Telangana State Medical Services And Infrastructure Development Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 10,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
340518Bid Award Id
ViewTender No
10-13/TSMSIDC/Tech/2022-23, Dated 08.07.2022Tender Authority
Telangana State Medical Services And Infrastructure Development Corporation ViewPurchaser Address
-Website
http://http://tsmsidc.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Plastering 20mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Ground Floor/First Floor:
829
-
260306
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). Ground Floor/First Floor:
2439
-
1380474
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Conveyance of un-useful excavated earth to a distance of 21 KM for disposal including hire charges of T & P, labour charges etc., and overheads & contractors profit complete for finished item of work.
150
-
55050
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504). Ground Floor/First Floor:
235
-
1813965
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Plain Cement Concrete M 20 nominal mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 300 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work for coping on top of compound wall (APSS No. 402 & 403).
28
-
185752
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard other than granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)
164
-
750628
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402).
18
-
89946
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)
102
-
28968
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete. Stone masonry in cement mortar
39
-
31629
... More
Construction of Compound wall around new site Aurobindo Block at MNJIO RCC, Red Hills, Hyderabad;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete. Brick masonry
70
-
22330
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements