Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Civil And Construction
Energy, Oil and Gas
Building Construction
Electrical and Electronics
Water Storage And Supply
Electrical Works
Opening Date13 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 2,75,61,002 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
National Academy of construction;Providing supply of electricity to the site premises through custamer service centre duly applying for new connection including service wire, application complete the work.

1

5408

5408

... More
National Academy of construction;Provd-DGPS & Total Staion Survey

1

5000

5000

... More
National Academy of construction;Supply of 3 Core 2.5 Sqmm Flat Copper cable of ISI for Submersible Motors of makes Finolex / Polycab / Gold Medal / Million / Payal / Sun Light / Power Flex / Fortune Art

210

192

40320

... More
National Academy of construction;Supply and erecting D.O.L Starter 250V , Single phase,50Hz with SS enclouserincluding cost and conveyance of all materials labour charges etc complete for finished item of work

1

1040

1040

... More
National Academy of construction;Supply and fixing of HDPE pipe 40mm dia of 16Kg/Sqm - SDR 9 including cost and conveyance of all materials labour charges etc complete for finished item of work as directed by the engineer-in-charge.

190

180

34200

... More
National Academy of construction;Supply and erecting, ISI mark submersible 2.0HP, Single Phase 30 stages pumpset suitable for 106/156mm dia borewell including cost and conveyance of all materials labour charges etc complete for finished item of work

1

21619

21619

... More
National Academy of construction;Supply and fixing of 160 mm dia PVC casing of A class 6Kg point pressure including cost and conveyance of all materials labour charges etc complete for finished item of work as directed by the engineer-in-charge.

25

883

22075

... More
National Academy of construction;Drilling of 165mm bore well with machine rig including deployment and hire charges of rig and other machinery and equipment labour charges , measuring the yeild of borewell including cost and conveyance etc complete 0 to 90M

230

336

77280

... More
National Academy of construction;Geophysical Investgation charges for water point by Geologist as directed by Engineer in chargecomplete for the finished item of work.

1

5000

5000

... More
National Academy of construction;Supply and fixing of MS GATE with redoxide and 2 Coats of Anamil paint Complete finished item of work as directed by Engineer - in-charge

31.84

5299

168720.16

... More
National Academy of construction;Flooring with chequrred terrazzo tiles of 22 mm thick (medium shade ) set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water and tiles etc., complete, including seigniorage charges, complete for finished item of work

50

766

38300

... More
National Academy of construction;Providing 20 mm chips in the transformer area including cost, lead and labour charges complete for finished item of work

9.4

1543

14504.2

... More
National Academy of construction;Carting away of excavated soils Complete for finished item of work

230

270

62100

... More
National Academy of construction;S&F of Glow sign board size 10' x 3' including lettering, labour charges, fitting charges cost of all materials and complete for finished item.

3.05

3553

10836.65

... More
National Academy of construction;Supply and fixing of AC sheets including cost of material labour conveyence etc complete for finished item of work as directed by the engineer in charge.

17.5

395

6912.5

... More
National Academy of construction;Supply & fixing NP soap dish heavy type with NP screws

1

675

675

... More
National Academy of construction;Supply & fixing 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws

1

489

489

... More
National Academy of construction;Supply & fixing Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type -20mm NB Size

21

331

6951

... More
National Academy of construction;Supply & fixing Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type - 25mm NB Size

1

466

466

... More
National Academy of construction;Supply and Fixing of (28.60mm)Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007)-28.60mm OD Pipe - SDR 11

50

410

20500

... More
National Academy of construction;Supply and Fixing of (22.20mm) Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007)-22.20mm OD Pipe - SDR 11

65

313

20345

... More
National Academy of construction;S & F of (15.90mm)Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007)- 15.90mm OD Pipe - SDR 11

25

239

5975

... More
National Academy of construction;Supply & fixing 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality complete for finished item of work

1

33

33

... More
National Academy of construction;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but with NECESSARY fittings & base support for tanks

1000

10

10000

... More
National Academy of construction;Supplying & Fixing low down Plastic flushing tank 10 Lit Capacity Hindustan Sanitary ware/ parry/ Neycer with internal components

1

2032

2032

... More
National Academy of construction;Supply & fixing of 4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand)

2

134

268

... More
National Academy of construction;Supply & fixing 38.1 mm C.P waste coupling Half or Full Thread 1st Quality Indian make Parryware or equivalent

1

309

309

... More
National Academy of construction;Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

1

1717

1717

... More
National Academy of construction;S&F 15 mm bib tap Indian make 400 grams Seiko/ Senior/ Nice or equivalent

3

298

894

... More
National Academy of construction;Supply & fixing 15mm Angle Stop Valve Qtr turn

2

721

1442

... More
National Academy of construction;Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996

1

1324

1324

... More
National Academy of construction;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap

1

2228

2228

... More
National Academy of construction;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

1

767

767

... More
National Academy of construction;Supply & fixing of 90 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar or any ISI Brand

3

410

1230

... More
National Academy of construction;Supply & fixing of 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar or any ISI Brand

10

462

4620

... More
National Academy of construction;Supply & fixing of 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand)

1

100

100

... More
National Academy of construction;Supply & fixing of 110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand)

1

128

128

... More
National Academy of construction;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg.

2

8766

17532

... More
National Academy of construction;Supplying, laying, jointing and testing 101.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping.

25

755

18875

... More
National Academy of construction;S&F 20W LED Tubelight Batten

4

582

2328

... More
National Academy of construction;Providing independent EARTHING by excavating a trench to a depth of 2.1M in all solid,as per size specified in the Data,using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of salt and Charcoal in layers and all labour charges etc., compiete for small quarters.

1

5345

5345

... More
National Academy of construction;Supply & Fixing of 12" heavy duty exhaust fan with metal blades etc including all operational, incidental and labour charges etc. complete for the finished item of worK Makes : Crompton / Havells Ventilair-DB / Orient hill air.

10

3887

38870

... More
National Academy of construction;Supply & fixing of Electronic Regulator for ceiling fans 900/1200/1400mm sweep including cost of material, Electrical charges complete for finished item of work

6

589

3534

... More
National Academy of construction;Supply & fixing of 1200mm (48'') sweep 230v,A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standared accessories.

6

2277

13662

... More
National Academy of construction;Supply & fixing of batten holder /slanting holder in lieu of ceiling rose of light point complete with all connection and all labour charges with 40W bulb (for new installation).

12

141

1692

... More
National Academy of construction;Supply and run of 2 of 36/0.3mm (2.5 sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for mains including all labour charges complete.

350

103

36050

... More
National Academy of construction;Supply and run of 2 of 22/0.3mm (1.5 sq.mm) (FR) P.V.C. insulated flexible copper cable in existing pipe for mains including all labour charges complete.

230

75

17250

... More
National Academy of construction;Supply of 12" (300mm)ISI, 900 RPM Light duty exhaust fan with metallic blades with Mark of makes Crompton / Bajaj / Havells / Orient.

2

2192

4384

... More
National Academy of construction;Supply & Fixing of 28W T5 fluorescent tube. Makes : Crompton / Bajaj / Phillips / Surya / Havells with copper choke,starter etc.,incuding 1No 40W tube etc., complete.

24

148

3552

... More
National Academy of construction;Wiring with 2 runs of 14/0.3mm (1.0 sq.mm)Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A modular type Switch,ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light points, bell , fan and exhaust fan points in Non-Residential Buildings.

54

676

36504

... More
National Academy of construction;Supply & fixing of 16A 3 pin and 6A 3pin plug Flush type socket with indicator lamp and 16Amps fuse unit and 16Amps switch control (5 in one )duly recessed in wall with wooden deep box of 6'' x 8'' x 2 1/2'' size covered with hylam sheet earth connection and all labour charges etc., complete on wall.

6

449

2694

... More
National Academy of construction;Supply & fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads,earth connection along with all labour charges etc., complete

12

166

1992

... More
National Academy of construction;Supply & fixing 4 way TPN Distribution board with IP-42 protection suitable for 3 phase 40A FP Isolator/ELCB/RCCB as incomer and 10kA-6-32A SP MCBs 12Nos as out going including internal connection and labour charges for surface / flush mounting etc Complete.

1

11353

11353

... More
National Academy of construction;Supply & fixing of 25mm dia 2mm thick surface P.V.C. pipe (ISI MARK) Concealed in wall with all required accessories including masonary work and labour charges etc.complete.

380

108

41040

... More
National Academy of construction;Supply and fabrication of beams,chanales and angles including labour charges complete for the finished item of work.

2389.67

128

305877.76

... More
National Academy of construction;Plain Cement contrete (1:3:6) Nominal Mix using 40 mm metal using concrete mixer including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including Seigniorage changes, sales & other taxes on all materials including alol operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete.

42.59

5155

219551.45

... More
National Academy of construction;Plain Cement contrete (1:2:4) Nominal Mix using 20 mm metal using concrete mixer including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including Seigniorage changes, sales & other taxes on all materials including alol operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete.

27.2

6252

170054.4

... More
National Academy of construction;Supplying and fixing Alluminium glazed door cum fixed window or door using anodised alluminium extruded sections and mat finish for frames sites and Handle/knib,locking arrangements and 4.0mm plain glass fixed to the frame with beeding and qasket with all required item of work.

10.5

6162

64701

... More
National Academy of construction;Painting to new walls with 2 coats of ACE paint external grade of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls as directed by Engineer incharge of the work.

1513.25

154

233040.5

... More
National Academy of construction;Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls as directed by Engineer incharge of the work

735.36

146

107362.56

... More
National Academy of construction;Providing skirting to internal walls to 15 cm height/risers of steps with ...mm thick polished Shahabad stone length equal to polished stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work as directed by Engineer incharge of the work.

23.62

876

20691.12

... More
National Academy of construction;Dadoing with Ceramic Tile (Flooring with decorated white back ground glazed tiles, set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed neatly with white cement paste mixed with pigment of matching shadeto full depth, including cost of all materials like cement, sand, water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work )

13.21

882

11651.22

... More
National Academy of construction;Flooring with polished shahabad stones 20 mmthick set over base coat of CM (1:3) over already laid CC bed /RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dresing of flooring stones etc., complete for finished item of work .

272.69

786

214334.34

... More
National Academy of construction;Ceramic Tile Flooring 20mmCM(1:3)(Flooring with cermic tiles of set over base coat of cement mortar (1:3) 20 mm thick over CC bed already laid or RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand, water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work .

3.3

914

3016.2

... More
National Academy of construction;Flush type Doors with 35mm Thick Flush Shutters with Bondwood solied Block Board Type Faced on Both the sides with Commercial Type Plywood (Schedule Item No. 301.) complete for finished item of work.

4

4371

17484

... More
National Academy of construction;Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc., complete for finished item of work as per special spn 1105.

9.3

4017

37358.1

... More
National Academy of construction;Supply & fixing of ms grill to windows with outer frame of ISA2525 of 25mm thick , horizontal and vertical square rods of 10x10mm and paintng with synthetic enamel paint per (0.3 x 1.2 )sqm.

32.3

2990

96577

... More
National Academy of construction;Supply & fixing Aluminimum Anodised Two/Three Track Sliding Windows as per approved drawing with aluminium anodised sections of Series C Jindal sections and outer frame top horizontals & both verticals of 8774 of size 62 x 29.5 mm and bottom horizontal - two track frame of 8773 of size 62 x 29.5 mm, Shutter frame top, bottom and verticals of 8304 of size 50 mm x 20 mm and Weather interlocking frame of 8306 of size 50 x 20 with plain clear float glass 5mm thick fixed including Supply & fixing aluminium handles of 100 mm for each shutter, nylon rollers assembly and all labour charges for fixing the fixtures with required no. of screws, bolts and nuts and includingt labour charges for fixing the frame in position, fixing shutter to frame etc. completed for finished item of work

24.35

3623

88220.05

... More
National Academy of construction;RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcemet as directed by Engineer-in-change with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charges, sales & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift changes etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903).

65.13

3049

198581.37

... More
National Academy of construction;Providng impervious coat to exposed RCC roof slab surface with CM(1:3), 20 mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., complete for finished item of work as directed by Engineer incharge of the work.

274.92

447

122889.24

... More
National Academy of construction;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16 mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., complete for finished item of work as directed by Engineer incharge of the work.

1382.37

560

774127.2

... More
National Academy of construction;Supplying and filling the substation site with borrowed gravel, watering, ramming, thoroughly complying with the standard specification as directed by Engineer incharge of the work.

484.84

493

239026.12

... More
National Academy of construction;Brick masonry in cement mortar (1:6) for superstructure using well burnt country made second class bricks of approved quality including cost and conveyance of all materials curing, scaffolding with all leads and lifts in all heights etc., complete for finished item of work - Ground Floor

91.71

8374

767979.54

... More
National Academy of construction;Raised pointing to the exposed surfaces of CRS masonry in cm 1:3 prop. including cost and conveyance of all materials, labour charges, all leads and lifts curing etc, complete for finished item of work.

89.25

124

11067

... More
National Academy of construction;Coursed rubble stone masonry 2nd sort with hard granite stones in cement mortar (1:6) for basement, including cost and conveyance of all materials, labour charges, curing, all leads and lifts, etc, complete for finished item of work as directed by Engineer incharge of the work.

244.85

5035

1232819.75

... More
National Academy of construction;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded,complete as directed by Engineer incharge of the work.

17

76127

1294159

... More
National Academy of construction;RCC M - 20 (1:1.5:3) Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all material as directed by Engineer incharge of the work. / h) Roofslab & Staircase "150mm

39.15

11009

431002.35

... More
National Academy of construction;RCC M - 20 GF Lintels(1:1.5:3) Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including Seigniorage changes, sales & other taxes on all materials including alol operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering as directed by Engineer incharge of the work e)Lintels

1.8

13213

23783.4

... More
National Academy of construction;RCC M - 20 GF Beams (1:1.5:3) Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all mater as directed by Engineer incharge of the work. d)Roof Beams"

17.22

12421

213889.62

... More
National Academy of construction;RCC M - 20 (1:1.5:3) Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including Seigniorage changes, sales & other taxes on all materials including alol operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering as directed by Engineer incharge of the work c)Plinth Beams

5.01

12505

62650.05

... More
National Academy of construction;RCC M - 20 GF (1:1.5:3) Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all material as directed by Engineer incharge of the work. b) Columns"

18.78

13383

251332.74

... More
National Academy of construction;RCC M - 20 (1:1.5:3) Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including Seigniorage changes, sales & other taxes on all materials including alol operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering as directed by Engineer incharge of the work.a) Column Footings

75.18

9635

724359.3

... More
National Academy of construction;Plain Cement contrete (1:4:8) using 40 mm metal with concrete Mixture. All work upto Plinth level including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including Seigniorage changes, sales & other taxes on all materials including alol operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete as directed by Engineer incharge of the work

97

4859

471323

... More
National Academy of construction;Filling with already available Earthwork in basement with 150mm thick layers incldg cost & conveyance all materials watering,consolidation etc complete for finished item of work.

225.1

40

9004

... More
National Academy of construction;Grouting the holes with neat cement slurry excluding cost of steel 25 mm dia meter including cost of material labour charges complete fro finished item of work as directed by the engineer in charge

144

93

13392

... More
National Academy of construction;Drilling holes in hard granite or sheet rock by Pneumatic compressor 25 mm dia meter etc for complete for item of work

144

144

20736

... More
National Academy of construction;Earth work excavation for foundations and depositing on bank for all lifts and with an iniutial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20B (APSS 308). Ordinary Soil

1031.16

486

501143.76

... More
National Academy of construction;Earth work excavation for foundations and depositing on bank for all lifts and with an iniutial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B(APSS 308).Hard rock ( blasting prohibited ).

31.96

1440

46022.4

... More
National Academy of construction;Design and submisiion of 2 sets of structural design drawings with soft copy complete finished item of work

7500

5

37500

... More
National Academy of construction;Providing report on Soil Bearing Capacity by Geologist/Geo-technical investigators with the sample collected from construction site complete for finished item of work

2

4500

9000

... More
National Academy of construction;Providing contour surveying maps with total station including preparation of boundary and contour levels with 2 No.s hard copies and soft copies complete for finished items of work.

1

5665

5665

... More
National Academy of construction;Clearing of site by hiring JCB, complete for the finished item of work.

24

2165

51960

... More
National Academy of construction;Supply of GI Bolts & Nuts etc

40

117

4700

... More
National Academy of construction;Painting of feeder name on support including cost of paint

8

53

424

... More
National Academy of construction;Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

8

142

1136

... More
National Academy of construction;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

8

146

1173.04

... More
National Academy of construction;Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

8

3200

25600

... More
National Academy of construction;Un loading of 11KV AB Switch Conventional type

8

80

640

... More
National Academy of construction;Loading of 11KV AB Switch Conventional type

8

80

640

... More
National Academy of construction;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50M height

16

386

6176

... More
National Academy of construction;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

16

1234

19747.2

... More
National Academy of construction;Supply of CI eath pipe with 80mm dia,2.75 M Length

16

2789

44624

... More
National Academy of construction;Coping of 1.5'x1.5'x1 with 1:8 slope Using form boxes(0.031Cumt.)

0.25

3892

965.46

... More
National Academy of construction;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc-Including the cost of cement

7.52

6579

49480.66

... More
National Academy of construction;Fabrication and connecting of M.S./ G.I. Flat 50x6mm to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.

160

41

6560

... More
National Academy of construction;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation - Box pole 9/10/11 Mtr

8

2643

21150.64

... More
National Academy of construction;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) - 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M

8

990

7925.44

... More
National Academy of construction;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

16

1132

18112

... More
National Academy of construction;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

16

512

8200.8

... More
National Academy of construction;Un loading of R.S. Joists 175 x 85 mm

16

50

800

... More
National Academy of construction;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 Km and upto 20 Km

4.61

412

1901.34

... More
National Academy of construction;Loading of R.S. Joists 175 x 85 mm

16

76

1216

... More
National Academy of construction;UNLOADING of MS Channel,Angles,Flats&Rod

0.61

185

113.59

... More
National Academy of construction;LOADING of MS Channel,Angles,Flats&Rods

0.61

220

135.69

... More
National Academy of construction;Supply of RCC cable Joint markers/ Cable route markers of size 700 X 240 X 75 mm duly engraving with 5 mm thick letters, CPDCL 33000/11000 Cable/Cable joint fixing the 300mm below ground level and 400mm above ground level confirming to IS 5820 2001

30

484

14520

... More
National Academy of construction;Consultation charges for providing traffic diversions and meeting other exegencies for execution of work during late night hours and wee hours.

3500

30

105000

... More
National Academy of construction;Raising of Single run 11 KV 3x300 Sqmm Cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

120

144

17289.6

... More
National Academy of construction;Making of 11 KV 3x300 Sqmm Cable Outdoor/Indoor End Termination

16

2370

37930.08

... More
National Academy of construction;Supply of 4" Hume Pipe

700

80

56000

... More
National Academy of construction;Supply 4" DWC pipe

500

759

379500

... More
National Academy of construction;Supply 4" BClass GI pipe 3.65mm thck 12.2Kg/M

1000

740

740000

... More
National Academy of construction;Making of 11 KV 3x300 Sqmm Cable Straight through joints

30

3725

111763.5

... More
National Academy of construction;S&E-Smart RFID marker

30

2745

82350

... More
National Academy of construction;Laying of 2nd cable in excavated trench

3700

204

755170

... More
National Academy of construction;Excavation & laying of UG Cable (Five Run ) - -Laying of XLPE UG cable Five Run including including excavation of trench of size 1050mm wide to 1200mm wide as per the site conditions and 1050mm for 11 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, Providing of RFID markers on Shabad Stones wherever required, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second,third or more cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.-Across the CC/ BT road crossing multi layer road requiring compressor (excluding the cost of Hume pipe)-11 KV 3x300 Sqmm Cable

100

2103

210375

... More
National Academy of construction;Excavation & laying of UG Cable (Five Run ) - Laying of XLPE UG cable Five Run including including excavation of trench of size 1050mm wide to 1200mm wide as per the site conditions and 1050mm for 11 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, Providing of RFID markers on Shabad Stones wherever required, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second,third or more cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.-.. Along the CC / BT multi layer road requiring compressor-11 KV 3x300 Sqmm Cable

400

2047

819060

... More
National Academy of construction;Excavation & laying of UG Cable (Triple Run ) - Laying of 11 KV 3x300 Sqmm XLPE UG cable Triple Run including excavation of trench of size 1000mm wide to 750mm wide as per the site conditions and 1050mm for 11 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, Providing of RFID markers on Shabad Stones wherever required, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second,third or more cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs. - Along the CC / BT multi layer road requiring compressor - 11 KV 3x300 Sqmm Cable

300

1578

473535

... More
National Academy of construction;Excavation & laying of UG Cable (Double Run) - Laying of 11 KV 3x300 Sqmm Cable Double Run including excavation of trench of size 600mm and wide1050mm for 11 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, Providing of RFID markers on Shabad Stones wherever required, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and liftetc.. (Second cable laying cost not Included) depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs - .Across the CC/ BT road crossing multi layer road requiring compressor (excluding the cost of Hume pipe)-11 KV 3x300 Sqmm Cable

100

1449

144906

... More
National Academy of construction;Excavation & laying of UG Cable (Double Run) - Laying of 11 KV 3x300 Sqmm Cable Double Run including excavation of trench of size 600mm and wide1050mm for 11 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, Providing of RFID markers on Shabad Stones wherever required, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and liftetc.. (Second cable laying cost not Included) depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs- Along the CC / BT multi layer road requiring compressor - 11 KV 3x300 Sqmm Cable

1000

1264

1264640

... More
National Academy of construction;Excavation & laying of UG Cable in Single Run - laying of 11KV 3x300sqmm XLPE UG cable Single Run including excavation of trench of size 450mm wide and 1050mm for 11KV form road level, providing of DWC/GI pipes whereever required depth is not acquiredas per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs Providing of RFID markers on Shabad Stones wherever required, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs- Across the CC/ BT road crossing multi layer road requiring compressor wih hume pipe (cxcluding the cost of Hume Pipe)-11 KV 3x300 Sqmm Cable

100

1199

119940

... More
National Academy of construction;Excavation & laying of UG Cable in Single Run - Laying of 11KV 3x300sqmm XLPE UG cable Single Run including excavation of trench of size 450mm wide and 1050mm for 11KV form road level, providing of DWC/GI pipes whereever required depth is not acquiredas per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs Providing of RFID markers on Shabad Stones wherever required, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc..depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs - Along the CC / BT multi layer road requiring compressor-11 KV 3x300 Sqmm Cable

1850

1073

1986789

... More
National Academy of construction;Un loading of 11KV/33KV XLPE UG Cable for all sizes

26

1024

26624

... More
National Academy of construction;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)- Above 10 Km and upto 20 Km with Lorry for each trip

13

3299

42896.1

... More
National Academy of construction;Loading of 11KV/33KV XLPE UG Cable for all sizes

26

1024

26624

... More
National Academy of construction;Survey line&cabl inc peg mark,tree clear&trail pits

3.85

765

2945.25

... More
National Academy of construction;Supply of GI Bolts & Nuts etc

30

117

3525

... More
National Academy of construction;Painting of feeder name on support including cost of paint

3

53

159

... More
National Academy of construction;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50M height

6

386

2316

... More
National Academy of construction;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

6

1234

7405.2

... More
National Academy of construction;Supply of CI eath pipe with 80mm dia,2.75 M Length

6

2789

16734

... More
National Academy of construction;Erection of 33 KV LAS station/Line type including earthing

3

880

2640

... More
National Academy of construction;Un loading of 33 KV, 10 KA LAs Station type

9

35

315

... More
National Academy of construction;Loading of 33 KV, 10 KA LAs Station type

9

41

369

... More
National Academy of construction;Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

3

142

426

... More
National Academy of construction;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

3

146

439.89

... More
National Academy of construction;Erection of 33 KV AB Switch including alignment and earthing

3

4500

13500

... More
National Academy of construction;Un loading of 33KV 800 Amps AB Switch

3

79

237

... More
National Academy of construction;Loading of 33KV 800 Amps AB Switch

3

126

378

... More
National Academy of construction;Fabrication of Main and Auxiliary structures with welding usingraw steel such as RS joist, M.S.Angles, Plates, Channels,including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

0.97

3426

3340.35

... More
National Academy of construction;Coping of 1.5'x1.5'x1 with 1:8 slope Using form boxes(0.031Cumt.)

0.37

3893

1448.2

... More
National Academy of construction;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc-Including the cost of cement

11.28

6579

74224.28

... More
National Academy of construction;Fabrication and connecting of M.S./ G.I. Flat 50x6mm to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.

155

41

6355

... More
National Academy of construction;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation - RS Joist 175 x 85 mm

6

1934

11604

... More
National Academy of construction;Assembly and erection of Structure as per specification which includes fixing of top channels and cross bracings, transport of all materials from road side to the location, earthing, back filling with earth ramming etc excluding pit excavation and concreting. - Erection of 33 KV DP Structure with 175x85/150x75mm RS joist

3

5670

17010

... More
National Academy of construction;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) - 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M

12

990

11888.16

... More
National Academy of construction;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

18

1132

20376

... More
National Academy of construction;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

12

512

6150.6

... More
National Academy of construction;Un loading of R.S. Joists 175 x 85 mm

18

50

900

... More
National Academy of construction;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 Km and upto 20 Km

5.85

412

2410.67

... More
National Academy of construction;Loading of R.S. Joists 175 x 85 mm

18

76

1368

... More
National Academy of construction;UNLOADING of MS Channel,Angles,Flats&Rod

1.35

185

249.75

... More
National Academy of construction;LOADING of MS Channel,Angles,Flats&Rods

1.35

221

298.35

... More
National Academy of construction;Supply of RCC cable Joint markers/ Cable route markers of size 700 X 240 X 75 mm duly engraving with 5 mm thick letters, CPDCL 33000/11000 Cable/Cable joint fixing the 300mm below ground level and 400mm above ground level confirming to IS 5820 2001

40

484

19360

... More
National Academy of construction;Consultation charges for providing traffic diversions and meeting other exegencies for execution of work during late night hours and wee hours.

3500

30

105000

... More
National Academy of construction;Raising of Single run 33KV 3x400sqmm UG cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

30

135

4069.8

... More
National Academy of construction;Raising of double run 33KV 3x400sqmm UG cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

60

323

19431

... More
National Academy of construction;Making of 33KV 3X400Sq.mm XLPE UG Cable Outdoor/Indoor End Termination

14

2764

38706.64

... More
National Academy of construction;Supply of Hume Pipe Size 9" size

350

125

43750

... More
National Academy of construction;supply of 6" DWC pipe

500

1012

506000

... More
National Academy of construction;Supply 6" B Class GI pipe 5mm thck 20Kg/M

800

1044

835200

... More
National Academy of construction;Making of 33KV 3X400Sq.mm XLPE UG Cable Straight through joints

24

5700

136818.72

... More
National Academy of construction;S&E-Smart RFID marker

40

2745

109800

... More
National Academy of construction;Laying of 2nd cable in excavated trench

2550

204

520455

... More
National Academy of construction;Excavation & laying of UG Cable in Single Run - Laying of Single Run 33KV 3x400sqmm XLPE UG cable including excavation of trench of size 450mm wide1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquiredas per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, Providing of RFID markers on Shabad Stones wherever required , back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs. - Across the CC/ BT road crossing multi layer road requiring compressor wih hume pipe (excluding the cost of Hume Pipe) - 33 KV 3x400 Sqmm Cable

50

1319

65992

... More
National Academy of construction;Excavation & laying of UG Cable in Single Run - Laying of Single Run 33KV 3x400sqmm XLPE UG cable including excavation of trench of size 450mm wide1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquiredas per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, Providing of RFID markers on Shabad Stones wherever required , back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc - .depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs. - Along the CC / BT multi layer road requiring compressor - 33 KV 3x400 Sqmm Cable

1300

1175

1528228

... More
National Academy of construction;Laying of 33KV XLPE UG cable Double Run of Size in HardRock (1.2*0.5x1=0.6cum)

400

1430

572000

... More
National Academy of construction;Excavation & laying of UG Cable (Double Run) - Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally 4" for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, Providing of RFID markers on Shabad Stones wherever required back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and liftetc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs &33 KV - 1.20 mtrs.-.Across the CC/ BT road crossing multi layer road requiring compressor (excluding the cost of Hume pipe)-33 KV 3x400 Sqmm Cable

150

1587

238060.5

... More
National Academy of construction;Excavation & laying of UG Cable (Double Run) - Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally 4" for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, Providing of RFID markers on Shabad Stones wherever required back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and liftetc - (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs &33 KV - 1.20 mtrs.- Along the CC / BT multi layer road requiring compressor - 33 KV 3x400 Sqmm Cable

2000

1388

2777680

... More
National Academy of construction;Un loading of 11KV/33KV XLPE UG Cable Drum for all sizes

22

1024

22528

... More
National Academy of construction;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)- Above 10 Km and upto 20 Km with Lorry for each trip

11

3299

36296.7

... More
National Academy of construction;Loading of 11KV/33KV XLPE UG Cable Drums for all sizes

22

1024

22528

... More
National Academy of construction;Survey line&cabl inc peg mark,tree clear&trail pits

3.9

765

2983.5

... More
National Academy of construction;S-10ft Aluminium Ladder

1

1654

1654

... More
National Academy of construction;Supply and fixing of safety instructions/Substation operation instruction board

1

2205

2205

... More
National Academy of construction;Supply and fixing of Substation board of size 3'x2.5' indicating the layout of switchyard

1

1654

1654

... More
National Academy of construction;Supply of 5000v megger

1

13860

13860

... More
National Academy of construction;Supply of Digital clamp meter.

1

2888

2888

... More
National Academy of construction;Supply of Gum Boots (Pair)

2

693

1386

... More
National Academy of construction;Supply of LC Boards

8

116

928

... More
National Academy of construction;Supply of Hack saw (12 inches)

1

289

289

... More
National Academy of construction;Sup Rechargeable LED torch light of Standard make

1

1733

1733

... More
National Academy of construction;Supply of Taparia Tool kit of Size 20?x10?x15? with tier arrangements Tool box with locking arrangement & keycontaining (1) Double Ended fix Spanner sets, (Ribbed) 6 x 7, 8x 9, 10 x 11, 12 x 13, 14 x 15, 16 x 17, 18 x19, 20 x 22, 21 x 23,24 x 27, 25 x28, 30 x 32, (2) Double Ended Ring Spanners sets,6 x 7 , 8 x 9, 10 x 11, 12 x 13, 14 x 15. 16 x 17 , 18 x 19, 20 x22 , 21 x 23, 24 x 27, 25 x28, 30 x 32 mm, (3) AdjustableSpanner 305 mm length least maximum opening 35mmchrome, (4) Pipe Wrench Length 350 mm 14?, (5) Soft faced Hammer with suitable handle 2 lb, (6) Hacksaw frame with metal handle heavy duty for 12" hacksaw blade with High Speed blade, (7) Insulated Screw drivers Transparent Green Handle Set Length 6?, 8? & 12?, (8) Star Screw Driver Transparent Green Handle Length 6?, (9) Insulated Wire Cutter,(10) Insulated Cutting Plier Length 8? with cable stripperinsulated with thick C. A. sleeve confirming to IS: 4378 - 1990,(11) Long Nose Plier insulated with thick C.A. sleeve generally confirming to IS:3552-1989, (12) Tester type screw driver (special with neon bulb) generally confirm to IS: 5579-1985 Grade:II handle yellow/ green colour overall length 130 mm,(13) Insulated Crimping Plier of all Taparia make.

1

4925

4925

... More
National Academy of construction;Supply of Wall clock standard make

1

578

578

... More
National Academy of construction;SupName board of the 33/11kV Sub-Station(As per Standard Specification)

1

10238

10238

... More
National Academy of construction;Supply of Danger boards with clamps

10

116

1160

... More
National Academy of construction;Sup Angle racks(18x36.6inches) Godrej

1

1733

1733

... More
National Academy of construction;Supply of S type chairs (Godrej)

4

924

3696

... More
National Academy of construction;Supply of Table (3x6ft) Godrej

1

6050

6050

... More
National Academy of construction;Sup Stand basic cell phone with charger

1

1386

1386

... More
National Academy of construction;Supply of Hand Gloves

4

289

1156

... More
National Academy of construction;Sup Earth Rods (8ft) Screw & clamp type

4

578

2312

... More
National Academy of construction;Supply of Safety Helmet of standard make

4

231

924

... More
National Academy of construction;Sup Room fire extinguisher (2 ltrs capacity) for control room

6

4620

27720

... More
National Academy of construction;Sup Fire bucket stand with 3 buckets (8 -10 ltr capacity)

2

1386

2772

... More
National Academy of construction;Sup- Trolley mounted CO2 (6.5Kgs) (IS-2878)

2

9240

18480

... More
National Academy of construction;Sup - Alluminium Ladder for indoor works

1

4410

4410

... More
National Academy of construction;Sup - Rubber mats ( 6?x3?) size for indoor SS

12

1386

16632

... More
National Academy of construction;Supplying & fabrication erection of 6mm Checkerd plates as per the field conditions

400

83

33200

... More
National Academy of construction;Sup Steel almarah(61/2 X 3ft) Godrej

1

9818

9818

... More
National Academy of construction;Fixing of Metal halide lamps with fixtures Make:Philips,Crompton,Bajaj junction box with MCB with 1.5 GI pipe complete.

8

1268

10144

... More
National Academy of construction;Supply of GI Bolts & Nuts

50

117

5875

... More
National Academy of construction;S-Metal Handle Lamp 150W

8

6450

51600

... More
National Academy of construction;Paint of coping with 2 coats of white cement incl cost of paints etc

8

48

384

... More
National Academy of construction;Coping of 1.5'x1.5'x1 with 1:8 slope Using form boxes(0.031Cumt.)

0.25

3892

965.46

... More
National Academy of construction;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc-Including the cost of cement

6.1

6579

40131.9

... More
National Academy of construction;Errection of tubular poles

8

1379

11032

... More
National Academy of construction;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) - 9.1 Mtrs PSCC Poles 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

8

928

7424

... More
National Academy of construction;Supply of stepped tubular poles single way made of steel of length 9mtrs with tensile strength of 42kgf/mm2 at a steps of 4.5 mtrs with outer dia 114.3 mm,2.1 mtrs with outer dia 88.9mm, 2.1 mtrs with outer dia 76.1 mm, normal Crippling load of 141 kgf, normal Breaking load of 198 kgf ,working Crippling load of 70 kgf, working Breaking load of 79 kgf as per IS 2713

8

13913

111304

... More
National Academy of construction;Un loading of 11KV/33KV XLPE UG Cable for all sizes

2

1024

2048

... More
National Academy of construction;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)- Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
National Academy of construction;Loading of 11KV/33KV XLPE UG Cable for all sizes

2

1024

2048

... More
National Academy of construction;Running of GI eartn flat of size 25X3mm from all metallic parts of channels, AB Switch, HG fuse set, DTr neutral and LT Distribution box and inter connection of earth pits etc complete

30

14

420.9

... More
National Academy of construction;Supply of GI Flat 25X3 mm

18

105

1890

... More
National Academy of construction;Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc

1

1594

1594.67

... More
National Academy of construction;Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

1

142

142

... More
National Academy of construction;Erection of 11KV 200A TT type AB Switch including fixing of cross angles and alignment complete

1

1813

1813.49

... More
National Academy of construction;Un loading of 11 KV AB SWCH T.T.200/400 A

1

80

80

... More
National Academy of construction;Loading of 11 KV AB SWCH T.T.200/400 A

1

80

80

... More
National Academy of construction;Erection of 11 KV HG Fuse set including earthing

1

740

740.52

... More
National Academy of construction;Un loading of 11 KV HG Fuse Sets

1

18

18

... More
National Academy of construction;Loading of 11 KV HG Fuse Sets

1

18

18

... More
National Academy of construction;Paint of coping with 2 coats of white cement incl cost of paints etc

5

48

240

... More
National Academy of construction;Coping of 1.5'x1.5'x1 with 1:8 slope Using form boxes(0.031Cumt.)

0.15

3893

603.42

... More
National Academy of construction;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.- Including the cost of cement

4.7

6579

30921.3

... More
National Academy of construction;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation - Box pole 9/10/11 Mtr

5

2643

13219.15

... More
National Academy of construction;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) - 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M

5

990

4953.4

... More
National Academy of construction;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete- Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium .

1.6

482

771.2

... More
National Academy of construction;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. - Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

1.6

1293

2068.8

... More
National Academy of construction;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. -Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium

1.6

851

1361.6

... More
National Academy of construction;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. - Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

1.6

2181

3489.6

... More
National Academy of construction;Fabrication of Main and Auxiliary structures with welding usingraw steel such as RS joist, M.S.Angles, Plates, Channels,including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

1.6

3426

5481.6

... More
National Academy of construction;Un loading of R.S. Joists 175 x 85 mm

6

50

300

... More
National Academy of construction;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 Km and upto 20 Km

1.6

412

659.33

... More
National Academy of construction;Loading of R.S. Joists 175 x 85 mm

6

76

456

... More
National Academy of construction;Cable terminations to the switch gear marshalling boxes/panel terminal blocks/control and relay panels LT AC panel including providing suitable ferrules and lugs as per pecification (including cost of ferrules, lugs and glands)

500

27

13500

... More
National Academy of construction;Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends

2200

27

59400

... More
National Academy of construction;Making of Outdoor/Indoor LT 3 1/2 x 185 Sqmm Cable Cable End Termination

2

968

1937.8

... More
National Academy of construction;Supply of 31/2x185Sqmm UG O/D end termination kits

2

550

1100

... More
National Academy of construction;Raising of cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe) - LT 3 1/2 x 185 Sqmm Cable

10

85

854.3

... More
National Academy of construction;Excavation & laying of UG Cable in Single Run - Laying of XLPE UG cable including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs - In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil / CC/BT Road - LT 3 1/2 x 185 Sqmm Cable

90

377

33986.7

... More
National Academy of construction;Making of Outdoor/Indoor 11 KV 3x185 Sqmm Cable End Termination

2

2370

4741.26

... More
National Academy of construction;Raising of cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe) - 11 KV 3x185 Sqmm Cable

15

126

1893.45

... More
National Academy of construction;Excavation & laying of UG Cable in Single Run - Laying of XLPE UG cable including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.- In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil / CC/BT Road - 11KV 3x185 Sqmm Cable

85

465

39564.1

... More
National Academy of construction;Making of Outdoor/Indoor 33 KV 3x400 Sqmm End Termination

4

2764

11059.04

... More
National Academy of construction;Install-33KV 1x630Sqmm OD Unit EndTermtn

8

4000

32000

... More
National Academy of construction;Install-33KV 1x630Sqmm GIS ID EndTermtn

8

17600

140800

... More
National Academy of construction;Supply of 33KV 1x630Sqmm OD Unit End Termination

8

4200

33600

... More
National Academy of construction;Supply of 33KV 1x630Sqmm GIS ID Unit End Termination

8

2500

20000

... More
National Academy of construction;Raising of 33kV 3x400 Sqmm Cu cable on already erected support with wooden / MS clamps and connecting it to over head line withcable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)- Single Run

14

135

1899.24

... More
National Academy of construction;Lay-Second 33KV UG Cb in Existing Duct

106

200

21200

... More
National Academy of construction;Raising of Single Run 33KV 1x630sqmm UG Cable on Supportrt

56

133

7448

... More
National Academy of construction;Laying of 4No's single core 630 sqmm UG cable (Single Circuit with one spare cable) including excavation of trench of size 0.7 Mtrs width and 1.2 Mtrs depth from road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench withearth, levelling and and removing the debris from the site inluding the cost of lead and lift etc. - In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil

106

2463

261109.8

... More
National Academy of construction;Providing of double earthing for neutral with flexible copper jumpers including arrangement by fixing M.S.Channel 100x50mm

2

1323

2646

... More
National Academy of construction;Supply of Copper Flexible jumper with 75 X 8 of length 250 mm at neutral of Power tranformer end and 50 X 6 of length 50mm two Nos at double neutral end duly brasing with flexible jumper of capacity of 5kA/3 sec for power transformer neutral

2

4725

9450

... More
National Academy of construction;Supply and painting of Black to all earth Flat

314

55

17270

... More
National Academy of construction;Supply of GI Bolts & Nuts

50

117

5875

... More
National Academy of construction;Fabrication and connecting of M.S./ G.I. Flat 50x6mm to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.

208.3

41

8540.3

... More
National Academy of construction;Laying of MS Flats /GI Flats 75x 8mm earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment andconnecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes including fabrication

531.9

65

34573.5

... More
National Academy of construction;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 Km and upto 20 Km

3.4

412

1401.07

... More
National Academy of construction;UNLOADING of MS Channel,Angles,Flats&Rod

3.4

185

629

... More
National Academy of construction;LOADING of MS Channel,Angles,Flats&Rods

3.4

221

751.4

... More
National Academy of construction;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50M height

36

386

13896

... More
National Academy of construction;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

36

1234

44431.2

... More
National Academy of construction;Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication

36

3486

125496

... More
National Academy of construction;Painting of Name Plates for any equipment

43

122

5246

... More
National Academy of construction;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete- Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium .

3.83

482

1846.06

... More
National Academy of construction;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. - Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

3.83

1293

4952.19

... More
National Academy of construction;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. -Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium

3.83

851

3259.33

... More
National Academy of construction;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. - Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

3.83

2181

8353.23

... More
National Academy of construction;Alligning the Main and Auxiliary structures such as RS joist,M.S.Angles, Plates, Channels, Structure to zero level duly leveling in prefabricated MS frames with Hydraulic jacks before galvanising/ fabrication.

3.83

1470

5630.1

... More
National Academy of construction;Fabrication of Main and Auxiliary structures with welding usingraw steel such as RS joist, M.S.Angles, Plates, Channels,including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

0.83

3426

2843.58

... More
National Academy of construction;Cutting Charges for RS joist 150x150mm

44

48

2112

... More
National Academy of construction;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 Km and upto 20 Km

3.83

412

1578.27

... More
National Academy of construction;UNLOADING of MS Channel,Angles,Flats&Rod

0.83

185

153.55

... More
National Academy of construction;LOADING of MS Channel,Angles,Flats&Rods

0.83

221

183.43

... More
National Academy of construction;UNLOADING of RSJoists150 x150 mm/RailPol

8

107

856

... More
National Academy of construction;LOADING of RSJoists150 x 150 mm/RailPole

8

176

1408

... More
National Academy of construction;Erection of control/Relay panels, AC Panels, announciation panels etc in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels & foundation bolts

1

2122

2122

... More
National Academy of construction;Supply of AC Supply panel inluding providing of changeover switch, SFU, metering unit, 32 A three phase MCB, 16 A Single phase MCB complete as per specification

1

42000

42000

... More
National Academy of construction;Erection of 220 V, 80 AH battery in complete shape fit for charging . Conventional lead acid

1

7666

7666

... More
National Academy of construction;Un loading of 220 V Batterry with charger

1

1024

1024

... More
National Academy of construction;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)- Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
National Academy of construction;Loading of 220 V Batterry with charger

1

1612

1612

... More
National Academy of construction;Erection of 33KV indoor switch gear panel/33KV indoor PT panel / Bus section panel / Bus raiser panel

10

9847

98470

... More
National Academy of construction;Un loading of 33 KV VCBs along with Panel boards

10

1044

10444.8

... More
National Academy of construction;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)- Above 10 Km and upto 20 Km with Lorry for each trip

5

3299

16498.5

... More
National Academy of construction;Loading of 33 KV VCBs along with Panel boards

10

1024

10240

... More
National Academy of construction;Erection of 11KV indoor switch gear panel/indoor PT panel /Bus section panel / Bus raiser panel/Capacitor panel/Switch fuse panel for DTR.

16

8894

142304

... More
National Academy of construction;Un loading of 11 KV VCBs along with Panel boards

16

1044

16711.68

... More
National Academy of construction;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)- Above 10 Km and upto 20 Km with Lorry for each trip

8

3299

26397.6

... More
National Academy of construction;Loading of 11 KV VCBs along with Panel boards

16

1024

16384

... More
National Academy of construction;Erection of DTR's including loading and Unloading DTR on the Structure/Plinth etc - 3 Phase DTRs 63,75 & 100 KVA

1

1650

1650

... More
National Academy of construction;RCC Column type DTR Plinth of size 1'X1'X10',topslab 4'x4'x6" & beam size 4'X8'X8" upto 160KVA

1

25967

25967.57

... More
National Academy of construction;UNLOADING of 50,63,75&100kva DTR

1

280

280

... More
National Academy of construction;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) -(excluding of loading unloading) - Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
National Academy of construction;LOADING of 50,63,75&100kva DTR

1

350

350

... More
National Academy of construction;Erection of PTR on constructed plinth - 8 MVA PTR

2

49480

98960.4

... More
National Academy of construction;UNLOADING of 8 MVA PTR

2

5805

11611.68

... More
National Academy of construction;Transport of Power transformers (0 to 100 KM) from one place to another place in GHMC Area.(excluding of loading & unloading ) - 8MVA power transformer

2

21945

43890

... More
National Academy of construction;LOADING of 8 MVA PTR

2

5805

11611.68



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.