Telangana State Power Generation Corporation Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Telangana State Power Generation Corporation Limited - TSGENCO Tender
Civil And Construction
Building Construction
Opening Date9 Apr 2025
Closing Date24 Apr 2025
Tender Amount₹ 1,90,182
Costs
EMD
₹ 2,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
587418Tender No
EPT-05/2025-26/SE/Civil/KTPS-VII Stage/PalonchaTender Authority
Telangana State Power Generation Corporation Limited ViewPurchaser Address
-Website
http://https://www.tsgenco.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing of shuttle court at Opp. ADE 69 quarter and Volley ball court at beside DE 35 quarter;Marking of Shuttle Court & Volley Ball Court with lime including materilas, labour charges and all working T&P etc. complete for finished item of work and as directed by the Engineer In-Charge
1
5000
5000
... More
Providing of shuttle court at Opp. ADE 69 quarter and Volley ball court at beside DE 35 quarter;Plastering with CM (1:4) in 20mm thick for wall plasterings including cost and conveyance of all materials and labour charges including cost of curing and fine polishing and thread lining etc., and complete for finished item of work as directed by the department (Cement will be issued by the department at free of cost)
90
218
19620
... More
Providing of shuttle court at Opp. ADE 69 quarter and Volley ball court at beside DE 35 quarter;Fabrication and erection of Structural steel MS angles,MS Pipes, channels,Beams etc., wrought and put up including including painting with two coats enamel paint over one coat primer, cutting,weldingfor medium framed structures and placing in position as per the approved structural designs and drawings, the rate including conveyance of steel , hire charges of welding machine, welding rods, labour charges, all T&P, all leads and lifts etc., complete for finished item of work as directed by the Engineer-in-charge.(MS Pipes scrap will be issued by the department at free of cost)
50
51
2575
... More
Providing of shuttle court at Opp. ADE 69 quarter and Volley ball court at beside DE 35 quarter;Supplying and fixing of Shuttle Court Net and Volly ball Court Net including T&P etc., .complete for finished item of work and as directed by the Engineer In-Charge B) Volley ball Court Net
1
3500
3500
... More
Providing of shuttle court at Opp. ADE 69 quarter and Volley ball court at beside DE 35 quarter;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, removal of stumps and other deleterious material and disposal upto a lead of 10m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification ., complete for finished item of work as directed by the department.
23
287
6601
... More
Providing of shuttle court at Opp. ADE 69 quarter and Volley ball court at beside DE 35 quarter;Brick masonry in CM (1:6) using fly ash bricks of size 230x110x75mm for super structure walls etc. at all heights including cost and conveyance of all materials (except cost of cement which will be issued by the dept; at KTPS departmental stores at free of cost), all labour charges with all leads and lifts,scaffolding,curing etc, complete for finished item of work and as directed by Engineer-in-charge.
12
5504
66048
... More
Providing of shuttle court at Opp. ADE 69 quarter and Volley ball court at beside DE 35 quarter;Laying Cement Concrete M20 by using 12mm and 20mm HBG metal of 50% each including cost and conveyance of all materials and labour charges etc., The rates includes cost of leveling, compacting and curing etc and complete for finished item of work as directed by the Engineer-In-Charge (Cement will be issued by the department at free of cost)
5.5
3620
19910
... More
Providing of shuttle court at Opp. ADE 69 quarter and Volley ball court at beside DE 35 quarter;Supply, filling and spreading of Red Earth for sports ground preparation with a lead of 9 km including cost and conveyance of the earth, all labour charges for filling with all leads and liftsetc., complete for finished item of work as directed by the Engineer- in- Charge.
70
706
49420
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements