Telangana State Power Generation Corporation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Telangana State Power Generation Corporation Limited - TSGENCO Tender
Civil And Construction
Building Construction
Opening Date6 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 16,23,143
Costs
EMD
₹ 24,350Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
566182Tender No
EPT-23/2024-25/CE/O&M/SE/Civil/KTPS-VII Stage/PalonchaTender Authority
Telangana State Power Generation Corporation Limited ViewPurchaser Address
-Website
http://https://www.tsgenco.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Painting to external walls with two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. of approved brand over already putty and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls etc., complete for finished item of work as directed by the Engineer in charge. C) Second Floor
280
213
59640
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Painting to external walls with two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. of approved brand over already putty and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls etc., complete for finished item of work as directed by the Engineer in charge. B) First Floor
270
207
55890
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Painting to external walls with two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. of approved brand over already putty and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for external walls etc., complete for finished item of work as directed by the Engineer in charge. A) Ground floor
290
177
51330
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Attending Repairs to the damaged DAV High school class rooms Iron benches including cutting, welding at damaged portions including all machinery hire charges such as welding machine, Gas cutting set and all labour charges etc., complete for finished item of work and as directed by the Engineer-in-charge.
2
7107
14214
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Supply and fixing of of Stainless steel mesh window shutters to the existing windows in DAV Primary school including cost and conveyance of all materials and labour charges, tools and tackles complete for finished item of work and as directed by the engineer in charge.
48
2440
117120
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Supply, Stacking and spreading of Red soil in uniform layers of 15cm thickness, breaking clods, watering compacting, including leveling of existing ground surface, cost and conveyance charges of all materials, stacking, labour, with all leads & lifts and all incidental charges etc., complete for finished item of work and as directed by the Engineer-in-Charge.
115
240
27600
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Painting single coat with synthetic enamel paint of approved make and color of Gr-II. to doors & windows including cost and conveyance of all materials, labour charges in all heights, and scrapping the surface to be painted thoroughly etc., complete for finished item of work and as directed by the Engineer-In-Charge.
80
70
5600
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;White washing two coats with lime for white wash of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work and as directed by the Engineer in charge.
172
43
7396
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Painting single coat with acrylic emulsion paint Exterior grade with sillicon additives having VOC (Volatile Organic Compound ) content less than 30gms/litafter thoroughly cleaning and scrapping the surface to be painted in all heights including cost and conveyance of all materials, labour charges etc., complete for finished item of work as directed by the department.
110
154
16940
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Painting single coat with acrylic emulsion paint interior grade having VOC (Volatile Organic Compound ) content less than 30gms/lit after thoroughly cleaning and scrapping the surface to be painted in all heights including cost and conveyance of all materials, labour charges etc., complete for finished item of work as directed by the engineer in charge.
530
66
34980
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Supply and fixing of of 32mm PPR Ball Valve conforming to DIN Standards 8077/8092 including cost and conveyance of all materials and labour charges complete for finished item of work and as directed by the engineer in charge.
4
278
1112
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture such as Sintex, Aquatech, Nandi, Agarwal, TRUFLO by Hindware with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes but without fittings & base support for tanks complete for finished item of work and as directed by the engineer in charge.
4000
10
40000
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Supply and fixing of of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 including cost and conveyance of all materials and labour charges etc complete for finished item of work and as directed by the engineer in charge.
30
275
8250
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Supply and fixing of premium make CPVC Pipes of 28.60mm OD Pipe - SDR 13.5 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in charge.
40
235
9400
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Supply and laying of 110mm dia PVC/SWR Pipe 4kgs/Sqm of any ISI approved brand for sewage lines and Rain water pipes including all bends, couplings etc including cost and conveyance of all materials and labour charges etc complete for finished item of work and as directed by the Engineer in-charge.
20
314
6280
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Supply and fixing of Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm including cost and conveyance of all materials and labour charges complete for finished item of work and as directed by the engineer in charge.
4
2317
9268
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Replacement of the damaged Thermocole False ceiling with new sheets in true horizontal level 600 mm x 600 mm using 19 mm thick Thermocole sheets to the existing aluminum frame in DAV High school class rooms including Cost &conveyance of all materials and labour charges such as cutting , fixing of standing of frame work exposing roof making complete for finished item of work and as directed by the engineer in charge.
325
55
17875
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Providing and fixing 30mm thick ?RAJSHRI? BRAND FACTORY MADE BOTH SIDE PRELAM SOLID PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, top and bottom rails. MS. Frame shall have a coat of steel primers of approved make and manufacture MS. Frame covered with 5mm thick heat moulded ?Rajshri? Prelam Pac ?C? channel of size 30mm thickness, 70mm width out of which 50mm shall be flat and 20mm shall be tapered in 450 angle on either side forming stiles; and 5mm thick, 95mm . wide Rajshri Prelam Pac sheet out of which 75mm shall be flat and 20mm shall be tapered in 450 on the inner side to form top and bottom rail 115mm wide Rajshri Prelam Pac sheet out of which 75mm shall be flat and 20mm shall be tapered on both sides to form lock rail. Top, bottom and lock rail shall be provided either side of the panel.10mm (5mmX2) thick, 20mmwide cross Pac sheet shall be provided as gap insert for top and bottom rail. Paneling of 5mm thick both side Prelam Pac sheet to be fitted in the MS. Frame welded/ sealed to the stiles & rails with 7mm(5mm+2mm) thick X 15mm wide Pac sheet beading on inner side, and joined together with solvent cement adhesive etc. an additional 5mm thick Pac strip of 20mm width is to be stuck on the interior side of the ?C? channel using Pac solvent cement adhesive etc. complete as per direction of Engineer ? in-charge.
6
2618
15708
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;SUPPLY & FIXING or RAJSHRI or equivalent SINGLE SIDE PRELAM SOLID PANEL PVC DOOR FRAME (CHOUKHAT) of the size 50X47 mm with a wall thickness of 5mm, made out of extruded 5mm rigid Pac single side prelam sheet, meter cut at two corners and joined with 2nos. of 150mm long brackets of 1515mm MS.Square tube. The two vertical door profiles are to be reinforced with 19X19mm MS. square tube of 19guage. The door frame shall be fixed to the wall using 65/100mm long MS. Screws through the frame by using Pac fasteners. a minimum of 4nos. of screws to be provided for each vertical member and minimum 2nos. for horizontal member etc. complete as per manufacture specification and direction of Engineer-in-charge.
23
330
7590
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Dadooing with 300mm x 450mm glazed ceramic tiles 6 mm thick 1st Quality confirming to relevant IS Standards of Johnson/ Rak/Somany/ Cera/ Kajaria or equivalent approved make set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, excluding cost of cement but including other taxes cost & conveyance of all materials, incidental charges, T & P etc., complete for finished item of work as directed by Engineer-In-Charge. (Required cement will be issued by the department at free of cost at KTPS O&M Stores )
17
595
10115
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Replacement of damaged AC Sheets with new Pre-painted Galvolume GCI Sheets of 0.5mm thick Trapezoidal Profile Roofing sheets (Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 1 Sqm 450.00 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colors) of approved brand at all heights by taking all necessary precautionary measures including cost of J-bolts, BT washers, bolts and nuts , all leads and lifts, conveyance of all materials etc., as directed by the engineer-in charge.
680
910
618800
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Painting to the iron benches, MS angles, MS Pipes, channels, etc., with Synthetic enamel paint (1st quality) of two coats over one coat of primer, the rate is inclusive of cost of paints and labour charges, all T&P, all leads and lifts etc., complete for finished item of work as directed by the Engineer-in-charge.
690
190
131100
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Fabrication and erection of Structural steel MS angles, MS Pipes, channels, Beams etc., wrought and put up including cutting, welding and placing in position. The as per the approved structural designs and drawings, rate is including conveyance of steel , hire charges of welding machine, welding rods, labour charges, all T&P, all leads and lifts etc., complete for finished item of work as directed by the Engineer-in-charge. ( Required structural steel , MS air heater pipes issued by the department at KTPS Stores)
0.35
40750
14262.5
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Laying of RCC (1:2:4) Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 330 kgs of cement per cum, 50% of 20mm size and 50% of 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like fine aggregate (sand), coarse aggregate etc., to site and including sales & other taxes on all materials, all operational, incidental and labour charges, such as machine mixing, laying concrete, curing etc., including centering and shuttering (excluding cost of cement and steel, which will be supplied by the department at free of cost at department stores) complete for finished item of work as directed by the Engineer in Charge.
3
3839
11517
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Plastering with CM (1:4) in 20mm thick for floorings and wall plasterings including cost and conveyance of all materials and labour charges including cost of curing and fine polishing and thread lining etc., and complete for finished item of work as directed by the department (Cement will be issued by the department at free of cost)
328
213
69864
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Construction of brick masonry in CM (1:6) using fly ash bricks of size 230x110x75mm for Binder walls in roof in DAV Primary school and rising of toilets side walls for providing roofing etc. at all heights including cost and conveyance of all materials except cost of cement which will be supplied by the dept; at KTPS departmental stores at free of cost, all labour charges with all leads and lifts, scaffolding, curing etc, complete for finished item of work and as directed by Engineer-in-charge.
17
5134
87278
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Supply & fixing of 6 mm thick corrugated AC sheets for Class rooms with G.I 'J' bolts, nuts and 8 mm dia plain BT washers including cost and conveyance of all materials, labour charges etc., complete for finished item of work and as directed by the engineer in charge. (Removed AC Sheets are property of TGGENCO and shall be kept at Section office in IM Colony by the contractor)
35
435
15225
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Cutting, bending and placing HYSD Bars below 36 mm dia including over laps and wastage, where they are not welded excluding cost of steel as it is supplied by the Department at free of cost from KTPS, O&M store, complete for finished item of work as directed by Engineer- In-Charge.
150
17
2550
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Laying PCC (1:4:8) using 40mm HBG metal for leveling course in foundation including cost and conveyance of all materials at site (excluding cost of cement), all labour charges with all leads and lifts, machine mixing, placing, ramming, curing, incidental charges etc complete for finished item of work and as directed by the Engineer in charge. (Required cement will be issued by the department at free of cost at KTPS Dept. Stores)
4.5
3160
14220
... More
Renovation of DAV Primary school and DAV High School to comply with norms of CBSE Board at KTPS VII;Earthwork excavation for foundations by manual means including setting out, removal of stumps and other deleterious material and disposal up to a lead of 10m, dressing of sides and bottom and backfilling in foundation with excavated suitable material as per Technical Specification complete for finished item of work and as directed by the Engineer in charge.
8
251
2008
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements