Telangana State Southern Power Distribution Company Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Civil And Construction
Electrical and Electronics
Electrical Works
Opening Date6 Feb 2025
Closing Soon21 Feb 2025
Tender Amount₹ 1,68,82,313 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Seigniorage Charges - Sand

82.29

40

3291.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and Fixing of Substation name board of size 6'x3' iron sheet with angle frame and channel supports of size 75x40mm, 8' height including concreting of channel supports and painting with enamel paint complete.

1.62

4326

7008.12

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;S&F Glow Sign Board

2.7

3553

9593.1

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of P V C chairs of approved quality & make incldg cost etc complete

2

1150

2300

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;supply of 'S' type chair with arms teakwood frame with seat back 's' type on G.I pipe.(Make: Godraj)

2

3650

7300

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of steel table of size 4'x2.'x30" with 18 mm plywood fixed with rubber beeding with drawers on right side with automatic locking arrangements etc copmlete.

1

7800

7800

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Constructing 1220.0 mm (4?0?) dia Soak pit with reinforced brick masonary(honey-comb wall) including excavating pits up to a depth of 1500 mm (5'-0") in all sorts of soils (excluding rock) as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site and all incidental and operational, labour charges etc., complete for finished item of work as as directed by the Engineer in charge.

1

5560

5560

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Constructing 1220.0 mm (4?0?) dia Septic tank with CC collars/rings including excavating pit up to a depth of 1800 mm (6'-0") in all sorts of soils (excluding rock), laying cement concrete (1:4:8) 150 mm thick using 40mm HBG Metal, Plastering 20mm thick for jointing CC collars and Providing M-20(Nominal mix) grade 3" thick RCC cover and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site and all incidental and operational, labour charges etc., complete for finished item of work as directed by the Engineer in charge.

1

8215

8215

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supplying and fixing of TV shape mirror with plastic size 609mmX 457.2 m

1

564

564

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Suplying and fixing of 31.75mm PVC waste pipe for wash basin including cost and conveyance of all materials and labour charges et complete

1

33

33

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing and placing on terrace (at all floor levels) Sintex /Aqua tech or equivalent Polyethylene water storage tank double layer conforming to ISI 12701/96 mark with lid and suitable locking arraqngments and making necessary holes for inlet and outleta and over flow pipes labour charges etc complete for finished item of work.

1000

10

10000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Suplying and fixing of bib tap 12.7mm dia fisrt quality indian make seiko or equivalent.

2

298

596

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Suplying and fixing of angle stop cock 12.7mm dia fisrt quality indian make seiko or equivalent.

2

721

1442

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

2

1717

3434

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing of PV low level system parryware/slim line with internal component and short bend of 10 lits capacity with choice color etc., complete.

2

2032

4064

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supplying and fixing of best indian make plastic seat and lid for European water closets and buffers as per IS 2548-1963

2

1324

2648

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap including cost and conveyance, labour charges etc complete.

1

2228

2228

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg.

1

4610

4610

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply&fixing of 4" (101.6 mm ) Nahany Trap ( Without Jali with inlet)UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

2

134

268

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply & fixing of Floor Trap (Bell Mouth ) 110 mm - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

2

269

538

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply & fixing of 110 mm dia - Door Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

2

128

256

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply & fixing of 110 mm dia - Plain Bend 87.5 Degree - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

2

96

192

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and Fixing of 110 mm dia 3 M Single Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar or any ISI Brand including cost and conveyance, labour charges of all materials etc. complete for finished item of work.

20

462

9240

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;b) 25 mm NB Size

2

466

932

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;S & F Gunmetal (GM) Ball valve with SS Ball and SS Spindle as per IS - Class - I, Indian make heavy type a) 20 mm NB Size

20

331

6620

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;c) 28.60mm OD Pipe - SDR 11

90

410

36900

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;b) 22.20mm OD Pipe - SDR 11

80

313

25040

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007)a)15.90mm OD Pipe - SDR 11

40

239

9560

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing independent earthing for sophisticated equipment like computer, medical equipment electronic gadgets etc with 600X600X3.15mm thick copper plate rigidly fixed to the 40mm dia GI pipe 2.5m long pipe and 19mm dia B class GI pipe of .3 mts long connectd with reducer providing of stggred holes of 16 Nos of 12 mm dia to earth electrode, enclosed in in a CC chamber of (400X400X400) mm with suitable reinforced RCC slab cover duly filling with betonite powder and clay in (1:6) prop from bottom of pipe to bottom of CC chamber giving earth connection from the electrode throuh necessary GI strip of 25X6X200 mm length provided with suitable size o 14 Nos holes GI washers nuts and bolts and all labour charges etc complete.

1

5345

5345

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing of Electronic Regulator of Modular of GM / Legrand Myrius / L & T / North West / Indo Simon / ABB /Schneider ZEN celo including cost and conveyance of all labour charges and as per the direction of Engineer in charge.

2

589

1178

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and errection ceiling fan of selected colour and delux model high breeze with 3 blades and double ball bearing and with condenser AC 250 V 50 C/S of 48" 600 mm sweep completed erected in position with resistance type regulator, canopy down rod upto 304.8 mm in length is provided with hook/clamps nuts and bolts and 24/0.2 flexible copper wire etc.,complete and pointed with lettering by enamel paint the Sr.No and date of erection including cost and conveyance of all labour charges (Almonard/CG/Khaitan/Bajaj) and as per the direction of Engineer in charge.

2

2277

4554

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing of batten holder/slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 11 to CF2 etc complete.(PHILIPS/CROMPTON)

4

141

564

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and erecting of approved make crom/bajaj make as directed by department 1x40W patty type fluorscent fitting made of CRCA sheet,completed with polyster filled 40W.choke,starter and side holders etc.complete with 40W tube all lobour charges etc complete (PHILIPS/CROMPTON)

8

755

6040

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing of 12 way SPN Distribution board with IP-20 protection suitable for single phase 40A DP Isolator/ELCB/RCCB as incomer and 10kA-6-32A SP MCBs 6Nos as out going including connections and all labour charges concealed in wall by chiseling and masonaqry work etc complete.

1

6394

6394

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;supplying and run of 2 of 28/0.3 mm(2.5 sqmm) PVC insulated flexiable copper cable in existing conduit pipe for run of mains including all labour charges and materials chages etc. complete. (FINOLEX/HAVELS)

120

103

12360

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;supplying and run of 2 of 14/0.3 mm(1.0 sqmm) PVC insulated flexiable copper cable in existing conduit pipe for run of mains including all labour charges and materials chages etc. complete. (FINOLEX/HAVELS)

30

56

1680

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supplying and erection of approved make 6 Amps one modular SP switch with 6 Amps 6 pin mudular type plug socket mounted on metallic box covered with appropriate front plate as including all labour and material charges etc., complete for finished item of work.

6

542

3252

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Wiring with 2X1.0 Sqm(14/.3mm) PVC insulated flexiable copper cable in the existing metalic/Non metalic conduit pipe with 6A modular SP switch, mounted on metalic box covereds with appropriate front plate modules etc ceiling rose including cot and conveyance of all mateials, labour charges complete for light points, bell points exhaust fan points in non residential builsing except circuit moving finished in all types masonary as directed by department (Anchor Roma/GM/HAVELLS/FINOLEX)

15

642

9630

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supplying and fixing of 25mm dia 1.5mm thick PVC conduit pipe conceald in wall with all required accessories with No 14 SWG wire for earth conitunity including chisiling the wall whereever necessary, including masonary work and all labour charges complete.

30

108

3240

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing 25mm dia 1.5mm thick recessed( concealed) PVC pipe alog with reinforcement to be laid in slab including No 14 SWG GI wire for earth contunity, cost of pipe, binding wire and all labour charges etc complete

40

97

3880

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply&Fixing of R.C.C hume pipe of 450 mm dia including cost & conveyance of all materials labour charges etc complete for finished item of work.

7.5

1474

11055

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply&Fabrication and fixing of Welded wire mesh ( 2" x 1") of 2.8mm dia. with ISMC (75x40x4.4mm) and Pheriperal frame of ISA(35x35x3mm) including cost& conveyance painting with synthetic enamil paint two coats over a coat of red oxide primer etc complete for finished item of work.

120

2310

277200

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply&Spreading ofHBG metal 20 mm size of 80mm thick including cost&conveyance labour charges etc complete for finished item of work

67

1672

112024

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Conducting of DGPS & Total Staion Survey and Providing of maps including preparation of boundary and contour levels with 2 Nos hard copies and soft copies complete for finished items of work as directed by the Engineer in charge of the work.

2

5000

10000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting to External Faces of walls(outside) in all floors as specified with two coats of ACE or equivalent quality paint of approved colour make and shade over one coat of white cement primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work .

1452

259

376068

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting in all floors as specified with two coats of Plastic emulation paint of approved colour make and shade over one coat of white primer including cost and conveyance of all materials, labour charges at all leads, lifts, hights, levels and floors,all incidental charges etc. complete for finished item of work .

106

155

16430

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;0.0

5.3

808

4282.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;0.0

40

730

29200

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tile length equal to floor tile, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Shahabad stone, cement, sand and water etc., complete for finished item of work

14.4

979

14097.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Flooring with ceramic tiles of 1st class quality of approved brand shade and design of different size laid over a floor bed of CM 1:3 of 12 mm thick base coat and neat grey cement slurry of honey like consistancy spread at the ratet of 3.3 kg of cement per sqm and pointed to full deapth, (joints must be flushed) with white cement paste mixed with pigment when requied including cost and conveyance of cement and all materials ,labour charges, at all levels, heights and floors,curing etc. complete for finished item of work.

3.7

844

3122.8

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supplying and fixing of MS safety grill with peripheral frame of ISA 25x25x4mm and 8mm square rods at 100mm c/c both in horizontal & vertical direction including cost and coveyance of all mateirals with all leads and lifts, labour charges, painting charges complete for finished item of work

6.8

2990

20332

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;S&F-UPVC Sliding Windows of approved make including cost and coveyance of all mateirals with all leads and lifts, labour charges, painting charges complete for finished item of work

5.8

6063

35165.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing of doors with the frames of the door shall be made well seasoned MT wood of cross section 100x75mm. The shutter shall be made ISI mark flushed door with two coats of synthetic enamel paint of approved color over one coat of primer over luppum with spary on both sides with 3 no 150mm hinges, 1 no door stoper, 1 no 250mm aldrop, 1 no 300 mm tower bolts, 2 no 150mm door handlers of MS Powder coated, including cost and conveyance of the meterials,fixing,labour carges,tools,handles,locking arrangementts and other fixtures & fittings for finished item work

6

7314

43884

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing Reinforced cement Drop Walls in CM 1:2 of 40mm thick over rabbit wire mesh including cost and conveyance of all meterials, labour charges, curing for specified number of days,at all levels, floors, height, leads and lifts, seignioage charges all incidental charges etc . complete, but excluding cost of steel as per the approved drawing for finished item of work

15

2953

44295

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing impervious coat over RCC roof slab surfaces to requried slopes with 20mm thick in CM 1:3 pro mixed with approved brand of water proofing compound as the rate of 1 kg per bag of cement including cost and conveyance of all materials, water, all labour charges, chemicals, curing for specifed number of days,rounding off junctions of wall and slab, all leads, lifts, heights,levels and floors etc.complete for finished item of work.

64.1

524

33588.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Raised pointing in CM(1:3) including curing, cost and conveyance of all materials and labour charges for complete item of work.

607.4

113

68636.2

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing plastering of 20mm thick to all uneven faces of walls and ceiling of superstructure in two coats with base coat in CM 1:5of 16mm thick and top coat in Cm 1:3 4mm thick with dubara sponge finish including cost and conveyance of all materials . water. all labour charges, curing for specified number of days, cutting grooves, at allheghits, level and floro, all leads, lifts and scaffolding charges, all incidental and scaffolding charges, seigniorage charges, all incidental charges etc. complete for finished item of work A)Ground floor

1644.5

498

818961

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc.,complete for finished item of work

2.6

78657

204508.2

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Brick masonry for wall in superstructure (230mm thick) in CM 1:6 using traditional Local madeSecound Class Bricks from approved sourse and quality having crushing strength of not less than 100 Kg/sq cm and water absorption not exceeding 20% by weight including cost and conveyance of all mateerials, seigniorage charge, all labour charges, curing for number of days as specified, for all leads, lifts scaffolding chargess, at all heght levels and floors all incidental charges etc completed item of work. A)Ground floor

146.7

8182

1200299.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;g)Slab

16.8

11035

185388

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;f)Sun shade 0.6m width 3" thick

3.4

1306

4440.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;e)Lintels

0.6

12573

7543.8

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;d)Roof beams

2.8

11965

33502

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;c)Plinth beams

2.2

12002

26404.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;b)Columns

3.7

12579

46542.3

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Reinforced Cement concerete M20 GRADE Nominal Mix for footings , columns, Beams and Slab using 12mm to 20mm size graded HBG machine crushed metal from approvaed quary giving cube crushing strenth of 20 N /sqmm and a minimum of 400 kgs of cement for 1 cum of concrete including cost and conveyance charges for cement and all other materials to site, scaffolding charge , seignorage charges, centering, shuttering, machine mixing,laying concrete, curing for specified number of days vibrating etc compaction by pen vibrator or needle vibrator supplemented by hand spreeding rodding and tamping ,all incident and operational charges , all leads and lifts and for all leaving gaps and pockets etc complete, but excuding cost of ssteel and its fabrication,all incidental charges etc .complete for finshed item of workA)Ground floora)Footings

5.6

9357

52399.2

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supplying and filling with borrowed gravel, watering, ramming, consolidating thoroughly complying with the standard specification including cost and conveyance of all materials, labour charges,hire charges of machnery,with all leads and incidental charges etc complete for finished item work

947.5

640

606400

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;CRS masonry in CM(1:6) using Hard Granite Stones including cost and conveyance of all materials, seignorage charges, labour charge for construction and for dressing stones to required size and shape, dewatering,scaffolding,cutting for all leads and lifts, all incidental charges etc .complete for finished item of work

248.5

5158

1281763

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing and laying Plain Cement Concrete of (1:2:4) with well graded machine crushed granite metal of 20mm nominal size from approved quarry for Bed Blocks, Hold Fasts including cost and conveyance of all materials, labour charges,hire charges of machnery,with all leads and lifts, for all floors curing for required number of days, all incidental charges etc complete for finished item work

6.8

6304

42867.2

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing and laying Plain Cement concrete of (1:4:8) for levelling course using 40mm size hard broaken Granite stone including cost and conveyance of all materials, se HBG metal for foundations and leveling course, including cost and conveyance of all materials,seignorage, water, labour charges, hire charges of nachinery, at all levels, depths,heights and floors consolidation by watering ,ramming in layers,bailing of water if any, and removal of form work after completion of work curing for reqired number of days,all incidental charges etc complete for finished item of work.

42.8

4887

209163.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Back Filling the foundation Columns, for lift wells ,Staircase foundation ,U.G Sump Septic tank, Road work ,storm water drain ,cable trench,soak pit and outside of hte reataining wall with the useful avilable excavated earth ,in layers not exceeding 150mm thick, conslidating each deposited layer by eatering and ramming including cost and conveyance of all materials labour chargess,hire charges of T&P,all leads and lifts etc,complete for finished item of work

11

34

374

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Earth Work Mass Excavation to a depth as directed, in soils such as Mixture of Gravel and Soft Disintegrated Rock like Shales, Ordinary Gravel, Stoney Earth and Earth Mixed with Fair Sized Boulders and in all conditions such as dry, wet, slurry etc.and in dense or hard soils, disposal and depositing of excavated soil with intial lead of 10 mt and intial lift of 2m or as directed, including cost and conveyance of all materials, ramping and lifting of materials, and labour charges, hire charges of machinery, tools & plants, bailing of water (either sub soil water, storm water, rain water, surface water or of any kind) if any at any stage of work until all works below ground level is finished to the satisfaction ,and from work such as shoring, timbering, strutting with required supports etc. for the work and removal of form work after completion of work etc all complete

254.1

486

123492.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Hiring of JCB for site levelling and cleaning

30

2165

64950

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and erecting D.O.L Starter 250V, Single phase, 50Hz with SS enclouser comprising of contactor with bi-metallic relay with necessary push buttons, transportation and all labour charges etc. complete.

1

1040

1040

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and Fixing of Flange Clamps including cost and conveyance of all materials

1

182

182

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing of 2.5mm single core copper cable complete for finished item.

215

192

41280

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and Fixing of 1.5HP Texmo/Kirloskar make motor of single phase submersible of multiple stage including all materials and labour charges complete for finished item.

1

29047

29047

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing of HDPE pipe 40mm dia. including cost and conveyance of all materials labour charges etc complete for finished item of work.

160

180

28800

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Suppy & fixing of 180 mm dia. 6 kg/cm2 PVC casing pipe including cost and conveyance of all materials labour charges etc complete for finished item of work.

20

883

17660

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Drill-165mm Bore Well 150M to 180M

30

492

14760

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Drill-165mm Bore Well 120 M to 150M

30

394

11820

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Drill-165mm Bore Well 90M to 120M

30

369

11070

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Drilling of 6.5" dia bore well from ground level in all formations including cost and conveyance of all materials labour charges etc., complete for finished item of work.Drilling-165mm Bore Well 0 to 90M

90

336

30240

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Geophysical investigation charges

1

5000

5000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fabrication of materials including 2 coats of Red oxide painting 1.07 mt. V. Cross arms with 75 x 40 mm MS Channel

175

114

19965.75

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fabrication of materials including 2 coats of Red oxide painting Fab Back clamps with 50 x 6 mm MS Flat

175

15

2625

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Laying of DR 11KV 3x300sqmm UG Cb HG/BC/CC/BT XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth,levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

630

631

397567.8

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

72

6579

473688

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of 11 M long PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

135

4336

585474.75

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sub-transport of 9M PSCC Poles incl. L&UL Workspot upto 10KM (Including loading and unloading)

40

407

16291.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sub-transport of poles 11M PSCC Pole incl. L&U upto Workspot upto 10KM (Including loading and unloading)

135

431

58315.95

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits 0.76 M x 0.76M x 1.52M (2.6" x 2.6" x 5.0') 0.88 cum in hard rock requiring blasting.

40

1514

60560

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Submission of auto CAD Drawing as per pole schedule (Detailed survey and sketch CAD Drawing per pole upto 10KM

1

6000

6000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Laying of earth mat GI Flat 25 x 3 mm (including material) including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.

100

68

6800

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits w/o blast 0.76X0.76X1.83M in hard rock not requiring blasting. (In hard murram / rock boulders)

135

928

125280

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;S-4" BClass GI pipe 3.65mm thck 12.2Kg/M

210

740

155400

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Cut-Tree Branch(LT/11/33)&Trnsprt Debris

3000

4

12000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

2.89

482

1392.98

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

2.89

1293

3736.77

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedLabour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

2.89

851

2459.39

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

2.89

2181

6303.09

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading )10 TO 20KM

2.89

412

1190.91

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rod

2.89

185

534.65

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rods

2.89

221

638.69

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Raising of double run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe) 11 KV 3x300 Sqmm Cable

120

275

33048

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Laying of11KV XLPE UG cable Double Run of Size in Hard Rock(1.05*0.5x1=0.525cum

700

1194

835800

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS 11/33KV Straight thr jointkit

4

4

16

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS 11/33KV Straight thr jointkit

4

8

32

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) >10 & <20Km

5

3299

16498.5

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS-11/33KV XLPE UG Cable all sizes

5

1024

5120

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS-11/33KV XLPE UG Cable for all sizes

5

1024

5120

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of Straight through joints 11kv 3x300 xlpe

12

3725

44705.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of Straight through joints of Outdoor/Indoor End Termination 11kv 3x300 xlpe

12

2370

28447.56

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

6

146

879.78

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedPainting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

6

142

852

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) >10 & <20Km

2

3299

6599.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 11 KV AB SWCH Con 200/400 A

10

80

800

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 11 KV AB SWCH Con 200/400 A

10

80

800

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

10

3200

32000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of pole in 9.1M position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

40

2400

96000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 9.1M PSCC POLE

40

91

3640

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 9.1M PSCC POLE

40

182

7280

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Formation of Cut point for 11 KV Single Circuit line excluding pole erection and stays

20

1435

28716.2

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of Conductor drums

6

100

600

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, >10 & <20Km control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)

1

3299

3299.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of Conductor drums

3

202

606

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Paving out and stringing of conductor 100sqmm 33/11kv Line 6 Cond DC by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

1.1

26255

28881.58

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Paving out and stringing of conductor 100sqmm 33/11kv Line 3 Cond SC by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location

3.25

13856

45034.28

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of earthing pipe GI flat 25x3 with materials

150

105

15750

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of Assemble Kit for 'T' Branche

2

1800

3600

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and erection of T-Branch kit

2

3215

6430

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile materialVCBs >10 & <20Km such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)

2

3299

6599.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 11 KV AB Cable (XLPE) 3 Cor

3

438

1314

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 11 KV AB Cable (XLPE) 3 Core

3

584

1752

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Raising of cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

150

135

20349

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Laying of XLPE UG cable Triple or more Run including excavation of trench of size 1000mm wide to 750mm wide as per the site conditions and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second,third or more cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.Along the CC / BT multi layer road requiring compressor Along the CC / BT multi layer road requiring compressor 33 KV 3x400 Sqmm Cable

450

1731

779152.5

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc incl.Including the cost of cement

81

6579

532899

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of 11 M pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation.

40

4336

173474

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Assembly and erection of stay set 33kv including fixing of guy insulators, clamps etc., on the pole and fixing stay wire and binding securely on either side as per standards, transport of material from road side to location and back filling with earth ramming

20

684

13690.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading)SubTrnsprt 9M PSCC Pole incl. L&UL<10KM

40

407

16291.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading)

150

771

115707

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of Spun poles 12.5 Mtrs / 12.9Mtrs PSCC pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

150

4521

678249

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits (3.0" x 3.0" x 7.6") in all soils except hard rock requiring blasting

40

842

33711.2

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits 0.75 M x 0.9 M x 1.95 M in all soils except hard rock requiring blasting

100

629

62985

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;S-6" B Class GI pipe 5mm thck 20Kg/M

60

1044

62640

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Cut-Tree Branch(LT/11/33)&Trnsprt Debris

2500

4

10000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of 33 KV AB Switch including alignment and earthing

1

4500

4500

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedLabour for 2nd coat Al. Painting.

0.26

482

127.25

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding Sup Material for 2nd coat Al. Painting.

0.26

1292

341.35

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedLabour for 1st coat Al. Painting.

0.26

850

224.66

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Sup Material for 1st coat Al. Painting.

0.26

2180

575.78

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rod

0.26

185

48.84

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rods

0.26

220

58.34

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Paint of coping with 2 coats of white cement incl cost of paints etc.

2

48

96

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

1.16

373

430.81

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.Mass concreting of supports incl. cement

1.32

6579

8704.02

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)Ex of Hard pit w/o blast 0.76X0.76X1.52M

50

793

39650

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour for 2nd coat Al. Painting.

1

482

482

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedSup Material for 2nd coat Al. Painting.

1

1293

1293

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedLabour for 1st coat Al. Painting. Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

1

851

851

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Sup Material for 1st coat Al. Painting.

1

2181

2181

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

4

50

200

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

1

412

412.08

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

4

76

304

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

1

146

146.63

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

1

142

142

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 33 KV AB SWCH Con 400/800 A

1

79

79

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALSof 33 KV AB SWCH Con 400/800 A

1

126

126

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Consultation charges for pursuing with various Departments for obtaining required permissions for Road cutting and submission of necessry Documents, Drawings etc.

1000

38

38250

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;S&E-Smart RFID marker

6

2745

16470

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of Outdoor/Indoor End Termination 33 KV 3x400 Sqmm Cable

12

2764

33177.12

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UG Cables Joints :Making of Straight through joints 33 KV 3x400 Sqmm Cable

12

5700

68409.36

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth,levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.Along the CC / BT multi layer road requiring compressor 33 KV 3x400 Sqmm Cable

400

1388

555536

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Raising of cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)33 KV 3x400 Sqmm Cable

100

323

32385

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport-33KV 3x400sqmm Cb Drum to 50km

4

21423

85692

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS-11/33KV XLPE UG Cable all sizes

4

1024

4096

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS-11/33KV XLPE UG Cable for all sizes

4

1024

4096

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Formation of Cut point for 33 KV Single Circuit line excluding pole erection and stays

20

1791

35822.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.100 Sqmm Single Circuit (3 Conductors)

3

13856

41570.1

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.100 Sqmm Double Circuit (6 Conductors)

4

26255

105023.92

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of Conductor drums

7

100

700

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Above 10 Km and upto 20 Km with Lorry for each trip

7

3299

23097.9

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of Conductor drums

7

202

1414

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Box pole 12 Mtr

8

3901

31210.96

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS-LT AB Cb 3x16+25sqmm

4

204

816

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS - LT AB Cb 3x16+25sqmm

4

200

800

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Earth work excavation of pits in hard rock requiring blasting.

1.44

1012

1457.78

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

20

146

2932.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedPainting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

20

142

2840

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of poles Paint of coping with 2 coats of white cement incl cost of paints etc.

8

48

384

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

4.62

373

1723.26

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

5.29

6579

34816.07

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*) Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

4

482

1928

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*)Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

4

1293

5172

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium.

4

851

3404

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

4

2181

8724

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits in hard rock requiring blasting. (other than SS)0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

8

1770

14160

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

16

50

800

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;TRANSPORT OF STEEL 10 TO 20KM

4

412

1648.32

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

16

76

1216

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Hoisting of Insulators and hardware, stretching the conductor and stringing of 11 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 3.5mt)

2

507

1014

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders)0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

8

928

7424

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;S-Hot dip gal./Zinc bolts & nuts washer

800

90

72000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sup 33/11kv S.S Permanent name board

1

10238

10238

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Digital clamp meter.

1

2888

2888

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Earth megger (1000v)

1

8085

8085

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of 5000v megger

1

13860

13860

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Gum Boots

4

693

2772

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of LC Boards

8

116

928

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Safety Helmet of standard make

6

231

1386

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sup TrollyMounted Co2 Cylinders(IS-2878)

4

9240

36960

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sup Fire Extinguisher for Control Room

2

4620

9240

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sup Fire Buckets Stand with Buckets

2

1386

2772

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Danger boards with clamps

14

116

1624

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sup Stand basic cell phone with charger

1

1386

1386

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;SupRubber mats( 6?x3?)size for indoorSS

12

1386

16632

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Hand Gloves

2

289

578

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Earth rods with (1) reputed make ISI PVC pipe of 5 feet length, 3 mm thickness, 32 mm dia inside cane wood stick closed both top & bottom ends with caps, (2) reputed make ISI (Finolex/ Polycab/Havells) first quality flexible PVC wire of 6 Sq.mm multi-strand copper 10 Mtrs length one side crimped with a suitable copper lug, other side fixed with a lug, bolt & nut to a suitable 3 inch long copper heavy duty crocodile clip having insulated sleeves, (3) Copper flat of size 25 mm width 3 mm thick 250 mm length make hook shape fixed to the PVC pipe with 2 No.s 6 mm dia 65 mm length hot dip galvanized bolts triple nuts with a 2 mm thick spring washer and 1 mm thick 4 flat washers and fixing of the copper wire to the bolts with lugs. Sup Earth Rods (8ft) Screw & clamp type

4

578

2312

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;T&P Supply of Hack saw (12 inches)

1

289

289

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;T&P Sup Angle racks(18x36.6inches) Godrej

1

1733

1733

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;T&P Supply of S type chairs (Godrej)

4

924

3696

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;T&P Supply of Table (3x6ft) Godrej

1

6050

6050

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;T&P Sup Steel almarah(61/2 X 3ft) Godrej

1

9818

9818

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;T&P Sup Rechargeable LED torch light.

1

1733

1733

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;T&P Supply of Taparia Tool kit of Size 20?x10?x15? with tier arrangements Tool box with locking arrangement & key containing (1) Double Ended fix Spanner sets, (Ribbed) 6 x 7, 8 x 9, 10 x 11, 12 x 13, 14 x 15, 16 x 17, 18 x19, 20 x 22, 21 x 23, 24 x 27, 25 x28, 30 x 32, (2) Double Ended Ring Spanners sets, 6 x 7 , 8 x 9, 10 x 11, 12 x 13, 14 x 15. 16 x 17 , 18 x 19, 20 x 22 , 21 x 23, 24 x 27, 25 x28, 30 x 32 mm, (3) Adjustable Spanner 305 mm length least maximum opening 35mm chrome, (4) Pipe Wrench Length 350 mm 14?, (5) Soft faced Hammer with suitable handle 2 lb, (6) Hacksaw frame with metal handle heavy duty for 12" hacksaw blade with High Speed blade, (7) Insulated Screw drivers Transparent Green Handle Set Length 6?, 8? & 12?, (8) Star Screw Driver Transparent Green Handle Length 6?, (9) Insulated Wire Cutter, (10) Insulated Cutting Plier Length 8?with cable stripper insulated with thick C. A. sleeve confirming to IS: 4378 -1990, (11) Long Nose Plier insulated with thick C.A. sleeve generally confirming to IS:3552-1989, (12) Tester type screw driver (special with neon bulb) generally confirm to IS: 5579-1985 Grade:II handle yellow/green colour overall length 130 mm, (13) Insulated Crimping Plier of all Taparia make.

1

4925

4925

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;T&P Painting of Name Plates for any equipmen

30

122

3660

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Sup Alluminium Ladder for indoor works

1

4410

4410

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;S-10ft Aluminium Ladder

1

1654

1654

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Wall clock standard make

1

578

578

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Control Panels Supplying & fabrication erection of 6mm Checkerd plates as per the field

750

83

62250

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing of safety instructions/Substation operation instruction board

1

2205

2205

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply and fixing of Substation board of size 3'x2.5' indicating the layout of switchyard

1

1654

1654

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of Outdoor/Indoor End Termination Supply of 31/2x185Sqmm UG O/D end term kits

2

968

1937.8

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of Outdoor/Indoor End Termination Supply of 31/2x185Sqmm UG O/D end term kits

2

550

1100

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Raising of cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)LT 3 1/2 x 185 Sqmm Cable

15

85

1281.45

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Laying of XLPE UG cable including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.LT 3 1/2 x 185 Sqmm Cable

85

377

32098.55

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of LT distribution box including laying of LT cable from distribution box to LT OH line and DTR to distribution box including earthing of distribution box and crimping of lugs connecting of jumpers etc

1

1594

1594.67

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of Outdoor/Indoor End Termination 11 KV 3x185 Sqmm Cable

2

2370

4741.26

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Raising of cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)11 KV 3x185 Sqmm Cable

20

126

2524.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Laying of XLPE UG cable including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.-SR 11KV 3x185sqmm UG Cb HG/BC/CC/BT 11KV 3x185 Sqmm Cable

40

465

18618.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV HG Fuse set including earthing

1

740

740.52

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 11 KV HG Fuse Sets

1

18

18

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 11 KV HG Fuse Sets

1

18

18

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switch and aligment complete Erection of 11KV 200A TT type AB Switch including fixing of cross angles and alignment complete

1

1813

1813.49

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 11 KV AB SWCH T.T.200/400 A

1

80

80

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 11 KV AB SWCH T.T.200/400 A

1

80

80

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of DTR's including loading and Unloading DTR on the Structure/Plinth etc Erection of 3 Phase DTRs 63,75 & 100 KVA

1

1650

1650

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 50,63,75&100kva DTR

1

280

280

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following ratesAbove 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 50,63,75&100kva DTR

1

350

350

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;RCC Column type DTR Plinth of size 1'X1'X13',topslab 5'x9'x9" & beam size 5'X9'X9"

1

25092

25092

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of poles Paint of coping with 2 coats of white cement incl cost of paints etc.

2

48

96

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

1.16

373

432.68

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.Including the cost of cement

1.97

6579

12960.63

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation-12Meter Box pole

2

3901

7802.74

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*) Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

0.75

482

361.5

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*)Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

0.75

1293

969.75

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

0.75

851

638.25

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

0.75

2181

1635.75

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits in hard rock requiring blasting. (other than SS)0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

2

1770

3540

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

3

50

150

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 10 KM and upto 20 KM

0.75

412

309.06

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

3

76

228

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply & spreading of 20mm machine crushed metal (HBG) including cost of conveneyance of all materials, labour charges etc complete for finished item of work and directed by the engineer incharge

45

2113

95085

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fixing of Metal halide lamps with fixtures Make:Philips,Crompton,Bajaj junction box with MCB with 1.5 GI pipe complete.

8

1268

10144

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

6.1

6579

40131.9

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of LED fixture set of (LUMINAIRE MAKE: PHILIPS /OSRAM/GE/VENTURE /CROMPTON/BAJAJ/VIN/WIPRO/JAGUAR/KESELEC/HAVELLS/HPL/SURYA/SYSKA. LEDMAKE: PHILIPS MILEDS/CREE/NICHIA/OSRAM/SUMSANG/LG LEDs) make with minimum 120 Lm/W Lumens Output, 105 V to 295 V Voltage range, more than 0.94 Power factor, Pressure Die cast Alluminium housing, Powder coated/ anodized finishing, toughed glass lamp cover, IP65 ingress protection, less than 25% THD, minimum 70% electronic efficiency, minimum 140 degrees along the road & 80 degrees across the road beam angle, 4500 to 6500K Color temperature, very low mercury 6.4mg max, Life more than 50,000 burning hours, maximum 20% depreciation during life, Fully cut off control of distribution, Electronic Ballast driver type, minimum 10KV Surge withstand capacity, Poly carbonate reflector/ Poly Carbonate Lens secondary optics, suitable for fixing to existing poles in the Substations, with five years warranty Errection of tubular poles

8

1379

11032

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits in hard rock requiring blasting. (other than SS)0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

8

1770

14160

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of LED fixture set of (LUMINAIRE MAKE: PHILIPS /OSRAM/GE/VENTURE CROMPTON/BAJAJ/VIN/WIPRO/JAGUAR/KESELEC/HAVELLS/HPL/SURYA/SYSKA. LEDMAKE: PHILIPS MILEDS/CREE/NICHIA/OSRAM/SUMSANG/LG LEDs) make with minimum 120 Lm/W Lumens Output, 105 V to 295 V Voltage range, more than 0.94 Power factor, Pressure Die cast Alluminium housing, Powder coated/ anodized finishing, toughed glass lamp cover, IP65 ingress protection, less than 25% THD, minimum 70% electronic efficiency, minimum 140 degrees along the road & 80 degrees across the road beam angle, 4500 to 6500K Color temperature, very low mercury 6.4mg max, Life more than 50,000 burning hours, maximum 20% depreciation during life, Fully cut off control of distribution, Electronic Ballast driver type, minimum 10KV Surge withstand capacity, Poly carbonate reflector/ Poly Carbonate Lens secondary optics, suitable for fixing to existing poles in the Substations, with five years warranty 90W LED fixture set

8

8200

65600

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of stepped tubular poles single way made of steel of length 9mtrs with tensile strength of 42kgf/mm2 at a steps of 4.5 mtrs with outer dia 114.3 mm,2.1 mtrs with outer dia 88.9 mm, 2.1 mtrs with outer dia 76.1mm, normal Crippling load of 141 kgf, normal Breaking load of 198 kgf ,working Crippling load of 70 kgf, working Breaking load of 79 kgf as per IS 2713.

8

13913

111304

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fixing of AC/DC Panel and giving Connections to the protection equipment and Metering circuits as per the specification and standards. The 3 1/2 core 25 Sqmm power cable required from distribution box to AC/DC panel in the control room is also to be supply

2

7871

15743.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of AC Supply panel inluding providing of changeover switch, SFU,metering unit, 32 A three phase MCB, 16 A Single phase MCB complete as per specification.

1

42000

42000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of DC Annunciation & relay panel for 10 feeder panel including the cost of LED Indiacation lamps, VAA auxilairy relays, Electronic Hooters complete as per specification.

1

42500

42500

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of 220 V, 200 AH battery in complete shape fit for charging .Conventional lead acid

1

7666

7666

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS 220 V Battery with Charger

1

1024

1024

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS220 V Battery with Charger

1

1612

1612

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of Marshalling boxes

4

374

1499.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of FRP PT Marshalling Box

4

4463

17852

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;L-Cable Termination to Switchgear

270

27

7290

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends

3074

27

82998

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing of cable trench as per DATA-IX

80

3148

251840

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing of earthing with various types of earth lectrodes.Providing of double earthing for neutral with flexible copper jumpers including arrangement by fixing M.S.Channel 100x50mm.

4

1323

5292

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Copper Flexible jumper with 75 X 8 of length 250 mm at neutral of Power tranformer end and 50 X 6 of length 50mm two Nos at double neutral end duly brasing with flexible jumper of capacity of 5kA/3 sec for power transformer neutral.

4

4725

18900

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

36

386

13896

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Providing of earthing with excavation of earth pit (0.6x0.6x2.4 Mts.) duly filling with bentonite, earth ,running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height

36

1234

44431.2

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of earthing pipe with materials iii)Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication

36

3486

125496

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fabrication and connecting to risers from earth mat to structures, equipment,marshalling boxes, electrical panels, PLCC panels, fencing posts etc.M.S./ G.I. Flat 50x6mm / 50 x 8 mm ( Above ground)

1010

41

41410

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Laying of earth mat including excavation of trenches of depth 600mm,welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.75x 8mm MS Flat / GI Flat.

584

65

37960

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rod

5.71

185

1056.54

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 10 KM and upto 20 KM

5.71

412

2353.39

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rods

5.71

221

1262.13

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Labour for Fixing of all types of clamps

57

65

3705

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Connection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

45

224

10080

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of various Clamps Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

45

299

13455

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of various Clamps Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy Supply of I Bolts

12

294

3528

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Tension Hardware 3 Bolted for single Zebra/panther with 150 mm spacing.

12

2055

24660

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV VCB with Control Panel

7

12000

84000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Cement concrete with 40MM metal VCB plin

48

5160

247680

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavate-Pit for 33KV VCB

41.6

331

13769.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 11 KV VCBs&Panel boards

7

1044

7311.36

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 10 Km and upto 20 Km with Lorry for each trip

4

3299

13198.8

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 11 KV VCBs&Panel boards

7

1024

7168

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV LAS line type including earthing

6

505

3030

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV LAS station type including earthing

2

559

1118

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 11 KV,10 KA LAs Station typ

24

32

768

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 11 KV,10 KA LAs Station type

24

32

768

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV three phase PTs

2

800

1600

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 11 KV CT - PT Sets

2

101

202

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 11 KV CT - PT Sets

2

190

380

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switch and aligment complete Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

3

3200

9600

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Earth pit renovation Ere 11KV 800A double throw AB Switches

17

3500

59500

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS11KV AB Switch Conventional type

20

80

1600

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Transport of Cond Drum,VCBs >10 & <20Km

2

3299

6599.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS 11KV AB Switch Conventional type

20

80

1600

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fabrication & erection of Channels Alligning the Main and Auxiliary structures such as RS joist, M.S.Angles,Plates, Channels, Structure to zero level duly leveling in prefabricated MS frames with Hydraulic jacks before galvanising/ fabrication.

4.64

1470

6823.74

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedLabour for 2nd coat Al. Painting. Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

4.64

482

2237.44

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedSupply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

4.64

1293

6002.11

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedLabour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium Labour for 1st coat Al. Painting.

4.64

851

3950.34

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be appliedSupply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

4.64

2181

10124.2

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RSJoist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

4.64

6852

31806.98

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UN-LOADING of LINE MATERIALS M.S.Channels, Angles, Flats & Rods etc.,

4.64

185

858.77

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Upto 10 KM

4.64

412

1912.88

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS M.S.Channels, Angles, Flats & Rods etc.,

4.64

221

1025.88

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Paint of coping with 2 coats of white cement incl cost of paints etc.

25

48

1200

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Plastering 2 Coats,20/16mm(1:6)(1:4)

14.44

373

5386.12

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.Including the cost of cement

27.75

6579

182567.25

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, R.S. Joists 150 x 150 mm

25

1952

48815.25

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Alligning the Main and Auxiliary structures such as RS joist, M.S.Angles,Plates, Channels, Structure to zero level duly leveling in prefabricated MS frames with Hydraulic jacks before galvanising/ fabrication.

8.68

1470

12759.6

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*) Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium ..

8.68

482

4183.76

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Sup Material for 2nd coat Al. Painting.(*)Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

8.68

1293

11223.24

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

8.68

851

7386.68

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

8.68

2181

18931.08

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RSJoist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

8.68

6852

59475.36

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits in hard rock requiring blasting. (other than SS)0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

25

1770

44250

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of RSJoists150 x150 mm/RailPol

25

107

2675

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 10 KM and upto 20 KM

8.68

412

3576.85

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of RSJoists150 x 150 mm/RailPole

25

176

4400

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Labour for Fixing of all types of clamps

69

65

4485

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Connection of equipment to bus and or another equipment with single zebra/Panther conductor including,cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

30

224

6720

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.(3 Conductors)

185

327

60620.8

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Hoisting of Insulators and hardware, stretching the conductor and stringing of 33 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 4.5mt)

4

781

3124

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

45

299

13455

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of various Clamps Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy Supply of I Bolts

24

294

7056

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Supply of Tension Hardware 3 Bolted for single Zebra/panther with 150 mm spacing

24

2055

49320

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of 33/11KV 8 MVA PTR as per spec

2

49480

98960.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Rail pole 90 lbs

4

3510

14040

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;S/o rail poles 90/105lb (250x2N)

700

47

33089

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 12.5 MVA PTR

2

12044

24089.86

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of Power transformers (0 to 100 KM) from one place to another place in GHMC Area.(excluding of loading & unloading )12.5MVA power transformer

2

27431

54862

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 12.5 MVA PTR

2

12044

24089.86

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 33 KV VCB with Control Panel

2

12500

25000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;SS-WORKS Cement concrete with 40MM metal VCB plin

14.52

5160

74923.2

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;SS-WORKS Excavate-Pit for 33KV VCB

12.58

331

4165.3

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 33 KV VCBs&Panel boards

2

1044

2088.96

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 33 KV VCBs&Panel boards

2

1024

2048

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 33 KV LAS station/Line type including earthing

4

880

3520

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 33 KV10 KA LAs Station type

12

35

420

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 33 KV10 KA LAs Station type

12

41

492

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 33 KV single phase PTs

2

1079

2158

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 33/11 KV CTs/ PTs

6

128

768

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 10 Km and upto 20 Km with Lorry for each trip

1

3299

3299.7

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 33/11 KV CTs/ PTs

6

165

990

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

32

146

4692.16

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

32

142

4544

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of AB Switch and aligment completeErection of 33 KV AB Switch including alignment and earthing

12

4500

54000

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of 33 KV AB SWCH Con 400/800 A

12

79

948

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels,current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading)Above 10 Km and upto 20 Km with Lorry for each trip

2

3299

6599.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of 33 KV AB SWCH Con 400/800 A

12

126

1512

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Alligning the Main and Auxiliary structures such as RS joist, M.S.Angles,Plates, Channels, Structure to zero level duly leveling in prefabricated MS frames with Hydraulic jacks before galvanising/ fabrication.

5.06

1470

7350

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*) Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium ..

5.06

482

2410

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Sup Material for 2nd coat Al. Painting.(*)Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

5.06

1293

6465

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

5.06

851

4255

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

5.06

2181

10905

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RSJoist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

5.06

6852

34260

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rod

5.06

185

925

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 10 KM and upto 20 KM

5.06

412

2060.4

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of MS Channel,Angles,Flats&Rods

5.06

221

1105

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of poles coping with 2 coats of white cement incl cost of paints etc.

2

48

96

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

1.16

373

373

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.Including the cost of cement

1.44

6579

6579

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Erection of 5 Mts RS Joist (Bit) Pole including fixing of Pole Mounted Box

2

1044

2088.46

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied (*) Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium ..

1

482

482

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Sup Material for 2nd coat Al. Painting.(*)Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

1

1293

1293

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

1

851

851

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

1

2181

2181

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;UNLOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

4

50

200

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading )Above 10 KM and upto 20 KM

1

412

412.08

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of R.S. Joists 175 x 85 mm

4

76

304

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of poles coping with 2 coats of white cement incl cost of paints etc.

16

48

768

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

9.24

373

3357

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand,Cement and curing etc.Including the cost of cement

17.76

6579

118422

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;R.S. Joists 150 x 150 mm Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports,back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

16

1952

31241.76

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fabrication & erection of Channels Alligning the Main and Auxiliary structures such as RS joist, M.S.Angles,Plates, Channels, Structure to zero level duly leveling in prefabricated MS frames with Hydraulic jacks before galvanising/ fabrication.

5.06

1470

7442.61

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied(*) Labour charges for painting including scratching and cleaning of Substation structures of 2nd coat of Aluminium .

5.76

482

2776.32

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied(*)Supply of material cost for Second coat of 1st Grade Aluminium Paint,brushes, etc.

5.76

1293

7447.68

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Labour charges for painting including scratching and cleaning of Substation structures of 1st coat of Aluminium

5.76

851

4901.76

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied Supply of material cost for First coat of 1st Grade Aluminium Paint,brushes etc.

5.76

2181

12562.56

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RSJoist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

5.76

6852

39467.52

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Excavation of pits in hard rock requiring blasting. (other than SS)0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

8

1770

14160

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS of R.S. Joists 150 x 150mm / Rail poles

16

107

1712

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S.Channels etc., by lorries. (excluding of loading & unloading) Above 10 KM and upto 20 KM

5.76

412

2373.58

... More
Erection of new 33/11kV Outdoor substation with connected 33KV and 11KV lines including civil works;LOADING of LINE MATERIALS R.S. Joists 150 x 150mm / Rail poles

16

176

2816



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.