Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Electrical Goods and Equipments
Electrical and Electronics
Opening Date29 Jun 2024
Closing Date6 Jul 2024
Tender Amount₹ 35,06,652 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of MS bolts & nuts and washers etc of all sizes

150

91

13687.5

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

62

1210

75020

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of GI Flat 25X3 mm for earthing

800

105

84000

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Running of GI eartn flat of size 25X3mm from all metallic parts of channels, AB Switch, HG fuse set, DTr neutral and LT Distribution box and inter connection of earth pits etc complete

720

13

9900

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of Control panel

11

1800

19800

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of Control Panel with busbars with required MCCBs including complete wiring

11

10000

110000

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply, transporting & erection of indoor type panel box with 14SWG CRCA sheet steel duly fabricating complete with cleaning & painting with 2coats of powder coating enamel painting inter locking arrangement and air vent provision on side of the box including fixing of 3-ph meters. Complete erection of panel and fixing of all above items, testing, commissioning as directed by department officers, approx. 13X13 inches (LXB ) for each three phase meter box for each meter with 4sqmm copper cable with standard make for internal connections (wiring) and 32A MCB with ISI standard for each meter. Panel board with Aluminium bus bar of size 10X20 mm including construction of plinth for panel board.

17

3500

59500

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply, transporting & erection of indoor type panel box with 14SWG CRCA sheet steel duly fabricating complete with cleaning & painting with 2coats of powder coating enamel painting inter locking arrangement and air vent provision on side of the box including fixing of 1-ph meters. Complete erection of panel and fixing of all above items, testing, commissioning as directed by department officers, approx. 11X11 inches (LXB ) for each single phase meter box for each meter with 4sqmm copper cable with standard make for internal connections (wiring) and 16A MCB with ISI standard for each meter. Panel board with Aluminium bus bar of size 10X20 mm including construction of plinth for panel board.

643

2000

1286000

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of LT Distribution Box

4

18

72

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of LT Distribution Box

4

18

72

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Fixing-GPRS Modem & Sim Card

6

300

1800

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, currenttransformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight andoccupy more space) (excluding of loading unloading) for above 20 Km and upto 30 Km with Lorry for each trip

1

3619

3619

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of LT XLPE UG Cable for all sizes

2

260

520

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of LT XLPE UG Cable for all sizes

2

500

1000

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of CT Metering/Distribution boxes with meters

10

18

180

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of CT Metering/Distribution boxes with meters

10

18

180

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of Single phase Meters -100nos lot

7

128

896

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of Single phase Meters -100nos lot

7

128

896

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Laying of 3 1/2 x 70 Sqmm UG Cable for LT (at Apartments only)

2580

110

283800

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc

4

1563

6253.64

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection & commissioning of CT meter along with box on LV side of DTRs including cable connections from Transformer LV to Distribution box via CT meters box

10

900

9000

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) for above 20 Km and upto 30 Km with Lorry for each trip

2

3619

7238

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of Conductor drums

1

100

100

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of Conductor drums

1

202

202

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) for above 30 KM and upto 50 KM

0.39

576

224.64

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of M.S.Channels, Angles, Flats & Rods etc.

0.39

185

72.15

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of M.S.Channels, Angles, Flats & Rods etc.

0.39

221

86.19

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of LT Pins

2

38

76

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of LT Pins

2

54

108

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of LT Metal parts Bag of 100nos

1

35

35

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of LT Metal parts Bag of 100nos

1

52

52

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of LT Shackle insulators

2

21

42

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of LT Shackle insulators

2

26

52

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of LT Pin insulators

3

18

54

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of LT Pin insulators

3

26

78

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Sub-transport of 9.1 Mtrs long PSCC Poles upto Workspot upto 10KM (Including loading and unloading)

49

363

17787

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un loading of LT Cable /AB Cable (XLPE) Single core Drum (including Accessories) for all size

1

260

260

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of LT Cable /AB Cable (XLPE) Single core Drum (including Accessories) for all size

1

500

500

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Stringing of LT AB cable 3x70 + 1x16 + 1x50

0.5

8450

4225

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Fabrication of materials including 2 coats of Red oxide painting 0.65 mt. LT single phase cross arms with 50x50x6 mm MS Angle

49

30

1470

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Formation of Cut point for LT line excluding pole erection and stays for 3/4/5 wire

14

938

13132

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strainpoints, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc.,including transport of material from road side to location.for LT 1-Phase (2 Conductors with conductor size of 55sqmm)

1.5

3985

5977.5

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply and Fixing of junction box and Providing with proper Fuse protection and required glauds suitable for Cable Terminations. The box shall be fixed on the pole.

40

345

13800

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Cable terminations to the switch gear marshalling boxes/panel terminal blocks/control and relay panels LT AC panel including providing suitable ferrules and lugs as per specification (including cost of ferrules, lugs and glands)

250

27

6750

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Fixing of metal halide lamps with fixtures junction box with MCB with 105 GI pipe complete.

49

1268

62132

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of 46W LED Fixture set of (LUMINAIRE MAKE: PHILIPS /OSRAM/GE/VENTURE / CROMPTON/ BAJAJ/VIN/WIPRO/JAGUAR/KESELEC/HAVELLS/HPL/SURYA/SYSKA. LED MAKE: PHILIPS LUMILEDS/ CREE/ NICHIA/ OSRAM/ SUMSANG/ LG LEDs) make with minimum 120 Lm/W Lumens Output, 105 V to 295 V Voltage range, more than 0.94 Power factor, Pressure Die cast Alluminium housing, Powder coated/ anodized finishing, toughed glass lamp cover, IP65 ingress protection, less than 25% THD, minimum 70% electronic efficiency, minimum 140 degrees along the road & 80 degrees across the road beam angle, 4500 to 6500K Color temperature, very low mercury 6.4mg max, Life more than 50,000 burning hours, maximum 20% depreciation during life, Fully cut off control of distribution, Electronic Ballast driver type, minimum 10KV Surge withstand capacity, Poly carbonate reflector/ Poly Carbonate Lens secondary optics, suitable for fixing to poles, with five years warranty.

49

4100

200900

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Fabrication of materials including 2 coats of Red oxide painting for Back clamps with 50 x 6 mm MS Flat

210

15

3150

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of MS bolts & nuts and washers etc of all sizes

300

91

27375

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

9

6450

58050

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Assembly and erection of stay set including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming

20

594

11899

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of 9.1 M long PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing ofsupports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

49

2108

103292

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Excavation of Stay pits of size 0.45x0.45x1.34 Mts' for burying the anchor rod with anchor plateof stay sets including dewatering, shoring, shuttering wherever necessary and back filling the pit (after erection and concreting the same whever is necessary) with the excavated earth/extra earth/ excavated rock bits any and leveling the site with out any lead.In all soils except Hard gravel Hard Murram, Disintegrated Rock, Hard rock Requiring blasting.

20

346

6920

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Excavation of pits in hard rock requiring blasting. (other than SS) 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum

49

909

44541

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of Danger boards with clamps

12

116

1392

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection-11KV Seating Channel

6

131

786

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of 11KV Seating channel set

6

12

72

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of 11KV Seating channel set

6

12

72

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of 11KV Polymer Pin Insulators with GI pins

18

1

18

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of 11KV Polymer Pin Insulators with GI pins

18

1

18

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of LT Distribution Box

12

18

216

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of LT Distribution Box

12

18

216

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Laying of 1Core XLPE 120Sqmm Cable

480

20

9600

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply & Fixing of LT Lugs

60

11

660

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Running of GI eartn flat of size 25X3mm from all metallic parts of channels, AB Switch, HG fuse set, DTr neutral and LT Distribution box and inter connection of earth pits etc complete

405

13

5568.75

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) above 20 Km and upto 30 Km with Lorry for each trip

4

3619

14476

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Transport of above 30 KM and upto 50 KMiron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading )

0.23

576

132.48

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of M.S.Channels, Angles, Flats & Rods etc.

0.23

185

42.55

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of M.S.Channels, Angles, Flats & Rods etc.

0.23

221

50.83

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of 11 KV HG Fuse Sets

6

18

108

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of 11 KV HG Fuse Sets

6

18

108

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of 11 KV AB SWCH T.T.200/400 A

6

80

480

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of 11 KV AB SWCH T.T.200/400 A

6

80

480

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of 160 KVA DTR

6

441

2646

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of 160 KVA DTR

6

468

2808

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of LT XLPE UG Cable for all sizes

1

260

260

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of LT XLPE UG Cable for all sizes

1

500

500

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Formation of Cut point for 11 KV Single Circuit line excluding pole erection and stays

5

1408

7044.05

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of 2" B class GI pipe

310

307

95170

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Fabrication of materials including 2 coats of Red oxide painting for Back clamps with 50 x 6 mm MS Flat

40

15

600

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Paiting of Structure code/DTR code and location name with yellow back gound and with black letters including cost of paint

6

110

660

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of MS bolts & nuts and washers etc of all sizes

