Telangana State Southern Power Distribution Company Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Civil And Construction
Civil Works Others
Electrical Cables And Wires
Electrical and Electronics
Electrical Works
Opening Date13 Mar 2023
Closing Date20 Mar 2023
Tender Amount₹ 21,21,910 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of 33kV Interlinking Line Macha Bollaram;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

7

1210

8470

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply & spreading of 20mm machine crushed metal (HBG) including cost of conveneyance of all materials, labour charges etc complete for finished item of work and directed by the engineer incharge

10

2113

21130

... More
Laying of 33kV Interlinking Line Macha Bollaram;Removing and providing of jumpers in SS.

12

64

768

... More
Laying of 33kV Interlinking Line Macha Bollaram;Labour for Fixing of all types of clamps

6

65

390

... More
Laying of 33kV Interlinking Line Macha Bollaram;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

0.9

3426

3083.4

... More
Laying of 33kV Interlinking Line Macha Bollaram;Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc - M.S./ G.I. Flat 50x6mm / 50 x 8 mm ( Above ground)

333.34

41

13666.94

... More
Laying of 33kV Interlinking Line Macha Bollaram;S-GI Bolts & Nuts,Washers etc.,including earthing pipe with materials

20

117

2350

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication

7

3486

24402

... More
Laying of 33kV Interlinking Line Macha Bollaram;Connection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

9

224

2016

... More
Laying of 33kV Interlinking Line Macha Bollaram;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) - Above 10 KM and upto 20 KM

2.7

404

1090.8

... More
Laying of 33kV Interlinking Line Macha Bollaram;Un loading of M.S.Channels, Angles, Flats & Rods etc.,

1.7

185

314.5

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of M.S.Channels, Angles, Flats & Rods etc.,

1.7

221

375.7

... More
Laying of 33kV Interlinking Line Macha Bollaram;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

2

845

1690

... More
Laying of 33kV Interlinking Line Macha Bollaram;UNLOADING of R.S. Joists 175 x 85 mm

2

50

100

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of R.S. Joists 175 x 85 mm

2

76

152

... More
Laying of 33kV Interlinking Line Macha Bollaram;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation - Box pole 9/10/11 Mtr

2

2591

5183.98

... More
Laying of 33kV Interlinking Line Macha Bollaram;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

4

502

2010

... More
Laying of 33kV Interlinking Line Macha Bollaram;Excavation of pits in all soils except hard rock requiring blasting - 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0") 1.05 cum

4

491

1964

... More
Laying of 33kV Interlinking Line Macha Bollaram;Mass Concreting for pole Coping of 1.5'x1.5'x1 with 1:8 slope Using form boxes (0.031Cumt.)

0.12

3892

482.73

... More
Laying of 33kV Interlinking Line Macha Bollaram;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc - including the cost of cement

4.2

6450

27090

... More
Laying of 33kV Interlinking Line Macha Bollaram;Laying of 4 core/10 core 2.5 sq. mm.Copper control cable in aready excavation trench including cost of providing single compress glands at both ends

1300

19

24700

... More
Laying of 33kV Interlinking Line Macha Bollaram;Fixing of Metal halide lamps with fixtures Make:Philips,Crompton,Bajaj junction box with MCB with 1.5 GI pipe complete.

2

1268

2536

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply of 90W LED fixture set

2

8200

16400

... More
Laying of 33kV Interlinking Line Macha Bollaram;Errection of tubular poles

2

1379

2758

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply of stepped tubular poles single way made of steel of length 9mtrs with tensile strength of 42kgf/mm2 at a steps of 4.5 mtrs with outer dia 114.3 mm,2.1 mtrs with outer dia 88.9 mm, 2.1 mtrs with outer dia 76.1 mm, normal Crippling load of 141 kgf, normal Breaking load of 198 kgf ,working Crippling load of 70 kgf, working Breaking load of 79 kgf as per IS 2713.

2

13913

27826

... More
Laying of 33kV Interlinking Line Macha Bollaram;Cable terminations to the switch gear marshalling boxes/panel terminal blocks/control and relay panels LT AC panel including providing suitable ferrules and lugs as per specification (including cost of ferrules, lugs and glands)

100

27

2700

... More
Laying of 33kV Interlinking Line Macha Bollaram;Cement concrete 1:3:6 ration with 40 MML HBG metal including the cost of all materials and labour complete 1.8 x 1.8 x 0.75 cum for VCB Plinth

6

5160

30960

... More
Laying of 33kV Interlinking Line Macha Bollaram;Erection of 33 KV VCB with Control Panel

1

6346

6346.08

... More
Laying of 33kV Interlinking Line Macha Bollaram;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) - Above 10 Km and upto 20 Km with Lorry for each trip

1

3235

3235

... More
Laying of 33kV Interlinking Line Macha Bollaram;Un loading of 33KV 800 /400 Amps AB Switch

2

79

158

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of 33KV 800/400 Amps AB Switch

2

126

252

... More
Laying of 33kV Interlinking Line Macha Bollaram;Un loading of 33 KV VCBs along with Panel boards

1

1024

1024

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of 33 KV VCBs along with Panel boards

1

1024

1024

... More
Laying of 33kV Interlinking Line Macha Bollaram;Erection of 33 KV LAS station/Line type including earthing

2

880

1760

... More
Laying of 33kV Interlinking Line Macha Bollaram;Erection of 33 KV AB Switch including alignment and earthing

2

2663

5326

... More
Laying of 33kV Interlinking Line Macha Bollaram;Drilling of holes upto 20 mm dia using power drills - MS Channel, Angles and flat

10

4

40

... More
Laying of 33kV Interlinking Line Macha Bollaram;Fabrication of materials including 2 coats of Red oxide painting - Back clamps with 75 x 8 mm MS Flat

3

31

93

... More
Laying of 33kV Interlinking Line Macha Bollaram;UNLOADING of Bolts&Nuts of all sizes.

1

17

17

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of Bolts & Nuts of all sizes

1

17

17

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply of GI Bolts & Nuts , washers etc including cost of Earthing pipe and materials

20

117

2350

... More
Laying of 33kV Interlinking Line Macha Bollaram;Making of coil earthing pole with 8mm GI wireNut&Bolts for AB Switch

1

143

143.75

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply of GI wire No 8 Including cost of Earthing pipe and materials

10

105

1050

... More
Laying of 33kV Interlinking Line Macha Bollaram;UNLOADING of 33 KV Metal parts-bagof 25

1

65

65

... More
Laying of 33kV Interlinking Line Macha Bollaram;LOADING of 33KV Metal parts-bag of 25no

1

65

65

... More
Laying of 33kV Interlinking Line Macha Bollaram;UNLOADING of 33 & 11 KV Disc insulator

1

2

2

... More
Laying of 33kV Interlinking Line Macha Bollaram;LOADING of 33 & 11 KV Disc insulators

1

2

2

... More
Laying of 33kV Interlinking Line Macha Bollaram;UNLOADING of 33 KV Pin insulators

1

3

3

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of 33 KV Pin insulators

1

3

3

... More
Laying of 33kV Interlinking Line Macha Bollaram;UNLOADING of Conductor drums

1

100

100

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of Conductor drums

1

202

202

... More
Laying of 33kV Interlinking Line Macha Bollaram;Formation of Cut point for 33 KV Single Circuit line excluding pole erection and stays

2

1756

3512

... More
Laying of 33kV Interlinking Line Macha Bollaram;Paving out and stringing of conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location - 100 Sqmm Single Circuit (3 Conductors)

0.15

13585

2037.75

... More
Laying of 33kV Interlinking Line Macha Bollaram;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc - including the cost of cement

4.33

6450

27941.4

... More
Laying of 33kV Interlinking Line Macha Bollaram;Excavation of pits in all soils except hard rock requiring blasting - 0.92 M x 0.92M x 2.3M (3.0" x 3.0" x 7.6") 1.94 cum

3

826

2478.75

... More
Laying of 33kV Interlinking Line Macha Bollaram;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation -Spun poles 12.5 Mtrs / 12.9Mtrs PSCC

3

4433

13299

... More
Laying of 33kV Interlinking Line Macha Bollaram;Sub-transport of poles upto Workspot upto 10KM (Including loading and unloading) - Trans 11/12.5/12.9M Spun pole upto 50KM

3

858

2574

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply of RCC cable Joint markers/ Cable route markers of size 700 X 240 X 75 mm duly engraving with 5 mm thick letters , CPDCL 33000/11000 Cable/Cable joint fixing the 300mm below ground level and 400mm above ground level confirming to IS 5820 2001

18

484

8712

... More
Laying of 33kV Interlinking Line Macha Bollaram;Fabrication of Main and Auxiliary structures with welding using raw steel such as RS joist, M.S.Angles, Plates, Channels, including the supply and fabrication of 6mm base plate to the RS-Joist poles excluding cost of Mild Steel and transport charges to substation site, including erection.

0.3

3426

1027.8

... More
Laying of 33kV Interlinking Line Macha Bollaram;Fabrication and connecting to risers from earth mat to structures, equipment, marshalling boxes, electrical panels, PLCC panels, fencing posts etc - M.S./ G.I. Flat 50x6mm / 50 x 8 mm ( Above ground)

125

41

5125

... More
Laying of 33kV Interlinking Line Macha Bollaram;Providing of RCC Collar guarding to the existing earth pits with damaged masonry including dismantling and removing of existing masonry and fixing the RCC collar of 0.60 M dia X 0.50 M height

3

386

1158

... More
Laying of 33kV Interlinking Line Macha Bollaram;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.75M dia x 0.5 M height

3

1210

3630

... More
Laying of 33kV Interlinking Line Macha Bollaram;Excavation of pits in all soils except hard rock requiring blasting 0.76 M x 0.76M x 1.83M (2.6" x 2.6" x 6.0") 1.05 cum

2

491

982

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply of CI earth pipe 100 mm dia, 2.75 mt long thickness 10mm with flange as per specication including earthing pipe with materials

3

3486

10458

... More
Laying of 33kV Interlinking Line Macha Bollaram;S-GI Bolts & Nuts,Washers etc.,including earthing pipe with materials

20

117

2350

... More
Laying of 33kV Interlinking Line Macha Bollaram;Submission of auto CAD Drawing as per pole schedule (Detailed survey and sketch) up to 10 KM

1

6000

6000

... More
Laying of 33kV Interlinking Line Macha Bollaram;S&E-Smart RFID marker Smart RFID markers SM1500 Power RFID based Electronic cable/pipe marker

18

2745

49410

... More
Laying of 33kV Interlinking Line Macha Bollaram;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) Above 10 KM and upto 20 KM

1.61

404

650.44

... More
Laying of 33kV Interlinking Line Macha Bollaram;Un loading of M.S.Channels, Angles, Flats & Rods etc.,

0.61

185

112.85

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of M.S.Channels, Angles, Flats & Rods etc.,

0.61

221

134.81

... More
Laying of 33kV Interlinking Line Macha Bollaram;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

4

845

3380

... More
Laying of 33kV Interlinking Line Macha Bollaram;Un loading of R.S. Joists 175 x 85 mm

4

50

200

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of R.S. Joists 175 x 85 mm

4

76

304

... More
Laying of 33kV Interlinking Line Macha Bollaram;Erection of pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation - Box pole 9/10/11 Mtr

2

2591

5183.98

... More
Laying of 33kV Interlinking Line Macha Bollaram;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

4

502

2010

... More
Laying of 33kV Interlinking Line Macha Bollaram;Mass Concreting for pole - Coping of 1.5'x1.5'x1 with 1:8 slope Using form boxes (0.031Cumt.)

0.06

3893

241.37

... More
Laying of 33kV Interlinking Line Macha Bollaram;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc - including the cost of cement

2.1

6450

13545

... More
Laying of 33kV Interlinking Line Macha Bollaram;Erection of 33 KV AB Switch including alignment and earthing

1

2663

2663

... More
Laying of 33kV Interlinking Line Macha Bollaram;Un loading of 33KV 800 Amps AB Switch

1

79

79

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of 33KV 800 Amps AB Switch

1

126

126

... More
Laying of 33kV Interlinking Line Macha Bollaram;Consultation charges for providing traffic diversions and meeting other exegencies for execution of work during late night hours and wee hours.

1760

30

52800

... More
Laying of 33kV Interlinking Line Macha Bollaram;supply of 6" DWC pipe including Cost of Pipes and slabs

30

1012

30360

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply of 6" B class GI pipe including Cost of Pipes and slabs

300

1044

313200

... More
Laying of 33kV Interlinking Line Macha Bollaram;Supply of 250 mm Hume pipe of class NP3 with compresive strength of 35N/mm2 for 28 days curing,barewall thickness of 30mm,1.25kG linear/meter and withstanding capability of 22.50KN/linear meter as per IS 458-1993.

50

363

18150

... More
Laying of 33kV Interlinking Line Macha Bollaram;UG Cables Joints :Making of Straight through joints- 33 KV 3 x 400 Sqmm XLPE Cable

7

5589

39123

... More
Laying of 33kV Interlinking Line Macha Bollaram;Making of Outdoor/Indoor End Termination - 33 KV 3 x 400 Sqmm XLPE Cable

2

2710

5421.1

... More
Laying of 33kV Interlinking Line Macha Bollaram;Raising of cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)- Single Run 33 KV 3X400 Sqmm Cable.

20

133

2660

... More
Laying of 33kV Interlinking Line Macha Bollaram;Laying of XLPE UG cable including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs - Along the CC / BT multi layer road requiring compressor -Single Run 33KV 3x400 Sqmm Cable

150

1152

172876.5

... More
Laying of 33kV Interlinking Line Macha Bollaram;Laying of XLPE UG cable including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs- In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil / CC/BT Road - Single Run 33KV 3x400 Sqmm Cable

1610

645

1038466.1

... More
Laying of 33kV Interlinking Line Macha Bollaram;Transport of conductor drums, cable drums, fragile material such as kiosks, VCBs, control panels, current transformers, boosters, lightning arrestors, insulators, transformers, meters (which are less in weight and occupy more space) (excluding of loading unloading) - Above 10 Km and upto 20 Km with Lorry for each trip

3

3235

9705

... More
Laying of 33kV Interlinking Line Macha Bollaram;Un loading of 11KV/33KV XLPE UG Cable for all sizes

6

1024

6144

... More
Laying of 33kV Interlinking Line Macha Bollaram;Loading of 11KV/33KV XLPE UG Cable for all sizes

6

1024

6144



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.