Telangana State Power Generation Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Power Generation Corporation Limited - TSGENCO Tender

Works
Civil And Construction
Civil Works Others
Opening Date21 Jan 2025
Closing Date29 Jan 2025
Tender Amount₹ 5,83,988 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of electrical storage shed at wagon tippler area in CHP;Internal Plastering with CM (1:4) 12mm thick including cost and conveyance of all materials and labour charges includes cost of curing, etc., and complete for finished item of work as directed by the Engineer-in-charge. (Cement will be issued by the department at free of cost).

144

139

20016

... More
Construction of electrical storage shed at wagon tippler area in CHP;Supplying and laying of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top):18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours for roofing at all heights by taking all precautionary measures including cost of self drilling screws,rubber washers, bolts and nuts , all leads and lifts etc., & cost of conveyance of all materials ,all labour charges,T&P. Complete for finished item of work as directed by Engineer-in charge.

59

785

46315

... More
Construction of electrical storage shed at wagon tippler area in CHP;Fabrication and erection of structural steel including painting with two coats of Synthetic enamel paint over red oxide, cost and conveyance of all materials, fabrication charges, cost of all consumables like gas, electrodes, hire charges of all equipment and T&P required for the work and all other incidental charges, all labour charges for working at all heights, all leads and lifts etc.,complete as directed by the Engineer-in charge at site.(Necessary Structural steel will be issued by the department at free of cost)

1.65

28002

46203.3

... More
Construction of electrical storage shed at wagon tippler area in CHP;Supply and fixing of RCC Ventilator of size 600mm x 450mm made of cement concrete including all labour charges, all leads and lifts, scaffolding charges and all taxes etc., as directed by Engineer-in-charge.

11

600

6600

... More
Construction of electrical storage shed at wagon tippler area in CHP;Brick Masonry in CM(1:6) using cured FLY ASH BRICKS of size 230 mmx 110 mm x70 mm and 75 kg/cm2 compressive strength including cost and conveyance of all materials, labour charges, curing and all leads & lifts etc., complete for finished item of work for the following floors as directed by the Engineer-in-Charge at site. (Necessary cement will be issued by the department at free of cost).

35.3

5456

192596.8

... More
Construction of electrical storage shed at wagon tippler area in CHP;RCC M- 20 Nominal mix for Columns & Chajja Cement : fine aggregate : coarse aggregate) corresponding to Table 9 of IS 456 using 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc., but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering with all leads & lifts and Complete finished item of work as directed by the Engineer-in-charge. (Cement will be issued by the deparment at free of cost). (C) Chajjas - Sunshades

0.2

13477

2695.4

... More
Construction of electrical storage shed at wagon tippler area in CHP;RCC M- 20 Nominal mix for Columns & Chajja Cement : fine aggregate : coarse aggregate) corresponding to Table 9 of IS 456 using 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc., but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering with all leads & lifts and Complete finished item of work as directed by the Engineer-in-charge. (Cement will be issued by the deparment at free of cost). (B) Lintle

0.26

10598

2755.48

... More
Construction of electrical storage shed at wagon tippler area in CHP;RCC M- 20 Nominal mix for Columns & Chajja Cement : fine aggregate : coarse aggregate) corresponding to Table 9 of IS 456 using 20mm & 12mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like fine aggregate (sand), coarse aggregate, water etc., to site and excluding seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, vibrating, curing etc., but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering with all leads & lifts and Complete finished item of work as directed by the Engineer-in-charge. (Cement will be issued by the deparment at free of cost). (A) Columns

3.3

10582

34920.6

... More
Construction of electrical storage shed at wagon tippler area in CHP;R.C.C in M20 grade Nominal mix using 12mm to 20mm size well graded HBG metal for footings, pedestals, plinth beams and grade slab/ cut lintle including cost and conveyance of all materials centering, shuttering, vibrating, machine mixing, curing, all labour charges with all leads and lifts and incidental charges etc complete for finished item of work and as directed by the Engineer in charge. (Except cost of cement which will be issued by the deparment for free of cost at KTPS O&M Stores). (D) Grade Slab/ Cut Lintle

