For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Police Housing Corporation Limited Tender

Opening Date2 Feb 2021
Closing Date16 Feb 2021
Tender Amount₹ 4,93,77,239 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 6U FLOOR MOUNTING NET WORK RACK WITH POWER SPIKE INCLUDING ALL ACCESSORIES AND GIVING ALL CONNECTIONS, LABOUR CHARGES ETC., COMPLETE. MAKES: HCL / VALL.

4

-

20653.64

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 24 PORT MANAGEBLE SWITCHES INCLUDING GIVING CONNECTIONS COST OF ALL ACCESSORIES AND ALL LABOUR CHARGES ETC., COMPLETE. MAKES: CISCO / NET GEAR / HP / D LINK.

4

-

27559.24

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND RUN OF 2 PAIR, 0.5MM TELEPHONE COPPER WIRE IN EXISTING PVC CONDUIT INCLUDING COST AND CONVEYANCE OF ALL MATERIALS AND LABOUR CHARGES ETC., COMPLETE. MAKES: FINOLEX / DELTON / SURABI / POLYCAB

800

-

15744

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF MODULAR SOCKET TYPE TELEPHONE JACK WITH CONNECTOR ON 2 MODULER PLASTIC SURFACE BOX AND 2 MODULAR COVER FRAME INCLUDING GIVING CONNECTIONS, COST OF ALL ACCESSORIES AND LABOUR CHARGES ETC. COMPLETE. TELEPHONE JACK WITH CONNECTOR, COVER FRAME & PVC SURFACE BOX MAKES: LEGRAND ARTEOR / SCHNEIDER ZEN CELO / HONEYWELL BLENGE PLUS.

21

-

7204.05

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF MODULAR SOCKET TYPE TELEPHONE JACK WITH CONNECTOR ON 2 MODULER HOT DIP GALVANIZED METAL BOX AND 2 MODULAR COVER FRAME INCLUDING GIVING CONNECTIONS, COST OF ALL ACCESSORIES AND LABOUR CHARGES ETC. COMPLETE. TELEPHONE JACK WITH CONNECTOR, COVER FRAME & METAL BOX MAKES: LEGRAND ARTEOR / SCHNEIDER ZEN CELO / HONEYWELL BLENGE PLUS.

37

-

11995.03

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND RUN OF LAN CABLE CAT - 6 UTP CABLE IN EXISTING PVC CONDUIT INCLUDING COST AND CONVEYANCE OF ALL MATERIALS AND LABOUR CHARGES ETC., COMPLETE. MAKES: D LINK / AMP / MOLEX / LEGRAND / KRONE.

2000

-

66400

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF CAT 6 RJ-45 INFORMATION OUTLETS INCLUDING DUEL FACE PLATE ON 2 MODULER PLASTIC SURFACE BOX INCLUDING GIVING CONNECTIONS, COST OF ALL ACCESSORIES AND LABOUR CHARGES ETC. COMPLETE. I/O & DUEL FACE PLATE MAKES: D LINK / AMP / MOLEX / LEGRAND / KRONE. PVC SURFACE BOX MAKE: LEGRAND / SCHNEIDER.

55

-

27991.15

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF CAT 6 RJ-45 INFORMATION OUTLETS INCLUDING DUEL FACE PLATE ON 2 MODULER HOT DIP GALVANIZED METAL BOX INCLUDING GIVING CONNECTIONS, COST OF ALL ACCESSORIES AND LABOUR CHARGES ETC. COMPLETE. I/O & DUEL FACE PLATE MAKES: D LINK / AMP / MOLEX / LEGRAND / KRONE. METAL BOX MAKE: LEGRAND / SCHNEIDER.

53

-

25973.71

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 172MM X 52MM G.I. JUNCTION BOX OF 2MM THICK FOR DIRECT ACCES TO CABLES AT THE INTER SECTION OF RACEWAYS INCLUDING GIVING CONNECTIONS COST OF ALL ACCESSORIES AND ALL LABOUR CHARGES ETC., COMPLETE.

15

-

6331.05

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 150MM X 38MM G I RACEWAYS OF 2MM THICK WITH TOP COVER AND REQUIRED HARD WARE ETC., COMPLETE.

100

-

71179

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 25MM OUTER DIA HEAVY GRADE, FRLS WITH IS: 9537 PART 3 REGID PVC PIPE (ISI MARK) CONCEALED IN UNDERNEETH THE FLOOR WITH ALL REQUIRED ACCESSORIES INCLUDING MASONARY WORK AND LABOUR CHARGES ETC., COMPLETE. MAKES : SUDHAKAR / MODI/ PRECISION ( ISI MARK).

900

-

65502

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 25MM OUTER DIA HEAVY GRADE, FRLS WITH IS: 9537 PART 3 REGID PVC PIPE (ISI MARK) CONCEALED IN WALL WITH ALL REQUIRED ACCESSORIES [LIKE 'U' NAILS, JUNCTION BOX, PVC BENDS AND CEMENT] INCLUDING MASONARY WORK FOR LIGHT, FAN, COMMON, SEPARATE PLUG POINT AND SWITCH/POWER BOARDS ETC., INCLUDING ALL LABOUR CHARGES ETC., COMPLETE. MAKES: SUDHAKAR / MODI/ PRECISION (ISI MARK).

200

-

18428

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND RUN OF 25MM X 6MM G.I STRIP INCLUDING COST OF ALL ACCESSORIES AND LABOUR CHARGES ETC., COMPLETE.

100

-

11066

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING INDEPENDENT EARTHING FOR IMPORTANT EQUIPMENT WITH 40MM DIA 'B' CLASS 2.5M LONG G.I PIPE AND 19MM DIA 'B' CLASS G.I PIPE OF 0.3MTR. LONG CONNECTED WITH REDUCER PROVIDING G.I FUNNEL WITH MESH ENCLOSED IN BRICK MASONRY (CM 1:3) CHAMBER OF 400MMX 400MM X 400MM WITH SUITABLE CAST IRON COVER DULY PROVIDING STAGGERED HOLES FILLING WITH SALT AND CHARCOAL FROM THE BOTTOM OF THE PIPE GIVING EARTH CONNECTION FROM ELECTRODE THROUGH G.I STRIP OF 25 X 6MM X 200MM LENGTH WITH ALL ACCESSORIES AND LABOUR CHARGES COMPLETE, AS PER IS SPECIFICATIONS 732/1982 (PART II).

4

-

26451.56

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 8 WAY TPN DB HORIZONTAL WITH IP 43 PROTECTION AS PER IS:13032 AND SUITABLE FOR 24 NOS S.P. OUT GOINGS AND FOR 1 NO 4 POLE INCOMMER ETC COMPLETE INCLUDING INTERNAL CONNECTION AND LABOUR CHARGES FOR SURFACE / FLUSH MOUNTING ETC., COMPLETE. (FOR PDBS & UPSDBS) INCOMMER: 63A FP ISOLATOR-1NO. OUTGOING: 10KA-6-32A SP MCBS - 24 NOS DB MAKES: LEGRAND / SCHNEIDER. ISOLATOR MAKE: LEGRAND-DX3 / SCHNEIDER-ACTI9. MCB MAKE: LEGRAND-DX3 / SCHNEIDER-ACTI9.

8

-

116818.96

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 4 WAY TPN DB HORIZONTAL WITH IP 43 PROTECTION AS PER IS:13032 AND SUITABLE FOR 12 NOS S.P.OUT GOINGS AND FOR 1 NO 4 POLE INCOMMER INCLUDING INTERNAL CONNECTION AND LABOUR CHARGES FOR FLUSH MOUNTING ETC., COMPLETE. (FOR LDB) INCOMMER: 40A FP ISOLATOR-1NO. OUTGOING: 10KA-6-32A SP MCBS - 12 NOS DB MAKES: LEGRAND / SCHNEIDER. ISOLATOR MAKE: LEGRAND-DX3 / SCHNEIDER-ACTI9. MCB MAKE: LEGRAND-DX3 / SCHNEIDER-ACTI9.

4

-

33891.36

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FIXING OF 36W LED LUMINAIRE IN FALSE CEILING / POP WITH NECESSARY ARRANGMENT INCLUDING GIVING CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE.

78

-

18868.98

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND TRANSPORTATION OF 36W BACK LIT, 2' X2' (600MM X 600MM) RECESSED / SURFACE MOUNTED LED LUMINAIRE MADE OF CRCA SHEET HOUSING WITH POWDER COATED WITH HIGH EFFICIENCY ACRYLIC WIDE DIFFUSER, WITH WIDE OPERATING VOLTAGE RANGE, POWER FACTOR > 0.9, SURGE PROTECTION >2KV, SYSTEM EFFICACY OF >100 LUMENS/WATT, CCT: 3000K - 6500K AS DESIRED BY THE DEPARTMENT, CRI >80, AND THD IS LESS THAN 15% ETC., COMPLETE WITH 50,000 BURNING HOURS WITH BIS CERTIFICATION. LUMINAIRE MAKE : CROMPTON / HAVELLS / HALONIX. LED MAKE : CREE / NICHIA / OSRAM.

78

-

328779.36

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FIXING OF LED LUMINAIRE 12W/18W DOWN LIGHTS WITH ALL NECESSARY ACCESSORIES IN FALSE CEILING / ON WALL INCLUDING GIVING CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE.

176

-

15618.24

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND TRANSPORTATION OF 18W BACK LIT LED DOWN LIGHT RECESSED / SURFACE MOUNTING ROUND / SQUARE WITH HOUSING MADE OF POWDER COATED PRESSURE DIE CAST ALUMINIUM HOUSING WITH EXTENDED HEAT SINK, WITH PROTRUDED HIGH EFFICIENCY DIFFUSER, IP20, WITH WIDE OPERATING VOLTAGE RANGE, POWER FACTOR > 0.9, SURGE PROTECTION: > 2KV, SYSTEM EFFICACY OF >100 LUMENS/WATT, CCT: 3000K - 6500K AS DESIRED BY THE DEPARTMENT AND AS PER IS, CRI >80, AND THD IS LESS THAN 15% ETC., COMPLETE WITH 50,000 BURNING HOURS WITH BIS CERTIFICATION. LUMINAIRE MAKE : CROMPTON / HAVELLS / HALONIX. LED MAKE : CREE / NICHIA / OSRAM.

156

-

347388.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND TRANSPORTATION OF 12W BACK LIT LED DOWN LIGHT RECESSED / SURFACE MOUNTING ROUND / SQUARE WITH HOUSING MADE OF POWDER COATED PRESSURE DIE CAST ALUMINIUM HOUSING WITH EXTENDED HEAT SINK, WITH PROTRUDED HIGH EFFICIENCY DIFFUSER, IP20, WITH WIDE OPERATING VOLTAGE RANGE, POWER FACTOR > 0.9, SURGE PROTECTION: > 2KV, SYSTEM EFFICACY OF >100 LUMENS/WATT, CCT: 3000K - 6500K AS DESIRED BY THE DEPARTMENT AND AS PER IS, CRI >80, AND THD IS LESS THAN 15% ETC., COMPLETE WITH 50,000 BURNING HOURS WITH BIS CERTIFICATION. LUMINAIRE MAKE : CROMPTON / HAVELLS / HALONIX. LED MAKE : CREE / NICHIA / OSRAM.

20

-

36129.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FIXING OF 20W LED TUBE LIGHT LUMINAIRE ON WALL / CEILING WITH ALL ACCESSORIES INCLUDING GIVING CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE.

107

-

14133.63

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND TRANSPORTATION OF 20W, 2000 LUMENS, 1200MM LENGTH LED RETRO TUBE LIGHT, HOUSING MADE WITH ALLUMINIUM ANODISED BODY, WIDE OPERATING VOLTAGE WITH DOUBLE SIDE CONNECTION, PF=0.9, SURGE PROTECTION: > 2KV, THD<15%, WITH INBUILT DRIVER AND FROSTED COVER CCT: 3000K - 6500K AS DESIRED BY THE DEPARTMENT AND AS PER IS SPECIFICATIONS, MINIMUM CRI=80,.ETC COMPLETE WITH 50,000 BURNING HOURS WITH BIS CERTIFICATION. LUMINAIRE MAKE: CROMPTON / HAVELLS. LED MAKE : CREE / NICHIA / OSRAM.

107

-

88744.73

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;LABOUR CHARGES FOR FIXING OF EXHAUST FAN IN WALL WITH NECESSARY CONNECTIONS ETC., COMPLETE (FOR HOLE ALREADY MADE AVAILABLE).

24

-

7322.64

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY OF 12" (300MM) LIGHT DUTY EXHAUST FAN WITH WIRE GUARD ETC., COMPLETE MAKES: CROMPTON / HAVELLS VENTILAIR-DB / ORIENT HILL AIR.

24

-

39521.28

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;LABOUR CHARGES FOR FIXING OF CEILING FAN AND REGULATOR INCLUDING TRANSPORTATION AND GIVING CONNECTIONS WITH TWIN CORE WIRE ETC., COMPLETE.

90

-

14230.8

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY OF MODULAR TYPE ELECTRONIC STEP TYPE FAN REGULATOR WITH 2 MODULE HOT DIP GALVANIZED MODULAR METAL BOX COVERED WITH 2 MODULAR COVER FRAME ETC., COMPLETE. MAKES: LEGRAND ARTEOR / SCHNEIDER ZEN CELO / HONEYWELL BLENGE PLUS.

90

-

58386.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY OF 48" (1200MM) 5 STAR RATED SWEEP CEILING FAN WITH ALL ACCESSORIES ETC., COMPLETE. MAKES : CROMPTON HS PLUS / HAVELLS ES NEO / ORIENT ENERGY STAR

90

-

216363.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND RUN OF 5 OF 84/0.3MM (6.0 SQMM) FRLS / HFFR PVC INSULATED 1100V GRADE AS PER IS:694/1990 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE FOR 4 RUNS OF MAINS AND 1 RUN OF EARTH CONTINUITY INLCUDING ALL LABOUR CHARGES ETC., COMPLETE. MAKES: FINOLEX / RR KABEL / POLYCAB (HR_FR-LF).

20

-

7865

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND RUN OF 3 OF 36/0.3MM (2.5 SQMM) FRLS / HFFR PVC INSULATED 1100V GRADE AS PER IS:694/1990 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE FOR 2 RUNS OF MAINS AND 1 RUN OF EARTH CONTINUITY INLCUDING ALL LABOUR CHARGES ETC., COMPLETE. MAKES: FINOLEX / RR KABEL / POLYCAB (HR_FR-LF).

4100

-

341202

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF BATTEN HOLDER / SLANTING HOLDER IN LIEU OF CEILING ROSE OF LIGHT POINT COMPLETE WITH ALL CONNECTIONS AND ALL LABOUR CHARGES WITHOUT BULB (FOR NEW INSTALLATION). BH MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.

7

-

403.62

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 6A / 10A 3/2 PIN 2 MODULE MODULAR SOCKET WITH SHUTTER-2 NOS AND 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROLS-2NOS DULY RECESSED IN WALL WITH 6 MODULE PLASTIC SURFACE BOX SIZE COVERED WITH 6 MODULAR COVER FRAME INCLUDING EARTH CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE. [FOR 2 SOCKET BOARD - FOR UPS POWER]. MODULAR SWITCH, SOCKET, PVC SURFACE BOX & COVER FRAME MAKE: LEGRAND ARTEOR / SCHNEIDER ZEN CELO /HONEYWELL BLENGE PLUS.

55

-

53896.15

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 6A / 10A 3/2 PIN 2 MODULE MODULAR SOCKET WITH SHUTTER-2 NOS AND 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROLS-2NOS DULY RECESSED IN WALL WITH 6 MODULE HOT DIP GALVANIZED MODULAR METAL BOX SIZE COVERED WITH 6 MODULAR COVER FRAME INCLUDING EARTH CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE. [FOR 2 SOCKET BOARD - FOR UPS POWER]. MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND ARTEOR / SCHNEIDER ZEN CELO /HONEYWELL BLENGE PLUS.

50

-

48655.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 6A / 10A 3/2 PIN 2 MODULE MODULAR SOCKET WITH SHUTTER-2 NOS AND 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROLS-2NOS DULY RECESSED IN WALL WITH 6 MODULE PLASTIC SURFACE BOX SIZE COVERED WITH 6 MODULAR COVER FRAME INCLUDING EARTH CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE. [FOR 2 SOCKET BOARD - FOR RAW POWER]. MODULAR SWITCH, SOCKET, PVC SURFACE BOX & COVER FRAME MAKE: LEGRAND ARTEOR / SCHNEIDER ZEN CELO /HONEYWELL BLENGE PLUS.

29

-

28417.97

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 6A / 10A 3/2 PIN 2 MODULE MODULAR SOCKET WITH SHUTTER-2 NOS AND 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROLS-2NOS DULY RECESSED IN WALL WITH 6 MODULE HOT DIP GALVANIZED MODULAR METAL BOX SIZE COVERED WITH 6 MODULAR COVER FRAME INCLUDING EARTH CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE. [FOR 2 SOCKET BOARD - FOR RAW POWER]. MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND ARTEOR / SCHNEIDER ZEN CELO /HONEYWELL BLENGE PLUS.

73

-

71037.03

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 20A 2 MODULE MODULAR SOCKET WITH SHUTTER AND 16A / 20A 1 WAY 1 MODULE MODULAR SWITCH DULY RECESSED IN WALL WITH 3 MODULE HOT DIP GALVANIZED MODULAR METAL BOX SIZE COVERED WITH 3 MODULAR COVER FRAME INCLUDING EARTH CONNECTIONS AND ALL LABOUR CHARGES ETC., COMPLETE. [ POWER PLUG ] MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND ARTEOR / SCHNEIDER ZEN CELO /HONEYWELL BLENGE PLUS.

20

-

13781.4

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 6A / 10A 3/2 PIN 2 MODULE MODULAR SOCKET WITH SHUTTER WITH 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL ON A COMMON SWITCH BOARD WITH WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME WITH EARTH CONTINUITY INCLUDING WIRE LEADS, EARTH CONNECTIONS ALONG WITH ALL LABOUR CHARGES ETC., COMPLETE. MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND ARTEOR / SCHNEIDER ZEN CELO /HONEYWELL BLENGE PLUS.

40

-

20375.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;WIRING WITH 2 RUNS OF 22/0.3MM (1.5 SQMM) FRLS/HFFR PVC INSULATED 1100V GRADE AS PER IS: 694/1990 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITHOUT CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR LIGHT POINTS IN NON-RESIDENTIAL BUILDINGS. [FOR SECONDARY LIGHT POINTS I.E., FROM EXISTING LIGHT POINT TO EXTENDED LIGHT POINT ] COPPER WIRE MAKE: FINOLEX / RR KABEL / POLYCAB (HR_FR-LF).

58

-

11545.48

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;WIRING WITH 2 RUNS OF 22/0.3MM (1.5 SQMM) FRLS / HFFR PVC INSULATED 1100V GRADE AS PER IS:694/1990 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITH 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR TYPE METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME, WITHOUT 3 PLATE JUMBO CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR LIGHT, BELL, FAN AND EXHAUST FAN POINTS IN NON-RESIDENTIAL BUILDINGS. COPPER WIRE MAKE: FINOLEX / RR KABEL / POLYCAB (HR_FR-LF). MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND ARTEOR /SCHNEIDER ZEN CELO / HONEYWELL BLENGE PLUS.

286

-

188628.44

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;WIRING WITH 2 RUNS OF 22/0.3MM (1.5 SQMM) FRLS / HFFR PVC INSULATED 1100V GRADE AS PER IS:694/1990 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITH 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL WITH SUITABLE SIZE HOT DIP GALVANIZED MODULAR TYPE METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME, WITH 3 PLATE JUMBO CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR LIGHT, BELL, FAN AND EXHAUST FAN POINTS IN NON-RESIDENTIAL BUILDINGS. [FOR STAIR CASE POINT] COPPER WIRE MAKE: FINOLEX / RR KABEL / POLYCAB (HR_FR-LF). MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND ARTEOR /SCHNEIDER ZEN CELO / HONEYWELL BLENGE PLUS. CEILING ROSE MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.

4

-

4086.72

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;WIRING WITH 2 RUNS OF 22/0.3MM (1.5 SQMM) FRLS / HFFR PVC INSULATED 1100V GRADE AS PER IS:694/1990 SPECIFICATION FOR COPPER CABLE IN EXISTING PIPE WITH 6A / 10A 1 WAY 1 MODULE MODULAR SWITCH CONTROL WITH SUITABLE MODULE HOT DIP GALVANIZED MODULAR TYPE METAL BOX COVERED WITH SUITABLE MODULAR COVER FRAME, WITH 3 PLATE JUMBO CEILING ROSE INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR LIGHT, BELL, FAN AND EXHAUST FAN POINTS IN NON-RESIDENTIAL BUILDINGS. COPPER WIRE MAKE: FINOLEX / RR KABEL / POLYCAB (HR_FR-LF). MODULAR SWITCH, SOCKET, METAL BOX & COVER FRAME MAKE: LEGRAND ARTEOR /SCHNEIDER ZEN CELO / HONEYWELL BLENGE PLUS. CEILING ROSE MAKE: GOLD MEDAL OLIVE / MILLION ZOOM / ANCHOR PENTA CHERRY.

134

-

91270.08

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 25MM OUTER DIA HEAVY GRADE, FRLS WITH IS: 9537 PART 3 REGID PVC PIPE (ISI MARK) SURFACE LAYING ON FALSE CEILING DULY FIXING WITH G.I. WIRE ON EXISTING SUPPORTED STUDS INCLUDING ALL LABOUR CHARGES ETC., COMPLETE FOR RUN OF MAINS. MAKES : SUDHAKAR / MODI / PRECISION ( ISI MARK).

250

-

16767.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 25MM OUTER DIA HEAVY GRADE, FRLS WITH IS: 9537 PART 3 REGID PVC PIPE (ISI MARK) CONCEALED IN UNDERNEETH THE FLOOR WITH ALL REQUIRED ACCESSORIES INCLUDING MASONARY WORK AND LABOUR CHARGES ETC., COMPLETE. MAKES : SUDHAKAR / MODI/ PRECISION ( ISI MARK).

2000

-

145560

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 25MM OUTER DIA HEAVY GRADE, FRLS WITH IS: 9537 PART 3 REGID PVC PIPE (ISI MARK) CONCEALED IN WALL WITH ALL REQUIRED ACCESSORIES [LIKE 'U' NAILS, JUNCTION BOX, PVC BENDS AND CEMENT] INCLUDING MASONARY WORK FOR LIGHT, FAN, COMMON, SEPARATE PLUG POINT AND SWITCH/POWER BOARDS ETC., INCLUDING ALL LABOUR CHARGES ETC., COMPLETE. MAKES: SUDHAKAR / MODI/ PRECISION (ISI MARK).

2000

-

184280

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 25MM OUTER DIA HEAVY GRADE, FRLS WITH IS: 9537 PART 3 REGID PVC PIPE (ISI MARK) CONCEALED IN ROOF SLABS WITH ALL REQUIRED ACCESSORIES INCLUDING MASONARY WORK AND LABOUR CHARGES ETC., COMPLETE. MAKES: SUDHAKAR / MODI/ PRECISION (ISI MARK).

1000

-

76330

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;CONSTRUCTION OF SLUDGE PITS (FOR TWIN PIT FLUSH TOILET SYSTEM) USING LOCALLY AVAILABLE RCM CASE WELL STEINING RINGS 6 NOS 1.20M DIA AND 30CM HEIGHT TO FORM ABOUT 1.50 DEEP SLUDGE PIT USING SHABAD TILE SPACERS IN BETWEEN RINGS INCLUDING EARTH WORK EXCAVATION IN ALL SOILS CONVEYANCE OF RCM RINGS TO SITE LAYING THEM IN GROUND OVER PCC ANGULAR BED OF C.C. (1:5:10) RCM PRECAST 230MMX100MM THICK FOR CIRCULAR RING PORTION INCLUDING COST AND CONVEYANCE CHARGES AND SEALING THE TOP OF PIT WITH RCM PRE CAST COVER 50MM THICK ,1.20M DIA INCLUDING FIXING CHARGES WITH CM (1:3) LEAK PROOF AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES SUCH AS REFILLING SIDE WITH EXCAVATION EARTH, BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.

2

-

12324.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR SINGLE TEE (WITH DOOR) AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

2

-

293.2

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING, LAYING, JOINTING AND TESTING OF 101.60MM DIA SWG SP-1 PIPES OF ISI MAKE CONFIRMING TO ISI:651&4127, WITH AIRTIGHT CEMENT JOINTS IN CM(1.5:1) PROP. INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M (3'-0") DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

10

-

4829

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

2

-

43.2

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;CONSTRUCTING 904.0 MM (3?0?) DIA FLY ASH BRICK MASONRY MANHOLE AS PER IS - 4111: PART-1:1986 WITH CEMENT MORTAR (1:6) PROP USING FLY ASH BRICKS OF 225 MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5 N/SQ.MM INCLUDING PLASTERING WITH CEMENT MORTAR 1:3 ROP; ½? THICK BOTH INSIDE AND OUTSIDE FITTED WITH 20? DIA RCC MANHOLE COVERS AND FRAMES INCLUDING EXCAVATING PITS UP TO A DEPTH OF 904.0 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND P.C.C. 1:2:4 BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SAND, BRICKS, WATER ETC., TO SITE, ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, LIFT CHARGES, CURING EXCLUDING GST AND SEIGNIORAGE CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK. AS PER STANDARD SPECIFICATION

2

-

16758.2

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING OF 50MM PPR BALL VALVE CONFORMING TO DIN STANDARDS 8077/8092 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES FOR FIXING EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

10

-

6317

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 54.00 MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIUM CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

100

-

57940

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING AND PLACING ON TERRACE POLYTHELENE WATER STORAGE TANKS (AT ALL FLOOR LEVELS) DOUBLE LAYER APPROVED BRAND AND MNUFACTURE WITH COVER AND SUITABLE LOCKING ARRANGEMENTS MAKING NECESSARY HOLES FOR INLET & OUTLETS AND OVERFLOW PIPES BUT WITHOUT FITTINGS & BASE SUPPORT FOR TANKS, MAKING GOOD THE SAME TO ENSURE LEAK PROOF WITH AN APPROPRIATE MASONARY PLATFORM INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK. AS DIRECTED BY THE ENGINEER -IN- CHARGE

6000

-

48000

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;CONSTRUCTING 904.0 MM (3?0?) DIA FLY ASH BRICK MASONRY MANHOLE AS PER IS - 4111: PART-1:1986 WITH CEMENT MORTAR (1:6) PROP USING FLY ASH BRICKS OF 225 MM THICK FROM APPROVED SOURCE HAVING A MINIMUM CRUSHING STRENGTH OF 5 N/SQ.MM INCLUDING PLASTERING WITH CEMENT MORTAR 1:3 ROP; ½? THICK BOTH INSIDE AND OUTSIDE FITTED WITH 20? DIA RCC MANHOLE COVERS AND FRAMES INCLUDING EXCAVATING PITS UP TO A DEPTH OF 904.0 MM (3'-0") IN ALL SORTS OF SOILS (EXCLUDING ROCK) AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND P.C.C. 1:2:4 BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION AND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SAND, BRICKS, WATER ETC., TO SITE, ALL INCIDENTAL AND OPERATIONAL, LABOUR CHARGES LIKE MIXING CEMENT MORTAR, CONSTRUCTING MASONRY, LIFT CHARGES, CURING EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS ETC., COMPLETE FOR FINISHED ITEM OF WORK. AS PER STANDARD SPECIFICATION.

10

-

83791

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;CONSTRUCTING 457.2 X 457.2 MM (1'-6" X 1'-6") BRICK MASONARY INSPECTION CHAMBER WITH CM (1:6) PROP. USING 2ND CLASS CLAY BRICKS OF 225MM THICK , AND FITTED WITH 457.2 X 457.2 MM (1'-6" X 1'-6") RCC COVER UP TO A DEPTH OF 914.4 MM (3'-0") AND LAYING CEMENT CONCRETE (1:4:8) 150 MM THICK USING 40 MM HBG METAL AND PCC (1:2:4) BENCHING AND CHANNEL 100 MM THICK AS PER STANDARD SPECIFICATION EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

12

-

50508

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 19.04 MM DIA, 609.60 MM LONG ALUMINUM ANODISED TOWEL ROD WITH BRACKETS AND SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

8

-

1181.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING UV RESISTANT UPVC SWR DOOR SINGLE 'Y' - 110MM DIA INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

10

-

1931

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

8

-

4253.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

15

-

238.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

15

-

324

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR DOOR BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

15

-

1141.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR DOOR BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

15

-

1824

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 75 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

15

-

852

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 110 MM DIA UV RESISTANT UPVC SWR PLAIN BEND 87.5 DEGREES AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

15

-

1414.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING INDIAN MAKE FLAT BACK WHITE GLAZED WASH HAND BASIN (HSW/PARRYWARE/NEYCER) IST QUALITY CONFIRMING TO IS: 2556-PART-4 :1972 OF SIZE 550 X 400MM SINGLE C.P. PILLAR COCK AS APPROVED BY EXECUTIVE ENGINEER WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, 32MM NOMINAL SIZE C.P. FITTING WITH PARALLEL PIPE THREAD CONFIRMING TO IS : 2963-1979 AND FITTED WITH 15MM NOMINAL BORE CHROMIUM PLATED PILLAR TAP OF 1ST QUALITY INDIAN MAKE 300GRAMS SEICO/ESSO OR EQUIVALENT COMPLETE WITH STANDARD CI BRACKETS INCLUDING WOODEN BLOCK AND PAINTING TO ALL IRON FITTINGS WITH 2 COATS OF SYNTHETIC ENAMEL PAINT OF APPROVED COLOUR AND MAKE INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

8

-

13416

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING IN POSITION EUROPEAN TYPE WATER CLOSET OF BEST INDIAN MAKE WHITE GLAZED WITH 100 MM 'P' TRAP, PLASTIC SEAT AND LID FOR EUROPEAN WATER CLOSET AND BUFFERS AS PER IS 2548-1963 AND PROVIDING PVC LOW LEVEL FLUSHING SYSTEM OF 8 LITRES CAPACITYOF PARRYWARE SLIMLINE (WHITE) WITH INTERNAL COMPONENTS AND SHORT BEND, 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

18

-

65442.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND LAYING 75 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

50

-

10455

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND LAYING 110 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

100

-

29840

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING, LAYING, JOINTING AND TESTING OF 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, AND JOINTING WITH SOLVENT CEMENT INCLUDING EXCAVATION OF TRENCHES AND SOCKET PITS IN ANY SOIL (EXCEPT ROCK REQUIRING BLASTING) UP TO 0.91M DEPTH AND REFILLING WITH EXCAVATED SOILS, WATERING, TAMPING, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

25

-

10495

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING OF 150MMX100MM SWG GULLY TRAP CONFIRMING TO ISI 651 & 4127 AND CONSTRUCTION OF BRICK MASONRY INTERMEDIATE CHAMBER OF SIZE 20"X14"X12" IN CM (1:6) OVER CC (1:5:10) PROP. BED OF SIZE 20"X14"X4" AND PLASTERING WITH 12MM THICK IN CM (1:4) PROP. BOTH INSIDE AND OUTSIDE SURFACES AND FITTED WITH 9"X12" (230X305MM) RCC M20 GRADE COVER 38MM THICK COVER INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

20

-

12112

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANY TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

20

-

2296

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;S&F OF CHROMIUM PLATED FINISH BRASS BODY QUARTER TURN BIB COCK CUM HEALTH FAUCET WITH 1M LONG TUBE AND WALL HOOK WITH 10 YEARS WARRANTY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES FOR FIXING, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

20

-

66556

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING OF 32MM PPR BALL VALVE CONFORMING TO DIN STANDARDS 8077/8092 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES FOR FIXING , EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

5

-

1323.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING OF 25MM PPR BALL VALVE CONFORMING TO DIN STANDARDS 8077/8092 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES FOR FIXING , EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

10

-

2534

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;S & F OF 15MM BRASS BODY BIB TAP CP FINISH INDIAN MAKE HEAVY DUTY QTR TURN SPINDLE INTERNAL/ EXTERNAL THREAD CONNECTION CONFIRMING TO IS 8931 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHARGES FOR FIXING EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK

40

-

24812

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 22.20MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIER CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

200

-

39320

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIER CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

200

-

47040

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 34.90MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIER CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

100

-

32040

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING OF 41.30MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL OR EQUIVALENT PREMIER CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES, EXCLUDING GST ETC., COMPLETE FOR FINISHED ITEM OF WORK.

