For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Works
Electrical and Electronics
Opening Date3 Feb 2025
Closing Soon10 Feb 2025
Tender Amount₹ 1,05,00,538 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Addl. PTR at Ayyappa Society SS;Reinforcement steel Supplying, Cutting, bending, binding, placing in position and tying reinforcement steel in all heights including cost and conveyance of steel and binding wire etc,. With all leads and lifts, labour charges, etc., complete for finished item of work.

4.89

69637

340524.93

... More
Addl. PTR at Ayyappa Society SS;RCC M20 Grade Column GF 'RCC 1:1.5:3 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials, labour, scaffolding, centering, machine mixing, vibrating, curing all leads and lifts,seignarage charges in all positions of the building but excluding cost of steel and its fabrication for finished item of work as directed by Engineer-in-charge

20.52

13206

270987.12

... More
Addl. PTR at Ayyappa Society SS;RCC M20 Grade Footing 'RCC 1:1.5:3 nominal mix using 12 to 20 mm HBG metal for following item of works including cost and conveyance of all materials, labour, scaffolding, centering, machine mixing, vibrating, curing all leads and lifts,seignarage charges in all positions of the building but excluding cost of steel and its fabrication for finished item of work as directed by Engineer-in-charge

20.25

9457

191504.25

... More
Addl. PTR at Ayyappa Society SS;Supplying and filling the substation site with borrowed gravel, watering, ramming, thoroughly complying with the standard specification.

405

309

125145

... More
Addl. PTR at Ayyappa Society SS;Plain Cement concrete (1:3:6) using 40mm HBG metal for foundations and leveling course, including cost and conveyance of all materials, labour all leads and lifts, consolidation and all operations, formwork as required, curing, etc. complete for finished item work

18.9

4995

94405.5

... More
Addl. PTR at Ayyappa Society SS;PCC (1:2:4) using 20mm size well graded HBG metal for foundations, including cost, conveyance of all materials,labour all leads and lifts,consolidation and all operations, formwork as required, curing,etc. complete for finished item of work

23.31

6074

141584.94

... More
Addl. PTR at Ayyappa Society SS;Grouting to Driled Hole with CementSlury including all charges complete for finished item of work

100

93

9300

... More
Addl. PTR at Ayyappa Society SS;Drilling 25mm Dia Holes in Sheet Rock including all charges complete for finished item of work

100

144

14400

... More
Addl. PTR at Ayyappa Society SS;Carting away the debris available at site including loading, unloading etc., upto 10 kms etc., complete

1414.8

270

381996

... More
Addl. PTR at Ayyappa Society SS;Earth Work Mass Excavation (hard rock) to a depth as directed, in soils such as hard rock requiring blasting in prohibited area and all conditions such as dry, wet, slurry etc.and in dense or hard soils, disposal and depositing of excavated soil with intial lead of 10 mt and intial lift of 2m or as directed, including cost and conveyance of all materials, ramping and lifting of materials, and labour charges, hire charges of machinery, tools & plants, bailing of water ( either sub soil water, stoMts water, rain water, surface water or of any kind) if any at any stage of work until all works below ground level is finished to the satisfaction ,and from work such as shoring, timbering, strutting with required supports etc. for the work and removal of form work after completion of work etc all complete as directed by the engineer-incharge.

1414.8

1440

2037312

... More
Addl. PTR at Ayyappa Society SS;Dismantling of Equipment Dismantling of 33KV CT/PT

3

190

570

... More
Addl. PTR at Ayyappa Society SS;Dismantling of Equipment Dismantling of 33KV Bus Conductor (3 conductors)

13.5

427

5766.26

... More
Addl. PTR at Ayyappa Society SS;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc. Dismantle-RS Joists 175 x 85 mm

6

1116

6696

... More
Addl. PTR at Ayyappa Society SS;Dismantling of Damaged Poles, not required and available in the middle of roads, transporting to stock point etc.Dismantle-R.S. Joists 150 x 150 mm

8

1133

9064

... More
Addl. PTR at Ayyappa Society SS;Dismantling of Equipment Dismantling of 11 KVAB Switch 400/200 A con

10

1500

15000

... More
Addl. PTR at Ayyappa Society SS;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

2.21

412

909.46

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of MS Scrap

2.21

578

1275.65

... More
Addl. PTR at Ayyappa Society SS;LOADING of MS Scrap

2.21

578

1275.65

... More
Addl. PTR at Ayyappa Society SS;Transport of Cond Drum,VCBs>10 & <20Km Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates

9

3299

29697.3

... More
Addl. PTR at Ayyappa Society SS;Fab Back clamps with 50 x 6 mm MS Flat Fabrication of materials including 2 coats of Red oxide painting Back clamps with 50 x 6 mm MS Flat

450

15

6750

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 11 KV AB Cable (XLPE) 3 Cor Un loading of 11 KV AB Cable (XLPE) 3 Core upto 500 Mts. Drum (including Accessories )

18

438

7884

... More
Addl. PTR at Ayyappa Society SS;LOADING of 11 KV AB Cable (XLPE) 3 Core Loading of 11 KV AB Cable (XLPE) 3 Core upto 500 Mts. Drum (including Accessories )

18

584

10512

... More
Addl. PTR at Ayyappa Society SS;Fabrication & erection of Channels Fabrication of struc.with power drilling Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

4.38

6852

29977.5

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of MS Channel,Angles,Flats&Rod

4.38

185

809.38

... More
Addl. PTR at Ayyappa Society SS;LOADING of MS Channel,Angles,Flats&Rods

4.38

221

966.88

... More
Addl. PTR at Ayyappa Society SS;Painting of poles Paint of coping with 2 coats of white cement incl cost of paints etc. Ptg of coping with 2cts white cmnt inclu

4

48

192

... More
Addl. PTR at Ayyappa Society SS;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

2.7

373

1007.1

... More
Addl. PTR at Ayyappa Society SS;AB Switch Coil Earthing GI No. 8 Wire Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

4

146

586.52

... More
Addl. PTR at Ayyappa Society SS;Painting AB switch OP rods with PO red Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

4

142

568

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 11 KV AB SWCH Con 200/400 A

4

80

320

... More
Addl. PTR at Ayyappa Society SS;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates Transport of Cond Drum,VCBs>10 & <20Km

1

3299

3299.7

... More
Addl. PTR at Ayyappa Society SS;LOADING of 11 KV AB SWCH Con 200/400 A

4

80

320

... More
Addl. PTR at Ayyappa Society SS;Erection of 11kv ABSwitch incl earthing Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles and alignment complete

4

3200

12800

... More
Addl. PTR at Ayyappa Society SS;Labour for 2nd coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium .

5.66

482

2728.12

... More
Addl. PTR at Ayyappa Society SS;Sup Material for 2nd coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint usingAluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2ndcoat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

5.66

1293

7318.38

... More
Addl. PTR at Ayyappa Society SS;Labour for 1st coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium..

5.66

851

4816.66

... More
Addl. PTR at Ayyappa Society SS;Sup Material for 1st coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters ofthinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes,labour charges etc., complete. Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

5.66

2181

12344.46

... More
Addl. PTR at Ayyappa Society SS;Erect-12Meter Box pole Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation - Box pole 12 Mtr

4

3901

15605.48

... More
Addl. PTR at Ayyappa Society SS;Fabrication of poles: Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

4

512

2050.2

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of R.S. Joists 175 x 85 mm

8

50

400

... More
Addl. PTR at Ayyappa Society SS;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

6.38

412

2627.01

... More
Addl. PTR at Ayyappa Society SS;LOADING of R.S. Joists 175 x 85 mm

8

76

608

... More
Addl. PTR at Ayyappa Society SS;ERECT. OF LINES-Providing of RCC collar Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X0.50 M height

30

386

11580

... More
Addl. PTR at Ayyappa Society SS;ERECT. OF LINES-Providing of earthing Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

30

1234

37026

... More
Addl. PTR at Ayyappa Society SS;S-GI pipe earthing 40mm dia 2m long Supply of earthing pipe with materials Supply of GI eath pipe with 40 mm dia,3mm thcikness with 2.0M Length

30

698

20940

... More
Addl. PTR at Ayyappa Society SS;Ex of Hard pit w/o blast 0.75X0.9X1.95M Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 11 Mtrs PSCC Poles/ Box poles 0.75 M x 0.9 M x 1.95 M

104

990

103030.72

... More
Addl. PTR at Ayyappa Society SS;EXCAV OF PIT HARD 0.75 Mx0.9 Mx1.95 M Excavation of pits in hard rock requiring blasting. (other than SS) 11Mtrs PSCC Pole/ Box poles 0.75 M x 0.9 M x 1.95 M

50

1326

66300

... More
Addl. PTR at Ayyappa Society SS;Mass concreting of supports incl. cement Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. Including the cost of cement

168.75

6579

1110206.25

... More
Addl. PTR at Ayyappa Society SS;Errection of 11 M long PSCC pole Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation - 11 Mtrs PSCC poles

150

4336

650527.5

... More
Addl. PTR at Ayyappa Society SS;Submission of auto CAD Drawing as per pole schedule (Detailed survey and sketch) CAD Drawing per pole upto 10KM

1

6000

6000

... More
Addl. PTR at Ayyappa Society SS;S-Earthing GI flat 25x3 mm incl material Supply of earthing pipe with materials

180

105

18900

... More
Addl. PTR at Ayyappa Society SS;Run-GI Earth Flat 25x3mm from metallic p Providing of RCC collar to earth pit. Running of GI eartn flat of size 25X3mm from all metallic parts of channels, AB Switch, HG fuse set, DTr neutral and LT Distribution box and inter connection of earth pits etc complete

300

14

4209

... More
Addl. PTR at Ayyappa Society SS;S-185Sqmm Alluminium Lug

138

13

1794

... More
Addl. PTR at Ayyappa Society SS;Supply of earthing pipe with materials S-GI Bolts & Nuts,Washers etc.,

150

117

17625

... More
Addl. PTR at Ayyappa Society SS;Supply and Erection of I Hook and Suspension Hook Erection- I Hook

200

55

11000

... More
Addl. PTR at Ayyappa Society SS;Supply and Erection of I Hook and Suspension Hook Supply- I Hook

200

158

31600

... More
Addl. PTR at Ayyappa Society SS;T Branch Kit Erection of Assemble Kit for 'T' Branche

30

1800

54000

... More
Addl. PTR at Ayyappa Society SS;T Branch Kit Supply & Erection of T-Branch kit

30

3215

96450

... More
Addl. PTR at Ayyappa Society SS;End Termnatn of AB cable 120 to 185 Sqmm

138

800

110400

... More
Addl. PTR at Ayyappa Society SS;Supply and erection of Angle line Asmbly kits Straight through joints of AB cable (each lead)

80

2124

169920

... More
Addl. PTR at Ayyappa Society SS;Supply and erection of Straight line Asmbly kits Straight through joints of AB cable (each lead)

200

1661

332200

... More
Addl. PTR at Ayyappa Society SS;S-of 11KV AB cable end kits End Termination of AB cable (each lead): Supply of 11KV 3x185+70sq.mm/ 3x70+70sq.mm/3x35+35sq.mm AB cable end Kits

138

950

131100

... More
Addl. PTR at Ayyappa Society SS;Stringing of AB cbl 11 KV 3x185+70 Sqmm Stringing of HT AB Cable with GI Metal Parts

9

41876

376884.9

... More
Addl. PTR at Ayyappa Society SS;Supply of AC Supply panel complete Control Panels Supply of AC Supply panel inluding providing of changeover switch, SFU, metering unit, 32 A three phase MCB, 16 A Single phase MCB complete as per specification.

1

42000

42000

... More
Addl. PTR at Ayyappa Society SS;Erect-220V 200Ah ConvtLead AcidBtry Batteries Erection of 220 V, 200 AH battery in complete shape fit for charging . Conventional lead acid

1

7666

7666

... More
Addl. PTR at Ayyappa Society SS;Un-loading 220 V Battery with Charger

1

1024

1024

... More
Addl. PTR at Ayyappa Society SS;Transport of Cond Drum,VCBs>10 & <20Km Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates

1

3299

3299.7

... More
Addl. PTR at Ayyappa Society SS;Loading 220 V Battery with Charger

1

1612

1612

... More
Addl. PTR at Ayyappa Society SS;33/11kv S.S Erection of AC&DC Panel Fixing of AC/DC Panel and giving Connections to the protection equipment and Metering circuits as per the specification and standards. The 3 1/2 core 25 Sqmm power cable required from distribution box to AC/DC panel in the control room is also to be supply

2

7871

15743.7

... More
Addl. PTR at Ayyappa Society SS;Supply of DC Anunc.relay panel 8 feeders Control Panels Supply of DC Annunciation & relay panel for 10 feeder panel including the cost of LED Indiacation lamps, VAA auxilairy relays, Electronic Hooters complete as per specification.

1

42500

42500

... More
Addl. PTR at Ayyappa Society SS;Supply & Spreading of 20mm HBG metal Supply of HBG metal Supply & spreading of 20mm machine crushed metal (HBG) including cost of conveneyance of all materials, labour charges etc complete for finished item of work and directed by the engineer incharge

45

2113

95085

... More
Addl. PTR at Ayyappa Society SS;Fixing of LED/Metal halide complete. Supply of LED fixture set of (LUMINAIRE MAKE: PHILIPS /OSRAM/GE/VENTURE/CROMPTON/BAJAJ/VIN/WIPRO/JAGUAR/KESELEC/HAVELLS/HPL/SURYA/SYSKA. LED MAKE: PHILIPS LUMILEDS/CREE/NICHIA /OSRAM / SUMSANG/LG LEDs) make with minimum 120 Lm/W Lumens Output, 105 V to 295 V Voltage range, more than 0.94 Power factor, Pressure Die cast Alluminium housing, Powder coated/ anodized finishing, toughed glass lamp cover, IP65 ingress protection, less than 25% THD, minimum 70% electronic efficiency, minimum 140 degrees along the road & 80 degrees across the road beam angle, 4500 to 6500K Color temperature, very low mercury 6.4mg max, Life more than 50,000 burning hours, maximum 20% depreciation during life, Fully cut off control of distribution, Electronic Ballast driver type, minimum 10KV Surge withstand capacity, Poly carbonate reflector/ Poly Carbonate Lens secondary optics, suitable for fixing to existing poles in the Substations, with five years warranty Fixing of Metal halide lamps with fixtures Make:Philips,Crompton,Bajaj junction box with MCB with 1.5 GI pipe complete.

8

1268

10144

... More
Addl. PTR at Ayyappa Society SS;Mass concreting of supports incl. cement Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. Including the cost of cement

4.32

6579

28421.28

... More
Addl. PTR at Ayyappa Society SS;Errection of tubular poles

8

1379

11032

... More
Addl. PTR at Ayyappa Society SS;EXCAV. OF PIT HARD(2.6" x 2.6" x 6.0") Excavation of pits in hard rock requiring blasting. (other than SS) 9.1Mtrs PSCC Pole 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0")

8

1770

14160

... More
Addl. PTR at Ayyappa Society SS;Supply-90W LED fixture set Supply of LED fixture set of (LUMINAIRE MAKE: PHILIPS /OSRAM/GE/VENTURE /CROMPTON/BAJAJ/VIN/WIPRO /JAGUAR/KESELEC/HAVELLS/HPL/SURYA/SYSKA. LED MAKE: PHILIPS LUMILEDS/CREE/NICHIA/OSRAM /SUMSANG/LG LEDs) make with minimum 120 Lm/W Lumens Output, 105 V to 295 V Voltage range, more than 0.94 Power factor, Pressure Die cast Alluminium housing, Powder coated/ anodized finishing, toughed glass lamp cover, IP65 ingress protection, less than 25% THD, minimum 70%electronic efficiency, minimum 140 degrees along the road & 80 degrees across the road beam angle, 4500 to 6500K Color temperature, very low mercury 6.4mg max, Life more than 50,000 burning hours, maximum 20% depreciation during life, Fully cut off control of distribution, Electronic Ballast driver type, minimum 10KV Surge withstand capacity, Polycarbonate reflector/ Poly Carbonate Lens secondary optics, suitable for fixing to existing poles in the Substations, with five years warranty

8

8200

65600

... More
Addl. PTR at Ayyappa Society SS;Supply 9mtrs tubular poles single way Yard lightning Supply of stepped tubular poles single way made of steel of length 9mtrs with tensile strength of 42kgf/mm2 at a steps of 4.5 mtrs with outer dia 114.3 mm,2.1 mtrs with outer dia 88.9 mm, 2.1 mtrs with outer dia 76.1 mm, normal Crippling load of 141 kgf, normal Breaking load of 198 kgf ,working Crippling load of 70 kgf, working Breaking load of 79 kgf as per IS 2713.

8

13913

111304

... More
Addl. PTR at Ayyappa Society SS;Erection of Marshalling boxes Marshalling Box

2

374

749.7

... More
Addl. PTR at Ayyappa Society SS;Supply of FRP PT Marshalling Box

2

4463

8926

... More
Addl. PTR at Ayyappa Society SS;L-Cable Termination to Switchgear Cable terminations to the switch gear marshalling boxes/panel terminal blocks/control and relay panels LT AC panel including providing suitable ferrules and lugs as per specification (including cost of ferrules, lugs and glands)

200

27

5400

... More
Addl. PTR at Ayyappa Society SS;Lay-4C/10C 2.5Sqmm Control Cable Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends .

2634

27

71118

... More
Addl. PTR at Ayyappa Society SS;Providing of cable trench as per DATA-XII

80

3148

251840

... More
Addl. PTR at Ayyappa Society SS;UnLoading of PVC Control Cb 4, 10C

2634

-

395.1

... More
Addl. PTR at Ayyappa Society SS;Transport of Cond Drum,VCBs>10 & <20Km Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates

1

3299

3299.7

... More
Addl. PTR at Ayyappa Society SS;Loading of PVC Control Cb 4, 10C

2634

1

2634

... More
Addl. PTR at Ayyappa Society SS;Providing of earthing with various types of earth electrodes. Provd-Dble Erth with CuJumper incl MSChl Providing of double earthing for neutral with flexible copper jumpers including arrangement by fixing M.S.Channel 100x50mm.

1

1323

1323

... More
Addl. PTR at Ayyappa Society SS;SupCU Flexi jumper for Power T/F Neutral Supply of Copper Flexible jumper with 75 X 8 of length 250 mm at neutral of Power tranformer end and 50 X 6 of length 50mm two Nos at double neutral end duly brasing with flexible jumper of capacity of 5kA/3 sec for power transformer neutral.

1

4725

4725

... More
Addl. PTR at Ayyappa Society SS;ERECT. OF LINES-Providing of RCC collar to earth pit Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X0.50 M height

20

386

7720

... More
Addl. PTR at Ayyappa Society SS;ERECT. OF LINES - Providing of earthing Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

20

1234

24684

... More
Addl. PTR at Ayyappa Society SS;Providing of earthing with various types of earth electrodes Inst. of CU bonded steel rod Hard rock Installation of copper bonded steel rod of dia 5/8 inch with a length of 3meters refilling with ground enhancing meterial EM- 25A / Zerolyte of 0.2 ohm meter resistiviity IEE 142-1992 in Hard Rock with bore 10"dia & 20feet deep or trench of 4'W X 10'L X 5' depth back filled with black cotton soil

4

8004

32016

... More
Addl. PTR at Ayyappa Society SS;Providing of earthing with various types of earth electrodes SupSup of CU bonded steel rod 5/8"X3mSS Supply of copper bonded steel rod of dia 5/8 inch with a length of 3meters, suitable for connecting 75X8 MS strip and supply of 33.9kgs ground enhancing meterial GEM-25A /Zerolyte of 0.2 ohm meter resistiviity as per IEE 142-1991 for 33/11kV Sub-Station

4

8820

35280

... More
Addl. PTR at Ayyappa Society SS;Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication Supply of earthing pipe with materials

20

3486

69720

... More
Addl. PTR at Ayyappa Society SS;Earthing for raisers of SS Flat 50x6 mm. Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc. M.S./ G.I. Flat 50x6mm / 50 x 8 mm ( Above ground)

1065

41

43665

... More
Addl. PTR at Ayyappa Society SS;Laying of earth mat,excavation 75x 8mm Laying of earth mat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication. 75x 8mm MS Flat / GI Flat

393.19

65

25557.35

... More
Addl. PTR at Ayyappa Society SS;Fabrication & erection of Channels Fabrication of struc.with power drilling Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

2.25

6852

15417

... More
Addl. PTR at Ayyappa Society SS;AB Switch Coil Earthing GI No. 8 Wire Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

11

146

1612.93

... More
Addl. PTR at Ayyappa Society SS;Painting AB switch OP rods with PO red Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

11

142

1562

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of MS Channel,Angles,Flats&Rod

2.25

185

416.25

... More
Addl. PTR at Ayyappa Society SS;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

2.25

412

927.18

... More
Addl. PTR at Ayyappa Society SS;LOADING of MS Channel,Angles,Flats&Rods

2.25

221

497.25

... More
Addl. PTR at Ayyappa Society SS;Bus Stringing Hoisting post ins&hrd wr 1panther 11kv Hoisting of Insulators and hardware, stretching the conductor and stringing of 11 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 3.5mt)

2

507

1014

... More
Addl. PTR at Ayyappa Society SS;Sup T clamp LM6 Al alloy of 12 mm, 800 A Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy conforming to A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring washers conforming to IS 2633-1964, IS 1363-1967, IS1367- 1961) Supply of Alluminum alloy T clamps conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

42

299

12558

... More
Addl. PTR at Ayyappa Society SS;Supply of I-Bolts Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy conforming to A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring washers conforming to IS 2633-1964, IS 1363-1967, IS1367- 1961) Supply of I-Bolts

12

294

3528

... More
Addl. PTR at Ayyappa Society SS;Supply of Tension Hardware 3 Bolted for single Zebra/panther with 150 mm spacing.

12

2055

24660

... More
Addl. PTR at Ayyappa Society SS;Erection of 11 KV VCB with Control Panel Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc

5

12000

60000

... More
Addl. PTR at Ayyappa Society SS;Cement concrete with 40MM metal VCB plin Cement concrete 1:3:6 ration with 40 MML HBG metal including the cost of all materials and labour complete 1.8 x 1.8 x 0.75 cum for VCB Plinth

24

5160

123840

... More
Addl. PTR at Ayyappa Society SS;Excavate-Pit in Soil except Hrd Rck Earth work excavation of in all soils except hard rock requiring blasting.

19.44

345

6706.8

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 11 KV VCBs&Panel boards

5

1044

5222.4

... More
Addl. PTR at Ayyappa Society SS;Transport of Cond Drum,VCBs>10 & <20Km Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates

3

3299

9899.1

... More
Addl. PTR at Ayyappa Society SS;LOADING of 11 KV VCBs&Panel boards

5

1024

5120

... More
Addl. PTR at Ayyappa Society SS;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV LAS line type including earthing

4

505

2020

... More
Addl. PTR at Ayyappa Society SS;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11 KV LAS station type including earthing

1

559

559

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 11 KV,10 KA LAs Station type

15

32

480

... More
Addl. PTR at Ayyappa Society SS;LOADING of 11 KV,10 KA Las Station type

15

32

480

... More
Addl. PTR at Ayyappa Society SS;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 11kv three phase PT s

1

800

800

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 11 KV CT - PT Sets

1

101

101

... More
Addl. PTR at Ayyappa Society SS;LOADING of 11 KV CT - PT Sets

1

190

190

... More
Addl. PTR at Ayyappa Society SS;Erection of AB Switch and aligment complete Erection of 11KV 800A double throw AB Switches

11

3500

38500

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 11 KV AB SWCH Con 200/400 A

11

80

880

... More
Addl. PTR at Ayyappa Society SS;Transport of Cond Drum,VCBs>10 & <20Km Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates

2

3299

6599.4

... More
Addl. PTR at Ayyappa Society SS;LOADING of 11 KV AB SWCH Con 200/400 A

11

80

880

... More
Addl. PTR at Ayyappa Society SS;Painting of poles Paint of coping with 2 coats of white cement incl cost of paints etc. Ptg of coping with 2cts white cmnt inclu

16

48

768

... More
Addl. PTR at Ayyappa Society SS;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

10.8

373

4028.4

... More
Addl. PTR at Ayyappa Society SS;Mass concreting of supports incl. cement Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. Including the cost of cement

16.8

6579

110527.2

... More
Addl. PTR at Ayyappa Society SS;Fabrication & erection of Channels Alligning the Main/Aux. structures. Alligning the Main and Auxiliary structures such as RS joist, M.S.Angles, Plates, Channels, Structure to zero level duly leveling in prefabricated MS frames with Hydraulic jacks before galvanising/ fabrication.

10.25

1470

15067.5

... More
Addl. PTR at Ayyappa Society SS;Labour for 2nd coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium .

10.25

482

4940.5

... More
Addl. PTR at Ayyappa Society SS;Sup Material for 2nd coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint usingAluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2ndcoat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

10.25

1293

13253.25

... More
Addl. PTR at Ayyappa Society SS;Labour for 1st coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium.

10.25

851

8722.75

... More
Addl. PTR at Ayyappa Society SS;Sup Material for 1st coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters ofthinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes,labour charges etc., complete. Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

10.25

2181

22355.25

... More
Addl. PTR at Ayyappa Society SS;Erect-12Meter Box pole Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation - Box pole 12 Mtr

16

3901

62421.92

... More
Addl. PTR at Ayyappa Society SS;EXCAV OF PIT HARD 0.75 Mx0.9 Mx1.95 M Excavation of pits in hard rock requiring blasting. (other than SS) 11Mtrs PSCC Pole/ Box poles 0.75 M x 0.9 M x 1.95 M

16

1326

21216

... More
Addl. PTR at Ayyappa Society SS;Fabrication of poles: Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

16

512

8200.8

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of R.S. Joists 175 x 85 mm

32

50

1600

... More
Addl. PTR at Ayyappa Society SS;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

8

412

3296.64

... More
Addl. PTR at Ayyappa Society SS;LOADING of R.S. Joists 175 x 85 mm

32

76

2432

... More
Addl. PTR at Ayyappa Society SS;Laying of 2nd cable in excavated trench

606

204

123684.6

... More
Addl. PTR at Ayyappa Society SS;Excavation & laying of UG Cable (Double Run) Raise-DR 33KV 3x400sqmm UG Cb on support Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, Raising of double run cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe) - 33 KV 3x400 Sqmm Cable

80

323

25908

... More
Addl. PTR at Ayyappa Society SS;Excavation & laying of UG Cable (Double Run) Lay-DR 33KV 3x400sqmm UG Cb CC/BT Compsr Laying of XLPE UG cable Double Run including excavation of trench of size 600mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second cable laying cost not Included) depth of the trench LT-0.85 mts, Along the CC / BT multi layer road requiring compressor - 33 KV 3x400 Sqmm Cable

156

1388

216659.04

... More
Addl. PTR at Ayyappa Society SS;Excavation & laying of UG Cable (Six Run ) Lay-6R 33KV 3x400sqmm UG Cb CC/BT Compsr Laying of XLPE UG cable Six Run including excavation of trench of size 1050mm wide to 1200mm wide as per the site conditions and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV from road level and cable separation with machine cut bricks horizontally for every 3 meters , providing of DWC/GI pipes wherever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and removing the debris from the site inluding the cost of lead and lift etc.. (Second,third or more cable laying cost not Included) depth of the trench LT-0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs. Along the CC / BT multi layer road requiring compressor - 33 KV 3x400 Sqmm Cable

90

2314

208271.7

... More
Addl. PTR at Ayyappa Society SS;OD/Idoor end termination 33kv 3x400 xlpe Making 33 KV 3x400 Sqmm Cable Out Door/Indoor end termination

24

2764

66354.24

... More
Addl. PTR at Ayyappa Society SS;UG Cables Joints Straight through joint 33kv 3x400 xlpe Making of Straight through joints - 33 KV 3x400 Sqmm Cable

9

5700

51307.02

... More
Addl. PTR at Ayyappa Society SS;Transport of Cond Drum,VCBs>10 & <20Km Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates

2

3299

6599.4

... More
Addl. PTR at Ayyappa Society SS;Unload-11/33KV XLPE UG Cable all sizes

4

1024

4096

... More
Addl. PTR at Ayyappa Society SS;Load-11/33KV XLPE UG Cable for all sizes

4

1024

4096

... More
Addl. PTR at Ayyappa Society SS;Labour for Fixing of all types of clamps

30

65

1950

... More
Addl. PTR at Ayyappa Society SS;Stringing of bus with panther conductor Stringing of bus with panther conductor including jumpering etc., complete to all the equipment in SS fixing to all clamps and equipment.(3 Conductors)

15

327

4915.2

... More
Addl. PTR at Ayyappa Society SS;Hoisting post ins&hrd wr 1panther 33kv Bus Stringing Hoisting of Insulators and hardware, stretching the conductor and stringing of 33 kV bus comprising of three phases with Single Zebra/panther conductor to a tension of 450kgs.(Bus section of 4.5mt)

2

781

1562

... More
Addl. PTR at Ayyappa Society SS;Sup T clamp LM6 Al alloy of 12 mm, 800 A Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy conforming to A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring washers conforming to IS 2633-1964, IS 1363-1967, IS1367- 1961) Supply of Alluminum alloy T clamps conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating .

24

299

7176

... More
Addl. PTR at Ayyappa Society SS;Supply of I-Bolts Supply of clamps as per IS 5561- 1970 , 12mm thickness with Alluminum and Alluminum alloy conforming to A6 of IS 617 1994 & hot dip galvanised with Nuts & Bolts including spring washers conforming to IS 2633-1964, IS 1363-1967, IS1367- 1961) Supply of I-Bolts

12

294

3528

... More
Addl. PTR at Ayyappa Society SS;S-Tension HW 3Bolt 1Zebra/Pnthr 150mm Supply of Tension Hardware 3 Bolted for single Zebra/panther with 150 mm spacing.

12

2055

24660

... More
Addl. PTR at Ayyappa Society SS;Erection of 12.5 MVA PTR. Erection of PTR on constructed plinth

1

51818

51818

... More
Addl. PTR at Ayyappa Society SS;Erection of Rail Pole 90Lbs Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation Rail pole 90 lbs

2

3510

7020

... More
Addl. PTR at Ayyappa Society SS;S/o rail poles 90/105lb (250x2N)

350

47

16544.5

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 12.5 MVA PTR

1

12044

12044.93

... More
Addl. PTR at Ayyappa Society SS;Transport of 12.5MVA power transformer Transport of Power transformers (0 to 100 KM) from one place to another place in GHMC Area.(excluding of loading & unloading ) 12.5MVA power transformer

1

27431

27431

... More
Addl. PTR at Ayyappa Society SS;LOADING of 12.5 MVA PTR

1

12044

12044.93

... More
Addl. PTR at Ayyappa Society SS;Erection of 33kv LA stn type incl earthing

5

880

4400

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 33 KV10 KA LAs Station type

15

35

525

... More
Addl. PTR at Ayyappa Society SS;LOADING of 33 KV10 KA Las Station type

15

41

615

... More
Addl. PTR at Ayyappa Society SS;Erection of AB Switches, VCBs, LAs, PTs, CTs, DTRs etc Erection of 33kv single phase PT s

1

1079

1079

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 33/11 KV CTs/ PTs

3

128

384

... More
Addl. PTR at Ayyappa Society SS;LOADING of 33/11 KV CTs/ PTs

3

165

495

... More
Addl. PTR at Ayyappa Society SS;AB Switch Coil Earthing GI No. 8 Wire Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

8

146

1173.04

... More
Addl. PTR at Ayyappa Society SS;Painting AB switch OP rods with PO red Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Painting of operating rods of 33kV, 11kV AB switches with post office red colour (including cost of paint)

8

142

1136

... More
Addl. PTR at Ayyappa Society SS;Erection of AB Switch and aligment complete Erection of 33 KV AB Switch including alignment and earthing

8

4500

36000

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of 33 KV AB SWCH Con 400/800 A

8

79

632

... More
Addl. PTR at Ayyappa Society SS;Transport of Cond Drum,VCBs>10 & <20Km Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) Note: 1). It will be treated as full load of 10 MT and paid for 10 MT. 2). For 3 Ton vehicle : 50% of the following rates

2

3299

6599.4

... More
Addl. PTR at Ayyappa Society SS;LOADING of 33 KV AB SWCH Con 400/800 A

8

126

1008

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of MS Channel,Angles,Flats&Rod

6.82

185

1262.07

... More
Addl. PTR at Ayyappa Society SS;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

6.82

412

2811.21

... More
Addl. PTR at Ayyappa Society SS;LOADING of MS Channel,Angles,Flats&Rods

6.82

221

1507.66

... More
Addl. PTR at Ayyappa Society SS;Fabrication of struc.with power drilling Fabrication & erection of Channels Fabrication of Main and Auxiliary structures with power drilling using raw steel such as M.S.Angles, Plates, Channels, R.S.Joists, including the supply and fabrication of 6mm base and top plate for Box pole to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

2.42

6852

16581.84

... More
Addl. PTR at Ayyappa Society SS;Painting of poles Paint of coping with 2 coats of white cement incl cost of paints etc. Ptg of coping with 2cts white cmnt inclu

18

48

864

... More
Addl. PTR at Ayyappa Society SS;Plastering 2 coats, 20/16 mm (1:6)/(1:4)

12.15

373

4531.95

... More
Addl. PTR at Ayyappa Society SS;Mass concreting of supports incl. cement Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc. Including the cost of cement

18.9

6579

124343.1

... More
Addl. PTR at Ayyappa Society SS;Fabrication & erection of Channels Alligning the Main/Aux. structures. Alligning the Main and Auxiliary structures such as RS joist, M.S.Angles, Plates, Channels, Structure to zero level duly leveling in prefabricated MS frames with Hydraulic jacks before galvanising/ fabrication.

11.42

1470

16787.4

... More
Addl. PTR at Ayyappa Society SS;Labour for 2nd coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Labour charges for painting including scratching and cleaning of Sub-station structures of 2nd coat of Aluminium .

11.42

482

5504.44

... More
Addl. PTR at Ayyappa Society SS;Sup Material for 2nd coat Al. Painting Painting of sub-station structures with two coats of Aluminium paint usingAluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2ndcoat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete. Supply of material cost for Second coat of 1st Grade Aluminium Paint, brushes, etc.

11.42

1293

14766.06

... More
Addl. PTR at Ayyappa Society SS;Labour for 1st coat Al. Painting. Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters of thinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes, labour charges etc., complete Labour charges for painting including scratching and cleaning of Sub-station structures of 1st coat of Aluminium.

11.42

851

9718.42

... More
Addl. PTR at Ayyappa Society SS;Sup Material for 1st coat Al. Painting Painting of sub-station structures with two coats of Aluminium paint using Aluminium paint 1st grade containing 3.6 kg of Aluminium paste for 18 liters ofthinner 1st coat is to be applied before erection of sub-station structures and 2nd coat after stringing and half round welding including cost of paint, cost of brushes,labour charges etc., complete. Supply of material cost for First coat of 1st Grade Aluminium Paint, brushes etc.

11.42

2181

24907.02

... More
Addl. PTR at Ayyappa Society SS;Erect-12Meter Box pole Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation - Box pole 12 Mtr

18

3901

70224.66

... More
Addl. PTR at Ayyappa Society SS;EXCAV OF PIT HARD 0.75 Mx0.9 Mx1.95 M Excavation of pits in hard rock requiring blasting. (other than SS) 11Mtrs PSCC Pole/ Box poles 0.75 M x 0.9 M x 1.95 M

18

1326

23868

... More
Addl. PTR at Ayyappa Society SS;Drill-Hole in Hard Rock for any Pole Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) (other than SS) Drilling of Holes in Hard rock wherever rock blasting is not possible for pole/ RS joist Box pole/ 11 Mtr PSCC Pole/ 9 Mtr PSCC Pole

10

13750

137500

... More
Addl. PTR at Ayyappa Society SS;Fabrication of poles: Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

18

512

9225.9

... More
Addl. PTR at Ayyappa Society SS;UNLOADING of R.S. Joists 175 x 85 mm

36

50

1800

... More
Addl. PTR at Ayyappa Society SS;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

9

412

3708.72

... More
Addl. PTR at Ayyappa Society SS;LOADING of R.S. Joists 175 x 85 mm

36

76

2736



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.