Telangana State Southern Power Distribution Company Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender
Civil And Construction
Civil Works Others
Electrical and Electronics
Opening Date30 Jan 2025
Closing Soon10 Feb 2025
Tender Amount₹ 13,02,238
Costs
EMD
₹ 26,045Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
573095Tender No
T-199/24-25Tender Authority
Telangana State Southern Power Distribution Company Limited ViewPurchaser Address
-Website
http://https://www.tssouthernpower.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of stepped tubular poles single way made of steel of length 9mtrs with tensile strength of 42kgf/mm2 at a steps of 4.5 mtrs with outer dia 114.3 mm,2.1 mtrs with outer dia 88.9 mm, 2.1 mtrs with outer dia 76.1 mm, normal Crippling load of 141 kgf, normal Breaking load of 198 kgf ,working Crippling load of 70 kgf, working Breaking load of 79 kgf as per IS 2713
4
13913
55652
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of Tension Hardware 3 Bolted for Twin Zebra/panther with 150 mm spacing.
6
2512
15072
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy conforming to A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring washers conforming to IS 2633-1964, IS 1363-1967, IS1367- 1961)Supply of Spacer T-Clamps with double dropper suitable for Zebra / Panther
3
788
2364
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy conforming to A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring washers conforming to IS 2633-1964, IS 1363-1967, IS1367- 1961)Supply of Spacer clamps suitable for twin zebra / Panther ACSR conductor with 150mm spacing
54
153
8262
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;S&E-33KV 1200A Isolator incl. Solid Core
1
65800
65800
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying excluding taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)
0.1
84560
8456
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;RCC M - 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregae) from approved quarry including cost and conveyance of all materials like cement, fine agregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work - Roof Slab Ground floor
0.45
11455
5154.75
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Plastering of 20mm thick to all uneven faces of walls of superstructure in two coats with base coat in CM 1:5 of 16mm thick and top coat in CM 1:3 4mm thick with dubara sponge finish including cost and conveyance of all materials, water, all labour charges, curing for specified number of days, cutting grooves, all leads, lifts and scaffolding charges,all incidental charges etc. complete for finished item of work and as directed by the Engineer - in - charge. Ground Floor
12.3
520
6396
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Brick masonry in cement mortar (1:6) for superstructure using well burnt country made second class bricks of approved quality including cost and conveyance of all materials curing, scaffolding with all leads and lifts etc., complete for finished item of work - Ground Floor
2.3
7209
16580.7
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply & Fixing MS Security Fencing Mesh (2"X2")
27
2310
62370
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Laying Plain C.C(1:2:4) nominal mix using 20 mm HBG metal incldg cost & conveyance of all materials mixing, curing,all labour charges,etc comp for finished item of work.
1.6
6449
10318.4
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;C.R.S Masonry in C.M(1:6) using HBG stone including cost & conveyance of all materials labour charges,curing,all leads lifts etc., complete for finished item of work.
13.97
4925
68812.1
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Laying Plain C.C (1:4:8) using 40 mm HBG metal including cost & conveyance of all materials labour charges, curing, all leads lifts etc., complete for finished item of work.
2.01
4706
9444.94
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Excavation-HardRock(Blasting prohibited)
92.55
1440
133272
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Erection of Marshalling boxes
1
374
374.85
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Painting of feeder name on support including cost of paint
12
53
636
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Fabrication and erection of Galvanization of Main and Auxiliary structures using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists excluding cost of zinc and transport charges to substation site.The average quantity of Zinc required for all structures is 60 Kgs./MT,including erection.
0.8
16000
12800
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of MS Powder coated CT Marshalling Box
1
3675
3675
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of Alluminum LA clamps conforming to A6 of IS 617, with hot dip galvanised bolts and nuts suitable for single zebra / Panther
3
357
1071
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Laying of 100x16mm earth flat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication.
36
65
2340
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of Earth Mat 100x16mm GI Flat from Earth
36
975
35100
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Fabrication and connecting to risers of SS flat75X8mm from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc.
78
50
3900
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Erection of 33KV TD Structure as per DATA-I as per SSR 2024-25
3
14839
44519.34
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Erection of 33KV TC Structure as per DATA-II as per SSR 2024-25
3
17393
52179.12
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of 33KV BD Boom as per DATA-IV
5
18244
91220
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of 33KV TC Structure as per DATA-II
3
50703
152109
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height
3
386
1158
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Excavation of earth pit, supply of cast iron pipe with flange on one end (as per ISS7181/86) of nominal dia 125mm and 2.75 meters long in side the pit including supply and fixing RCC collars 0.75 meter dia (OD), 50mm thick and 0.60meters long complete as per APTRANSCO standards
3
9804
29412
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Providing of earthing with excavation of earth pit (0.6x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height
3
1234
3702.6
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of GI Bolts & Nuts etc
25
117
2937.5
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch
3
146
439.89
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of GI wire No .8
5
105
525
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint) in existing Substation
3
144
434.52
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply & Fixing 22.20mm OD CPVC Pipe-SDR 11
20
313
6260
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply & Fixing-15mm Bib Tap 300gm Qtr turn
3
684
2052
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Excavation in Ordinary Soil
25
486
12150
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply and Filling with stone dust in basement with 150mm thick layers incldg cost & conveyance all materials watering,consolidation etc complete for finished item of work.
6
1062
6372
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply & spreading of 20mm machine crushed metal (HBG) including cost of conveneyance of all materials, labour charges etc complete for finished item of work and directed by the engineer incharge
8
2113
16904
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Hoisting of Insulators and hardware, stretching the conductor and stringing of 11 kV bus comprising of three phases with Twin Zebra/Panther conductor to a tension of 900kgs including fixing of spacer clamps.(Bus section of 3.5mt)
44
891
39204
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Hoisting of Insulators and hardware, stretching the conductor and stringing of 33 kV bus comprising of three phases with Twin Zebra/Panther conductor to a tension of 900kgs including fixing of spacer clamps.(Bus section of 4.5mt)
43
1302
55986
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of U-Bolts 16 mm
6
37
222
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of CT stud clamps with hot dip galvanised bolts and nuts suitable for zebra / Panther conductor on one side and 28/30/40 mm CT stud on other side with stud size for single zebra / panther (4 bolted) with bimetallic sleeve for carrying 800 A
6
399
2394
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Erection of I Hook
6
55
330
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of I Hook
6
158
948
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Supply of Moose Conductor
0.15
375155
56273.25
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends
2000
27
54000
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Labour for Fixing of all types of clamps
20
65
1300
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.
3.51
6579
23092.29
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Excavation of pits 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0") in hard rock not requiring blasting. (In hard murram / rock boulders)
3.51
928
3257.28
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Erection of 33kV Twin feeder control & Relay panel in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels & foundation bolts
1
1729
1729
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Erection of 33kv CT s
1
1079
1079
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Erection of 33kv VCB with control panel
1
12500
12500
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Painting of coping with two coats of white cement including cost of paint & conveyance charges for PTR/VCB plinths
1
160
160
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Plastering 2 Coats,20/16mm(1:6)(1:4)
6.4
373
2387.2
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Cement concrete 1:3:6 ration with 40 MML HBG metal including the cost of all materials and labour complete 1.8 x 1.8 x 0.75 cum for VCB Plinth
6
5160
30960
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Excavate-Pit for 33KV VCB
4.8
331
1588.8
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading )10km
0.8
339
271.73
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;UNLOADING of MS Channel, Angles,Flats&Rod
0.8
185
148
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;LOADING of MS Channel, Angles,Flats&Rods
0.8
221
176.8
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Above 10 Km and upto 20 Km with Lorry for each trip
2
3299
6599.4
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;UnLOADING of 33 KV VCBs&Panel boards
2
1044
2088.96
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;LOADING of 33 KV VCBs&Panel boards
2
1024
2048
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Erection of 33 KV LAS station/Line type including earthing
1
880
880
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Erection of 33 KV AB Switch including alignment and earthing
2
4500
9000
... More
Construction of 1 No new bay and 1 No 33 KV VCB at 220/132/33KV Nagole EHT SS for takeoff arrangemen;Item Detailed Specification Description
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%