Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Opening Date11 Jul 2022
Closing Date11 Aug 2022
Tender Amount₹ 53,80,137 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;S&F of 20 mm dia GM Ball valve etc complete

2

-

610.4

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;S&F of 25 mm dia GM Ball valve etc complete

2

-

836.4

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;S&F of 12.7 mm dia G.I B class bib tap etc complete

24

-

5448

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply & fixing of 4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand)

2

-

222

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply & fixing of Floor Trap (Bell Mouth ) 110 mm - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand)

2

-

450

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply & fixing of 90 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand)

2

-

188

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply & fixing of 90 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand)

2

-

140

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing 558.8mmX406.4mm Indian make color wash hand basins (HSW/Parry/Earthen wave) with 12.7mm double N.P 400 grms pillars traps, waste plug, chain complete with ci bracket including wooden block

1

-

1301

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing of 584.2mm long approved color of Orissa pan of parry/Neycer/H.S.W make with P and S trap- ISI mark heavey type including cost and conveyance, labour charges of all materials etc.. Complete for finished item of work.

1

-

1331

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply&Fabrication and fixing of Welded wire mesh ( 2" x 1") of 2.8mm dia. with ISMC (75x40x4.4mm) and Pheriperal frame of ISA(30x30x2mm) incldg cost& conveyance painting with synthetic enamil paint two coats over a coat of red oxide primer etc complete for finished item of work..

113.4

-

194821.2

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply&Spreading of hbg metal 20 mm size of 75mm thick including cost&conveyance labour charges etc complete for finished item of work

48.32

-

78730.68

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Painting ACE two coats over a coat of primer of approved color &make incldg cost &conveyance of all materials etc complete for finished item of work.

44.94

-

6327.55

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply of P V C chairs of Neelkamal of approved quality & make incldg cost etc complete

2

-

1900

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;supply of 'S' type chair with arms teakwood frame with seat back 's' type on G.I pipe.

1

-

3086

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply of steel table of size 4'x2.5'x30" with 18 mm plywood fixed with rubber beeding with drawers on right side with automatic locking arrangements etc copmlete.

1

-

3500

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and erecting of approved make crom/bajaj make as directed by department 1x40W patty type fluorscent fitting made of CRCA sheet,completed with polyster filled 40W.choke,starter and side holders etc.complete with 40W tube S&F 20W LED Retro Tube Light

3

-

2065.98

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and errection ceiling fan of selected colour and delux model high breeze with 3 blades and double ball bearing and with condenser , of 48" completed erected in position with resistance type regulator, provided with hook/clamps nuts and bolts including cost and conveyance of all labour charges as per the direction of Engineer in charge.

1

-

2282

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing of batten holder/slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges complete.

6

-

640.5

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing Distribution board with 20A single phase plug and Socket in sheet steel enclosure with 10/16/20A SP MCB including internal connection and labour charges for surface/flush mounting etc Complete.

1

-

3304

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;supplying and run of 2 of 22/0.3 mm(1.5 sqmm) PVC insulated flexiable copper cable in existing conduit pipe for run of mains including all labour charges and materials chages etc. complete.

50

-

2425.5

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;supplying and run of 2 of 14/0.3 mm(1.0 sqmm) PVC insulated flexiable copper cable in existing conduit pipe for run of mains including all labour charges and materials chages etc. complete.

90

-

3341.7

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Wiring with 2X1 Sqm(14/.3mm) PVC insulated flexiable copper cable in the existing conduit pipe for 6A 3pin/2pin scokets including all labour charges(but excluding cost of switch control and scoket)

3

-

1134.9

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Wiring with 2X1.0 Sqm(14/.3mm) PVC insulated flexiable copper cable in the existing metalic/Non metalic conduit pipe with 6A mini modular SP switch, mounted on metalic box covereds with appropriate front plate modules etc ceiling rose including cot and conveyance of all mateials, labour charges complete for light points, bell points exhaust fan points in non residential builsing except circuit moving finished in all types masonary as dire3cted by department.

12

-

5590.08

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;S&Fixing of PVC rain water pipe of size 90 mm dia 4kg/cm2 inclduing all fittings labour charges etc complete for finished item of work.

4

-

1250.68

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing of ms grills of approved design including cost and conveyance of all materials ,labour cahrges etc. complete.

2.88

-

5644.8

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Providing 100 mm high skirting with tandoor blue slabs including cost & conveyance of all materials,labour charges etc complete for finished item of work.

2.16

-

1216.92

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Inside painting with two coats of OBD over a primary coat total three coats of approved colour and quality including cost and conveyance of all materials labour charges etc., complete for finished item of work.

95.88

-

8948.48

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Outside painting with two coats of ACE paint over a primary coat total three coats of approved colour and quality including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

761.46

-

107213.57

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Flooring with double machine polished and hand cut Tandur blue stone 20mm thick of approved colour, quality and approved size over a bed of cement mortar 1:3 20mm thick including cost of all materials, with all leads and lifts jointing and pointing with cement, labour etc, complete for finished item of work.

25.22

-

12718.95

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supplying and fixing Alluminium sliding windows with fixed glass panels using anodised aluminium extruded sections of mat finish for frames and mullions providing 5mm plain glass fixed to the frame with beading gasket and glazing clips with all accessories, locking arrangements etc., including cost and coveyance of all mateirals with all leads and lifts, labour charges, its., complete for finished item of work excluding cost of steel grill.

2.88

-

8826.05

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing in position of doors with MShollow frame with prelaminated particle board shutter exterior grade (both sides laminated) of approved quality and design and fitted with teak wood lippings around duly polished/synthetic enamil paint including cost and conveyance of all fixtures, materials etc., complete for finished item of work.

5.1

-

24162.07

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Plastering to roof slab immediately after laying the roof slab with CM (1:3) 20mm thick with required slopes mixed with approved water proof cement compound and finishing the surface by fine rendering, including cost and conveyance of all materials all leads and lifts labour etc., complete for finished item of work.

55.34

-

22320.28

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply & Fixing of 15.90 mm Nominal CPVC Pipes Medium grade prperties & weight including all fittings,labour charges etc complete for finished item of work.

20

-

2880

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply & Fixing of 22.90 mm Nominal CPVC Pipes Medium grade prperties & weight including all fittings,labour charges etc complete for finished item of work.

100

-

17500

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply&Fixing of PVC storage tank of syntex type including cost & conveyance of all materials labour charges etc complete for finished item of work.

500

-

3650

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Painting with lovelycem to new walls of three coats including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

478.5

-

28111.88

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Plastering with two coats, 1st coat in cm1:5 16mm thick and 2nd coat in cm 1:4 4mm thick, total 20mm thick for superstructure walls, ceiling, sunshades, Beams, etc., with sponge finishing including cost and conveyance of all materials all leads & lifts scaffolding curing, labour etc., complete for finished item of work.

972.9

-

361286.42

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supplying and fixing of 20mm dia 2mm thick PVC conduit pipe conceald in wall with all required accessories with No 14 SWG wire for earth continuity including chisiling the wall whereever necessary, including masonary work and all labour charges complete.

15

-

1042.2

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing 25mm dia 2mm thick recessed( concealed) PVC pipe alog with reinforcement to be laid in slab including No 14 SWG GI wire for earth contunity, cost of pipe, binding wire and all labour charges etc complete

20

-

1517

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Raised pointing to the exposed surfaces of CRS masonry in cm 1:3 prop. including cost and conveyance of all materials, labour charges, all leads and lifts curing etc, complete for finished item of work.

267.35

-

23275.49

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Brick masonry in cement mortar (1:6) for superstructure using well burnt country made second class bricks of approved quality including cost and conveyance of all materials curing, scaffolding with all leads and lifts in all heights etc., complete for finished item of work.

90

-

538979.4

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;S&Fabrication and fixing of MS Gate of approved design including painting red oxide & synthetic enamil paint etc complete

10.41

-

37844.41

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply&Fixing of R.C.C hume pipe of 450 mm dia including cost & conveyance of all materials labour charges etc complete for finished item of work.

7.5

-

9375

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supplying and filling with borrowed gravel, watering, ramming, consolidating thoroughly complying with the standard specification.

910.65

-

291107.49

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;RCC 1:2:4 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials labour scaffolding, centering, machine mixing, vibrating, curing all leads and lifts, in all positions of the building but excluding cost of steel and its fabrication for the finished item of work. b) Columns

0.55

-

5722.6

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;RCC 1:2:4 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials labour scaffolding, centering, machine mixing, vibrating, curing all leads and lifts, in all positions of the building but excluding cost of steel and its fabrication for the finished item of work. a) Footings

1

-

8062.55

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supplying, Cutting, bending, binding, placing in position and tying reinforcement steel in all heights including cost and conveyance of steel and binding wire etc,. With all leads and lifts, labour charges, etc., complete for finished item of work.

1.65

-

114060.77

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;RCC M20 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials labour scaffolding, centering, machine mixing, vibrating, curing all leads and lifts, in all positions of the building but excluding cost of steel and its fabrication for the finished item of work. g) Roof slab 125 mm thick

4.43

-

44001.37

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;RCC M20 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials labour scaffolding, centering, machine mixing, vibrating, curing all leads and lifts, in all positions of the building but excluding cost of steel and its fabrication for the finished item of work. f) Sunshades 0.6m width & 75 mm thick

4.29

-

4599.44

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;RCC M20 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials labour scaffolding, centering, machine mixing, vibrating, curing all leads and lifts, in all positions of the building but excluding cost of steel and its fabrication for the finished item of work. e) Lintels

0.4

-

4205.49

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;RCC M20 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials labour scaffolding, centering, machine mixing, vibrating, curing all leads and lifts, in all positions of the building but excluding cost of steel and its fabrication for the finished item of work. d) Plinth Beams

1.45

-

14703.8

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;RCC M20 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials labour scaffolding, centering, machine mixing, vibrating, curing all leads and lifts, in all positions of the building but excluding cost of steel and its fabrication for the finished item of work. c) Roof Beams

1.66

-

16885.95

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;RCC M20 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials labour scaffolding, centering, machine mixing, vibrating, curing all leads and lifts, in all positions of the building but excluding cost of steel and its fabrication for the finished item of work. b) Columns

2.17

-

22578.26

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;RCC M20 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials labour scaffolding, centering, machine mixing, vibrating, curing all leads and lifts, in all positions of the building but excluding cost of steel and its fabrication for the finished item of work. a) Footings

3.61

-

29105.81

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;C.C(1:2:4) nominal mix using 10 to 12 mm HBG metal incldg cost & conveyance of all materials mixing,curing,all labour charges,etc comp for finished item of work..

47.4

-

270154.88

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Coursed Rubble stone masonry in 2nd sort with hard granite stones in cement mortar (1:6) for basement, including cost and conveyance of all materials, labour charges, curing, all leads and lifts, etc, complete for finished item of work.

202.19

-

776783.65

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Cement concrete (1:4:8) using 40mm HBG metal for foundations and levelling course, including cost and conveyance of all materials, labour all leads and lifts, consolidation and all operations, formwork as required, curing, etc. complete for finished item of work.

25.9

-

104238.18

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing of Panel box and starter including cost of all materials and labour charges for finished item of work

1

-

1270.15

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing of 2.5mm single core copper cable complete for finished item.

160

-

15288

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and Fixing of 1.5HP Texmo/Kirloskar make motor of single phase submersible of multiple stage including all materials and labour charges complete for finished item.

1

-

22141

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing of HDPE pipe 40mm dia. including cost and conveyance of all materials labour charges etc complete for finished item of work.

145

-

19996.95

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Suppy & fixing of 180 mm dia. 6 kg/cm2 PVC casing pipe including cost and conveyance of all materials labour charges etc complete for finished item of work

20

-

13480

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Drilling of 6.5" dia bore well from ground level in all formations including cost and conveyance of all materials labour charges etc., complete for finished item of work-90M & above

60

-

20160

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Drilling of 6.5" dia bore well from ground level in all formations including cost and conveyance of all materials labour charges etc., complete for finished item of work-0 to 90 M

90

-

27450

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Earth work excavation in all type of soils red earth, Hard gravelly soils, earth mixed with sand and sandy soils etc., in all conditions such as slushy and dry with initial leads and lifts for foundations.

150.2

-

44490.74

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Geophysical investigation charges

1

-

3000

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Hiring of JCB for levelling of ground.

8

-

6800

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Providing of guarding to the telephone line / road crossings including fixing the cross arms, providing protective guard in complete shape

20

-

46200

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Providing of GI bolts & Nuts Washers ect., of different sizes as per requirement

216

-

20304

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Numbering of poles incl. cost of paint

180

-

5400

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;11 KV Double Jumpering.

18

-

2970

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Formation of Vertical/Horizontal Cut point for 11 KV Single Circuit line excluding pole erection and stays

18

-

18306

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud

8

-

8000

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 11 KVAB Switch 400/200 A conventional type including alignment and earthing

4

-

6393.36

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Assembly and erection of 11 KV D.P. Structure with 8 Mtrs PSCC Poles as per specification which includes fixing of top channels and cross bracings, transport of all materials from road side to the location, earthing, back filling with earth ramming etc excluding pit excavation and concreting and erection of poles

7

-

13608

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;33/11 KV lines: 55 Sq.mm. Single circuit (3 Conductors) Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding,keeping stifner rectification of poles, guys and jumpering etc., including transportation of material from road side to location.

9

-

61182

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Detailed Survey and way leave clearance. The work includes Peg marking and necessary tree clearance

9

-

4500

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

46.04

-

237566.4

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Assembly and erection of 11 KV and LT stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming

40

-

19000

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of Stay Pit in all soils except hard rock requiring blasting. (0.45 M x 0.45 M x 1.34 M)

40

-

10640

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 8.0 Mts. Strut pole including fixing clamps

30

-

26820

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;ERECTION OF LINES : Erection of 8.0 Mts poles Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming excluding pit excavation.

144

-

128736

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Sub Transport of 8.0 Mts. PSCC Pole

174

-

42108

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of pits in HARD Rock dosen't requires blasting. 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0")

60

-

62818.8

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of pits in all soils except hard rock requiring blasting. 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0")

114

-

41496

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;ERECTION OF LINES : Erection of 9.1 Mts poles Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming excluding pit excavation and concreting.

36

-

58356

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Sub Transport of 9.1 Mts. PSCC Pole

36

-

13068

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of pits in all soils except hard rock requiring blasting. 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

36

-

13572

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

3.2

-

16512

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Detailed Survey and way leave clearance. The work includes Peg marking and necessary tree clearance

0.5

-

250

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Providing of GI bolts & Nuts Washers ect., of different sizes as per requirement

15

-

1410

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Numbering of poles incl. cost of paint

13

-

390

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;FABRICATION Fabrication of materials Back clamps with 75 x 8 mm MS Flat

5

-

155

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Sub Transport of 11 Mts. PSCC Pole

2

-

770

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Sub Transport of 9.1 Mts. PSCC Pole

4

-

1452

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Sub Transport of 8.0 Mts. PSCC Pole

4

-

968

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 33 Kv AB Switches including earthing

1

-

2048.16

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Formation of Vertical Cut point for 33 KV line excluding pole erection and stays

3

-

8553

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;33/11 KV lines: 100 Sq.mm. Single circuit (3 Conductors) Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding,keeping stifner rectification of poles, guys and jumpering etc., including transportation of material from road side to location.

0.5

-

6176.5

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;FABRICATION Fabrication of materials Manufacture of RCC Base Plate of size 1'-3' x 1'3' x 0' - 4" with 1:2:4 Cement concrete mixture with 1/2" to 1/4" HBG Metal with required reinforcement including cost of steel (0.80 Kg.) and Cement (5.30 Kg.)

9

-

1503

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;ERECTION OF LINES : 33 KV Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, and back filling with earth rammming etc excluding pit excavation.

9

-

4779

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 8.0 Mts. Strut pole including fixing clamps

4

-

3576

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;ERECTION OF LINES : Erection of 11mtr PSCC poles. Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including trasportation of material from road side to location excluding pit excavation and concreting.

2

-

6462

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;ERECTION OF LINES : Erection of 9.1 Mts poles Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming excluding pit excavation and concreting.

9

-

14589

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of Stay Pit Size 0.45 x 0.45 x 1.265 mm in Hard Soil

4

-

3987.92

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of Stay pits of size 0.45x0.45x1.34 Mts' for burying the anchor rod with anchor plateof stay sets including dewatering, shoring, shuttering wherever necessary and back filling the pit (after erection and concreting the same whever is necessary) with the excavated earth/extra earth/excavated rock bits any and leveling the site with out any lead.In all soils except Hard gravel Hard Murram, Disintegrated Rock,Hard rock Requiring blasting.

5

-

1330

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of Hard pit w/o blast 0.76X0.76X1.52M

2

-

2093.96

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of pits in all soils except hard rock requiring blasting. 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

9

-

3393

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of pits in all soils except hard rock requiring blasting. 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0")

4

-

1456

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Fixing of I-Bolts

12

-

240

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply of I-Bolts

12

-

3528

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Laying of earth mat,excavation 50x6mm

300

-

19500

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Fixing of Pad clamps for AB switch

77

-

8932

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Fixing T clamps

48

-

5568

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Painting of 9.1Mtr PSCC poles with two coats of Birla Chemical white paint including cost of paint and consumables for SS structure poles

31

-

13082

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply-DC Annunciator Panel 4 Feeders

1

-

20000

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply-AC Supply Panel Complete

1

-

27000

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Hoisting of Insulators and hardware, stretching the conductor and stringing of 11 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 3.5mt)

12

-

6084

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply-10ft Aluminium Ladder

1

-

1654

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Providing of yard lighting in the substation switch yard including transportation and erection of 11 mtr. Long tubular / RS joist poles in a pit of size 0.75 x 0.75 x 1.5 mts including 1:4:8 CC mix concreting and coping, painting with one coat of Red oxide and two coats of Aluminum paint, supply and fixing of 400 Watt SV / MV lamps with fixtures, junction box with fuse unit, 1.5 mtr GI pipe, providing PVC wire of 7/20 guage and laying of cables from control room to pole.

6

-

42000

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 11KV Potential Transformer sets complete including jumpering. The LV side of the PT shall be provided with proper fuse protection mounted in separate marshalling boxwith proper size cable glauds Etc. The box shall be mounted on the Substation structure.

1

-

718

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply-MS Bolts & Nuts,Washers etc.,

350

-

25550

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply & Fixing -33/11KV SS Feeder Indicator Board

4

-

2204

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Laying -4C/10C 2.5Sqmm Control Cable

930

-

13020

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc

1

-

1242

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.,.M.S./ G.S. Flat 50x6mm / 50 x 8 mm ( Above ground)

675

-

27675

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Laying of earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.75x 8mm MS Flat / GI Flat. Laying of earth mat,excavation 75x8mm

499

-

32435

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply-33KV HG Fuse Set excl Ins & Chnl

1

-

6431

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection -24V Batery with Chrgr incl grot-SS

4

-

2380

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Laying of UG Cable Erection of VCBs 11 KV Erection of 11 KV VCB with Control Panel

4

-

17568

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection-11KV AB Switch in SS

8

-

18000

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Fabrication & erection -MS Chnl 100x50mm for SS Bay

6

-

39600

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;(*)Material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

6

-

7758

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

6

-

13086

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Bimetalic Copper die clamps suitable for power transformer/ Lclamps HV of 1/2 inch bush rod and other end suitable for panther conductor and with bimetallic sheet on the pad of size 75X75X10mm with four holes of 14mm diameter (hole to hole distance 40mm) with suitable GI bolts and nuts including washers

7

-

6363

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 5 to 8MVA PTR on plinth (total)

1

-

4809

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Room fire extinguisher (2 ltrs capacity) for control room

4

-

18480

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of Fire fighting Stand made out of MS Channel / Angle 75x40 mm / 50x50x6 including the fabrication charges connecting and providing of 6 Nos GI buckets, painting with post office red paint on out side and white enamel paint inside the bucket and lettering with white paint out side, including cost of all materials, but excluding the cost of M.S.Materials.

2

-

2772

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Sup Earth Rods (8ft) Screw & clamp type

3

-

1734

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Copper Flexible jumper with 75 X 8 of length 100mm at neutral of Power tranformer end and 50 X 6 of length 50mm two Nos at double neutral end duly brasing with flexible jumper of capacity of 5kA/3 sec for power transformer neutral.

1

-

4725

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;"Taparia Tool kit of Size 20?x10?x15? with tier arrangements Tool box containing ?D?Spanners from size 6 to 54, Hammer small and big size, Ring spanners from 6 to 28, Adjustable spanner, Pipe wrench, Cutting Plier, Nose plier, Tester, insulated Screw drivers 6? size.

1

-

4925

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply of Hand Gloves

2

-

578

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply of Safety Helmet of standard make

2

-

462

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply of Digital clamp meter.

