Telangana State Road Transport Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Telangana State Road Transport Corporation - TSRTC Tender
Civil And Construction
Road Construction
Opening Date15 Sep 2022
Closing Date20 Sep 2022
Tender Amount₹ 49,99,026
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,180
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
351783Bid Award Id
ViewTender No
Item 6 of T N No.04/CCE/2022-23 dt.18.08.2022Tender Authority
Telangana State Road Transport Corporation ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
including stacking to departmental guage for
-
-
-
... More
pre-measurements, ' charges payable to department
-
-
-
... More
of mines, all incidental, operational charges,all taxes, ,
-
-
-
... More
etc., cost and conveyance of all labour and materials
-
-
-
... More
excluding seigniorage charges at site of work
-
-
-
... More
complete as per the direction of the
-
-
-
... More
Engineer-in-charge.
-
-
-
... More
Supply and Stacking of 12mm gauge SS5 hard granite
112.73
197289
1750.1
... More
machine crushed metal brought from approved quarry
-
-
-
... More
including stacking to departmental gauge for
-
-
-
... More
premeasurements, ' charges payable to department of
-
-
-
... More
mines, all incidental, operational charges,all taxes,,
-
-
-
... More
etc., cost and conveyance of all labour and materials
-
-
-
... More
excluding seigniorage charges at site of work
-
-
-
... More
complete as per the direction of the
-
-
-
... More
Engineer-in-charge.
-
-
-
... More
Supplying and stacking of CLEAN NATURAL SAND
188.03
497903
2648
... More
brought from approved quarry including stacking to
-
-
-
... More
departmental gauge for premeasurements, ' charges
-
-
-
... More
payable to department of mines, all incidental,
-
-
-
... More
operational charges,all taxes,,, cost and conveyance
-
-
-
... More
of all labour and materials excluding seigniorage
-
-
-
... More
charges at site of work complete as per the direction
-
-
-
... More
of the Engineer-in-charge.
-
-
-
... More
Labour charges for placing in position(while the work is in progress) of 12.70mm thick premoulded Mastic pads to a depth of 137.50mm from base with a groove of 12.70mm x 12.50mm at top at every 31.5 M apart for Expansion joints with priming coat with Shalimar primer and providing and filling with Shalijet sealing compound over mastic pads provided for expansion joints at 31.50 M apart rounding off the edges, finishing including all taxes,cost of fuel,heating charges, cost of brushes, , etc., cost and conveyance of all material at site of work and all labour and tools and plants, all incidental, operational charges complete as directed by the Engineer-in-charge.
162.71
3091
19
... More
Labour charges for Laying of mechanically mixed cement concrete pavement 150mm thick to required levels as set for C.C.pavement using hard granite coarse aggregates, and fine aggregate brought from approved quarry laid in panels of size 3.50 M X 3.50 M in line and level or slope, using Admixtures of approved quality, including form work, machine mixing,compacted with pin and screed board vibrator and cost of cement fine finishing to even surface, curing, and making grooves of 6mm x 50mm and rounding edges for Transverse/ contraction joints and filling the joints with shalijet sealing compound at every joint of exposed surface as approved by site incharge including all incidental, hire and operational charges and taxes, , etc,cost and conveyance of all labour, tools and materials at site of work complete as directed by the Engineer-in-charge.
2562
2785919
1087.4
... More
Supply of 12.70mm thick premoulded Mastic pad of
31
14474
466.9
... More
STP/LLOYD or equivalent make including cost and
-
-
-
... More
conveyance of all labour and materials at site of work
-
-
-
... More
complete as directed by the Engineer- In- Charge.
-
-
-
... More
Supply of Cement Concrete plasticiser (Chemical
45
9558
212.4
... More
Admixture) of approved make including cost and
-
-
-
... More
conveyance of all labour and materials at site of work
-
-
-
... More
complete as directed by the Engineer- In- Charge.
-
-
-
... More
Supply of sealing compound of STP/LLOYD or
641
81535
127.2
... More
equivalent make including cost and conveyance of all
-
-
-
... More
labour and materials at site of work complete as
-
-
-
... More
directed by the Engineer- In- Charge.
-
-
-
... More
Supply of Primer of STP/LLOYD or equivalent make
7
581
83
... More
including cost and conveyance of all labour and
-
-
-
... More
materials at site of work complete as directed by the
-
-
-
... More
Engineer- In- Charge.
-
-
-
... More
SUPPLYING and STACKING of GRAVEL
360
113760
316
... More
brought from approved quarry for pre-measurements
-
-
-
... More
to departmental gauge including seigniorage charges
-
-
-
... More
and all incidental and operational charges, cost and
-
-
-
... More
conveyance of all labour and materials,, at site of
-
-
-
... More
work complete as directed by the Engineer-in-charge.
-
-
-
... More
NOTE 1 : Contractor is responsible for showing
-
-
-
... More
justification for the quantity of gravel brought by him.
-
-
-
... More
SUPPLY&SPREADING of GRAVEL in
360
47952
133.2
... More
LAYERS not exceeding 225mm. thick and below,
-
-
-
... More
loose compacted to 150mm. thick including
-
-
-
... More
sectioning each layer to prop®r profile, watering
-
-
-
... More
before and after spreading of gravel and
-
-
-
... More
consolidating each layer with 8 to 10 Tonne capacity
-
-
-
... More
contractor's power roller at OPTIMUM MOISTURE
-
-
-
... More
CONTENT to obtain 90% Proctor's density including
-
-
-
... More
all incidental labour charges and all hire and
-
-
-
... More
operational charges of power roller and all water leads
-
-
-
... More
and lift charges,, etc. etc., complete for finished item
-
-
-
... More
of work as directed by the Engineer-in-charge. NOTE 1:
-
-
-
... More
The payment will be made for compacted thickness
-
-
-
... More
based on levels at suitable intervals and computed as
-
-
-
... More
per pre-levels and finished levels after consolidation.
-
-
-
... More
Providing, laying, Spreading and compacting graded
375
887213
2365.9
... More
HBG crushed stone aggregates (30% of 45-22.4mm,
-
-
-
... More
40% of 22.4-2.36mm and 30% of 2.36mm-75 microns)
-
-
-
... More
to Wet Mix Macadam specification including premixing
-
-
-
... More
the material with water at OMC in Mechanical mix plant
-
-
-
... More
carriage of mixed material by tipper to site, laying in
-
-
-
... More
uniform layers with mechanical paver finisher in base
-
-
-
... More
courses on well prepared surface and compacting with
-
-
-
... More
Vibratory roller of 8 to 10 tonnes to achieve the desired
-
-
-
... More
density inlcuding all hire and operational charges of
-
-
-
... More
plant and machinery, all incidental, cost and
-
-
-
... More
conveyance of all materials and labour charges
-
-
-
... More
excluding seigniorage charges etc. complete as
-
-
-
... More
directed by the Engineer-in-charge and as per
-
-
-
... More
MORT&H Specification (5th revision) for finished item
-
-
-
... More
of work . (payment will be made based on levels for
-
-
-
... More
finished item of work)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements