Telangana State Power Generation Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Power Generation Corporation Limited - TSGENCO Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date7 Feb 2024
Closing Date23 Feb 2024
Tender Amount₹ 7,98,264 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Earthwork excavation of damaged portion of WBM road, including vertical cutting, edge chipping and excavating in box shape in all types of aggregates,stones, all types of soils etc with neat dressing of edges to required depth as directed by the engineer in charge, including, cleaning of surface to remove loose particles and keeping the surface in dry state, compacting the bottom surface and disposing excess excavated material in low lying areas with a lead upto 1 KM. The rate includes all labour charges, T&P required, dewatering and dressing charges, disposal charges, all leads and lifts and incidental charges etc., complete for finished item of work and as directed by Engineer in charge

94

239

22466

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Supplying and laying the Hume pipe with collar 300 mm dia (NP2) for WBM road at KSP dam & Canal, including cost of material, labour charges, Conveyance charges, T&P etc., complete for finished item of work as directed by the Engineer in charge.

15

1041

15615

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Providing, laying, spreading and compacting graded stone aggregate of size from 45 mm to 75 micron to wet mix macadam specification by mechanical means including premixing the material with water at OMC in mechanical mixer (pug mill), carriage of mixed material by tipper to site, laying in uniform layers in base course on a well prepared sub-base and compacting with vibratory roller 80-100 KN weight to achieve the desired density including lighting, barricading and maintenance of diversion etc., as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/MORTH.The rate includes cost and conveyance of all materials to site, hire charges of machinary and T&P, all labour charges with all leads and lifts and other incidental charges etc., as directed by the Engineer-In-Charge.

31

2291

71021

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Earthwork excavation of damaged portion of WBM road, including vertical cutting, edge chipping and excavating in box shape in all types of aggregates,stones, all types of soils etc with neat dressing of edges to required depth as directed by the engineer in charge, including de-watering of pot holes, cleaning of surface to remove loose particles and keeping the surface in dry state, compacting the bottom surface and disposing excess excavated material in low lying areas with a lead upto 1 KM. The rate includes all labour charges, T&P required, dewatering and dressing charges, disposal charges, all leads and lifts and incidental charges etc., complete for finished item of work and as directed by Engineer in charge

15

239

3585

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Supplying and fixing galvanised steel barbed wire (IS:278-1962TypeI) weighing 9.38 Kg per 100 metres (min.), Straining and fixing to RCC poles, including securing with and provision of galvanised mild steel wire, stapples or steel pins, etc., as directed. The rate includes cost and conveyance of all material, all labour charges with all leads and lifts, other inidental charges etc., complete for finished item of work as direted by the Engineer in charge

900

15

13500

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Providing 2.4 m long RCC fencing posts (2.4m x 0.15m x 0.1m) with 8 mm dia steel bars & 4mm ties as reinforcement, including cost of all materials with all leads and lifts, conveyance charges and other incidential charges etc.., complete for finished item of work as directed by the Engineer in charge.

85

1100

93500

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Providing plastering in CM (1:4) 20 MM thick including cost and conveyance of all mateials, labour charges with all leads and lifts and other incidential charges etc., complete for finished item of work as directed by the Engineer in charge (excluding cost of cement which will be supplied by the department at free of cost)

90

199

17910

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Construction of kerb wall of Brick masonary in cm (1:3) with Bricks with traditional size 23 x 11 x 7 cms including cost and conveyance of all material, all labour charges with all leads and lifts, other inidental charges etc., complete for finished item of work as direted by theEngineer in charge (excluding cost of cement which will be supplied by the department at free of cost)

2.5

5217

13042.5

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Laying of PCC(1:4:8) using 40mm size well graded HBG metal for leveling course in foundations including cost and conveyance of all materials mixing, placing, compacting, curing all leads and lifts etc.. Complete for finished item of work as directed by the Engineer in charge but excluding of cement which will be supplied by the department at free of cost.

22

3575

78650

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Earth work excavation for RCC fencing poles, in Mixture of gravel and DRT like shales ordinary gravel, stoney earth and earth mixed with fair sized boulders with all leads and lifts and etc.., for finished item of work as directed by Engineer in charge

24

239

5736

... More
Barbed wire fencing and Wet mix macadam at KSP Dam;Dismatling the collapsed/damaged RCC fencing poles at KSP dam area, including cost of all materials, machinery, labour, incidental charges, all leads, lifts, delifts and disposal of unserviceable materials in dump area as directed by the Engineer in charge.

1.5

1596

2394



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.