Telangana State Power Generation Corporation Limited Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Power Generation Corporation Limited - TSGENCO Tender

Opening Date10 May 2021
Closing Date14 Jun 2021
Tender Amount₹ 12,23,551 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Erection of Penstock intake gate of U-II (by using crane of irrigation department) including cost of all labour, materials incidental charges, tools,tackles etc complete for finished item of work as directed by the Engineer-in-charge.

1

-

4940.46

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Transportation charges for carrying the Hydraulic cylinder of Unit-II, of 7.5 m stroke, 70 MT capacity ( OD is 360 mm, and Length is 8.50 m) from work site at SRSP dam Pochampad to workshop at Hyderabad including all transit insurance , all incidental charges, cost of all materials tools and tackles etc complete for finished item of work as directed by the Engineer-in-charge.

220

-

65538

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Replacement of piston if required, including cost of basic metal, casting/forging charges and machining charges, including all labour charges, all handling charges, all machine hiring charges, all transport charges and all incidental charges etc complete for finished item of work as directed by engineer-in-charge (The necessity of piston shall be decided by TSGENCO officers only after inspecting the piston if their is no necessity this item of work shall not be executed).

0.28

-

84730.31

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Honing of the hydraulic cylinder for removing the pitting patches if any on the inner surface of the cylinder including all labour charges, handling charges, machine hiring charges and incidental charges etc complete for finished item of work as directed by Engineer-in-charge ( The neccessity of honing of cylinder shall be decided by TSGENCO officers only after inspecting the cylinder if their is no necessity this item of work shall not be executed).

1

-

316000

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Rectification of Hydraulic cylinder at workshop such as replacement of piston seals as per specification , including assembling of the cylinder and pressure testing as per standard tests and prescribed procedures including all labour charges, all incidental chrages and handling charges etc complete for finished item of work as directed by the Engineer-in-charge.

1

-

85000

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Rectification of Hydraulic cylinder at workshop such as replacement of Shaft seals as per specification , including cost of seals, all labour charges all incidental chrages and handling charges etc complete for finished item of work as directed by the Engineer-in-charge.

1

-

19500

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Fixing of Corner seals for Intake gates of Unit-II approved quality and size as per the specification , including GI counter sunk bolts , removing the old rubber seals , refixing with new rubber seals with new GI counter sunk bolts of approved size , including all labour charges , conveyance incidental charges, charges tools tackles etc complete for finished item of work as directed by the Engineer in charge.

4

-

2237.04

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Fixing of Rubber seals (Bottom, Top & Side) Double Stem type Teflon claded for Intake gates of Unit-II of approved quality and size as per the specification , including GI counter sunk bolts, and nuts removing the old rubber seals , refixing with new rubber seals with new GI counter sunk bolts of approved size (rubber seals will be supplied by TSGENCO) including all labour charges , conveyance charges, incidental charges, tools tackles etc complete for finished item of work as directed by the Engineer in charge.

21.14

-

11822.76

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Painting of Intake gates of unit-II and painting with one coat of inorganic zinc silicate (airless spray preferred) 70+/-5 and two super coats with a total thickness of 300 microns (each 150+/- 5) of solventless coaltar epoxy paint excluding of cost of materials (painting materials supplied by TSGENCO) and including incidental charges, labour, scaffolding etc., complete with all leads and lifts etc complete as directed by the engineer - in -charge.

260

-

80150.2

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Supply of Hot dipped galvanized bolts/ nuts and washers of approved size for placing in position/erection of connecting Splice plates & supporting plates etc complete as directed by the engineer - in -charge.

0.08

-

9020

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Supply and placing in position / erection of connecting MS plate, side plate and supporting plate using structural plates/ flats for Penstock head gate with new GI bolts/ nuts and washers of approved size, including cost of all materials, cutting , drilling, machinery, labour, welding, aligning finishing seal fixing, erection etc., with all leads and lifts, complete as per specifications excluding painting, sand blasted or mechanical cleaning surfaces, which are paid seperately.

0.33

-

42281.9

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Cleaning the Penstock intake gates of Unit-II to expose fresh metal surface for painting by sand blasting method as per specifications including cost of all materials, all incidental & operational charges, labour, machinery, scaffolding, all leads & lifts etc complete as directed by the engineer - in -charge.

260

-

182819

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Removing of Penstock intake gates of Unit-II (by using crane of irrigation department) and ensure safe by keeping on the top of support cribs for level support including cost of all labour, materials, all incidental charges tools, tackles and temporary working platform etc complete for finished item of work as directed by the Engineer-in-charge.

1

-

6307.1

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Transportation charges for carrying the Hydraulic cylinder of Unit-II, of 7.5 m stroke, 70 MT capacity ( OD is 360 mm, and Length is 8.50 m) from work site at SRSP dam Pochampad to workshop at Hyderabad including all transit insurance , all incidental charges, cost of all materials tools and tackles etc complete for finished item of work as directed by the Engineer-in-charge.

220

-

65538

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Removing of hydraulic cylinder from penstock groove of Unit-II (by using irrigation department crane) including removing of the gate pin and the hydraulic pipe line and ensuring proper safety to the removed pipe line and safe by keeping on the top of support cribs for level support on dam including cost of all materials tools all incidental chages and tackles etc complete for finished item of work as directed by the Engineer-in-charge.

1

-

27492.96

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Caulking of stop log gates for Unit-II with the help of diving team and irrigation department crane. Including caulking with cotton waste, coconut rope, saw dust etc, all incidental charges, all leads & lifts complete (compressor air will be supplied by the department at free of cost), for finished item of work as directed by the Engineer-in-Charge. ( If it is required the item will be executed) (The supply of material will be in seperate item).

2

-

36000

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Lowering of stop log gates for Unit-II with the help of diving team and irrigation department crane. Including all incidental charges, all leads & lifts complete (compressor air will be supplied by the department at free of cost), for finished item of work as directed by the Engineer-in-Charge. (If it is required the item will be executed).

2

-

39100

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;To and Fro charges of diving team for Lowering and Caulking of stop log gates for Unit -II including all incidental charges, etc., complete for finished item of work as directed by the Engineer-in-Charge. (If it is required the item will be executed).

1

-

18000

... More
PIG gates Painting with sandblasting and reconditioning of Hydraulic cylinder;Supply of required material for caulking of Unit-II with cotton waste, coconut rope, saw dust, suthily, empty gunny bags etc, and including transportation charges for diving team and caulking materials from project house to site, including cost and conveyance of all materials, all incidental charges, all leads & lifts complete for finished item of work as directed by the Engineer-in-Charge. (If it is required the item will be executed).

1

-

45580



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.