Telangana State Portal Roads And Buildings Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Portal Roads And Buildings Tender

Civil And Construction
Civil Works Others
Opening Date3 Aug 2022
Closing Date10 Aug 2022
Tender Amount₹ 35,69,987 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Strengthening of infrastructure facilities;Supply and fixing of modular Electronic stept type fan regulator hum free step type socket size with MS box, front plate in the existing switch board ( Modular Type ) Makes :Makes : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.

8

-

4788.16

... More
Strengthening of infrastructure facilities;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 nos blades, 30 cm long down rod, 2 nos canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient

8

-

25933.76

... More
Strengthening of infrastructure facilities;Supply and fixing of batten holder / slanting holder (Makes : Anchor / Gold Medal Olive / Million Zoom). in lieu of ceiling rose of light point complete with all connections and all labour charges with 18 Watt CFL bulb Makes : Phillips / Crompton / Bajaj / Surya / Havells / HPL/ Halonix.

4

-

771.68

... More
Strengthening of infrastructure facilities;Supply and Fixing and transportation of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per ISspecifications, minimum CRI=80,.etc complete with 50,000 burning hours with BIs Certification. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

4

-

3317.56

... More
Strengthening of infrastructure facilities;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant Low Smoke (FRLS) / HFFR P.V.C. insulated 1100 V Grade as per IS: 694 / 1990 specification for flexible copper cable (ISI MARK) in existing pipe with 6A 1 way modular switch, Ceiling rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard. Makes of Switches : Legrand Myrius / Cabtree Verona / Million / Logus/ Gold Medal Curve / Anchor Roma viola / CPL / GreatWhite / Vimal / GM Four-Five / HPL / L&T / Salzar / Stanjo

20

-

11991

... More
Strengthening of infrastructure facilities;Supply and Fixing of ISI 25mm outer dia mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

24

-

2361.36

... More
Strengthening of infrastructure facilities;Supply and fixing of e-3 Ceramic magnetic Green Chalk Board of size 80x40 with viturious enamil coated sheet made up of 0.30 to 0.4mm thick steel sheet having 0.095 mm thick on top and 0.03mm min on the back supported with 9mm thick MDF board having bulk density of 750kg/m3 and laminated with 0.25 mm thick electro Galvanised steel sheet at the back both the top and backing sheet shall be properly fixed with MDF board using suiltable addhesive to avoid any moisture absorption. Fixed in deluxe quality alluminium channels confirming to ISI standards including cost transportaion and all labour charges for fixing etc complete for finshing item of work.

2

-

20639.3

... More
Strengthening of infrastructure facilities;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors

264.01

-

62514.93

... More
Strengthening of infrastructure facilities;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors

381.12

-

64737.04

... More
Strengthening of infrastructure facilities;Providing and fixing of Casement/ Open able Windows made of pre-painted steel as per IS 513 of 0.58 mm thick galvanized as per IS 277, finish painted with a polyester paint and section for outer frame of 48 x 50 mm, centre mullion of 48 x 50 mm, section for shutter of 48 x 25 mm and the fixed glass beading section should be 12 x 12 mm and the outer frame and mullions to have rebate for glazed shutter with a 20 mm provision for guard bars/grills, handle, stay, 2 nos. of stainless steel heavy duty pivot hinges provided per shutter and windows fitted with 0.5 mm thick Galvalume corrugated sheet with rubber gaskets including fixing the frames in concrete/masonry wall by means of self expanding screws, Including 10mm Square guard bars with 6? (152.4mm) pitch etc., complete Centre fixed both side open able shutter window for sizes 5?0?x4?0? (1524mm x1219.2mm) and 6?0?x4?0? (1828.8mmx1219.2mm)

12.15

-

74142.46

... More
Strengthening of infrastructure facilities;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as SS Tower Bolts 250mm long 2 Nos, SS Handles 150mm long 2 Nos, 300mm long SS Aldrops 1No, 125 mm long SS butt hinges 6Nos, 300 mm long Aluminium Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos 300mm long including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

2

-

26609.96

... More
Strengthening of infrastructure facilities;Providing skirting to internal walls 12.5 Cm high withPolished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) with length equal to flooring stones set over a base coat of CM (1:3) using 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm and jointed with neat cement paste mixed with pigment of matching shade to full depth (joints of stone should be flushed), including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)

8.99

-

6628.6

... More
Strengthening of infrastructure facilities;Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.703 & 701)

98.9

-

65285.87

... More
Strengthening of infrastructure facilities;Supply and run of 1 of 22/0.3 mm ( 1.5 sq.mm) FRLS / HFFR PVC insulated 1100 V grade as per IS: 694 / 1990 specifications for flexible copper cable for existing pipe for earth continuity including all labour charges etc., complete.Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard.

20

-

590.8

... More
Strengthening of infrastructure facilities;Supply and Fixing of 16A/6A 3pin plug socket with shutter and 16A modular switch control duly recessed in wall with Galvanised hot deep box of with common switch board including earth connections and all labour charges etc., complete. Makes of Switches : Legrand myreus/Crabtree verona / Gold Madel curve / Million / LogusAnchor Roma viola / Great White /CPL/Vimal/ GM four-five/HPL/L&T

2

-

794.4

... More
Strengthening of infrastructure facilities;Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using 20mm size (SS 5) machine crushed hard blasted Trap graded metal (coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item of work for 25mm thick shelves GF

4

-

2297.32

... More
Strengthening of infrastructure facilities;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall but excluding seigniorage charges for finished item of work. (APSS 901,903 & 904) GF

179.63

-

81755

... More
Strengthening of infrastructure facilities;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for Internal walls GF

166.16

-

72653.46

... More
Strengthening of infrastructure facilities;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for External walls GF

234.83

-

102679.42

... More
Strengthening of infrastructure facilities;Supply and fixing of 6A 3/2 pin Modular wall plug socket with shutter and 6A 1 way modular switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.Makes of Switches : Legrand myreus/Crabtree verona / Gold Madel curve / Million / LogusAnchor Roma viola / Great White /CPL/Vimal/ GM four-five/HPL/L&T/Salzar / Stanjo

2

-

554.06

... More
Strengthening of infrastructure facilities;Supply and Fixing of ISI 25mm outer dia heavygrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

16

-

1361.12

... More
Strengthening of infrastructure facilities;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,JSW & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

7

-

580493.13

... More
Strengthening of infrastructure facilities;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using , 20mm size Hard Blasted Trap (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)

0.1

-

485.11

... More
Strengthening of infrastructure facilities;Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using 20mm size (SS 5) machine crushed hard blasted Trap graded metal (coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item of work for Sunshades in GF

19.52

-

16166.85

... More
Strengthening of infrastructure facilities;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).

35.66

-

233468.16

... More
Strengthening of infrastructure facilities;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) for Lintels in GF

1.04

-

11571.59

... More
Strengthening of infrastructure facilities;Providing impervious coat with required slopes in CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903).

142.5

-

67231.5

... More
Strengthening of infrastructure facilities;Painting to Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

2.43

-

266.28

... More
Strengthening of infrastructure facilities;Supplying and fixing of MS iron Ventilators of size 1.20x0.30mts with 25x25x5mm angular for frame and providing 10mm square rods verticals - 10nos and horizontals - 2nos including c/c of all materials, labour charges, fabrication charges and applying one coat of red oxide paint etc., complete for finished item of work.

0.72

-

781.65

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) for Roof Beams in GF

7.43

-

72023.75

... More
Strengthening of infrastructure facilities;Supplying and fixing of MS iron Ventilators of size 1.50x0.30mts with 25x25x5mm angular for frame and providing 10mm square rods verticals - 13nos and horizontals - 2nos including c/c of all materials, labour charges, fabrication charges and applying one coat of red oxide paint etc., complete for finished item of work.

0.9

-

1188.2

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc, complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Columns in GF

10.4

-

121171.02

... More
Strengthening of infrastructure facilities;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, hire charges of T & P etc., completebut but excluding seignorage charges, for finished item of work. (APSS NO. 309 & 310)

55.08

-

11923.17

... More
Strengthening of infrastructure facilities;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

117.04

-

5422.46

... More
Strengthening of infrastructure facilities;Flush Pointing to RR Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

27.98

-

2537.51

... More
Strengthening of infrastructure facilities;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete but excluding seigniorage charges for finished item of work for foundation and basement (APSS No. 601 & 615)

23.12

-

75337.68

... More
Strengthening of infrastructure facilities;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using,40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished item of work for Foundations and Flooring Bed (APSS No. 402) Under external walls to construct RR masonry

17.99

-

60557.94

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Plinth beam

7.77

-

93360.59

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Pedastals

2.67

-

26792.2

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Footings

9.77

-

92158.65

... More
Strengthening of infrastructure facilities;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using , 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402)

4.98

-

17771.93

... More
Strengthening of infrastructure facilities;Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

117.04

-

47265.43

... More
Strengthening of infrastructure facilities;Supply and run of 3 of 4 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DBS with pin type lugs and connection Makes of Wires :Finolex / RR kabel / Havells / APAR EBXL / V-Guard.

20

-

3572

... More
Strengthening of infrastructure facilities;Supply and run of 3 of 2.5 Sq mm PVC F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DBS with pin type lugs and connection. Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / V-Guard.

15

-

1821.75

... More
Strengthening of infrastructure facilities;New Class Rooms: Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) for Slab 125 MM thick in GF

142.5

-

166301.78

... More
Strengthening of infrastructure facilities;Painting to New wood work with two coats of ready mixed synthetic enamel paint Grade I all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors

11.5

-

2266.88

... More
Strengthening of infrastructure facilities;Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete.

20

-

468.6

... More
Strengthening of infrastructure facilities;Labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete

2

-

1092.52

... More
Strengthening of infrastructure facilities;Supply of 12 (300 mm) 900 R.P.M of heavy duty exhaust fan 250V A.C.50Hz.. 300mm size etc., complete. Makes: Crompton / Almounard / Havells Turbo Force.

2

-

7162.76

... More
Strengthening of infrastructure facilities;Supply and fixing of batten holder / slanting holder (Makes : Anchor / Gold Medal Olive / Million Zoom). in lieu of ceiling rose of light point complete with all connections and all labour charges with 18 Watt CFL bulb Makes : Phillips / Crompton / Bajaj / Surya / Havells / HPL/ Halonix.

2

-

385.84

... More
Strengthening of infrastructure facilities;Supply and Fixing and transportation of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per ISspecifications, minimum CRI=80,.etc complete with 50,000 burning hours with BIs Certification. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

2

-

1658.78

... More
Strengthening of infrastructure facilities;Supply and run of 1 of 22/0.3 mm ( 1.5 sq.mm) FRLS / HFFR PVC insulated 1100 V grade as per IS: 694 / 1990 specifications for flexible copper cable for existing pipe for earth continuity including all labour charges etc., complete.Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard.

30

-

886.2

... More
Strengthening of infrastructure facilities;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant Low Smoke (FRLS) / HFFR P.V.C. insulated 1100 V Grade as per IS: 694 / 1990 specification for flexible copper cable (ISI MARK) in existing pipe with 6A 1 way modular switch, Ceiling rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard. Makes of Switches : Legrand Myrius / Cabtree Verona / Million / Logus/ Gold Medal Curve / Anchor Roma viola / CPL / GreatWhite / Vimal / GM Four-Five / HPL / L&T / Salzar / Stanjo

10

-

5995.5

... More
Strengthening of infrastructure facilities;Supply and Fixing of ISI 25mm outer dia mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

12

-

1180.68

... More
Strengthening of infrastructure facilities;Supply and Fixing of ISI 25mm outer dia heavygrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

10

-

850.7

... More
Strengthening of infrastructure facilities;Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges for placing and fixing in position as directed by Engineer-in-Charge.

1000

-

7950

... More
Strengthening of infrastructure facilities;Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) for 90 mm dia single socket pipe

9.6

-

1457.95

... More
Strengthening of infrastructure facilities;Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) for 110 mm dia single socket pipe

19.6

-

3982.52

... More
Strengthening of infrastructure facilities;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4 to 2 ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007)22.2 mm OD Pipe SDR 13.5

60

-

10157.4

... More
Strengthening of infrastructure facilities;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4 to 2 ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007)28.6 mm OD Pipe SDR 13.5

90

-

20143.8

... More
Strengthening of infrastructure facilities;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets including wooden block ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 300 gms Seiko or equivalent including cost and conveyance of all materials to site, labour charges etc. complete for finished item of work

2

-

5709.38

... More
Strengthening of infrastructure facilities;Supply and fixing of white glazed flat back bowl urinals of size 440 mm x 265 mm x 315 mm with internal rim flushing mm fixied with screws complete inidan make (HS W/Parry/Neycer) conforming to IS 2556 -1995 as approved be Engineer - in - charge 12.7 mm PVC connection with brass plumber union nuts CM Coated. including 12.70 mm push cock 1st qulaity of approved make including supply & fixing 31.75 m dia PVC flexible waser pipe of 914.40 mm lenght of 1st including cost and conveyance of all materials to site labour charges etc., complete for finished item of work for all floors

4

-

3712.04

... More
Strengthening of infrastructure facilities;Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qualityISI marked confirming to IS:2556-Part-3-1981 with P or S trap Hindware / Parryware / Neycer with brick masonry seat, CC squatting plate and fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges etc., complete for finished item of work.

2

-

3864.28

... More
Strengthening of infrastructure facilities;Constructing 457.2mm x 457.2mm (1-6 x 1-6) brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3-0) and fitted with light weight 457.2mm x 457.2mm (1-6 x 1-6) frame and cover of 20kg., including cost and convenyance of all materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for finished item of work

2

-

8825.62

... More
Strengthening of infrastructure facilities;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors

73.8

-

17475.1

... More
Strengthening of infrastructure facilities;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors

99.55

-

16909.56

... More
Strengthening of infrastructure facilities;Providing and fixing of louvered Ventilators made of pre-painted steel as per IS 513 of 0.80 mm thick galvanized as per IS 277 with a polyester paint with and fitted with 4 mm thick plain float glass including fixing the frames in concrete/masonry wall by means of self expanding screws, etc., complete for finished item of work for (i) Single fixed Louvers Ventilator size of 2? 0? x 2? 0? (609.6 x 609.6mm) outer frame box section size of 80 x 45mm and (ii) Double fixed Louvers ventilator Size of 4? 0? x 2? 0? (1219.2mm x 609.6mm) outer frame box section size of 80 x 45mm, vertical mullion section size of 80 x 60 mm and (iii) Double fixed Louvers Ventilator size of 4?0? x 3?0? (1219.2mm x 914.4mm) outer frame box section size of 80 x 45mm , Vertical mullion section size of 80 x 60 mm

4.32

-

20840.07

... More
Strengthening of infrastructure facilities;Dadooing to walls with any color glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.701 & 707) in All Floors

46.27

-

24629.52

... More
Strengthening of infrastructure facilities;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of Non-skid red or white full body Ceramic floor tiles of size not less than 300 x 300 mm and thickness between 7-8 size as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)

14.79

-

12359.56

... More
Strengthening of infrastructure facilities;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 10mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work .

2.91

-

7214.12

... More
Strengthening of infrastructure facilities;Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in-Charge for finished item of work

11.44

-

3899.32

... More
Strengthening of infrastructure facilities;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as SS Tower Bolts 250mm long 2 Nos, SS Handles 150mm long 2 Nos, 300mm long SS Aldrops 1No, 125 mm long SS butt hinges 6Nos, 300 mm long Aluminium Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos 300mm long including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

2

-

26609.96

... More
Strengthening of infrastructure facilities;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for Internal walls GF

65.94

-

28832.27

... More
Strengthening of infrastructure facilities;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall but excluding seigniorage charges for finished item of work. (APSS 901,903 & 904) GF

33.61

-

15296.92

... More
Strengthening of infrastructure facilities;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for External walls GF

73.8

-

32269.05

... More
Strengthening of infrastructure facilities;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using , 20mm size Hard Blasted Trap (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)

0.1

-

485.11

... More
Strengthening of infrastructure facilities;Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using 20mm size (SS 5) machine crushed hard blasted Trap graded metal (coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item of work for Sunshades in GF

2.16

-

1788.96

... More
Strengthening of infrastructure facilities;Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: Fly Bricks of size 290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509).

13.85

-

10037.51

... More
Strengthening of infrastructure facilities;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).

14.91

-

97616.66

... More
Strengthening of infrastructure facilities;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) for Lintels in GF

0.21

-

2336.57

... More
Strengthening of infrastructure facilities;Providing impervious coat with required slopes in CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903).

28.57

-

13479.33

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) for Slab 100 MM thick in SF

28.57

-

31742.98

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) for Roof Beams in GF

1.35

-

13086.41

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Plinth beam

1.39

-

16701.57

... More
Strengthening of infrastructure facilities;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, hire charges of T & P etc., completebut but excluding seignorage charges, for finished item of work. (APSS NO. 309 & 310)

8.87

-

1920.09

... More
Strengthening of infrastructure facilities;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

11.86

-

549.47

... More
Strengthening of infrastructure facilities;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using,40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished item of work for Foundations and Flooring Bed (APSS No. 402) Under external walls to construct RR masonry

2.75

-

9257.05

... More
Strengthening of infrastructure facilities;Supplying and fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded conenction conforming to IS 8931 including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

16

-

4326.4

... More
Strengthening of infrastructure facilities;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,JSW & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

0.8

-

66342.07

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc, complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Columns in GF

1.65

-

19224.25

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) for Footings

1.62

-

15281.17

... More
Strengthening of infrastructure facilities;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using , 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402)

0.88

-

3140.42

... More
Strengthening of infrastructure facilities;Supplying and fixing PPR ball valve of 25 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

2

-

506.72

... More
Strengthening of infrastructure facilities;Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

11.86

-

4789.54

... More
Strengthening of infrastructure facilities;Toilet with running water: Supplying and fixing UPVC/SWR Nahani traps 4 or 101.6mm dia 1st quality ISI marked conforming to IS:1729-1979 with 4 dia SS Grating fixing with white cement as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work.

4

-

772.6

... More
Strengthening of infrastructure facilities;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete but excluding seigniorage charges for finished item of work for foundation and basement (APSS No. 601 & 615)

6.52

-

21245.75

... More
Strengthening of infrastructure facilities;Painting to New walls with two coats of acrylic emulsion paint weather proof water-based of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors

57.45

-

13603.59

... More
Strengthening of infrastructure facilities;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for External walls GF

57.45

-

25120.01

... More
Strengthening of infrastructure facilities;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).

5.18

-

33913.77

... More
Strengthening of infrastructure facilities;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using , 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402)

0.9

-

3211.79

... More
Strengthening of infrastructure facilities;Compound wall: Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

5.4

-

2180.74

... More
Strengthening of infrastructure facilities;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504). First Floor

2.48

-

17469.37

... More
Strengthening of infrastructure facilities;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall but excluding seigniorage charges for finished item of work. (APSS 901,903 & 904) GF

24.78

-

11278.12

... More
Strengthening of infrastructure facilities;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of Non-skid red or white full body Ceramic floor tiles of size not less than 300 x 300 mm and thickness between 7-8 size as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707)

14.04

-

11732.81

... More
Strengthening of infrastructure facilities;Dadooing to walls with any color glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.701 & 707) in All Floors

36

-

19162.8

... More
Strengthening of infrastructure facilities;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 10mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work .

8.74

-

21667.16

... More
Strengthening of infrastructure facilities;Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in-Charge for finished item of work

34.32

-

11697.97

... More
Strengthening of infrastructure facilities;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,JSW & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

0.25

-

20731.9

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) for Slab 100 MM thick in GF

24.78

-

25261.23

... More
Strengthening of infrastructure facilities;Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.703 & 701)

28.44

-

18773.81

... More
Strengthening of infrastructure facilities;Major & Minor Repairs: Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for External walls GF

14.55

-

6361.99

... More
Strengthening of infrastructure facilities;Manufacture, supply & delivery of 50mm of outer dia Polyethylene pipes (PE-100 Grade) of 6Kg/Sqcm. conforming to IS 4984 - 1995 including transportation to site including laying and jointing of HDPE pipes as per BIS No.7634 Part -II/75 including fixing required specials /fittings including excavation of trenches up to 0.50 mts depth in all soils except rock requires blasting and refilling trenches after laying and jointing of pipes as per standard specifications including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.

30

-

3858.3

... More
Strengthening of infrastructure facilities;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4 to 2 ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007)22.2 mm OD Pipe SDR 13.5

30

-

5078.7

... More
Strengthening of infrastructure facilities;Flooring with chequered cement concrete heavy duty tiles confirming to IS:13801 using aggregates, cement, pigments of size 300mm x 300mm and thickness 25mm of any shade as approved by Engineer - In - Charge set over base coat of cement mortar (1:6), 12 mm thick using screened sand over CC bed alredy laid or RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm and jointed with neat white cement to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water and tiles etc.,and overheads & contractors profit complete for finished item of work.

2.19

-

1637.79

... More
Strengthening of infrastructure facilities;Dadooing to walls with any color glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.701 & 707) in All Floors

9.29

-

4945.07

... More
Strengthening of infrastructure facilities;Supplying and fixing PPR ball valve of 25 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

2

-

506.72

... More
Strengthening of infrastructure facilities;Supplying and fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded conenction conforming to IS 8931 including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

10

-

2704

... More
Strengthening of infrastructure facilities;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).

0.65

-

4255.59

... More
Strengthening of infrastructure facilities;Providing impervious coat with required slopes in CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903).

40.62

-

19164.52

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) for Slab 100 MM thick in GF

21.84

-

22264.13

... More
Strengthening of infrastructure facilities;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using,40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished item of work for Foundations and Flooring Bed (APSS No. 402) Under external walls to construct RR masonry

1.68

-

5655.22

... More
Strengthening of infrastructure facilities;Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

20.95

-

8460.45

... More
Strengthening of infrastructure facilities;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,JSW & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

0.3

-

24878.28

... More
Strengthening of infrastructure facilities;Supply of 3 Core 2.5 Sqmm PVC / XLPE Insulated, Flexible Armouring Flexible Copper cable as per IS 7098 / Part-I / 1988 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells

35

-

4573.1

... More
Strengthening of infrastructure facilities;Supply and Transportation of control panel for single phase submersible motors up to 3 HP @ 220V 50Hz operating range between 80 to 240V including supply and fixing of Direct - on - Line LTLK / SIEMENS / CROMPTON make Volt meter and Ammeter with starting and running capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete.

1

-

7988.27

... More
Strengthening of infrastructure facilities;Supply and Transportation Of 1.00 HP Single phase open well ISI submersible motor pumpset.

1

-

12724.88

... More
Strengthening of infrastructure facilities;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for Internal walls GF

11.48

-

5019.63

... More
Strengthening of infrastructure facilities;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc, complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Columns in GF

3.5

-

40778.71

... More
Strengthening of infrastructure facilities;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4 to 2 ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007)28.6 mm OD Pipe SDR 13.5

45

-

10071.9

... More
Strengthening of infrastructure facilities;Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work[15.90 mm dia CPVC SDR 13.50].

10

-

1477

... More
Strengthening of infrastructure facilities;Drinking Water Supply: Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges for placing and fixing in position as directed by Engineer-in-Charge.

1000

-

7950

... More
Strengthening of infrastructure facilities;Supply and run of 3 of 2.5 Sq mm PVC F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DBS with pin type lugs and connection. Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / V-Guard.