100

91

9125

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of earthing GI Flat 25X3 mm with materials

450

105

47250

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

18

386

6948

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wireetc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

18

1210

21780

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of CI eath pipe with 80mm dia,2.75 M Length earthing pipe with materials

18

2789

50202

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of 3 Phase DTRs 160/250 KVA including loading and Unloading DTR on the Structure/Plinth etc

6

1815

10890

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;RCC Column type DTR Plinth of size 1'X1'X13',topslab 5'x9'x9" & beam size 5'X9'X9" above 160KVA with plastering and white paint

6

24600

147600

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply & Fixing of PVC Cleats for LT cable including cleats

40

27

1080

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc

12

1563

18760.92

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of 11 KV HG Fuse set including earthing AB Switches, VCBs, LAs, PTs, CTs, DTRs etc

6

726

4356

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of 11KV 200A TT type AB Switch including fixing of cross angles and alignment complete

6

1777

10667.64

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Excavation of pits in all soils except hard rock requiring blasting 8.0Mtrs PSCC Poles - 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum

12

474

5688

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Excavation of pits in all soils except hard rock requiring blasting 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0") 1.05 cum

2

491

982

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) above 20 Km and upto 30 Km with Lorry for each trip

2

3619

7238

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Running of GI eartn flat of size 25X3mm from all metallic parts of channels, AB Switch, HG fuse set, DTr neutral and LT Distribution box and inter connection of earth pits etc complete

40.5

13

556.88

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of GI Flat 25X3 mm earthing pipe with materials

45

105

4725

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;UN Loading of 11 KV Metal Bag parts

2

48

96

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of 11 KV Metal parts

2

48

96

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of 11KV Polymer Pin Insulators with GI pins

120

1

120

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of 11KV Polymer Pin Insulators with GI pins

120

1

120

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un Loading of Conductor drums

2

100

200

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of Conductor drums

2

202

404

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of R.S. Joists 175 x 85 mm

4

76

304

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un loading of R.S. Joists 175 x 85 mm

4

50

200

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un loading of 11KV AB Switch Conventional type 200/400 A

1

80

80

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of 11KV AB Switch Conventional type 200/400 A

1

80

80

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Un loading of M.S.Channels, Angles, Flats & Rods etc.,

2

185

370

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Loading of M.S.Channels, Angles, Flats & Rods etc.,

2

221

442

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Transport of Above 30 KM and upto 50 KM iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading )

3

576

1728

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Cutting charges for MS Sections for MS Angle of all sizes

120

7

840

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Fabrication of materials including 2 coats of Red oxide painting for Back clamps with 50 x 6 mm MS Flat

90

15

1350

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Numbering of poles including.cost of paint

45

32

1440

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of Danger boards with clamps

45

116

5220

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of MS bolts & nuts and washers etc of all sizes

200

91

18250

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Sub-transport of 9 Mtr long PSCC poles upto Workspot upto 10KM (Including loading and unloading)

45

399

17968.5

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Sub-transport of 8Mt long PSCC poles upto Workspot upto 10KM (Including loading and unloading)

12

266

3194.4

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Assembly and erection of stay set for 11kv< including fixing of guy insulators, clamps etc., on the pole and fixing staywire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming

10

594

5949.5

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Excavation of Stay pits of size 0.45x0.45x1.34 Mts' for burying the anchor rod with anchor plateof stay sets including dewatering, shoring, shuttering wherever necessary and back filling the pit (after erection and concreting the same whever is necessary) with the excavated earth/extra earth/ excavated rock bits any and leveling the site with out any lead.In all soils except Hard gravel Hard Murram, Disintegrated Rock, Hard rock Requiring blasting.

10

346

3460

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

1

1210

1210

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Supply of CI eathing pipe with 50mm dia,2.0 M Length

1

2441

2441

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

1

143

143.75

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

1

2078

2078

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Formation of Cut point for 11 KV Single Circuit line excluding pole erection and stays

20

1408

28176.2

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Paving out and stringing of 55 Sqmm Single Circuit (3 Conductors)conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

1.5

9451

14177.52

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.

21.2

6450

136740

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

4

845

3380

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost ofconsumable.

4

502

2010

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of Box pole 12 Mtr in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly amming including transport of materials from road side tolocation excluding pit excavation

2

3824

7649.74

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of 8.0 m long PSCC poles for Strut pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side tolocation excluding pit excavation

12

1163

13956

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Erection of 9.1 M long PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

45

2108

94860

... More
Electrification arrangements to 2BHK works at Jawaharnagar III;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum

45

679

30555



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.