2320

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;SubTrnsprt 8M PSCC Pole incl. L&UL<10KM

60

271

16291.2

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of Danger boards with clamps

175

407

71275.75

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud

7

765

5355

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex

60

720

43200

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Detailed survey of line and cable including peg marking and necessary tree clearance

93.5

6579

615136.5

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Formation of Horizontal Cut point for 33 KV line excluding pole erection and stays including bolts & nuts etc.,

235

32

7520

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Excavation of Stay pits of size 0.45x 0.45x1.34M for burying Anchor rods with the anchor plates for Stay sets including dewatering,shoring & shuttering wherever necessary and back filling (after bury of anchor rods with anchor plate and concreting the sa:i) In all soils except hard morum gravel, hard disintegrated rock and hard rock

450

117

52875

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES :Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling

3

16700

50100

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

7

8500

59500

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side

40

606

24274

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;FABRICATION Fabrication of materials LT 3-Phase cross arms with MS angle 50x50x6 mm or 65x65x6 mm.

30

1350

40500

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Sub Transportation of 8 Mts PSCC Poles to location from road side.

60

1500

90000

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Sub Transportation of 9.1 Mts PSCC Poles to location from road side.

175

2400

420000

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Detailed survey of line and cable including peg marking and necessary tree clearance

40

520

20800

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

175

840

147000

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Conveyance of men and materials

12

36

432

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side

5

116

580

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES :Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling

30

14

420.9

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Formation of (Vertical/ Horizontal) Cut point for 11 KV line excluding pole erection and stays

30

105

3150

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing ofsupports, back filling with earth and stones properly ramming including transport of materials from road side to location e

2

1234

2468.4

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex

2

3486

6972

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Excavation of Stay pits of size 0.45x 0.45x1.34M for burying Anchor rods with the anchor plates for Stay sets including dewatering,shoring & shuttering wherever necessary and back filling (after bury of anchor rods with anchor plate and concreting the sa:i) In all soils except hard morum gravel, hard disintegrated rock and hard rock

1

4500

4500

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud

1

6204

6204

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex

27

431

11663.19

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Detailed survey of line and cable including peg marking and necessary tree clearance

16

407

6516.64

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Formation of Horizontal Cut point for 33 KV line excluding pole erection and stays including bolts & nuts etc.,

16

2400

38400

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Excavation of Stay pits of size 0.45x 0.45x1.34M for burying Anchor rods with the anchor plates for Stay sets including dewatering,shoring & shuttering wherever necessary and back filling (after bury of anchor rods with anchor plate and concreting the sa:i) In all soils except hard morum gravel, hard disintegrated rock and hard rock

16

840

13440

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES :Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling

100

117

11750

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

1

16700

16700

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side

1

765

765

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud

6

1759

10557

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex

8

520

4160

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Detailed survey of line and cable including peg marking and necessary tree clearance

8

684

5476.24

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Formation of Horizontal Cut point for 33 KV line excluding pole erection and stays including bolts & nuts etc.,

27

4165

112462.56

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Excavation of Stay pits of size 0.45x 0.45x1.34M for burying Anchor rods with the anchor plates for Stay sets including dewatering,shoring & shuttering wherever necessary and back filling (after bury of anchor rods with anchor plate and concreting the sa:i) In all soils except hard morum gravel, hard disintegrated rock and hard rock

23

1308

30087.45

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES :Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling

43

32

1376

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

30

6579

197370

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side

4

1802

7211.4

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of Danger boards with clamps

1

12600

12600.06

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Erect-5 to 8MVA PTR on plinth (total)

5

116

580

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Lay-Cable Terminations to Switchgear

1

4809

4809

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;F-Cu Lugs & Ferrole-Int. Wiring per ckt

150

34

5164.5

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S-Cu Lugs & Ferrole-Int. Wiring per ckt

50

120

6000

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Testing & Commissioning of Equipment

4

2660

10640

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;UNLOADING of 11 KV AB SWCH Con 200/400 A

12

80

960

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;LOADING of 11 KV AB SWCH Con 200/400 A

12

80

960

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;UNLOADING of 33 KV AB SWCH Con 400/800 A

3

79

237

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;LOADING of 33 KV AB SWCH Con 400/800 A

3

126

378

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;UNLOADING of MS Channel,Angles,Flats&Rod

13.5

185

2497.5

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;LOADING of MS Channel,Angles,Flats&Rods

13.5

221

2983.5

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;UNLOADING of 11 KV VCBs&Panel boards

4

1044

4177.92

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;LOADING of 11 KV VCBs&Panel boards

4

1024

4096

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;EXCAV. OF PIT HARD(2.6" x 2.6" x 6.0")

9

1680

15120

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Exca Hard pit w/o blast 0.76X0.76X1.83M

22

840

18480

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;SubTrnsprt 8M PSCC Pole incl. L&UL<10KM

8

271

2172.16

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;SubTrnsprt 9M PSCC Pole incl. L&UL<10KM

31

407

12625.99

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Protection-Men&Material Conveyance Chgrs

4

16700

66800

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF EQUIPMENT Substations Erection of 11 KV HG Fuse set including earthing

15

146

2199.45

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S&E-400A 11KV ABSwth Conv 1ph(1/3) in SS

4

4232

16928

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Erect. of 11kv HG Fuseset incl earthing

1

740

740.52

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of FRP PT Marshalling Box

2

374

749.7

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of FRP CT Marshalling Box

1

4463

4463

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of FRP CT Marshalling Box

1

4148

4148

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S-GI Bolts & Nuts,Washers etc.,

300

117

35250

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Painting of Name Plates for any equipmen

5

122

610

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of S type chairs (Godrej)

4

924

3696

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of Table (3x6ft) Godrej

1

6050

6050

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of LC Boards

4

116

464

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of Gum Boots

1

693

693

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of Safety Helmet of standard make

1

231

231

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of Hand Gloves

1

289

289

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S-Earth Rod 8ft Long 3mm Thick

4

1000

4000

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of 5000v megger

1

13860

13860

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of Earth megger (1000v)

1

8085

8085

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;"Taparia Tool kit of Size 20?x10?x15? with tier arrangements Tool box containing ?D?Spanners from size 6 to 54, Hammer small and big size, Ring spanners from 6 to 28, Adjustable spanner, Pipe wrench, Cutting Plier, Nose plier, Tester, insulated Screw drivers 6? size.

1

2888

2888

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Rechargeable LED torch light of Standard make

1

4925

4925

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Sup Rechargeable LED torch light.

1

1733

1733

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Fire bucket stand with 3 buckets (8 -10 ltr capacity)

2

9240

18480

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Sup Fire Buckets Stand with Buckets

1

1386

1386

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Name board of the 33/11kV Sub-Station(As per Standard Specification)

1

4410

4410

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Sup 33/11kv S.S Permanent name board

1

10238

10238

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S-25W LED fixture set

8

3200

25600

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Yard LightingSupply and Fixing of junction box and providing with proper fuse protection and required glands suitable for Cable Terminations. The box shall be fixed on the pole

8

351

2815.2

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Erection of 15KVA Single Phase Station Transformer / 25 KVA 3 Phase Distribution Transformerupply and Erection of AC & DC Panel and giving connections to the protection and metering circuits as per the specification and standards including the 3 1/2 core 25 Sqmmpower cable required for station transformer LT side to distribution box and to AC/DC panel in the control room

1

7871

7871.85

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of DC Annunciation & relay panel for 8 feeder panel including the cost of LED Indiacation lamps, VAA auxilairy relays, Electronic Hooters complete as per specification.

1

42500

42500

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of AC Supply panel inluding providing of changeover switch, SFU, metering unit, 32 A three phase MCB, 16 A Single phase MCB complete as per specification.

1

42000

42000

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF EQUIPMENT Fixing of clamps T-Clamps

45

116

5220

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply and providing of Panther T clamps.

45

320

14400

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Fixing of LT open wiring set

1

382

382.5

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Supply of LT Open wiring set

1

1125

1125

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Laying of UG Cable Erection of DTRs Three phase**In city 30% extra as erection of DTRs requiring crane to save time

1

1139

1139.95

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Painting of all suppports to a height of 0.3m with bituminous paint.

31

688

21328

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;(*) Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium .

7.5

482

3615

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium

7.5

851

6382.5

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Lay-4C/10C 2.5Sqmm Control Cable

1650

27

44550

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Copper Flexible jumper with 75 X 8 of length 100mm at neutral of Power tranformer end and 50 X 6 of length 50mm two Nos at double neutral end duly brasing with flexible jumper of capacity of 5kA/3 sec for power transformer neutral.

1

4725

4725

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.,.M.S./ G.S. Flat 50x6mm / 50 x 8 mm ( Above ground)

1250

41

51250

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Laying of earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.75x 8mm MS Flat / GI Flat.

532

65

34580

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud

23

1234

28386.6

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S-CI Pipe earthing 100mm dia 2.75m long

23

3486

80178

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF EQUIPMENT Substations Erection of 11 KV HG Fuse set including earthing

1

740

740.52

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S-11KV HG Fuse Set

1

1733

1733.75

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF EQUIPMENT Substations Erection of 33 KV HG Fuse set including earthing

1

1331

1331.81

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;S-33KV HG Fuse Set excl Ins & Chnl

1

6431

6431

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF EQUIPMENT Substations Erection of 11 KV LAS line type including earthing

3

505

1515

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF EQUIPMENT Substations Erection of 11 KV LAS station type including earthing

2

559

1118

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF EQUIPMENT Substations Erection of 33 KV LAS station type including earthing

2

880

1760

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Erection of 11kv three phase PT s

1

800

800

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Erect-24V Batery with Chrgr incl grot-SS

4

1050

4200

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Laying of UG Cable Erection of VCBs 11 KV

4

12000

48000

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Cement concrete 1:3:6 ration with 40 MML HBG metal including the cost of all materials and labour complete 1.8 x 1.8 x 0.75 Cum.forVCB plinth

24.25

5160

125130

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Previously 28.07.2020 - Excav. of pit in soils except hard rock

24.25

345

8366.25

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Paint-Opertng Rods 33/11KV AB Swth in SS

15

144

2172.6

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF EQUIPMENT Substations Erection of 11 KVAB Switch including alignment and earthing

12

3200

38400

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF EQUIPMENT Substations Erection of 33 KV AB Switch including alignment and earthing

3

4500

13500

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Hoisting of post type insulators and hardware, stretching of conductor stringing of bus comprising three conductors with single panther conductor and connecting equipment to bus and or another equipment with single Panther (200 Sq.mm.AAAC) /Zeebraconductor including necessary clamping and connecting with required aluminium connectors wherever necessary complete11 KV

2

507

1014

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Hoisting of post type insulators and hardware, stretching of conductor stringing of bus comprising three conductors with single panther conductor and connecting equipment to bus and or another equipment with single Panther (200 Sq.mm.AAAC)/Zeebra conductor including necessary clamping and connecting with required aluminium connectors wherever necessary complete33 KV

1

781

781

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.

100

327

32768

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;FABRICATION Cutting Charges for MS Sections per cutMS Channel 100 x 50 mm

7500

10

75000

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Coping & Muffing-Iron Pole

3.1

3893

12068.3

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

17.05

6579

112171.95

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

4.4

6579

28947.6

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Paint-9.1M PSCC Poles as desc SSR

31

485

15035

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing ofsupports, back filling with earth and stones properly ramming including transport of materials from road side to location e

8

1500

12000

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex

31

2400

74400

... More
Erection of new 33 11KV SS with connecting 33KV and 11KVlines along with civil works at Regonda Vg;Ex of Hard pit w/o blast 0.76X0.76X1.52M

8

720

5760



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.