40

-

4858

... More
Strengthening of infrastructure facilities;Supply and fixing 4 WAY TPN Distribution board with IP-43 protection (Metal Door) as per IS 13032 and suitable for 1 No. 3 phase 63 FP Isolator as incomer and 12 Nos 10kA 10-32 A SP MCBs as outing goings including internal connection and labour charges for flush mounting etc., complete.Make: Legrand / Schneider/Seimens/L&T (Power DBs)

1

-

9668.64

... More
Strengthening of infrastructure facilities;Providing independent earthing for Important equipment with 40mm dia B class 2.5m long G.I pipe and 19mm dia B class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

1

-

5261.51

... More
Strengthening of infrastructure facilities;Supply and fixing of batten holder / slanting holder (Makes : Anchor / Gold Medal Olive / Million Zoom). in lieu of ceiling rose of light point complete with all connections and all labour charges with 18 Watt CFL bulb Makes : Phillips / Crompton / Bajaj / Surya / Havells / HPL/ Halonix.

10

-

1929.2

... More
Strengthening of infrastructure facilities;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.

14

-

2828.14

... More
Strengthening of infrastructure facilities;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG /Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal /Suncab

14

-

2732.66

... More
Strengthening of infrastructure facilities;Supply and fixing of modular Electronic stept type fan regulator hum free step type socket size with MS box, front plate in the existing switch board ( Modular Type ) Makes :Makes : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina.

14

-

8379.28

... More
Strengthening of infrastructure facilities;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 nos blades, 30 cm long down rod, 2 nos canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient

14

-

45384.08

... More
Strengthening of infrastructure facilities;Supply and Fixing and transportation of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per ISspecifications, minimum CRI=80,.etc complete with 50,000 burning hours with BIs Certification. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

12

-

9952.68

... More
Strengthening of infrastructure facilities;Supply and fixing Distribution board with 20A single phase plug and Socket, in sheet steel enclosure with 10/16/20A SP MCB including internal connection and labour charges for flush mounting etc., complete Makes : Legrand / Schneider / Siemens / L&T Makes of MCB: Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora.

1

-

2097.33

... More
Strengthening of infrastructure facilities;Supply and run of 1 of 22/0.3 mm ( 1.5 sq.mm) FRLS / HFFR PVC insulated 1100 V grade as per IS: 694 / 1990 specifications for flexible copper cable for existing pipe for earth continuity including all labour charges etc., complete.Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard.

40

-

1181.6

... More
Strengthening of infrastructure facilities;Supply and Fixing of 16A/6A 3pin plug socket with shutter and 16A modular switch control duly recessed in wall with Galvanised hot deep box of with common switch board including earth connections and all labour charges etc., complete. Makes of Switches : Legrand myreus/Crabtree verona / Gold Madel curve / Million / LogusAnchor Roma viola / Great White /CPL/Vimal/ GM four-five/HPL/L&T

6

-

2383.2

... More
Strengthening of infrastructure facilities;Supply and fixing of 6A 3/2 pin Modular wall plug socket with shutter and 6A 1 way modular switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.Makes of Switches : Legrand myreus/Crabtree verona / Gold Madel curve / Million / LogusAnchor Roma viola / Great White /CPL/Vimal/ GM four-five/HPL/L&T/Salzar / Stanjo

6

-

1662.18

... More
Strengthening of infrastructure facilities;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant Low Smoke (FRLS) / HFFR P.V.C. insulated 1100 V Grade as per IS: 694 / 1990 specification for flexible copper cable (ISI MARK) in existing pipe with 6A 1 way modular switch, Ceiling rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard. Makes of Switches : Legrand Myrius / Cabtree Verona / Million / Logus/ Gold Medal Curve / Anchor Roma viola / CPL / GreatWhite / Vimal / GM Four-Five / HPL / L&T / Salzar / Stanjo

52

-

31176.6

... More
Strengthening of infrastructure facilities;Supply and Fixing of ISI 25mm outer dia mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

90

-

8855.1

... More
Strengthening of infrastructure facilities;Electrical: Supply and transportation of 90W +/-10% LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >100 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA / Capart / Fortune Art / FIEM / Panasonic LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

2

-

19200.94



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.