Police Housing Corporation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 9,440
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
224903Bid Award Id
ViewTender No
T89/2020-21Tender Authority
Police Housing Corporation Limited ViewPurchaser Address
-Website
http://http://www.tsphcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
STO CHERIYAL;SUPPLYING AND FIXING110 MM DIA UV RESISTANT UPVC SWR COWL AS PER ISI STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.
2
-
38
STO CHERIYAL;SUPPLYING AND FIXING BEST INDIAN MAKE 609.6X457.2mm T.V SHAPE MIRROR WITH PLASTIC FRAME MIRROR INCLUDING WOODEN BLOCKS, SCREWS ETC., INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., FOR FINISHED ITEM OF WORK COMPLETE.
5
-
2456
STO CHERIYAL;SUPPLYING AND FIXING 19.04 MM DIA, 609.60 MM LONG ALUMINUM ANODISED TOWEL ROD WITH BRACKETS AND SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK .
5
-
694
STO CHERIYAL;SUPPLYING AND FIXING 76.2MM (3") DIA UV RESISTANT UPVC SWR NAHANI TRAP WITH JALI OF APPROVED ISI BRAND INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK.
2
-
202
STO CHERIYAL;SUPPLYING & FIXING INDIAN MAKE FLAT BACK WASH HAND BASIN 1ST QUALITY CONFORMING TO IS:2556-PART-4:1972 WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, 32 MM NOMINAL SIZE C.P. FITTING WITH PARALLEL PIPE THREAD CONFORMING TO IS:2963-1979 AND FITTED WITH 15 MM NOMINAL BORE CHROMIUM PLATED PILLAR TAP OF 1ST QUALITY INDIAN MAKE 400 GRAMS COMPLETE WITH STANDARD CI BRACKETS INCLUDING WOODEN BLOCK: 550 X 400 MM - SINGLE C.P. PILLAR COCK AS APPROVED BY EXECUTIVE ENGINEER WITH WASTE FITTINGS LIKE RUBBER PLUG, CHAIN, AND PAINTING TO ALL IRON FITTINGS WITH 2 COATS OF SYNTHETIC ENAMEL PAINT OF APPROVED COLOUR AND MAKE INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK. INCLUDING WOODEN BLOCK INCLUDING CUTTING THE WALLS WHEREVER NECESSARY AND MAKING THE SAME GOOD FOR FINISHED ITEM OF WORK
1
-
1561.8
STO CHERIYAL;SUPPLY AND FIXING IN POSITION 584.2MM LONG ORRISA PAN WITH 100 MM 'P' OR 'S' TRAP INCLUDING PROVIDING BRICK MASONARY SEAT USING 2 ND CLASS BRICKS AS PER STANDARD PRACTICE, AND PROVIDING PVC LOW LEVEL FLUSHING SYSTEM OF 8 LITRES CAPACITYOF PARRYWARE SLIMLINE (WHITE) WITH INTERNAL COMPONENTS AND SHORT BEND, 12.70 MM PVC CONNECTION WITH BRASS UNION NUTS C.P COATED, INCLUDING CUTTING THE WALLS AND FLOORS AND MAKING GOOD THE SAME, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE
2
-
5189.6
STO CHERIYAL;SUPPLYING AND LAYING 75 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS, PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.FOR GROUND FLOOR
20
-
3924
STO CHERIYAL;SUPPLYING AND LAYING 110 MM DIA SINGLE SOCKET PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, AND LABOUR CHARGES FOR LAYING, FIXING, AND COMMISSIONING THE PVC PIPES INCLUDING COUPLERS/ BENDS/TEES ETC., INCLUDING FIXING NECCESSARY FITTINGS LIKE BENDS PLUGS, COUPLERS, JUNCTIONS, TEES ETC., WITH SOLVENT JOINTING AS PER STANDARDS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
50
-
13745
STO CHERIYAL;SUPPLYING AND FIXING OF 150MMX100MM SWG GULLY TRAP CONFIRMING TO ISI 651 & 4127 WITH CI GRATING AND CONSTRUCTION OF BRICK MASONRY INTERMEDIATE CHAMBER OF SIZE 20"X14"X12" IN CM (1:6) OVER CC (1:5:10) PROP. BED OF SIZE 20"X14"X4" AND PLASTERING WITH 12MM THICK IN CM (1:4) PROP. BOTH INSIDE AND OUTSIDE SURFACES AND FITTED WITH 9"X12" (230X305MM) RCC (1:11/2:3) 1 1/2" THICK COVER INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., FOR FINISHED ITEM OF WORK COMPLETE.
1
-
528.8
STO CHERIYAL;SUPPLYING AND FIXING 15mm brass Bib Tap cp finish - Indian make heavy duty full turn 300gms AS DIRECTED BY THE ENGINEER-IN-CHARGE, INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
4
-
938.4
STO CHERIYAL;SUPPLY AND FIXING OF 28.60MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
20
-
4140
STO CHERIYAL;SUPPLY AND FIXING OF 15.90MM OD PIPE - SDR 11 ASHIRVAD / ASTRAL FLOW GUARD OR EQUIVALENT CPVC PIPES AND FITTINGS TO MEET THE REQUIREMENTS OF ASTM-D 2846 AND ARE PRODUCED IN CTS (COPPER TUBE SIZES 1/2" TO 2") ASHIRVAD FLOWGUARDS SDR 11 MADE FROM IDETICAL CPVC COMPOUNDS HAVING THE SAME PHYSICAL PROPERTIES FOR HOT AND COLD WATER (IS 15778-2007) INCLUDING COST AND CONVEYANCE OF PIPE & ITS FITTINGS AND ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
10
-
1420
STO CHERIYAL;SUPPLY AND FIXING GYP BOARD SUSPENDED REGULAR SINGLE LAYER FALSE CEILING (GS-MFSC-4.1 AS PER INDIA GYPSUM) USING 12.50 MM THICK GYP BOARD CONFORMING TO IS 2095-1982 FIXING TO GYP STEEL GI PERIMETER CHANNELS OF SIZE 20 X 27 X 30 MM (WEB) OF 0.55 MM THICK ALONG THE PERIMETER OF CEILING SCREW FIXED TO BRICK WORK / PARTITION AT 610 MM C/C AND SUSPENDING THE FRAME WORK USING INTERMEDIATE CHANNELS (45 X 15 X 15 X 0.90 MM) FROM SOFFIT AT 1220 MM C/C WITH CEILING ANGLE (25 X 10 X 0.55 MM) FIXED WITH GI CLEAT AND STEEL EXPANSION FASTENERS & CONNECTING CLIP TO THE CEILING CHANNELS (WITH KNURLED WEB OF 51.50 X 26 X 10.50 X 0.55 MM) FIXED IN DIECTION PERPENDICULAR TO THE INTERMEDIATE CHANNEL AT 457 MM C/C AND FIXING THE 12.50 MM DRYWALL SCEWS AT 230 MM C/C & JOINTING, FIXING USING JOINT COMPOUND AND PAPER TAPE TO HAVE A FLUSH LOOK INCLUDING FILLING THE TAPPERED & SQUARE EDGES WITH JOINTING COMPOUND, TWO COATS OF DRYWALL TOPCOAT COMPLETE FOR FINISHED ITEM OF WORK AS PER INDIA GYPSUM LTD., SPECIFICATION.
30
-
27249
STO CHERIYAL;SUPPLY AND FIXING OF PRE-PAINTED STEEL TOP HUNG AND FIXED LOUVERED VENTILATORS MADE OF PRE PAINTED STEEL AS PER IS 513 OF -0.58 MM THICK 'D QUALITY, GALVANIZED AS PER IS 277, FINISH PAINTED WITH A POLYESTER PAINT & 4 MM PINHEAD GLASS FOR VENTILATORS WITH EPDM GASKET WITH HANDLE MADE OF HIGH GRADE ALUMINIUM POWDER COATED AND NYLON RECEIVER, CORNER BRACKETS MADE OF CRCA WITH ZINC PHOSPHATE, MULLION CAPS MADE OF GLASS FILLED NYLON, FRAMES FIXED TO THE CONCRETE /MASONRY WALL BY MEANS OF SELF EXPANDING SCREWS INCLUDING 10 MM SQUARE GUARD BARS WITH 6 PITCH COMPLETE FOR FINISHED ITEM OF WORK FOR (I) VENTILATORS: TOP HUNG 2 '-0 X 2'-0 (609.6X609.6MM) OUTER FRAME SECTION SIZE OF 46MM X 52 MM SHUTTER FRAME SECTION SIZE OF 46MM X 46 MM AND (II) VENTILATORS: TOP HUNG 4 '-0 X 2'-0 (1219.2X609.6MM) OUTERFRAME SECTION SIZE OF 46 X 52 M SHUTTER FRAME SECTION SIZEOF46X46MMMULLIONSECTIONSIZEOF46X70 MM AND (III) VENTILATORS: TOP HUNG 4 '-0 X 3'-0 (1219.2X914.4MM) OUTER FRAME SECTION SIZE OF 46 X 52M M SHUTTER FRAME SECTION SIZE OF 46 X 46 MMULLIONSECTIONSIZEOF46X70MM
2
-
13884
STO CHERIYAL;TOILET DOOR:0.85X2.1 SUPPLY AND FIXING OF 30 MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF SIZE 100 MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 230X40X5MM, 3 NOS. OF 125 MM BUTT HINGES, 1 NO. DOOR STOPER, 2 NOS. 100 MM LONG DOOR HANDLES, 1 NOS ALDROP OF SIZE 250 MM LONG, 1NOS. OF 200MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND FIXING THE SHUTTER ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).
1.78
-
7532.96
STO CHERIYAL;INTERNAL DOOR: 1.05X2.1 SUPPLY AND FIXING OF 35MM THICK FLUSH DOOR SHUTTER, SOLID BOND WOOD BLOCK BOARD TYPE WITH COMMERCIAL PLY ON BOTH FACES INCLUDING SUPPLY, POSITIONING AND FIXING DOOR FRAME MADE WITH MEDIUM TEAK WOOD SCANTLINGS OF SIZE 100 MM X 75 MM, INCLUDING 6 NOS. OF MS HOLD FASTS OF SIZE 250X50X5MM, 3 NOS. OF 125 MM BUTT HINGES, 1 NO. DOOR STOPER, 2 NOS. 100 MM LONG DOOR HANDLES, 1 NOS ALDROP OF SIZE 250 MM LONG, 1NOS. OF 200MM LONG TOWER BOLTS WITH BOLTS, NUTS, NF SCREWS INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR MAKING THE FRAME AND FIXING THE SHUTTER ETC., INCLUDING MINOR EXTRA FIXTURES REQUIRED IF ANY AS DIRECTED BY THE ENGINEER-IN-CHRGE OF THE WORK COMPLETE FOR FINISHED ITEM OF WORK. (ALL FITTINGS AND FIXTURES SHOULD BE OF ALLUMINUM, ISI MARK, GOT APPROVED BY THE ENGINEER-IN-CHARGE) (APSSNO:1001&1002).
2.21
-
8359.77
STO CHERIYAL;SUPPLYING AND LAYING RAIN WATER DOWN TAKE PIPES WITH 110 MM DIA PVC / SWR PIPES OF APPROVED MAKE OF 4 Kg/cm2 CONFIRMING TO IS:13592-1992, WITH NECESSARY UPVC PIPE CLIPS @ 5' INTERVALS AND JOINTED WITH SOLVENT CEMENT INCLUDING CUTTING OF WALLS AND FLOORS AND MAKING THE SAME GOOD, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK.
10
-
2749
STO CHERIYAL;PAINTING TO NEW IRON WORK TWO COATS OVER ONE COAT OF RED OXIDE PRIMER COAT WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY, ALL INCIDENTAL, OPERATIONAL CHARGES ETC., COMPLETE (THE RATE INCLUDES ONE COAT OF PRIMER AND TWO COATS OF PAINT ) (APSS NO.1201, 1207, 1212).FOR FINISHED ITEM OF WORK
20
-
3220
STO CHERIYAL;PAINTING TO NEW WOOD WORK TWO COATS OVER ONE COAT OF WOOD PRIMER WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND SHADE INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES FOR PREPARING AND CLEANING THE SURFACE OF DIRT WITH SOAP AND BRUSHES INCLUDING PUTTY AND ALL INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE (THE RATE INCLUDES ONE COAT OF PRIMER AND TWO COATS OF PAINT) (APSS NO.1201, 1207, 1212).FOR FINISHED ITEM OF WORK
50
-
8575
STO CHERIYAL;PAINTING WITH EXTERIOR EMULSION PAINT OF APPROVED MAKE (ACE FROM ASIAN PAINT) AND COLOUR TO THE EXTERIOR FACES OF WALLS AS DIRECTED 2 COATS BY DILUTING 1 LIT. OF EMULSION PAINT WITH A MAXIMUM 750 ML OF WATER WITHIN AN INTERVAL OF NOT LESS THAN 6 HOURS BETWEEN TWO COATS OVER 1 COAT OF EXTERIOR WALL PRIMER BY DILUTING 1 LIT. OF PRIMER WITH 1 LIT. OF WATER (TOTAL 3 COATS) WITH SURFACE PREPARATION ETC., AS PER STANDARD SPECIFICATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS, BRUSHES, LABOUR CHARGES, CURING, SCAFFOLDING AND ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK IN ALL FLOORS. (APSS NO.908).
250
-
49700
STO CHERIYAL;PAINTING TO NEW WALLS WITH 2 COATS OF READY MIXED OIL BOUND WAHSABLE DISTEMPER OF APPROVED BRAND AND SHADE OVER A BASE COAT OF APPROPRIATE PRIMER OF APPROVED BRAND, MAKING 3 COATS IN ALL TO GIVE AN EVEN SHADE AFTER THOURUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES ETC. COMPLETE FOR FINISHED ITEM OF WORK AS PER SS 911 FOR INTERNAL WALLS FOR ALL FLOORS
50
-
5290
STO CHERIYAL;PAINTING TO NEW WALLS WITH 3COATS OF PLASTIC EMULSION PAINT INCLUDING ONE COAT OF CEMENT PRIMER OF APPROVED BRAND AND SHADE AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR INTERNAL WALLS. (APSS NO. 911)
250
-
39375
STO CHERIYAL;PROVIDING AND APPLYING SYNTHETIC PLASTER PUTTY OR EQUIVALENT PUTTY SUCH AS BIRLA WALL CARE PUTTY OF AVERAGE 1 TO 2 MM THICK OVER PLASTERED SURFACE TO PREPARE THE SURFACE EVEN AND SMOOTH AFTER THOROUGHLY BRUSHING THE SURFACE TO REMOVE ALL DIRT AND REMAINS OF LOOSE POWDERED MATERIALS, APPLYING EMERY PAPER, SAND THE SURFACE, CLEAN & WIPE OFF LOOSE DUST, APPLYING, KNIFING PASTE FILLER BY PUTTY KNIFE / MUSLIN PAD, AIR DRY FOR 2-3 HRS., SAND WITH 180 AND 320 NO. EMERY PAPER FOR THE SURFACE PREPARATION INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES ETC., COMPLETE FOR FINISHED ITEM OF WORK FOR INTERNAL WALLS.
250
-
46375
STO CHERIYAL;FLOORING WITH CERAMIC NON SKID TILES 7.3MM THICK 1ST QUALITY OF ALL SHADES, STANDARD MAKE AS SPECIFIED OF NOT LESS THAN 300X300MM OF APPROVED PATTERN FOR FLOORING SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES, LIFTING ( MANNUAL), INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK, GROUND FLOOR (APSS.NO:701&707). FOR BATH AND WCS
10
-
7465
STO CHERIYAL;PROVIDING SKIRTING TO INTERNAL WALLS TO 15 CM WITH Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm THICK NORMAL COLOUR 1ST QUALITY LENGTH EQUAL TO FLOORING STONES, SET OVER BASE COAT OF CM (1:5) 12 MM THICK WITH CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD AT THE RATE OF 3.30 KGS PER SQM AND JOINTED WITH WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO FULL DEPTH, INCLUDING COST OF ALL MATERIALS LIKE TILES, CEMENT, SAND AND WATER LIFTING ( MANNUAL), ETC., COMPLETE , ETC., COMPLETE FOR FINISHED ITEM OF WORK.GROUND FLOOR
5
-
5094
STO CHERIYAL;FLOORING WITH DOUBLE CHARGED/MULTI CHARGED STAIN FRESS FULL BODY PORCELAIN VITRIFIED TILES WITH DOUBLE LAYER PIGMENT OF SIZE 600X600 MM AND THICNESS BETWEEN 8-10 MM 1ST QUALITY CONFORMING TO 3711, IS:13712, IS:13630 (PARTS 1 TO 15) OF ANY COLOUR AND FINISH IN ALL SHADES AND DESIGNS, SET OVER BASE COAT OF CEMENT MORTAR (1:8), 12 MM THICK OVER CC BED ALREADY LAID OR RCC ROOF SLAB, INCLUDING NEAT CEMENT SLURRY OF HONEY LIKE CONSISTENCY SPREAD @ 3.3.KGS PER SQM & JOINTED NEATLY WITH WHITE CEMENT PASTE TO FULL DEPTH MIXED WITH PIGMENT OF MATCHING SHADE, INCLUDING COST OF ALL MATERIALS LIKE CEMENT, SAND WATER AND TILES ETC., COMPLETE, INCLUDING SEIGNIORAGE CHARGES, ETC., COMPLETE FOR FINISHED ITEM OF WORK GROUND FLOOR
100
-
102810
STO CHERIYAL;PROVIDING DADOOING WITH COLOURED GLAZED TILES ( IVORY OR GREY COLOUR ) 1ST QUALITY, OF SIZE NOT LESS THAN 200 X 300 MM, AS PER APPROVED MAKE, DESIGN AND PATTERN AS APPROVED BY EXECUTIVE ENGINEER, SET OVER 12MM THICK CM (1:3) BASE COAT AND NEAT GREY CEMENT SLURRY OF HONEY LIKE CONSISTENCY AT THE RATE OF 3.3 KGS PER SQ.MT AND JOINTED WITH 2 KGS WHITE CEMENT PASTE MIXED WITH PIGMENT OF MATCHING SHADE TO MATCH THE SHADE OF TILES INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, Lifting ( Mannual),ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS MIXING MORTAR, FIXING TILES IN POSITION, INCLUDING LIFT CHARGES, CURING, CUTTING THE BRICK MASONARY WALLS AND REDOING THE SAME SUCH THAT THE TOP SURFACE OF TILES IS TO BE FLUSHED WITH PLASTERED SURFACE ETC., COMPLETE FOR FINISHED ITEM OF WORK. FOR GROUND FLOOR.
20
-
15388
STO CHERIYAL;PLASTERING TO SUPERSTRUCTURE 20MM THICK WITH A BASE COAT OF 16 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, Lifting ( Mannual),CURING CHARGES, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK GROUND FLOOR (APSS NO: 901&904)
50
-
21365
STO CHERIYAL;PLASTERING TO SUPERSTRUCTURE 12MM THICK WITH A BASE COAT OF 8 MM THICK IN CM (1:6) PROP. AND TOP COAT OF 4 MM THICK IN CM (1:4) PROP. WITH DUBARA SPONGE FINISHING COMPLETE INCLUDING MAKING GROOVES, COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, SCAFFOLDING, Lifting ( Mannual),CURING CHARGES, ALL OTHER INCIDENTAL AND OPERATIONAL CHARGES ETC., COMPLETE.FOR FINISHED ITEM OF WORK GROUND FLOOR (APSS NO: 901&904)
100
-
40150
STO CHERIYAL;PROVIDING IMPERVIOUS COAT TO EXPOSED RCC ROOF SLAB SURFACE WITH CM(1:3), 20MM THICK WITH 1KG OF WATER PROOF COMPOUND PER BAG OF CEMENT LAID OVER ROOF WHEN IT IS GREEN INCLUDING COST OF ALL MATERIALS, SEIGNIORAGE CHARGES, INCLUDING CONVEYANCE CHARGES OF MATERIALS AND INCLUDING ALL OPERATIONAL, INCIDENTAL AND LABOUR CHARGES FOR MIXING MORTAR, LAYING, RENDERING SMOOTH AND THREAD LINING, CURING, ROUNDING OFF JUNCTIONS OF WALL AND SLAB ETC,, COMPLETE FOR FINISHED ITEM OF WORK (APSS.NO: 901&903) GROUND FLOOR FOR FINISHED ITEM OF WORK .
100
-
45690
STO CHERIYAL;PROVIDING MASONRY IN CM (1:4 WITH 2ND CLASS BRICKS TRADITIONAL SIZE 23 X 11 X 7 CMS HAVING A CRUSHING STRENGTH OF NOT LESS THAN 35.00KG/CM2 INCLUDING COST AND SEIGNORAGE CHARGES AND CONVEYANCE OF ALL MATERIALS AND WATER FROM APPROVED SOURCES TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES SUCH AS SCAFFOLDING MIXING MORTOR CONSTRUCTING MASONARY LIFT CHARGES(MANNUAL), CURING ETC. COMPLETE FOR GROUND FLOOR SUPERSTRUCTURE WALLS OF 110 MM THICK FOR FINISHED ITEM OF WORK AS PER (APSS 504 ) GROUND FLOOR
3.5
-
22868.65
STO CHERIYAL;PROVIDING MASONRY IN CM (1:6) WITH 2ND CLASS BRICKS TRADITIONAL SIZE 23 X 11 X 7 CMS HAVING A CRUSHING STRENGTH OF NOT LESS THAN 35.00KG/CM2 INCLUDING COST AND SEIGNORAGE CHARGES AND CONVEYANCE OF ALL MATERIALS AND WATER FROM APPROVED SOURCES TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES SUCH AS SCAFFOLDING MIXING MORTOR CONSTRUCTING MASONARY LIFT CHARGES(MANNUAL), CURING ETC. COMPLETE FOR GROUND FLOOR SUPERSTRUCTURE WALLS OF 230 MM THICK FOR FINISHED ITEM OF WORK AS PER (APSS 504 ) GROUND FLOOR
3
-
17630.4
STO CHERIYAL;FILLING WITH CARTED GRAVEL IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL OPERATIONAL, INCIDENTAL, LABOUR CHARGES, HIRE CHARGES OF T & P ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST AND SEIGNIORAGE CHARGES. (APSS NO. 309 & 310)
20
-
8978
STO CHERIYAL;RANDAM RUBBLE MASONRY USING HARD GRANITE STONE IN CM(1:6) PROP. INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LABOUR CHARGES, CURING, ETC.,COMPLETE FOR FOUNDATIONS AND BASEMENTS FOR FINISHED ITEM OF WORK. APSS NO: 615).
2
-
8096
STO CHERIYAL;RE-FILLING WITH USEFUL AVAILABLE EXCAVATED EARTH OTHER THAN EXPANSIVE SOILS LIKE RED EARTH AND ORDINARY GRAVEL ETC., (EXCLUDING ROCK) IN TRENCHES, SIDES OF FOUNDATIONS AND BASEMENT WITH INITIAL LEAD IN LAYERS NOT EXCEEDING 15 CM THICK, CONSOLIDATING EACH DEPOSITED LAYER BY WATERING AND RAMMING INCLUDING COST AND CONVEYANCE OF WATER TO WORK SITE AND ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES , HIRE CHARGES OF T & P ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST. (APSS NO. 309 & 310)
5
-
197
STO CHERIYAL;CEMENT CONCRETE (1:4:8) PROP. USING 40MM HARD TRAP MACHINE CRUSHED METAL WITH MACHINE MIXING UP TO PLINTH LEVEL INCLUDING COST AND CONVEYANCE OF ALL MATERIALS TO SITE, LAYING, CURING, FINISHING, ALL OTHER INCIDENTAL, OPERATIONAL, LABOUR ETC., COMPLETE FOR FINISHED ITEM OF WORK EXCLUDING GST AND SEIGNIORAGE CHARGES. FOUNDATION BED, BELOW RR MASONARY & PLINTH BEAM . (APSS NO: 402).
8
-
34146.4
STO CHERIYAL;EARTH WORK EXCAVATION FOR FOUNDATIONS AND DEPOSITING ON BANK, FOR ALL LIFTS AND WITH AN INITIAL LEAD OF 10M INCLUDING ALL INCIDENTAL, OPERATIONAL, LABOUR CHARGES SUCH AS SHORING, SHEETING, PLANKING, STRUTTING, DEWATERING SITE CLEARANCE, CLEARING SHURBS, BRUSHWOOD, UNDER GROWTH AND SMALL TREES NOT EXCEEDING 300 MM GIRTH, MEASURED AT ONE METRE ABOVE GROUND ETC., COMPLETE FOR FINISHED ITEM OF WORK INCLUDING DEWATERING CHARGES ETC AS PER SS - 20 B FOR STIFF BLOCK COTTON SOIL , HARD RED EARTH, MURRAM, ORDINARY GRAVEL EXCLUDING GST - MANUAL MEANS UP TO 3M DEPTH - FOUNDATION OF BUILDING (APSS 308).
5
-
1701
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements