Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Civil And Construction
Opening Date20 Apr 2021
Closing Date5 May 2021
Tender Amount₹ 9,43,377 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
T and D Improvement works;Supply of Earthing GI Wire No 8 including material

13

-

1092

... More
T and D Improvement works;Providing of Coil earthing of pole with No.8 GI wire

13

-

5018

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG Cable In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil / CC/BT Road including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

100

-

36300

... More
T and D Improvement works;Coping & Muffing-Iron Pole

0.15

-

603.41

... More
T and D Improvement works;Fixing of Side Arm along with Cross Arm including angle strut up to 5 feet for LT

10

-

2300

... More
T and D Improvement works;Fabrication of LT 3 Phase cross arms with 75x40 mm MS channel including 2 coats of Red oxide painting

10

-

350

... More
T and D Improvement works;Formation of Cut point (Ver/ Hor) for LT line excluding pole erection -1 ckt

5

-

4690

... More
T and D Improvement works;Erection of 9/10/11Meter Box pole in position, aligning and setting to work, fixing of cross arms and A105 top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

5

-

10240

... More
T and D Improvement works;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

5

-

2010

... More
T and D Improvement works;Painting of RS Joist(1C RO, 2C Al.Paint)

5

-

4755

... More
T and D Improvement works;Cut-Tree Branch(LT/11/33)&Trnsprt Debris

8000

-

24000

... More
T and D Improvement works;Removing and Reconnection of LT Services

120

-

5280

... More
T and D Improvement works;Paving out and stringing of LT 3ph line 4 conductor (55sqmm) by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

0.2

-

1596.32

... More
T and D Improvement works;Dismantling of 11kV 34/ 55 Sqmm SC

0.2

-

679.8

... More
T and D Improvement works;Raise-Middle Ph Conductor for 11KV Line

22

-

6930

... More
T and D Improvement works;Supply of 6" B class GI pipe

200

-

208800

... More
T and D Improvement works;Consultation charges for providing traffic diversions and meeting other exegencies for execution of work during late night hours and wee hours

460

-

13800

... More
T and D Improvement works;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

6

-

6600

... More
T and D Improvement works;Supply of Earthing GI flat 25x3 mm incl material

60

-

5040

... More
T and D Improvement works;Supply of GI eath pipe with 40 mm dia,3mm thcikness with 2.0 M Length

6

-

4188

... More
T and D Improvement works;Making of Outdoor/Indoor End Termination 11kv 3x300 Sqmm xlpe cable

4

-

8084

... More
T and D Improvement works;Making of Straight through joint 11kv 3x300 xlpe UG cable

2

-

6352

... More
T and D Improvement works;Raising of Single run 11KV 3x300sqmm UG cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

40

-

4520

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG Cable along the CC / BT multi layer road requiring compressorr including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

300

-

251700

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG XLPE UG cable across the CC/ BT road crossing multi layer road requiring compressor wih hume pipe including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs

60

-

56220

... More
T and D Improvement works;Supply of 4" B class GI pipe

12

-

8880

... More
T and D Improvement works;Fabrication of Back clamps with 50 x 6 mm MS Flat

100

-

1500

... More
T and D Improvement works;Fixing of Side Arm along with Cross Arm including angle strut up to 5 feet 11KV

27

-

9450

... More
T and D Improvement works;Fabrication of V Cross arms with 75 x 40 mm MS Channel including 2 coats of Red oxide painting

27

-

2970

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG Cable along the CC / BT multi layer road requiring compressorr including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

50

-

4700

... More
T and D Improvement works;Supply of MS bolts & nuts and washers etc of all sizes

50

-

3650

... More
T and D Improvement works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) UPTO 10KM

3.18

-

1058.94

... More
T and D Improvement works;Paving out and stringing of 55sqmm 33/11kv Line 3 conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

0.67

-

4974.35

... More
T and D Improvement works;Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles, earthing and alignment complete

2

-

3196.68

... More
T and D Improvement works;Erection of 9.1M Pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

22

-

35662

... More
T and D Improvement works;Sub transport of 9.1Mt PSCC Pole upto Workspot upto 10KM

22

-

7986

... More
T and D Improvement works;Formation of Cut point for 11 KV Single Circuit line excluding pole erection and stays

10

-

11190

... More
T and D Improvement works;Mass concreting of supports erectred with CC (1:4:8) using 40 mm, HBG metal including the cost of metal, sand and cuting etc. (including cost of Cement)

16.28

-

84004.8

... More
T and D Improvement works;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 0.76X0.76X1.83M

5

-

6300

... More
T and D Improvement works;AB Switch Coil Earthing GI No. 8 Wire

4

-

460

... More
T and D Improvement works;Paint-Opertng Rods 33/11KV AB Swth in SS

4

-

568

... More
T and D Improvement works;Painting of Name on Panel

1

-

50

... More
T and D Improvement works;Excavation of Pit for VCB

4.8

-

1588.8

... More
T and D Improvement works;Stringing of bus with panther conductor

26.67

-

6860.86

... More
T and D Improvement works;Making of Straight through joint 11kv 3x300 xlpe UG cable

1

-

3176

... More
T and D Improvement works;LOADING of 11 KV,10 KA LAs Station type

1

-

32

... More
T and D Improvement works;UNLOADING of 11 KV,10 KA LAs Station typ

1

-

32

... More
T and D Improvement works;UNLOADING of 11 KV AB SWCH Con 200/400 A

4

-

320

... More
T and D Improvement works;LOADING of 11 KV AB SWCH Con 200/400 A

4

-

320

... More
T and D Improvement works;LOADING of 11 KV, 10 KA LAs Line type

1

-

32

... More
T and D Improvement works;UNLOADING of 11 KV, 10 KA LAs Line type

1

-

32

... More
T and D Improvement works;Making of Outdoor/Indoor End Termination 11kv 3x300 Sqmm xlpe cable

4

-

8084

... More
T and D Improvement works;Raising of Single run 11KV 3x300sqmm UG cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

40

-

4520

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG Cable along the CC / BT multi layer road requiring compressorr including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

260

-

218140

... More
T and D Improvement works;Supply of Earthing GI Wire No 8 including material

8

-

672

... More
T and D Improvement works;Labour for Fixing of all types of clamps

39

-

2535

... More
T and D Improvement works;Supply of 6" B class GI pipe

9

-

9396

... More
T and D Improvement works;Supply of I-Bolts

6

-

1764

... More
T and D Improvement works;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

2

-

804

... More
T and D Improvement works;Erection of 9/10/11Meter Box pole in position, aligning and setting to work, fixing of cross arms and A105 top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

2

-

4096

... More
T and D Improvement works;Fabrication U Clamp 50x6 mm MS Flat

12

-

204

... More
T and D Improvement works;Painting of RS Joist(1C RO, 2C Al.Paint)

4

-

3804

... More
T and D Improvement works;EXCAVATION OF PIT (2.6" x 2.6" x 6.0")

4

-

1508

... More
T and D Improvement works;S&F-33/11KV SS Feeder Indicator Board

1

-

551

... More
T and D Improvement works;Providing of Coil earthing of pole with No.8 GI wire

4

-

1544

... More
T and D Improvement works;Supply of MS bolts & nuts and washers etc of all sizes

50

-

3650

... More
T and D Improvement works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) UPTO 10KM

2.8

-

932.4

... More
T and D Improvement works;Erect of 11kvLA line type incl earthing

1

-

505

... More
T and D Improvement works;Fixing of I-bolts

6

-

120

... More
T and D Improvement works;Conn. of equip/bus single zebra/panther

33

-

7392

... More
T and D Improvement works;SupTension clamps for earthwire 3bolted

6

-

4290

... More
T and D Improvement works;S-Al Pad Clamp 75x75x15mm 1 Panther 600A

24

-

5448

... More
T and D Improvement works;Sup T clamp LM6 Al alloy of 12 mm, 800 A

9

-

2691

... More
T and D Improvement works;Supply of 120 Sqmm Aluminium lugs

24

-

300.48

... More
T and D Improvement works;Lay-4C/10C 2.5Sqmm Control Cable

700

-

9800

... More
T and D Improvement works;Coping & Muffing of Iron Poles

0.26

-

996.61

... More
T and D Improvement works;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

6

-

6600

... More
T and D Improvement works;Supply of GI pipe of 40 mm dia 2 mtrs

3

-

2199

... More
T and D Improvement works;S-CI Pipe earthing 100mm dia 2.75m long

3

-

10458

... More
T and D Improvement works;Supply & Spreading of 20mm HBG metal

6.4

-

13523.2

... More
T and D Improvement works;Laying of Earth mat 50x6mm flat

191.7

-

12460.5

... More
T and D Improvement works;Supply of Earthing GI flat 25x3 mm incl material

60

-

5040

... More
T and D Improvement works;Erection of 11kv VCB

1

-

4392

... More
T and D Improvement works;Erect-11KV AB Switch in SS

4

-

9000

... More
T and D Improvement works;UNLOADING of 11 KV VCBs&Panel boards

1

-

1024

... More
T and D Improvement works;LOADING of 11 KV VCBs&Panel boards

1

-

1024

... More
T and D Improvement works;PCC with 40mm Metal (1:3:6)

6

-

32178

... More
T and D Improvement works;Mass concreting of supports erectred with CC (1:4:8) using 40 mm, HBG metal including the cost of metal, sand and cuting etc. (including cost of Cement)

3.38

-

17440.8

... More
T and D Improvement works;Laying of earth mat 75x 8mm MS Flat / GI Flat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication

85

-

5525

... More
T and D Improvement works;Erection of 11 KV LAS station type including earthing

1

-

559

... More
T and D Improvement works;Supply of CT stud clamps 1Zebra/Panth for 800A

6

-

2394

... More
T and D Improvement works;Erect-33/11KV Bay in SS (incl all)

1

-

7016

... More
T and D Improvement works;R.S. joist box poles erection complete

2

-

1638

... More
T and D Improvement works;EXCAVATION OF PIT (2.6" x 2.6" x 6.0")

14

-

5278

... More
T and D Improvement works;AB Switch Coil Earthing GI No. 8 Wire

2

-

230

... More
T and D Improvement works;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 0.76X0.76X1.52M

8

-

8376

... More
T and D Improvement works;Supply of Earthing GI Wire No 8 including material

13

-

1092

... More
T and D Improvement works;Providing of Coil earthing of pole with No.8 GI wire

13

-

5018

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG Cable In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil / CC/BT Road including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

100

-

36300

... More
T and D Improvement works;Coping & Muffing-Iron Pole

0.15

-

603.41

... More
T and D Improvement works;Fixing of Side Arm along with Cross Arm including angle strut up to 5 feet for LT

10

-

2300

... More
T and D Improvement works;Fabrication of LT 3 Phase cross arms with 75x40 mm MS channel including 2 coats of Red oxide painting

10

-

350

... More
T and D Improvement works;Formation of Cut point (Ver/ Hor) for LT line excluding pole erection -1 ckt

5

-

4690

... More
T and D Improvement works;Erection of 9/10/11Meter Box pole in position, aligning and setting to work, fixing of cross arms and A105 top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

5

-

10240

... More
T and D Improvement works;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

5

-

2010

... More
T and D Improvement works;Painting of RS Joist(1C RO, 2C Al.Paint)

5

-

4755

... More
T and D Improvement works;Cut-Tree Branch(LT/11/33)&Trnsprt Debris

8000

-

24000

... More
T and D Improvement works;Removing and Reconnection of LT Services

120

-

5280

... More
T and D Improvement works;Paving out and stringing of LT 3ph line 4 conductor (55sqmm) by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

0.2

-

1596.32

... More
T and D Improvement works;Dismantling of 11kV 34/ 55 Sqmm SC

0.2

-

679.8

... More
T and D Improvement works;Raise-Middle Ph Conductor for 11KV Line

22

-

6930

... More
T and D Improvement works;Supply of 6" B class GI pipe

200

-

208800

... More
T and D Improvement works;Consultation charges for providing traffic diversions and meeting other exegencies for execution of work during late night hours and wee hours

460

-

13800

... More
T and D Improvement works;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

6

-

6600

... More
T and D Improvement works;Supply of Earthing GI flat 25x3 mm incl material

60

-

5040

... More
T and D Improvement works;Supply of GI eath pipe with 40 mm dia,3mm thcikness with 2.0 M Length

6

-

4188

... More
T and D Improvement works;Making of Outdoor/Indoor End Termination 11kv 3x300 Sqmm xlpe cable

4

-

8084

... More
T and D Improvement works;Making of Straight through joint 11kv 3x300 xlpe UG cable

2

-

6352

... More
T and D Improvement works;Raising of Single run 11KV 3x300sqmm UG cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

40

-

4520

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG Cable along the CC / BT multi layer road requiring compressorr including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

300

-

251700

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG XLPE UG cable across the CC/ BT road crossing multi layer road requiring compressor wih hume pipe including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs

60

-

56220

... More
T and D Improvement works;Supply of 4" B class GI pipe

12

-

8880

... More
T and D Improvement works;Fabrication of Back clamps with 50 x 6 mm MS Flat

100

-

1500

... More
T and D Improvement works;Fixing of Side Arm along with Cross Arm including angle strut up to 5 feet 11KV

27

-

9450

... More
T and D Improvement works;Fabrication of V Cross arms with 75 x 40 mm MS Channel including 2 coats of Red oxide painting

27

-

2970

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG Cable along the CC / BT multi layer road requiring compressorr including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

50

-

4700

... More
T and D Improvement works;Supply of MS bolts & nuts and washers etc of all sizes

50

-

3650

... More
T and D Improvement works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) UPTO 10KM

3.18

-

1058.94

... More
T and D Improvement works;Paving out and stringing of 55sqmm 33/11kv Line 3 conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

0.67

-

4974.35

... More
T and D Improvement works;Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles, earthing and alignment complete

2

-

3196.68

... More
T and D Improvement works;Erection of 9.1M Pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

22

-

35662

... More
T and D Improvement works;Sub transport of 9.1Mt PSCC Pole upto Workspot upto 10KM

22

-

7986

... More
T and D Improvement works;Formation of Cut point for 11 KV Single Circuit line excluding pole erection and stays

10

-

11190

... More
T and D Improvement works;Mass concreting of supports erectred with CC (1:4:8) using 40 mm, HBG metal including the cost of metal, sand and cuting etc. (including cost of Cement)

16.28

-

84004.8

... More
T and D Improvement works;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 0.76X0.76X1.83M

5

-

6300

... More
T and D Improvement works;AB Switch Coil Earthing GI No. 8 Wire

4

-

460

... More
T and D Improvement works;Paint-Opertng Rods 33/11KV AB Swth in SS

4

-

568

... More
T and D Improvement works;Painting of Name on Panel

1

-

50

... More
T and D Improvement works;Excavation of Pit for VCB

4.8

-

1588.8

... More
T and D Improvement works;Stringing of bus with panther conductor

26.67

-

6860.86

... More
T and D Improvement works;Making of Straight through joint 11kv 3x300 xlpe UG cable

1

-

3176

... More
T and D Improvement works;LOADING of 11 KV,10 KA LAs Station type

1

-

32

... More
T and D Improvement works;UNLOADING of 11 KV,10 KA LAs Station typ

1

-

32

... More
T and D Improvement works;UNLOADING of 11 KV AB SWCH Con 200/400 A

4

-

320

... More
T and D Improvement works;LOADING of 11 KV AB SWCH Con 200/400 A

4

-

320

... More
T and D Improvement works;LOADING of 11 KV, 10 KA LAs Line type

1

-

32

... More
T and D Improvement works;UNLOADING of 11 KV, 10 KA LAs Line type

1

-

32

... More
T and D Improvement works;Making of Outdoor/Indoor End Termination 11kv 3x300 Sqmm xlpe cable

4

-

8084

... More
T and D Improvement works;Raising of Single run 11KV 3x300sqmm UG cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

40

-

4520

... More
T and D Improvement works;Laying of single run 11KV 3x300sqmm UG Cable along the CC / BT multi layer road requiring compressorr including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

260

-

218140

... More
T and D Improvement works;Supply of Earthing GI Wire No 8 including material

8

-

672

... More
T and D Improvement works;Labour for Fixing of all types of clamps

39

-

2535

... More
T and D Improvement works;Supply of 6" B class GI pipe

9

-

9396

... More
T and D Improvement works;Supply of I-Bolts

6

-

1764

... More
T and D Improvement works;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

2

-

804

... More
T and D Improvement works;Erection of 9/10/11Meter Box pole in position, aligning and setting to work, fixing of cross arms and A105 top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

2

-

4096

... More
T and D Improvement works;Fabrication U Clamp 50x6 mm MS Flat

12

-

204

... More
T and D Improvement works;Painting of RS Joist(1C RO, 2C Al.Paint)

4

-

3804

... More
T and D Improvement works;EXCAVATION OF PIT (2.6" x 2.6" x 6.0")

4

-

1508

... More
T and D Improvement works;S&F-33/11KV SS Feeder Indicator Board

1

-

551

... More
T and D Improvement works;Providing of Coil earthing of pole with No.8 GI wire

4

-

1544

... More
T and D Improvement works;Supply of MS bolts & nuts and washers etc of all sizes

50

-

3650

... More
T and D Improvement works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) UPTO 10KM

2.8

-

932.4

... More
T and D Improvement works;Erect of 11kvLA line type incl earthing

1

-

505

... More
T and D Improvement works;Fixing of I-bolts

6

-

120

... More
T and D Improvement works;Conn. of equip/bus single zebra/panther

33

-

7392

... More
T and D Improvement works;SupTension clamps for earthwire 3bolted

6

-

4290

... More
T and D Improvement works;S-Al Pad Clamp 75x75x15mm 1 Panther 600A

24

-

5448

... More
T and D Improvement works;Sup T clamp LM6 Al alloy of 12 mm, 800 A

9

-

2691

... More
T and D Improvement works;Supply of 120 Sqmm Aluminium lugs

24

-

300.48

... More
T and D Improvement works;Lay-4C/10C 2.5Sqmm Control Cable

700

-

9800

... More
T and D Improvement works;Coping & Muffing of Iron Poles

0.26

-

996.61

... More
T and D Improvement works;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

6

-

6600

... More
T and D Improvement works;Supply of GI pipe of 40 mm dia 2 mtrs

3

-

2199

... More
T and D Improvement works;S-CI Pipe earthing 100mm dia 2.75m long

3

-

10458

... More
T and D Improvement works;Supply & Spreading of 20mm HBG metal

6.4

-

13523.2

... More
T and D Improvement works;Laying of Earth mat 50x6mm flat

191.7

-

12460.5

... More
T and D Improvement works;Supply of Earthing GI flat 25x3 mm incl material

60

-

5040

... More
T and D Improvement works;Erection of 11kv VCB

1

-

4392

... More
T and D Improvement works;Erect-11KV AB Switch in SS

4

-

9000

... More
T and D Improvement works;UNLOADING of 11 KV VCBs&Panel boards

1

-

1024

... More
T and D Improvement works;LOADING of 11 KV VCBs&Panel boards

1

-

1024

... More
T and D Improvement works;PCC with 40mm Metal (1:3:6)

6

-

32178

... More
T and D Improvement works;Mass concreting of supports erectred with CC (1:4:8) using 40 mm, HBG metal including the cost of metal, sand and cuting etc. (including cost of Cement)

3.38

-

17440.8

... More
T and D Improvement works;Laying of earth mat 75x 8mm MS Flat / GI Flat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication

85

-

5525

... More
T and D Improvement works;Erection of 11 KV LAS station type including earthing

1

-

559

... More
T and D Improvement works;Supply of CT stud clamps 1Zebra/Panth for 800A

6

-

2394

... More
T and D Improvement works;Erect-33/11KV Bay in SS (incl all)

1

-

7016

... More
T and D Improvement works;R.S. joist box poles erection complete

2

-

1638



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.