150

-

59655

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING OF CURTAIN GLAZING MADE OF PRE PAINTED STEEL AS PER IS 513 OF 0.58 MM THICK D QUALITY, GALVANIZED AS PER IS 277 PRIMER COATED WITH EPOXY, FINISH PAINTED WITH A POLYESTER PAINT USING THE SECTION FOR OUTER FRAME OF 46 X 52 MM, SECTION FOR MULLION OF 46 X 70 MM AND SECTION FOR BEADING OF 18 X 25 MM AND THE GLAZING WITH 5 MM THICK PLAIN FLOAT GLASS FITTED WITH EPDM GASKETS INCLUDING HANDLE MADE OF HIGH GRADE ALUMINIUM POWDER COATED AND NYLON RECEIVER, CORNER BRACKETS MADE OF CRCA WITH ZINC PHOSPHATING, MULLION CAPS MADE OF GLASS FILLED NYLON INCLUDING FIXING THE FRAMES IN THE CONCRETE / MASONRY WALL WITH SELF EXPANDING SCREWS, ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST. SIZES : FIXED GLAZING 2'-0 X 2'-0 (609.6X609.6MM) AND FIXED GLAZING 2'-0 X 3'-0 (609.6X914.4MM)

270

-

1848852

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING, SUPPLYING & FIXING OF FIXED LOUVERED VENTILATOR MADE OUT OF MULTI CHAMBERED UPVC SECTIONS WITH GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC. HAVING ISOLATED DRAINAGE AND REINFORCED WITH GALVANIZED IRON PROFILES THROUGHOUT THE WINDOW. THE OUTER FRAME HAVING AN OVERALL SIZE OF 60 MM X 55 MM X 2.40 WITH REINFORCEMENT OF 1 MM THICKNESS AND MULLION WITH OVERALL SIZE OF 74 MM X 60 MM X 2.40 MM WITH REINFORCEMENT OF 1 MM THICKNESS. (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN).VENTILATOR SHALL BE PROVIDED WITH 4.5 MM PIN HEAD GLASS, STANDARD HARDWARE. WALL THICKNESS OF FRAME & MULLION SHALL BE 2.4 MM.,INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING GST.

36

-

246225.6

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;TOILET DOOR : 0.75 X 2.10 M: SUPPLYING POSITIONING AND FIXING OF ISI MARK, STANDARD MAKE FLUSH DOOR SHUTTER OF 35 MM THICK , SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF SIZE 100 MM X 75 MM, INCLUDING 6 NOS. OF MS 'Z' HOLD FASTS OF SIZE 250X50X8 MM, 3 NOS. OF 125 MM LONG BUTT HINGES, 1 NOS. DOOR STOPPER, 2 NOS. 125 MM LONG DOOR HANDLES, 1 NOS. ALDROP OF SIZE 250 MM LONG, 1 NOS. OF 200 MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING, INCLUDING PROVIDING KICK PLATE WITH 24GUAGE ALLUMINIUM SHEET TO INTERNAL FACE FULL AND EXTERNAL FACE OF THE SHUTTER UPTO 0.23m HT. COVERING BOTTOM EDGE WITH BOLTS,NUTS COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES LABOUR CHARGES FOR MAKING THE FRAME AND FIXING OF FRAME AND SHUTTER ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).

40

-

206744

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;DOOR : 1.00 X 2.10 M: SUPPLY AND FIXING OF 35 MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF SIZE 100 MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 250X50X8 MM, 3 NOS. OF 125 MM BUTT HINGES, 2 NOS. 125 MM LONG DOOR HANDLE, 1 NO. ALDROP OF SIZE 250 MM LONG, 2 NOS. OF 200 MM LONG TOWER BOLTS, I NO. DOOR STOPPER FIXED TO THE SHUTTER WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND SHUTTER AND FIXING ETC.., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).

60

-

266982

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND FIXING GYP BOARD SUSPENDED REGULAR SINGLE LAYER FALSE CEILING (GS-MFSC-4.1 AS PER INDIA GYPSUM) USING 12.50 MM THICK GYP BOARD CONFORMING TO IS 2095-1982 FIXING TO GYP STEEL GI PERIMETER CHANNELS OF SIZE 20 X 27 X 30 MM (WEB) OF 0.55 MM THICK ALONG THE PERIMETER OF CEILING SCREW FIXED TO BRICK WORK / PARTITION AT 610 MM C/C AND SUSPENDING THE FRAME WORK USING INTERMEDIATE CHANNELS (45 X 15 X 15 X 0.90 MM) FROM SOFFIT AT 1220 MM C/C WITH CEILING ANGLE (25 X 10 X 0.55 MM) FIXED WITH GI CLEAT AND STEEL EXPANSION FASTENERS & CONNECTING CLIP TO THE CEILING CHANNELS (WITH KNURLED WEB OF 51.50 X 26 X 10.50 X 0.55 MM) FIXED IN DIECTION PERPENDICULAR TO THE INTERMEDIATE CHANNEL AT 457 MM C/C AND FIXING THE 12.50 MM DRYWALL SCEWS AT 230 MM C/C & JOINTING, FIXING USING JOINT COMPOUND AND PAPER TAPE TO HAVE A FLUSH LOOK INCLUDING FILLING THE TAPPERED & SQUARE EDGES WITH JOINTING COMPOUND, TWO COATS OF DRYWALL TOPCOAT COMPLETE, BUT EXCLUDING GST FOR FINISHED ITEM OF WORK AS PER INDIA GYPSUM LTD., SPECIFICATION.

660

-

650430

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING OF UNPLASTICISED POLY VINYL CHLORIDE (UPVC) 3 TRACK SLIDING WINDOWS WITH MESH SHUTTER PROVISION ? (ONLY 2-GLASS SHUTTERS) DULY MANUFACTURED USING UPVC REINFORCED PROFILES (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN) OF (80 MM X 52 MM)/ (94 MM X 45 MM) X 2.20MMFOROUTERFRAMES,(54MMX38MM)/(39 MM X 58 MM) X 2.20 MM FOR SLIDING SHUTTER FRAMES CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM, STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.0/1.2 MM PREFABRICATED & WELDED THROUGH FUSION WELDING. THE WINDOW SASH SHALL BE FITTED WITH 5 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE DULY FIXED WITH GREY COLOUR TPV GASKET FOR SASH & GLAZING BEAD SHALL BE COEXTRUDED WITH GREY COLOUR SOFT PVC. SYSTEM SHALL HAVE SINGLE POINT LOCKING WITH TOUCH LOCK AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/ DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE COMPLETE FORFINISHED ITEM OF WORK.BUT EXCLUDING GST. FOR GROUND FLOOR AND FIRST FLOOR

355

-

2424046.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING OF UNPLASTICISED POLY VINYL CHLORIDE (UPVC) OPENABLE DOORS WITH OPENABLE SHUTTERS DULY MANUFACTURED USING UPVC REINFORCED PROFILES (COMPOSITION OF PROFILE SHALL CONSISTS A MINIMUM OF 5.5 PHR OF TIO2 AND NOT MORE THAN 12 PHR OF CACO3 FOR EVERY 100 PARTS OF PVC RESIN) OF 60 MM X 55 MM X 2.40 MM FOR OUTER FRAMES, 74 MM X 60 MM X 2.40 MM FOR MULLION SECTIONS AS PER THE NEED AND 102 MM X 60 MM X 2.40 MM FOR OPENABLE SHUTTER FRAME CAPABLE OF MOUNTING SINGLE GLAZING SYSTEM STRUCTURALLY REINFORCED WITH HOT DIP GALVANIZED UP TO 50 MICRONS OF MINIMUM THICKNESS OF 1.2 MM PREFABRICATED & WELDED THROUGH FUSION WELDING THE DOOR SASH SHALL BE FITTED WITH 6 MM THICK CLEAR FLOAT GLASS OF REPUTED MAKE DULY FIXED WITH GREY COLOUR TPV GASKETS FOR SASH & GLAZING BEAD SHALL BE CO-EXTRUDED WITH GREY COLOUR SOFT PVC SYSTEM SHALL BE PROVIDED WITH 4 NO?S OF 3D HINGES FOR EACH SHUTTER AND MULTIPOINT LOCKING WITH KEYS WITH RAISER WEDGES FOR SMOOTH OPERATION AND THE SYSTEM IS TO BE INSTALLED AT THE SITE USING ANCHOR FASTENERS, SILICON RUBBER SEALANT, EASY GLAZING/ DEGLAZING AT SITE ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, ACCESSORIES, LABOUR CHARGES FOR TRANSPORTATION, ERECTION AT SITE -COMPLETE FOR FINISHED ITEM OF WORK. BUT EXCLUDING GST -FOR GROUND FLOOR AND FIRST FLOOR

22

-

200688.4

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND LAYING OF RAIN WATER DOWN TAKE PIPES WITH 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST.

20

-

5968

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;CEMENT CONCRETE (1:4:8) PROP. USING 20MM HARD GRANITE MACHINE CRUSHED METAL (COARSE AGGREGATE) WITH MACHINE MIXING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, EXCLUDING SEIGNIORAGE CHARGES, SALES & OTHER TAXES ON ALL MATERIALS, INCLUDING ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LAYING CONCRETE, LIFT, CURING AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES EXCLUDING GST ON ALL MATERAILS. FOR FIRST FLOOR DUMMY COLUMNS (APSS NO 403)

20

-

141984

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;RCM FACIA 5CM THICK IN CM (1:3) FOR DROP WALLS, FINS WITH RABBIT WIRE MESH & NOMINAL REINFORCEMENT AS DIRECTED BY ENGINEER-IN-CHARGE WITH DUBARA SPONGE FINISHING, INCLUDING COST & CONVEYANCE OF ALL MATERIALS TO SITE, INCLUDING OPERATIONAL & INCIDENTAL, COST AND CONVEYANCE OF CEMENT, WIRE MESH, WATER TO WORK SITE, PROVIDING CENTERING, SCAFFOLDING AND FORM WORK, LIFT CHARGES, EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERAILS ETC., COMPLETE FOR FINISHED ITEMS OF WORK BUT EXCLUDING COST OF STEEL & ITS FABRICATION CHARGES, FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR. (APSS NO.403 & 903)

240

-

537336

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING MS FLATS OF ALL SIZES FOR GRILLS WINDOWS /VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., EXCLUDING GST -COMPLETE FOR THE FINISHED ITEM OF WORK. FOR FIRST FLOOR

250

-

22025

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;MANUFACTURING, SUPPLYING AND FIXING IN POSITION OF STAIRCASE RAILING AS PER DRAWING USING STAINLESS STEEL TUBES, SECTIONS, PLATES SHEETS & PIPES OF ALL DIAMETERS FOR 304 GRADE INCLUDING LABOUR CHARGES FOR FABRICATION OF STAINLESS STEEL RAILING WORKS USING STAINLESS STEEL WELDING RODS INCLUDING BUFFING, POLISHING, LACQUER FINISHING, TO PRESENT SEAMLESS FINISH ETC., EXCLUDING GST-COMPLETE AS DIERCTED BY THE ENGINEER-IN-CHARGE FOR FINISHED ITEM OF WORK. FOR FIRST FLOOR

150

-

92025

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;DADOOING WITH DIGITAL / POLISHED GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNSAS APPROVED BY EXECUTIVE ENGINEER SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LIFTING (MANNUAL), ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS. FOR TOILETS FIRST FLOOR.

190

-

161785

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FLOORING WITH SUPPLY OF NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712,IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:3), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, LIFTING ( MANNUAL) ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS FOR TOILETS- FIRST FLOOR (APSS.NO:701&707)

55

-

43961.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING , ETC., COMPLETE FOR FINISHED ITEM OF WORK.BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS. FOR FIRST FLOOR

60

-

66522

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FLOORING WITH HIGH POLISHED GRANITE SLAB 16 TO 18 MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE @ 3.3 KGS PER SQM. & JOINTED WITH NEAT CEMENT TO FULL DEPTH INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND, AND WATER AND FLOORING STONES ETC., COMPLETE, LABOUR CHARGES FOR DRESSING OF FLOORING STONES ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS. FOR-FIRST FLOOR

75

-

304147.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FLOORING WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, , ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS. FOR FIRST FLOOR

950

-

1061055

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PAINTING TO EXTERIOR FACES OF WALLS WITH EMULSION PAINT OF APPROVED MAKE (ACE FROM ASIAN PAINT) AND COLOUR 2 COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 ML OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1 COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, BRUSHES, ALL INCIDENTAL, OPERATIONAL & LABOUR CHARGES, CURING, SCAFFOLDING ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST. FOR FIRST FLOOR (APSS NO:908)

1925

-

380380

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR PLASTER OF PARIS PUTTY OR LIME PUNNING OF AVERAGE 1 TO 2 MM THICKNESS OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2 - 3 HRS, SAND WITH 180 AND 320 NO., EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, BRUSHES, ALL INCIDENTAL, OPERATIONAL & LABOUR CHARGES, CURING, SCAFFOLDING ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST. FOR INTERNAL WALLS - FIRST FLOOR

2750

-

525525

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PAINTING TO NEW WALLS & CEILING WITH THREE (3) COATS OF PLASTIC EMULSION PAINT OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST. FOR INTERNAL WALLS-FIRST FLOOR

3050

-

479155

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFT, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS. FOR FIRST FLOOR (APSS NO: 901&904)

4750

-

1942750

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;ORNAMENTAL PLASTERING TO CEILING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFT, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERAILS. FOR FIRST FLOOR (APSS NO: 901 & 904)

770

-

331331

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1 KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LIFT, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERAILS.FOR FIRST FLOOR (APSS.NO: 901&903)

1150

-

530840

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;BRICK MASONRY IN CEMENT MORTAR (1:4) PROP USING FLY ASH BRICKS OF SIZE 290X100X140 MM-CLASS -5, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHAGES , SCAFFOLDING, CURING, LIFT CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERAILS. A COMPRESIVE STRENGTH OF 5 N/ MM2 FOR SUPERSTRUCTURE WALLS OF 100 MM THICK-FOR FIRST FLOOR(INCLUDING PARAPET WALL) (APSS NO. 504 & 501)

50

-

410215

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;BRICK MASONRY IN CEMENT MORTAR (1:6) PROP USING FLY ASH BRICKS OF SIZE 290X225X140 MM OF CLASS-5 INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHAGES , SCAFFOLDING, CURING, LIFT CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK WITH A COMPRESIVE STRENGTH OF 5 N/ MM2 BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERAILS- FOR SUPERSTRUCTURE WALLS OF 225 MM THICK FOR FIRST FLOOR (APSS NO. 504 & 501)

225

-

1621507.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM HARD GRANITE, TRAP METAL WITH MACHINE MIXING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, ,CURING, CENTRING, FINISHING, INCLUDING ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR BED BLOCKS IN FIRST FLOOR (APSS NO: 402).

1

-

5555.2

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED- EXCLUDING GST. FOR FIRST FLOOR

55

-

3554331

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;RCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS . FOR SUNSHADES OF 50MM AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP. SUNSHADES FOR FIRST FLOOR (APSS NO. 403)

25

-

22647.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING OTHER TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M, BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR FINISHED ITEM OF WORK (APSS NO.403) LINTELS FOR FIRST FLOOR

20

-

214798

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LIFT, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR FIRST FLOOR SLABS 210 MM THICK (APSS NO.403)

10

-

87419

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LIFT, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR FIRST FLOOR SLABS 150 MM THICK (APSS NO.403)

65

-

614081

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LIFT, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR FIRST FLOOR SLABS 125 MM THICK (APSS NO.403)

110

-

1097701

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LIFT, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR FIRST FLOOR BEAMS (APSS NO.403)

110

-

1133693

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LIFT, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR FIRST FLOOR COLUMNS (APSS NO.403)

80

-

946672

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FLOORING WITH PRECAST TERRAZZO CHEQUERRED TILES 20 MM THICK CONFORMING TO IS:138011, OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS, ETC., COMPLETE FOR FINISHED ITEM OF WORK -GROUND FLOOR

200

-

152700

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;RCM FACIA 5CM THICK IN CM (1:3) FOR DROP WALLS, FINS WITH RABBIT WIRE MESH & NOMINAL REINFORCEMENT AS DIRECTED BY ENGINEER-IN-CHARGE WITH DUBARA SPONGE FINISHING, INCLUDING COST & CONVEYANCE OF ALL MATERIALS TO SITE, SALES & OTHER TAXES ON ALL MATERIALS, OPERATIONAL & INCIDENTAL, COST AND CONVEYANCE OF CEMENT, WIRE MESH, WATER TO WORK SITE, CENTERING, SCAFFOLDING AND FORM WORK, LIFT CHARGES, EXCLUDING SEIGNIORAGE CHARGES & GST ON ALL MATERIALS ETC., COMPLETE FOR FINISHED ITEMS OF WORK BUT EXCLUDING COST OF STEEL & ITS FABRICATION CHARGES, FOR FINISHED ITEM OF WORK FOR GROUND FLOOR. (APSS NO.403 & 903)

320

-

683904

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLYING AND FIXING MS FLATS OF ALL SIZES FOR GRILLS WINDOWS /VENTILATORS OF ALL SIZES AS DIRECTED BY THE ENGINEER-IN- CHARGE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE AND LABOUR CHARGES FOR FABRICATION, FIXING ETC., EXCLUDING GST -COMPLETE FOR THE FINISHED ITEM OF WORK. FOR GROUND FLOOR

250

-

22025

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;MANUFACTURING, SUPPLYING AND FIXING IN POSITION OF STAIRCASE RAILING AS PER DRAWING USING STAINLESS STEEL TUBES, SECTIONS, PLATES SHEETS & PIPES OF ALL DIAMETERS FOR 304 GRADE INCLUDING LABOUR CHARGES FOR FABRICATION OF STAINLESS STEEL RAILING WORKS USING STAINLESS STEEL WELDING RODS INCLUDING BUFFING, POLISHING, LACQUER FINISHING, TO PRESENT SEAMLESS FINISH ETC., EXCLUDING GST-COMPLETE AS DIERCTED BY THE ENGINEER-IN-CHARGE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR

150

-

92025

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;DADOOING WITH DIGITAL / POLISHED GLAZED FULL BODY PORCELAIN WALL TILES OF SIZE 300 X 600 MM WITH ANY TYPE OF DESIGN TEXTURE SUCH AS MARBLE FINISH, WOODEN, BAMBOO, STONE FINISHES ETC., SCRATCH LESS, STAIN FREE AND THICKNESS BETWEEN 6-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNSAS APPROVED BY EXECUTIVE ENGINEER SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LIFTING (MANNUAL), ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS. FOR TOILETS GROUND FLOOR.

110

-

92741

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FLOORING WITH SUPPLY OF NON-SKID RED OR WHITE FULL BODY CERAMIC FLOOR TILES OF SIZE 300 X 300 MM AND THICKNESS BETWEEN 7-8 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712,IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS OR AS APPROVED BY THE ENGINEER - IN -CHARGE ,OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:3), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, LIFTING ( MANNUAL) ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS FOR TOILETS- GROUND FLOOR (APSS.NO:701&707)

50

-

38260

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM HEIGHT/RISERS OF STEPS WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER ETC., COMPLETE INCLUDING , ETC., COMPLETE FOR FINISHED ITEM OF WORK.BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS. FOR GROUND FLOOR

55

-

59103

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FLOORING WITH HIGH POLISHED GRANITE SLAB 16 TO 18 MM THICK UPTO 8'-00"(2.43M) OTHER THAN BLACK SET OVER BASE COAT OF CM (1:3) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE @ 3.3 KGS PER SQM. & JOINTED WITH NEAT CEMENT TO FULL DEPTH INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND, AND WATER AND FLOORING STONES ETC., COMPLETE, LABOUR CHARGES FOR DRESSING OF FLOORING STONES ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS. FOR ENTERANCE STEPS -GROUND FLOOR

75

-

299437.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FLOORING WITH DOUBLE CHARGED / MULTI CHARGED STAIN FREE FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600 X 600 MM AND THICKNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO IS:13711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, , ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST & SEGNIORAGE CHARGES ON ALL MATERIALS. FOR GROUND FLOOR

1000

-

1082800

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PAINTING TO EXTERIOR FACES OF WALLS WITH EMULSION PAINT OF APPROVED MAKE (ACE FROM ASIAN PAINT) AND COLOUR 2 COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750 ML OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1 COAT OF ASIAN EXTERIOR WALL PRIMER BY DILUTING 1LIT. OF PRIMER WITH 1LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, BRUSHES, ALL INCIDENTAL, OPERATIONAL & LABOUR CHARGES, CURING, SCAFFOLDING ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST . FOR GROUND FLOOR (APSS NO:908)

1800

-

355680

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR PLASTER OF PARIS PUTTY OR LIME PUNNING OF AVERAGE 1 TO 2 MM THICKNESS OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2 - 3 HRS, SAND WITH 180 AND 320 NO., EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, BRUSHES, ALL INCIDENTAL, OPERATIONAL & LABOUR CHARGES, CURING, SCAFFOLDING ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST. FOR INTERNAL WALLS - GROUND FLOOR

2750

-

525525

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PAINTING TO NEW WALLS & CEILING WITH THREE (3) COATS OF PLASTIC EMULSION PAINT OF APPROVED BRAND AND SHADE (ASIAN /BERGER /NEROLAC /SAICOAT /INDOCEM OR EUIVALENT) OVER ONE COAT OF PRIMER OF APP BRAND AFTER THOUROULY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDER MATERIALS INCLUDING COST OF ALL MATERIALS TO THE INTERIOR FACES OF WALLS AS DIECTED 2COATS BY DILUTING 1LIT OF EMULSION PAINT WITH A MAXIMUM 750ML OF WATER WITH AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS (TOTAL3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC.,COMPLETE FOR FINISHED ITEM OF WORK EXLCUDING GST. FOR INTERNAL WALLS GROUND FLOOR

3050

-

479155

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PLASTERING TO SUPERSTRUCTURE 12 MM THICK IN TWO COATS, WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR GROUND FLOOR (APSS NO: 901&904)

3200

-

1195840

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;ORNAMENTAL PLASTERING TO CEILING 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:5) PROP. AND FINISH COAT OF 4MM THICK IN CM (1:3) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS.FOR GROUND FLOOR (APSS NO: 901 & 904)

1000

-

391200

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE IN CM(1:3), 20MM THICK WITH 1 KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN, INCLUDING COST OF ALL MATERIALS, COST & CONVEYANCE OF ALL MATERIALS, INCIDENTAL, OERATIONAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR GROUND FLOOR (APSS.NO: 901&903)

350

-

150815

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;BRICK MASONRY IN CEMENT MORTAR (1:4) PROP USING FLY ASH BRICKS OF SIZE 290X100X140 MM-CLASS -5, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHAGES , SCAFFOLDING, CURING, LIFT CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. A COMPRESIVE STRENGTH OF 5 N/ MM2 FOR SUPERSTRUCTURE WALLS OF 100 MM THICK FOR GROUND FLOOR-(APSS NO. 504 & 501)

9

-

68222.7

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;BRICK MASONRY IN CEMENT MORTAR (1:6) PROP USING FLY ASH BRICKS OF SIZE 290 X 225 X140 MM -CLASS 5, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, LABOUR CHAGES , SCAFFOLDING, CURING, LIFT CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK WITH A COMPRESIVE STRENGTH OF 5N/ MM2 EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR SUPERSTRUCTURE WALLS OF 225 MM THICK FOR GROUND FLOOR-(APSS NO. 504 & 501)

200

-

1362040

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PLAIN CEMENT CONCRETE (1:3:6) PROP. USING 20MM HARD GRANITE, TRAP METAL WITH MACHINE MIXING INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, ,CURING, CENTRING, FINISHING, INCLUDING ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR BED BLOCKS IN GROUND FLOOR (APSS NO: 402).

2

-

10958.4

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED, EXCLUDING GST. FOR GROUND FLOOR

47

-

3037337.4

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;RCC M-20 NOMINAL MIX (CEMENT : FINE AGGREGATE : COARSE AGGREGATE) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND) , COARSE AGGREGATE, WATER ETC., TO SITE, OTHER TAXES ON ALL MATERIALS, ALL INCIDENTAL, OPERATIONAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING (MANUAL), LAYING CONCRETE, VIBRATING, CURING ETC., COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS . FOR SUNSHADES OF 50MM AVERAGE THICK INCLUDING DRIP COURSE OF SIZE 40MM WIDE X 20MM HEIGHT IN CEMENT MORTAR (1:4)PROP. SUNSHADES FOR GROUND FLOOR (APSS NO. 403)

25

-

21760

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;RCC M - 20 NOMINAL MIX (Cement:fine aggregate: coarse aggregate) CORRESPONDING TO TABLE 9 OF IS 456 USING 20MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE) FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, FINE AGGREGATE (SAND), COARSE AGGREGATE, WATER ETC., TO SITE AND INCLUDING OTHER TAXES ON ALL MATERIALS INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS MACHINE MIXING, LIFTING ( MANNUAL), LAYING CONCRETE, CURING ETC.,COMPLETE AND PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., FOR UNSUPPORTED HIEGHT OF 3.66M, BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES AND EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR FINISHED ITEM OF WORK (APSS NO.403) LINTELS FOR GROUND FLOOR

20

-

206700

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES, BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR GROUND FLOOR SLABS 210 MM THICK(APSS NO.403)

10

-

84834

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES, BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR GROUND FLOOR SLABS 150 MM THICK(APSS NO.403)

65

-

594392.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES, BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR GROUND FLOOR SLABS 125 MM THICK(APSS NO.403)

115

-

1109635

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES, BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR GROUND FLOOR BEAMS (APSS NO.403)

100

-

996480

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES, BUT EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR GROUND FLOOR COLUMNS (APSS NO.403)

65

-

735982

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING "HYSD/TMT" STEEL BARS OF DIFFERENT DIAMETERS BELOW 36MM DIAMETER Fe 500 GRADE (AS PER IS 1786 - 2008 AND ALL ITS LATEST AMMENDMENTS) FROM PRIMARY STEEL PRODUCERS LIKE TATA, SAIL, VSP, JSW & SHYAM STEEL FOR REINFORCEMENT INCLUDING CUTTING, BENDING TO REQUIRED SIZES AND SHAPES, PLACING THEM IN POSITION WITH COVER BLOCKS OF APPROVED SHAPE AND SIZE, TYING FIRMLY WITH M.S BINDING WIRE OF SWG, FORMING GRILLS FOR REINFORCEMENT WORKS AS PER APPROVED DESIGNS AND DRAWINGS TO BE SUPPLIED AT THE TIME OF EXECUTION OF WORK INCLUDING COST AND CONVEYANCE OF DEFORMED BARS, BINDING WIRE, COVER BLOCKS AND ALL WASTAGES SUCH AS OVER LAPS, COUPLINGS, WELDED JOINTS, CHAIRS, SPACE BARS ETC., AS DIRECTED BY THE ENGINEER-IN-CHARGE AND ALL OPERATIONAL, INCIDENTAL LABOUR CHARGES SUCH AS CUTTING, BENDING, PLACING IN POSITION, TYING ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR ALL LENGTHS AS PER DRAWINGS AND TECHNICAL SPECIFICATIONS FOR BARS BELOW 36MM DIA WHERE THEY ARE NOT WELDED, EXCLUDING GST. FOR SUBSTRUCTURE

45

-

2908089

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PLASTERING TO SUPERSTRUCTURE 20MM THICK WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING, INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, LIFTING ( MANUAL) CURING, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. COMPLETE.FOR FINISHED ITEM OF WORK. BASEMENT (APSS NO: 901&904)

300

-

115260

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, ETC. INCLUDING HIRE AND LABOUR CHARGES FOR CENTERING ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS. FOR COLUMNS BELOW GL UPTO PLINTH BEAM LEVEL (APSS NO.403)

25

-

283070

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;PROVIDING CENTERING, SHUTTERING AND SCAFFOLDING TO VRCC WALL 230MM THICK (BOTH FACES) OF ANY THICKNESS WHICH WILL GIVE NEAT FINISH (NO PLASTERING IS ALLOWED FOR VRCC SURFACE) WITH PROVIDING PROPS AND STEEL PLATES, WALLER, FOOT PLATES, BRACKETS, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS,INCLUDING ALL BRACINGS, CROSS MEMBERS ETC., AS PER THE APPROVED PLAN AND OTHER ACCESSORIES AS PER THE NORMS AND STABILITY CALCULATIONS INCLUDING COST AND OPERATIONAL OF ALL ACCESSORIES, INCIDENTAL AND OPERATIONAL CHARGES ETC., EXCLUDING GST, COMPLETE AS DERECTED BY THE ENGINEER -IN-CHARGE FOR FINISHED ITEM OF WORK RATE FOR TWO SIDES CENTERING UP TO 3.66M HEIGHT.

305

-

238418.5

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC.,PROVIDING CENTERING USING STEEL CENTERING PLATES, CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS ETC. BUT EXCLUDING HIRE AND LABOUR CHARGES FOR CENTERING, EXCLUDING GST AND SEIGNIORAGE CHARGES ON ALL MATERIALS ETC. COMPLETE FOR FINISHED ITEM OF WORK BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES . FOR GRADE BEAMS / GRADE WALLS (APSS NO.403)

70

-

604275

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM), SAND (FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., PROVIDING , FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. EXCLUDING GST AND SEIGNIORAGE CHARGES. FOR PLINTH BEAMS (APSS NO.403)

55

-

653312

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., PROVIDING , FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES FOR FINISHED ITEM OF WORK. EXCLUDING GST AND SEIGNIORAGE CHARGES. FOR PEDASTALS (APSS NO.403)

80

-

804384

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;SUPPLY AND PLACING OF THE DESIGN MIX CONCRETE M 30 GRADE CORRESPONDING TO IS 456 USING WEIGH BATCHER / MIXER WITH 20 MM SIZE GRADED MACHINE CRUSHED HARD GRANITE METAL (COARSE AGGREGATE-0.8 CUM ), SAND ( FINE AGGREGATE 0.4 CUM ), FROM APPROVED QUARRIES, CEMENT 400 KGS FOR ESTIMATE PURPOSE AND WATER ETC., INCLUDING COST AND CONVEYANCE AND OTHER CHARGES OF ALL MATERIALS TO SITE, INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES SUCH AS WEIGH BATCHING, MACHINE MIXING, LAYING CONCRETE, VIBRATING, CURING ETC., PROVIDING CENTERING USING CASURINA BALLIES, BAMBOOS, WOODEN REAPERS, RUNNERS, WOOD POSTS, WALL PLATES, STEEL CENTERING PLATES ETC., PROVIDING FOR UNSUPPORTED HIEGHT OF 3.66M BUT EXCLUDING COST OF STEEL AND ITS FABRICATION CHARGES, EXCLUDING GST AND SEIGNIORAGE CHARGES FOR FINISHED ITEM OF WORK. FOR FOOTINGS (APSS NO.403)

240

-

2295624

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;RANDOM RUBBLE STONE MASONRY IN CM(1:6) PROP; (CEMENT: SCREENED SAND) USING HARD GRANITE STONES CARTED FROM APPROVED QUARRY INCLUDING COST AND CONVEYANCE OF ALL MATERIALS LIKE CEMENT, SCREENED SAND, WATER, STONES ETC., TO SITE AND INCLUDING OTHER TAXES ON ALL MATERIALS INCLUDING LABOUR FOR CUTTING STONES TO REQUIRED SIZE AND SHAPE, MIXING OF CEMENT MORTAR, CONSTRUCTION, CURING ETC., AND OVERHEADS & CONTRACTORS PROFIT, BUT EXCLUDING GST AND SEIGNIORAGE CHARGES- COMPLETE FOR FINISHED ITEM OF WORK . FOR FOUNDATIONS AND BASEMENTS. (APSS NO.601 & 615)

165

-

691218

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;FILLING WITH CARTED GRAVEL IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES, HIRE CHARGES OF T & P ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST AND SEIGNIORAGE CHARGES. (APSS NO. 309 & 310)

2700

-

848070

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., EXCLUDING GST. COMPLETE FOR FINISHED ITEM OF WORK (APSS NO. 309 & 310)

1170

-

46215

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD TRAP MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., BUT EXCLUDING GST AND SEIGNIORAGE CHARGES. COMPLETE FOR FINISHED ITEM OF WORK FOUNDATION BED AND UNDER STONE SLAB FLOORING . (APSS NO: 402).

170

-

741438

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;EARTH WORK EXCAVATION FOR SURFACE HARD ROCK (BLASTING PROHIBITED) WITH ROCKBREAKERS INCLUDING BREAKING ROCK AND LOADING IN TIPPERS AND DISPOSAL WITHIN ALL LIFTS AND LEAD UP TO 1000MTS, TRIMMING BOTTOM AND SIDE SLOPES IN ACCORDANCE WITH REQUIREMENTS OF LINES, GRADES AND CROSS SECTIONS AND INCLUDING HIRE AND OPERATIONAL CHARGES OF T & P,.EXCLUDING GST- COMPLETE FOR FINISHED ITEM OF WORK FOR TRENCH CUTTING AS PER THE MORT&H SPECIFICATION NO.301 AS DIRECTED BY THE ENGINEER-IN-CHARGE.

1040

-

833768

... More
Construction of Command and Control Center at 5th IR Btn, Chalvai;EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL, HARD RED EARTH, MURRAM, ORDINARY GRAVEL, EXCLUDING GST - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).

1170

-

376857



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.