Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Electrical Cables And Wires
Electrical and Electronics
Opening Date11 Jun 2024
Closing Date19 Jun 2024
Tender Amount₹ 12,66,637 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of 11KV Line Works;Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth,levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.11 KV 3x185 Sqmm Cable

160

-

100969.6

... More
Erection of 11KV Line Works;Restringing of existing loose Lines by removing the pin-binding and jumpers,Providing of temporary stays, providing stiffners pieces, replacement of damaged insulators, alignment of cross arms, pin binding and jumpering after tensioning and removing of the temporary stays complete Dismantling of 11KV 34/55 sqmm SC

0.2

-

900

... More
Erection of 11KV Line Works;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc-RS Joists 175 x 85 mm

2

-

2232

... More
Erection of 11KV Line Works;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc-9.1 M long PSCC pole

2

-

1896.18

... More
Erection of 11KV Line Works;OD/Idoor end termination 11kv 3x185 xlpe 11 KV 3x185 Sqmm Cable

8

-

18965.04

... More
Erection of 11KV Line Works;Laying of the cable along the footpath through 225mm dia GI pipe for 33KV, 150mm dia GI pipe for 11KV (excluding the cost of GI pipe)Laying of 2nd cable in excavated trench

50

-

10205

... More
Erection of 11KV Line Works;Bus Stringing Connection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

2

-

448

... More
Erection of 11KV Line Works;Supply of Alluminum alloy T clamps conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

6

-

1794

... More
Erection of 11KV Line Works;Raising of double run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe) 11 KV 3x300 Sqmm Cable

20

-

5508

... More
Erection of 11KV Line Works;Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth,levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs. 11KV 3x300sqmm UG Cb HG/BC/CC/BT

50

-

31553

... More
Erection of 11KV Line Works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Erection of 5 Mts RS Joist (Bit) Pole including fixing of Pole Mounted Box

2

-

2088.46

... More
Erection of 11KV Line Works;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

3

-

1537.65

... More
Erection of 11KV Line Works;Making of Outdoor/Indoor End Termination 11 KV 3x300 Sqmm Cable

4

-

9482.52

... More
Erection of 11KV Line Works;UNLOADING of LINE MATERIALS MS Channel,Angles,Flats&Rod

1.47

-

271.95

... More
Erection of 11KV Line Works;LOADING of LINE MATERIALS MS Channel,Angles,Flats&Rods

1.47

-

324.87

... More
Erection of 11KV Line Works;SS Work. UL-PVC Control Cb 4, 10C

550

-

82.5

... More
Erection of 11KV Line Works;SS Work. L-PVC Control Cb 4, 10C

550

-

550

... More
Erection of 11KV Line Works;UNLOADING of LINE MATERIALS 11 KV AB SWCH Con 200/400 A

4

-

320

... More
Erection of 11KV Line Works;LOADING of LINE MATERIALS 11 KV AB SWCH Con 200/400 A

4

-

320

... More
Erection of 11KV Line Works;UNLOADING of LINE MATERIALS 11 KV VCBs&Panel boards

1

-

1044.48

... More
Erection of 11KV Line Works;LOADING of LINE MATERIALS11 KV VCBs&Panel boards

1

-

1024

... More
Erection of 11KV Line Works;UNLOADING of LINE MATERIALS RSJoists150 x150 mm/RailPol

3

-

321

... More
Erection of 11KV Line Works;LOADING of LINE MATERIALS RSJoists150 x 150 mm/RailPole

3

-

528

... More
Erection of 11KV Line Works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

4

-

568

... More
Erection of 11KV Line Works;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

4

-

586.52

... More
Erection of 11KV Line Works;Laying of earth mat including excavation of trenches of depth 600mm,welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication. Connecting with GI Wire No.8 (Labour)

10

-

140

... More
Erection of 11KV Line Works;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

4

-

1544

... More
Erection of 11KV Line Works;Supply of earthing pipe with materials Supply of GI Bolts & Nuts etc

25

-

2937.5

... More
Erection of 11KV Line Works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc. Including the cost of cement

3.15

-

20723.85

... More
Erection of 11KV Line Works;Supply of earthing pipe with materials Supply of GI wire No 8

10

-

1050

... More
Erection of 11KV Line Works;Laying of earth mat including excavation of trenches of depth 600mm,welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.75x 8mm MS Flat / GI Flat.

25.53

-

1659.45

... More
Erection of 11KV Line Works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Above 20 Km and upto 30 Km with Lorry for each trip

1

-

3691.38

... More
Erection of 11KV Line Works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 20 KM and upto 30 KM

3.22

-

1533.81

... More
Erection of 11KV Line Works;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

1.05

-

3597.3

... More
Erection of 11KV Line Works;Labour for Fixing of all types of clamps

18

-

1170

... More
Erection of 11KV Line Works;Control Cable Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends

550

-

14850

... More
Erection of 11KV Line Works;Supply of earthing pipe with materials Supply of GI Flat 25X3 mm

40

-

4200

... More
Erection of 11KV Line Works;Providing of earthing with excavation of earth pit (0.6x0.6x2.4 Mts.) duly filling with bentonite, earth ,running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

4

-

4936.8

... More
Erection of 11KV Line Works;Supply of earthing pipe with materials iii)Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication

4

-

13944

... More
Erection of 11KV Line Works;Erection of AB Switch and aligment complete Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

4

-

12800

... More
Erection of 11KV Line Works;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)0.75 M x 0.9 M x 1.95 M

3

-

2972.04

... More
Erection of 11KV Line Works;Erection of 11 KV VCB with Control Panel

1

-

12000

... More
Erection of 11KV Line Works;SS Work - Con of Plinth for 11kv VCB 1.8x1.8x0.75m

1

-

27629

... More
Erection of 11KV Line Works;Earth work excavation of in all soils except hard rock requiring blasting.

3.89

-

1341.36

... More
Erection of 11KV Line Works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Box pole 9/10/11 Mtr

3

-

7931.49

... More
Erection of 11KV Line Works;Laying of the cable along the footpath through 225mm dia GI pipe for 33KV, 150mm dia GI pipe for 11KV (excluding the cost of GI pipe)Laying of 2nd cable in excavated trench

85

-

17348.5

... More
Erection of 11KV Line Works;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

4

-

2050.2

... More
Erection of 11KV Line Works;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

2

-

772

... More
Erection of 11KV Line Works;Restringing of existing loose Lines by removing the pin-binding and jumpers,Providing of temporary stays, providing stiffners pieces, replacement of damaged insulators, alignment of cross arms, pin binding and jumpering after tensioning and removing of the temporary stays complete .Restring-LT 3-Ph 34Sqmm-4 Conduct

0.32

-

2326.4

... More
Erection of 11KV Line Works;Making of Outdoor/Indoor End Termination 11 KV 3x185 Sqmm Cable

4

-

9482.52

... More
Erection of 11KV Line Works;Raising of double run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe) 11KV 3x185sqmm UG Cb on support

15

-

3652.95

... More
Erection of 11KV Line Works;Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth,levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.-DR 11KV 3x185sqmm UG Cb HG/BC/CC/BT

85

-

53640.1

... More
Erection of 11KV Line Works;Providing of earthing with excavation of earth pit (0.6x0.6x2.4 Mts.) duly filling with bentonite, earth ,running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

2

-

2468.4

... More
Erection of 11KV Line Works;Supply of earthing pipe with materials iii)Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication

2

-

6972

... More
Erection of 11KV Line Works;Excavation of pits in all soils except hard rock requiring blasting 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0") 1.05 cum.

5

-

3500

... More
Erection of 11KV Line Works;Cut-Tree Branch(LT/11/33)&Trnsprt Debris

1000

-

4000

... More
Erection of 11KV Line Works;Excavation of pits in all soils except hard rock requiring blasting 0.92 M x 0.92M x 2.3M (3.0" x 3.0" x 7.6") 1.94 cum

4

-

3371.12

... More
Erection of 11KV Line Works;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading)9.1 Mtrs long PSCC Poles

5

-

2036.45

... More
Erection of 11KV Line Works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation 11 Mtrs PSCC poles

59

-

255874.15

... More
Erection of 11KV Line Works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation 9.1 M long PSCC poles for Strut

5

-

12000

... More
Erection of 11KV Line Works;S&R 25x6mm GI Strip for Earthing

10

-

1130

... More
Erection of 11KV Line Works;UNLOADING of LINE MATERIALS MS Channel,Angles,Flats&Rod

1.9

-

351.5

... More
Erection of 11KV Line Works;LOADING of LINE MATERIALS MS Channel,Angles,Flats&Rods

1.9

-

419.9

... More
Erection of 11KV Line Works;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading)11 Mtrs long PSCC Poles

59

-

25486.23

... More
Erection of 11KV Line Works;Cutting charges for MS Sections MS Channel 100 x 50 mm

245

-

2450

... More
Erection of 11KV Line Works;Supply of earthing pipe with materials,Supply of MS bolts & nuts and washers etc of all sizes

90

-

8212.5

... More
Erection of 11KV Line Works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Above 20 Km and upto 30 Km with Lorry for each trip

1

-

3691.38

... More
Erection of 11KV Line Works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 20 KM and upto 30 KM

3.9

-

1857.73

... More
Erection of 11KV Line Works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc. Including the cost of cement

29.4

-

193422.6

... More
Erection of 11KV Line Works;Excavation of pits in all soils except hard rock requiring blasting 0.75 M x 0.9 M x 1.95 M

59

-

37161.15

... More
Erection of 11KV Line Works;Erection of AB Switch and aligment complete Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

2

-

6400

... More
Erection of 11KV Line Works;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner,rectification of poles, guys and jumpering etc., including transport of material from road side to location.55 Sqmm Single Circuit (3 Conductors)

2.55

-

24109.77

... More
Erection of 11KV Line Works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Box pole 9/10/11 Mtr

4

-

10575.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.