Telangana State Education Women And Infrastructure Development Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
230853Bid Award Id
ViewTender No
EE/TSEWIDC/HYD DIST/ NIT/27/2020-21, Dt: 27.03.2021Tender Authority
Telangana State Education Women And Infrastructure Development Corporation ViewPurchaser Address
-Website
http://https://www.roadbuild.telangana.gov.in/home.do
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Balance work for Repairs and Maintenance;Supplying and fixing CI Nahani traps 100mm dia. Inlet 75mm (3") outlet pipe-4kgs 1st qualilty ISI marked conforming to IS:1729:1979 with C.P Grating fixing with white cement as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges etc, complete for finished item of work.
3
-
507
Balance work for Repairs and Maintenance;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) 22.2 mm OD Pipe SDR 13.5
30
-
4410
Balance work for Repairs and Maintenance;Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 110mm dia 3 Mts single socket
16.8
-
3214
Balance work for Repairs and Maintenance;Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 75mm dia 3 Mts single socket
9.15
-
1058
Balance work for Repairs and Maintenance;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.
21
-
13860
Balance work for Repairs and Maintenance;Providing & fixing 30 mm thick solid panel PVC door shutter consisting of frame made out of 19 gauge M.S tube of 19 x 19 mm for stiles, top & bottom rail, with a coat of primer of approved make. M.S. Frame covered with 5 mm thick heat moulded PVC ?C? channel of size of 30 x 50 mm forming stiles, 5 mm thick 75 mm wide PVC sheet for top, lock & bottom rail on either side 20 mm wide cross PVC sheet as gap insert for top & bottom rail, panelling of 10mm(+/-)( 5mm+5mm)? thick PVC sheet fitted in the M.S. frame welded /sealed to the stiles, on either side joined together with solvent cement adhesive etc., additional 5 mm thick PVC strip of 20 mm width stuck on the interior side of the C channel using solvent cement, complete as per direction of Engineer?in?charge, manufacturers specification.such as SS Aldrop 150mm long 1Nos , SS Handles 150mm long 2 Nos, 100mm long SS butt hinges 3Nos, 100mm Long Tower Bolts 2 Nos Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.
7
-
24261
Balance work for Repairs and Maintenance;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of Non-skid red or white full body Ceramic floor tiles of size not less than 300 x 300 mm and thickness between 7-8 size as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)
16
-
12897
Balance work for Repairs and Maintenance;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors
160
-
26176
Balance work for Repairs and Maintenance;Providing impervious coat with required slopes in CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903).
47
-
25483
Balance work for Repairs and Maintenance;Supply and fixing of MS pipes of size 50mm x 50mm square of 2.60mm thickness including labour charges for fixing complete including cost and conveyance of all materials to site sales and other taxes, all labour charges etc., complete for finished item of work
9
-
2994
Balance work for Repairs and Maintenance;Roofing: - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove
12
-
8700
Balance work for Repairs and Maintenance;Providing specialized high performance acrylic polymer modified elastomeric cementitious waterproof coating to the terrace / walls / internal portion of the bathroom & toilets / internal portion of the water tanks duly cleaning of the surface from dirt, dust and other contaminations, providing and application of Two coats of High performance Acrylic polymer modified Elastomeric cementitious waterproof coating ( 1.8 Sq. Mtr. / Kg /Each Coat )
47
-
19129
Balance work for Repairs and Maintenance;In - situ - Granolithic Concrete Flooring 20mm thick with CC(1:1:2) Prop: using 6mm to 12mm size HBG machine crushed metal laid monolithically over 100mm thick CC flooring bed (1:5:10) with 40mm HBG metal in alternate panels of size not exceeding 1.50m x 1.50m and finishing the top surface to required smoothness and slopes, thread lining as directed by the Engineer - in - charge including cost and conveyance of all materials like cement, sand, water, etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement concrete, laying, curing, lift charges etc., complete for finished item of work (APSS No.701 & 710)
47
-
18088
Balance work for Repairs and Maintenance;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
24
-
11089
Balance work for Repairs and Maintenance;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished item of work for Foundations and Flooring Bed (APSS No. 402)
4
-
17063
Balance work for Repairs and Maintenance;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, hire charges of T & P etc., completebut but excluding seignorage charges, for finished item of work. (APSS NO. 309 & 310)
6
-
3116
Balance work for Repairs and Maintenance;Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)
6
-
2381
Balance work for Repairs and Maintenance;Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 metres lead for PCC work in Cement Mortor including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work
4
-
5383
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements