Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Opening Date22 Oct 2022
Closing Date31 Oct 2022
Tender Amount₹ 44,13,038 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Erection of battery & battery chargers

1

-

5593

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Lay-Cable Terminations to Switchgear

350

-

9450

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Laying-4 core cable

80

-

1200

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

2.8

-

14448

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.

50

-

12850

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Construction of Plinth for mounting 11KV VCB of size 1.8mx1.8mx 0.75m (0.3m above GL & 0.45m below GL) with 1:3:6 CC , 40mm HBG metal including plastering and cost of cement

1

-

20066

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Transport of T&P(10T) for P.Trs >100km

150

-

21000

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF EQUIPMENT Substations Erection of 11 KVAB Switch including alignment and earthing

2

-

3196

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;S-GI Bolts & Nuts,Washers etc.,

10

-

940

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Laying of earth mat with 50X6 mm MS Flat including fixing of earth flat, welding, connecting to equipment and including connecting cast iron pipes with MS flat (50x6mm)as per Technical specification.

40

-

2600

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Laying of earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.75x 8mm MS Flat / GI Flat.

40

-

2600

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Exca Hard pit w/o blast 0.76X0.76X1.83M

2

-

1110

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex

2

-

3242

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud

3

-

3300

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Laying of UG Cable Erection of VCBs 11 KV

1

-

4392

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF EQUIPMENT Fixing of clamps Pad clamps for AB switch

12

-

1392

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF EQUIPMENT Fixing of clamps T-Clamps

12

-

1392

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Erection of 8.0Mts PSCC Poles for stuts

200

-

178800

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Supply of Crane for replacing Equipment

40

-

50400

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Exca Hard pit w/o blast 0.76X0.76X1.83M

567

-

314685

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Numbering of poles incl. cost of paint

567

-

17010

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Excavation of Stay pits of size 0.45x 0.45x1.34M for burying Anchor rods with the anchor plates for Stay sets including dewatering,shoring & shuttering wherever necessary and back filling (after bury of anchor rods with anchor plate and concreting the sa:i) In all soils except hard morum gravel, hard disintegrated rock and hard rock

100

-

26600

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES :Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling

100

-

47500

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Detailed survey of line and cable including peg marking and necessary tree clearance

17

-

8500

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

260

-

1341600

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Formation of (Vertical / Horizontal) Cut point for LT line excluding pole erection and stays Single Circuit

100

-

85300

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;S-MS Bolts & Nuts,Washers etc.,

400

-

29200

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;CIVIL WORKS : Excavation of pits in all soils except hard rock requiring blasting. 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0')

200

-

65200

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing ofsupports, back filling with earth and stones properly ramming including transport of materials from road side to location

567

-

506898

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Sub Transportation of 8 Mts PSCC Poles to location from road side.

767

-

185614

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Paving out conductor, providing temporary stays, tensioning, sagging correctly, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side to location. LT lines : 55 sqmm LT 3-Phase (4 Conductors)

17

-

154411

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;S-MS Bolts & Nuts,Washers etc.,

50

-

3650

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Excavation of Stay pits of size 0.45x 0.45x1.34M for burying Anchor rods with the anchor plates for Stay sets including dewatering,shoring & shuttering wherever necessary and back filling (after bury of anchor rods with anchor plate and concreting the sa:i) In all soils except hard morum gravel, hard disintegrated rock and hard rock

8

-

2128

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Erection of the main and auxiliary structures etc., excluding bolts and nuts.

1

-

1931

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site.

1

-

3426

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site.

1

-

6852

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;UNLOADING of 11 KV AB SWCH Con 200/400 A

4

-

320

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;LOADING & UNLOADING11 KV AB Switch Conventional type 200/400 A

4

-

320

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;S-MS Bolts & Nuts,Washers etc.,

20

-

1460

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES :Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling

8

-

3800

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF EQUIPMENT Distribution transformers Running of 11 KV jumpering to 11 KV AB switch, HG Fuse set and distribution transformers terminal etc.

4

-

1320

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud

4

-

4400

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF EQUIPMENT Substations Erection of 11 KVAB Switch including alignment and earthing

4

-

6392

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Erection of 8.0Mts PSCC Poles for stuts

50

-

44700

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Sub Transportation of 8 Mts PSCC Poles to location from road side.

50

-

12100

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;CIVIL WORKS :Excavation of pits in all soils except hard rock requiring blasting. 0.6 M x 0.9 M x 1.5 M

50

-

15050

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Numbering of poles incl. cost of paint

160

-

4800

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Excavation of Stay pits of size 0.45x 0.45x1.34M for burying Anchor rods with the anchor plates for Stay sets including dewatering,shoring & shuttering wherever necessary and back filling (after bury of anchor rods with anchor plate and concreting the sa:i) In all soils except hard morum gravel, hard disintegrated rock and hard rock

50

-

13300

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES :Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling

50

-

23750

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Formation of (Vertical/ Horizontal) Cut point for 11 KV line excluding pole erection and stays

50

-

50850

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand and curing etc. Including the cost of cement

63.8

-

329208

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Detailed survey of line and cable including peg marking and necessary tree clearance

8

-

4000

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;S-MS Bolts & Nuts,Washers etc.,

200

-

14600

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side

8

-

54384

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Supply of Crane for replacing Equipment

25

-

31500

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Exca Hard pit w/o blast 0.76X0.76X1.83M

160

-

88800

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES : Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location ex

160

-

259360

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Sub Transportation of 9.1 Mts PSCC Poles to location from road side.

160

-

58080

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Erect-12Meter Box pole

6

-

18336

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Testing of Meters as per I.S. Erection of CT operated meters for LV side of Distribution Transformers Fixing of CT operated meter on LV side of Distribution transformers with box including cost of lugs, clamps, GI wire and transport from District Stor

6

-

5196

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Erect-11KV Seating Channel

6

-

786

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Fix-GPRS Modem & Sim Card

6

-

1800

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES : Paving out conductor, providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, rectification of poles, guys and jumpering etc., including transport of material from road side

0.06

-

407.88

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Labour charges for erection of LT distirbution box including laying of LT cable from transformer to distribution box and from distribution box to OH line along the pole incluidng cost of lugsWithout distribution box

6

-

10416

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;S-Earthing GI flat 25x3 mm incl material

120

-

10080

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Laying of 1Core XLPE 120Sqmm Cable

215

-

4300

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Releasing of three phase services by fixing the meter in the meter box and giving service cable connections first to the meter and from the meter to the cutout/ MCB and seal the terminal covers and meter box.

1

-

74

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF EQUIPMENT Distribution transformers Running of 11 KV jumpering to 11 KV AB switch, HG Fuse set and distribution transformers terminal etc.

6

-

1980

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;UNLOADING of 50,63,75&100kva DTR

6

-

1680

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;LOADING & UNLOADING 50,63, 75 & 100 KVA Distribution Transformers

6

-

2100

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF LINES : Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, sand & brick masonry on four sides of the earth pit and plastering to brick masonry work, running of earth wire etc., complete, exclud

18

-

19800

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;S-MS Bolts & Nuts,Washers etc.,

30

-

2190

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Erection of 11 KV 200/400 A TT Type AB Switch with transportation and required bolts and nuts

6

-

8430

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Column type DTR Plinth topslab 5'x5'x6"

6

-

147600

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;ERECTION OF EQUIPMENT Substations Erection of 11 KV HG Fuse set including earthing

6

-

3960

... More
Providing of infrastructure to the RR Colony being developed in the area spread over Lay out 85.66;Laying of UG Cable Erection of DTRs Three phase**In city 30% extra as erection of DTRs requiring crane to save time

6

-

6096



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.