Telangana State Road Transport Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,360
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
364884Bid Award Id
ViewTender No
Item 11 of T N No.05/CCE/2022-23 dt.14.10.2022Tender Authority
Telangana State Road Transport Corporation ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
aggregates and fine aggregates brought from approved
-
-
-
quarry laid in panels of size 3.50 M X 3.50 M in line and level,
-
-
-
slope, using admixtures of approved quality, including
-
-
-
formwork, cost of cement, compaction with vibrators fine
-
-
-
finishing to even surface, curing, and making grooves 6mm x
-
-
-
50mm by using necessary tools/by cutting with necessary
-
-
-
machine for Transverse/ contraction joints and using
-
-
-
premoulded filler mastic pads of 12.7mm thick for Expansion
-
-
-
joints, rounding of edges and filling with hot sealing compound
-
-
-
at all joints as approved by site incharge etc, all incidental,
-
-
-
hire and operational charges cost and conveyance of all
-
-
-
labour, tools and materials at site of work complete as directed
-
-
-
by Engineer- in- charge. (The quantity of materials required
-
-
-
for 1 bag of cement are indicated at schedule "A-1" and the
-
-
-
materials to be manually loaded).
-
-
-
SUPPLYING and STACKING 40mm. GAUGE hard granite
736.17
-
1079.3
machine crushed metal brought from approved quarry including
-
-
-
stacking to departmental gauge for premeasurements all
-
-
-
incidental, operational charges, cost and conveyance of all labour
-
-
-
and materials etc., excluding seigniorage charges at site of work
-
-
-
complete as directed by the Engineer-in-charge.
-
-
-
Supplying and stacking of 12mm gauge hard granite machine
315.68
-
1461
crushed metal (SS5) brought from approved quarry including
-
-
-
stacking to departmental gauge for premeasurements, all
-
-
-
incidental, operational charges, cost and conveyance of all labour
-
-
-
and materials etc., excluding seigniorage charges at site of work
-
-
-
complete as directed by the Engineer-in-charge
-
-
-
Supplying and stacking of pure river sand brought from approved
526.55
-
3949.5
quarry including stacking to departmental gauge for
-
-
-
premeasurements all incidental, operational charges, cost and
-
-
-
conveyance of all labour and materials excluding seigniorage
-
-
-
charges at site of work complete as directed by the
-
-
-
Engineer-in-charge
-
-
-
Labour charges for placing in position(while the work is in
455.64
-
22.2
progress) of 12.70mm thick premoulded Mastic pads to a
-
-
-
depth of 137.50mm from base with a groove of 12.70mm x
-
-
-
12.50mm at top at every 31.5 M apart for Expansion joints and
-
-
-
wherever necessary with priming coat with primer and
-
-
-
providing and filling with sealing compound over mastic pads
-
-
-
provided for expansion joints, rounding off the edges finishing
-
-
-
including all taxes,cost of fuel, heating charges, brushes, T & P, all
-
-
-
incidental and operational charges cost and conveyance of all
-
-
-
labour and materials at site of work complete as directed by the
-
-
-
Engineer-in-charge.
-
-
-
Labour charges for laying of mechanically mixed cement
7174.5
-
1187.6
concrete pavement 150mm thick to required levels as set for
-
-
-
C.C.pavements using hard granite coarse aggregates and
-
-
-
fine aggregates brought from approved quarry laid in panels
-
-
-
of size 3.50 M X 3.50 M in line and level or slope, using
-
-
-
Admixtures of approved quality, including form work, machine
-
-
-
mixing,compacted with pin and screed board vibrator, Pan
-
-
-
vibrator and cost of cement fine finishing to even surface,
-
-
-
curing, and making grooves of 6mm x 50mm and rounding
-
-
-
edges for Transverse/ contraction joints and filling the joints
-
-
-
with sealing compound at every joint of exposed surface as
-
-
-
approved by site incharge including hire charges of all T&P, all
-
-
-
incidental and operational charges, cost and conveyance of all
-
-
-
labour and materials at site of work complete as directed by the
-
-
-
Engineer-in-charge.
-
-
-
Supply of 12.70mm thick premoulded Mastic pad of
87
-
466.9
STP/LLOYD or equivalent make including all taxes, etc cost
-
-
-
and conveyance of all labour and materials at site of work
-
-
-
complete as directed by the Engineer- In- Charge.
-
-
-
Supply of Cement Concrete plasticiser (Chemical Admixture)
125
-
212.4
of approved make including all taxes, etc cost and
-
-
-
conveyance of all labour and materials at site of work
-
-
-
complete as directed by the Engineer- In- Charge.
-
-
-
Supply of Shalijet sealing compound of STP/LLOYD or
1794
-
127
equivalent make including all taxes, etc cost and conveyance
-
-
-
of all labour and materials at site of work complete as directed
-
-
-
by the Engineer- In- Charge.
-
-
-
Supply of Primer of STP/LLOYD or equivalent make including
19
-
83
all taxes, etc cost and conveyance of all labour and materials
-
-
-
at site of work complete as directed by the Engineer- In-
-
-
-
Charge.
-
-
-