1

-

2888

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Sup Rechargeable LED torch light of Standard make

1

-

1733

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Alluminum alloy T clamps conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

48

-

14352

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply of MS Powder coted PT Marshalling Box

2

-

8190

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 33KV LAs (Station type) including earthing

6

-

5280

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 11KV LAs ( Station type) including earthing

6

-

3354

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 11KV LAs (Line type ) including earthing

12

-

6060

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;(*) Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium .

6

-

2892

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium

6

-

5106

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Cable termination to switchgear marshalling boxes/panel terminal blocks/control and relay panels LT AC Panel including providing suitable ferrules and lugs as per specification (including cost of ferrules,lugs and glands)

620

-

16740

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and fixing of safety instructions/sub-station operation instruction board

1

-

2205

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Permanent Name BoardSupply and Erection of Permanent Name Board of on 3' X 4 ' mounted on steel frame as described in Specification

1

-

3308

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply and Fixing of junction box and Providing with proper Fuse protection and required glands suitable for Cable Terminations. The box shall be fixed on the pole.

6

-

1656

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of Marshalling boxes

1

-

294

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 15KVA Single Phase Station Transformer / 25 KVA 3 Phase Distribution Transformerupply and Erection of AC & DC Panel and giving connections to the protection and metering circuits as per the specification and standards including the 3 1/2 core 25 Sqmmpower cable required for station transformer LT side to distribution box and to AC/DC panel in the control room.

1

-

6174

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 25 KVA (CSP) Copper wound, three star rated,Three phase Station Transformer on the Substation Structures and giving jumpers/connections on HT side to the 11kV bus.

1

-

1525

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of earth pit, putting cast iron pipe with flange on one end of nominal dia 100mm and 2.75 meters long in side the pit including supply and fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long in side the pit, backfill the pit

25

-

48250

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 11KV HG Fuse Set including earthing

1

-

660

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 33KV HG Fuse Set including earthing

1

-

1187

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Supply of 11 KV HG Fuse set

1

-

660

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Construction of Plinths for VCB (33KV & 11KV), Excavation of pit in all types of soils as per the drawing (2 X 2 X 1.2 mtrs), Providing of Base Concreting (2 X 2 X 0.15 mtrs) with 1:3:6 Concrete mix, Providing of Concreting (1.8 X 1.8 X 1.2 mtrs) with 1:3:6 Concrete mix as shown in the drawings, Providing the foundation boils (20mm) suitable to VCB Structure plastering of the plinth for smooth finishing with 12mm thick 1:2 cement mortor and providing two coats of white washing for part of the plinth above ground level

27

-

139320

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of pit in all types of soils of size 2.x2.x0.85Mts. for VCB (33 KV & 11 KV) for 2No. LV and 4Nos. Feeder Breakers

20.4

-

6752.4

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

10

-

1420

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of 33 KV 800 Amps Double Break (conventional) AB Switches

2

-

4096.32

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.(3 Conductors)

350

-

90037.5

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Alligning the Main and Auxiliary structures such as RS joist, M.S.Angles, Plates, Channels, Structure to zero level duly leveling in prefabricated MS frames with Hudraulic jacks before galvanising/ fabrication.

6

-

8820

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Mass concreting of supports using form boxes (0.6X0.6X2.25 Mts) erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement Structure poles(31 Nos)9.1M & (8 Nos)8.0M

29.28

-

151084.8

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of Sub-Station structure supports in the switch Yard. Erection of 8.0Mts PSCC pole

8

-

7152

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Erection of Sub-Station structure supports in the switch Yard. Erection of 9.1Mts PSCC pole

31

-

50251

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of pole pit including dewatering, shoring and shuttering wherever necessary for Sub-Station structure supports. CIVIL WORKS : Excavation of pits in hard rock requiring blasting.0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0')

10

-

20950

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Excavation of pole pit including dewatering, shoring and shuttering wherever necessary for Sub-Station structure supports. Excavation of pits in all soils except hard rock requiring blasting. 0.76 M x 0.76M x 1.52M (2.6"x 2.6"x 5.0")

29

-

10556

... More
Erection of new 33/11 KV Sub Station with connecting 33KVand11 KV lines and construction of control;Marking of Sub-Station lay out in the identified site

1

-

5000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.