Telangana State Southern Power Distribution Company Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Southern Power Distribution Company Limited - TSSPDCL Tender

Civil And Construction
Opening Date20 Apr 2021
Closing Date5 May 2021
Tender Amount₹ 9,96,488 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Improvement works;Excavation of Pit for VCB

4.8

-

1588.8

... More
Improvement works;Stringing of bus with panther conductor

26.67

-

6860.09

... More
Improvement works;Making of Straight through joint 11kv 3x300 xlpe UG cable

1

-

3176

... More
Improvement works;LOADING of 11 KV,10 KA LAs Station type

1

-

32

... More
Improvement works;UNLOADING of 11 KV,10 KA LAs Station typ

1

-

32

... More
Improvement works;UNLOADING of 11 KV AB SWCH Con 200/400 A

4

-

320

... More
Improvement works;LOADING of 11 KV AB SWCH Con 200/400 A

4

-

320

... More
Improvement works;LOADING of 11 KV, 10 KA LAs Line type

1

-

32

... More
Improvement works;UNLOADING of 11 KV, 10 KA LAs Line type

1

-

32

... More
Improvement works;Making of Outdoor/Indoor End Termination 11kv 3x300 Sqmm xlpe cable

4

-

8084

... More
Improvement works;Raising of Single run 11KV 3x300sqmm UG cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

12

-

1356

... More
Improvement works;Laying of single run 11KV 3x300sqmm UG Cable along the CC / BT multi layer road requiring compressorr including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 \KV-1.05Mtrs & 33 KV - 1.20 mtrs.

168

-

140952

... More
Improvement works;Supply of Earthing GI Wire No 8 including material

8

-

672

... More
Improvement works;Labour for Fixing of all types of clamps

39

-

2535

... More
Improvement works;Supply of 6" B class GI pipe

9

-

9396

... More
Improvement works;Supply of I-Bolts

6

-

1764

... More
Improvement works;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable.

2

-

804

... More
Improvement works;Erection of 9/10/11Meter Box pole in position, aligning and setting to work, fixing of cross arms and A105 top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

2

-

4096

... More
Improvement works;Fabrication of U Clamp 50x6 mm MS Flat including 2 coats of Red oxide painting

12

-

204

... More
Improvement works;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

5

-

4755

... More
Improvement works;Excavation of pits in all soils except hard rock requiring blasting (2.6" x 2.6" x 6.0")

5

-

1885

... More
Improvement works;Supply and fixing of 33/11KV SS Feeder Indicator Board

1

-

551

... More
Improvement works;Providing of Coil earthing of pole with No.8 GI wire

4

-

1544

... More
Improvement works;Supply of MS bolts & nuts and washers etc of all sizes

50

-

3650

... More
Improvement works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) UPTO 10KM

3

-

999

... More
Improvement works;Erection of 11 KV LAS line type including earthing

1

-

505

... More
Improvement works;Fixing of I-bolts

6

-

120

... More
Improvement works;Connection of equipment to bus and or another equipment with single zebra/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary

33

-

7392

... More
Improvement works;Supply of Tension clamps for earthwire 3bolted

6

-

4290

... More
Improvement works;Laying of single run 11KV 3x300sqmm UG Cable along the CC / BT multi layer road requiring compressorr including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

24

-

5448

... More
Improvement works;Supply of Alluminum alloy T clamps LM6 Al alloy of 12 mm, 800 A conforming to A6 of IS 617, 4 bolted with hot dip galvanised bolts and double nuts with spring and flat washers of size M10 x 65 i.e(3/8" x 21/2 " to suit for panther ACSR on all three ways /on one side and Zebra ACSR on take off side or any other combination for carrying 800 A current rating

9

-

2691

... More
Improvement works;Supply of 120 Sqmm Aluminium lugs

24

-

300.48

... More
Improvement works;Lay-4C/10C 2.5Sqmm Control Cable

800

-

11200

... More
Improvement works;Coping & Muffing of Iron Poles

0.15

-

603.41

... More
Improvement works;Mass concreting of supports erectred with CC (1:4:8) using 40 mm, HBG metal including the cost of metal, sand and cuting etc. (including cost of Cement)

4.4

-

22704

... More
Improvement works;Providing of earthing with excavation of earth pit (0.6 x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height .

8

-

8800

... More
Improvement works;Supply of GI pipe 40 mm dia, 2 mtrs, 3mm thickness with bolts and nuts

5

-

3665

... More
Improvement works;Supply of CI earth pipe 100 mm dia, 2.75 mt long with flange

3

-

10458

... More
Improvement works;Supply & spreading of 20mm machine crushed metal (HBG) including cost of conveneyance of all materials, labour charges etc complete for finished item of work and directed by the engineer incharge

6.4

-

13523.2

... More
Improvement works;Laying of earth mat 50x6mm flat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication

191.7

-

12460.5

... More
Improvement works;Supply of Earthing GI flat 25x3 mm incl material

60

-

5040

... More
Improvement works;Erection of 11 KV VCB with Control Panel

1

-

4392

... More
Improvement works;Erection of 11KV AB Switch in SS

4

-

9000

... More
Improvement works;UNLOADING o11 KV VCBs along with Panel boards

1

-

1024

... More
Improvement works;LOADING of 11 KV VCBs along with Panel boards

1

-

1024

... More
Improvement works;PCC with 40mm Metal (1:3:6)

6

-

32178

... More
Improvement works;Laying of earth mat 75x 8mm MS Flat / GI Flat including excavation of trenches of depth 600mm, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes with the following sizes of MS Flats /GI Flats. including fabrication

85

-

5525

... More
Improvement works;Erection of 11 KV LAS station type including earthing

1

-

559

... More
Improvement works;Supply of CT stud clamps with hot dip galvanised bolts and nuts suitable for zebra / Panther conductor on one side and 28/30/40 mm CT stud on other side with stud size for single zebra / panther (4 bolted) with bimetallic sleeve for carrying 800 A

6

-

2394

... More
Improvement works;Erecttion of 33/11KV Bay in SS (incl all)

1

-

7016

... More
Improvement works;Erection of 5 Mts RS Joist (Bit) Pole including fixing of Pole Mounted Box in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation R.S. joist box poles erection complete

3

-

2457

... More
Improvement works;AB Switch Coil Earthing GI No. 8 Wire

2

-

230

... More
Improvement works;Transport of Cond Drum,VCBs >10 & <20Km

1

-

3235

... More
Improvement works;Coping & Muffing-Iron Pole

0.31

-

1206.83

... More
Improvement works;Cut-Tree Branch(LT/11/33)&Trnsprt Debris

8000

-

24000

... More
Improvement works;Painting of R.S Joist,Box poles including cross arms and clamps with one coat of red oxid and two coats of Al.paint including cost of paint and consumables

10

-

9510

... More
Improvement works;Fabrication of 175x85/150x75mm RS joist pieces upto 12.5 meters length by welding joint together by means of 50x6mm flat and MS channel on either side including the cost of consumable

10

-

4020

... More
Improvement works;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 0.76X0.76X1.52M

62

-

64914

... More
Improvement works;Erection of 9/10/11Meter Box pole in position, aligning and setting to work, fixing of cross arms and A105 top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

10

-

20480

... More
Improvement works;Formation of Cut point (Ver/ Hor) for LT line excluding pole erection -1 ckt

10

-

9380

... More
Improvement works;Fabrication of LT 3 Phase cross arms with 75x40 mm MS channel including 2 coats of Red oxide painting

23

-

805

... More
Improvement works;Fixing of Side Arm along with Cross Arm including angle strut up to 5 feet for LT

23

-

5290

... More
Improvement works;Removing and Reconnection of LT Services

450

-

19800

... More
Improvement works;Paving out and stringing of LT 3ph line 4 conductor (55sqmm) by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

0.7

-

5587.12

... More
Improvement works;Dismantling of 11kV 34/ 55 Sqmm SC

0.7

-

2379.3

... More
Improvement works;Raise-Middle Ph Conductor for 11KV Line

72

-

22680

... More
Improvement works;Supply of Earthing GI Wire No 8 including material

31

-

2604

... More
Improvement works;Providing of Coil earthing of pole with No.8 GI wire

10

-

3860

... More
Improvement works;Supply of 6" B class GI pipe

100

-

104400

... More
Improvement works;Consultation charges for providing traffic diversions and meeting other exegencies for execution of work during late night hours and wee hours

260

-

7800

... More
Improvement works;Providing of earthing with excavation of earth pit (0.6x0.6x2.4 Mts.) duly filling with bentonite, earth , running of earth wire etc., complete, including cost of bentonite and excluding cost of RCC collar of size 0.6M dia x 0.5 M height

6

-

6600

... More
Improvement works;Supply of Earthing GI flat 25x3 mm incl material

60

-

5040

... More
Improvement works;Supply of GI eath pipe with 40 mm dia,3mm thcikness with 2.0 M Length

6

-

4188

... More
Improvement works;Making of OD/Idoor end termination 11kv 3x300 xlpe

4

-

8084

... More
Improvement works;Making of Straight through joint 11kv 3x300 xlpe

1

-

3176

... More
Improvement works;Raising of Single run 11KV 3x300sqmm UG cable on already erected support with wooden / MS clamps and connecting it to over head line with cable jumpers including cost of required wooden cleats, lugs and bolts and nuts through GI pipe (excluding the cost of GI pipe)

40

-

4520

... More
Improvement works;Laying of single run 11KV 3x300sqmm UG Cable along the CC / BT multi layer road requiring compressorr including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

140

-

117460

... More
Improvement works;Laying of single run 11KV 3x300sqmm UG Cable In Hard Gravel Soil / BC soil / Red earth / stone and earth mixed with fair boulders / Normal soil / CC/BT Road including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs.

60

-

21780

... More
Improvement works;Laying of single run 11KV 3x300sqmm UG XLPE UG cable across the CC/ BT road crossing multi layer road requiring compressor wih hume pipe including excavation of trench of size 450mm wide and 850mm for LT, 1050mm for 11 KV and 1200mm for 33 KV form road level, providing of DWC/GI pipes whereever required depth is not acquired as per the instructions of Engineer in Charge, the prorata basis rates to be adopted for 2 feet, 3feet depths and filling with sand 250mm above the cable and 50mm below the cable, laying of cable, placing 40mm shabad protective slabs, back filling the trench with earth, levelling and and removing the debris from the site inluding the cost of lead and lift etc.depth of the trench) LT -0.85 mts, 11 KV-1.05Mtrs & 33 KV - 1.20 mtrs

60

-

56220

... More
Improvement works;Supply of 4" B class GI pipe

12

-

8880

... More
Improvement works;Fabrication of Back clamps with 50 x 6 mm MS Flat

220

-

3300

... More
Improvement works;Fixing of Side Arm along with Cross Arm including angle strut up to 5 feet 11KV

72

-

25200

... More
Improvement works;Fabrication of V Cross arms with 75 x 40 mm MS Channel including 2 coats of Red oxide painting

72

-

7920

... More
Improvement works;Supply of GI Bolts & Nuts and Washers etc.,

50

-

4700

... More
Improvement works;Supply of MS bolts & nuts and washers etc of all sizes

45

-

3285

... More
Improvement works;Transport of iron materials such as R.S. Joists, Rail Poles, fabricated supports, steel, iron, flat, M.S. Channels etc., by lorries. (excluding of loading & unloading ) UPTO 10KM

8.11

-

2700.63

... More
Improvement works;Paving out and stringing of 55sqmm 33/11kv Line 3 conductor by providing temporary stays, tensioning, sagging correctly, fixing strain points, transferring to pin points binding, keeping stifner, rectification of poles, guys and jumpering etc., including transport of material from road side to location.

2.67

-

19912.35

... More
Improvement works;Erection of 11KV 400/200A Conventional type AB Switch including fixing of cross angles, earthing and alignment complete

2

-

3196.68

... More
Improvement works;Erection of 9.1M Pole in position, aligning and setting to work, fixing of cross arms and top clamps, earthing of supports, back filling with earth and stones properly ramming including transport of materials from road side to location excluding pit excavation

62

-

100502

... More
Improvement works;Sub transport of 9.1Mt PSCC Pole upto Workspot upto 10KM

62

-

22506

... More
Improvement works;Formation of Cut point for 11 KV Single Circuit line excluding pole erection and stays

19

-

21261

... More
Improvement works;Mass concreting of supports erected with CC (1:4:8) using 40 mm, HB G metal including the cost of metal, sand, Cement and curing etc.

42.28

-

218164.8

... More
Improvement works;Excavation of pits in hard rock not requiring blasting. (In hard murram / rock boulders) 0.76X0.76X1.83M

10

-

12600



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.