8.6

5760

49536

... More
Construction of electrical storage shed at wagon tippler area in CHP;R.C.C in M20 grade Nominal mix using 12mm to 20mm size well graded HBG metal for footings, pedestals, plinth beams and grade slab/ cut lintle including cost and conveyance of all materials centering, shuttering, vibrating, machine mixing, curing, all labour charges with all leads and lifts and incidental charges etc complete for finished item of work and as directed by the Engineer in charge. (Except cost of cement which will be issued by the deparment for free of cost at KTPS O&M Stores). (C) Plinth Beam

2.3

10005

23011.5

... More
Construction of electrical storage shed at wagon tippler area in CHP;R.C.C in M20 grade Nominal mix using 12mm to 20mm size well graded HBG metal for footings, pedestals, plinth beams and grade slab/ cut lintle including cost and conveyance of all materials centering, shuttering, vibrating, machine mixing, curing, all labour charges with all leads and lifts and incidental charges etc complete for finished item of work and as directed by the Engineer in charge. (Except cost of cement which will be issued by the deparment for free of cost at KTPS O&M Stores). (B) Pedestal

0.8

7800

6240

... More
Construction of electrical storage shed at wagon tippler area in CHP;R.C.C in M20 grade Nominal mix using 12mm to 20mm size well graded HBG metal for footings, pedestals, plinth beams and grade slab/ cut lintle including cost and conveyance of all materials centering, shuttering, vibrating, machine mixing, curing, all labour charges with all leads and lifts and incidental charges etc complete for finished item of work and as directed by the Engineer in charge. (Except cost of cement which will be issued by the deparment for free of cost at KTPS O&M Stores). (A) Footings

3

7149

21447

... More
Construction of electrical storage shed at wagon tippler area in CHP;Cutting, bending & placing of HYSD/TMT reinforcement steel bars of different diameters for all RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap splicing with binding wire of 18 SWG, forming grills for reinforcement work, including conveyance of steel bars at site, all wastages such as over laps, couplings, chairs, spacer bars, cost and conveyance of binding wire, cover blocks and all incidental, all labour charges etc., (but excluding cost of reinforcement steel). Complete for finished item of work as directed by Engineer in charge. (Reinforcement steel will be issued by the Dept. for free of cost at Dept. Stores).

1.1

17279

19006.9

... More
Construction of electrical storage shed at wagon tippler area in CHP;Laying PCC(1:4:8) using concrete mixer with 40mm size well graded HBG metal for leveling course in foundations including cost and conveyance of all materials, all labour charges for mixing, placing, compacting, curing etc., with all leads and lifts, all operational charges and incidental charges etc (but excluding cost of cement & seigniorage charges) Complete for finished item of work and as directed by the Engineer in charge. (Cement will be issued by the Department at free of cost at dept. stores)

6.15

3355

20633.25

... More
Construction of electrical storage shed at wagon tippler area in CHP;Earth work excavation for foundations and depositing on bank by mechanical means as per the approved drawings and specification in all kinds of soils like mixture of gravel and SDR like shales, ordinary rock (not requiring blasting) for all lifts and with an initial lead of 10M including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc. Complete for finished item of work as directed by the Engineer in Charge.

49

115

5635

... More
Construction of electrical storage shed at wagon tippler area in CHP;Demolition of Brick work including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead, including all labour charges for working at all heights, all leads and lifts etc. Complete as directed by the Engineer-in charge at site.

1

282

282.5

... More
Construction of electrical storage shed at wagon tippler area in CHP;Dismantling doors, windows and clear storey windows, ventilators etc.; (wood or steel) shutters including chowkhats, architraves, hold fasts and other attachments etc. Complete and stacking them within 100 metre lead hire charges of all equipment and T&P required for the work and all other incidental charges, all labour charges for working at all heights, all leads and lifts etc. Complete as directed by the Engineer-in charge at site

1

251

251



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.