Telangana State Medical Services And Infrastructure Development Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Medical Services And Infrastructure Development Corporation - TSMSIDC Tender

Works
Civil And Construction
Building Construction
Opening Date4 Jan 2025
Closing Date7 Jan 2025
Tender Amount₹ 7,89,195 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Badminton and volley ball courts;Supply of Stag Iconic Stealth Performance Table Tennis (T.T) Table| Full Size Professional Table with Quick Easy Setup| Single Player Playback Mode (1 Table Cover,2 TT Rackets,3 Balls) for finished item of work.etc., complete for finished item of work.

2

31000

62000

... More
Construction of Badminton and volley ball courts;Supply of AMZ SPORTS NETS Volley Ball NET Nylon Standard Quality Four Sided Tape for finished item of work.etc., complete for finished item of work

1

690

690

... More
Construction of Badminton and volley ball courts;Supply of Cosco Super Volley Volleyball, Size 4 (Multicolour) for finished item of work.etc., complete for finished item of work

1

1280

1280

... More
Construction of Badminton and volley ball courts;Supply of Yonex Mavis 200i Nylon Shuttle Cock, Pack of 6 for finished item of work.etc., complete for finished item of work

1

590

590

... More
Construction of Badminton and volley ball courts;Supply Yonex Badminton Net for Outdoor and Indoor Courts, Nylon Mesh for finished item of work.etc., complete for finished item of work.

5

2410

12050

... More
Construction of Badminton and volley ball courts;Supply of YONEX GR 303i Aluminium Strung Badminton Racket with Full Racket Cover High Durability for finished item of work.etc., complete for finished item of work.

20

970

19400

... More
Construction of Badminton and volley ball courts;Supplying and fixing 50mm dia nominal bore Medium Grade properties & weight as per IS 1239 ISI mark MS Tube for fixing of GI Sheet including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit for finished item of work.etc., complete for finished item of work in all floors for stair case head room roof.

295.5

741

218966

... More
Construction of Badminton and volley ball courts;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

36

305

10980

... More
Construction of Badminton and volley ball courts;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402).

44

6161

271084

... More
Construction of Badminton and volley ball courts;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)

17.9

4426

79225

... More
Construction of Badminton and volley ball courts;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308).

49

130

6370

... More
Construction of Badminton and volley ball courts;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete. Kadapa slabs or shahabad stone slabs on sand bed

240

18

4320



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.