Telangana State Medical Services And Infrastructure Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Medical Services And Infrastructure Development Corporation - TSMSIDC Tender

Civil And Construction
Electrical and Maintenance Works
Building Construction
Civil Construction
Opening Date28 Feb 2022
Closing Date4 Mar 2022
Tender Amount₹ 2,68,753 
Notes
Download

Costs

Summary

Minor Civil & Electrical Repairs To Blood Storage Centre At Community Health Centre, Husnabad

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Labour Rate Per 100 Rm

-

3300

-

... More
Labour Rate for 1 Mtr

-

33

-

... More
b) Material

-

-

-

... More
Material Rate for 100 Mtrs

-

3920

-

... More
Material Rate for 1 Mtr

-

39

-

... More
Total Cost of Material + Labour Charges

-

72

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

72

-

... More
Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe concealed in wall with all required PVC / Metallic Junction Boxes including masonary work and labour charges etc., Makes:- Sudhakar / Finolex / Modi / VIP / Precision / Universal / Polycab / DEC.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour Rate Per 100 Rm

-

4390

-

... More
Labour Rate for 1 Mtr

-

43

-

... More
b) Material

-

-

-

... More
Material Rate for 100 Mtrs

-

3324

-

... More
Material Rate for 1 Mtr

-

33

-

... More
Total Cost of Material + Labour Charges

-

77

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

77

-

... More
Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. Makes:- Sudhakar / Finolex / Modi / VIP / Precision / Universal / Polycab / DEC.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour Rate Per 100 Rm

-

3300

-

... More
Labour Rate for 1 Mtr

-

33

-

... More
b) Material

-

-

-

... More
Material Rate for 100 Mtrs

-

3820

-

... More
Material Rate for 1 Mtr

-

38

-

... More
Total Cost of Material + Labour Charges

-

71

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

71

-

... More
Supply and erecting PVC / GI / MS Galvanished fan hook box with hook in RCC slab including all Labour charges etc., complete.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour Rate for 1 Mtr

-

34

-

... More
a) Material

-

-

-

... More
Rate

-

92

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

126

-

... More
Wiring

-

-

-

... More
Point wiring in Non Residential Building

-

-

-

... More
Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in N.R.B. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR) Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 6 Points

-

1299

-

... More
Labour for 1 Point

-

216

-

... More
b) Material

-

-

-

... More
Cost of Material for 6 Points

-

2961

-

... More
Cost of Material Rate per 1 Point

-

493

-

... More
Total Cost of Material + Labour Charges

-

710

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

710

-

... More
Stair case point wiring Point wiring in Non Residential Building

-

-

-

... More
Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for staircase light points in N.R.B. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR) Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T.

-

-

-

... More
Rate per Each

-

1065

-

... More
Point wiring in Residential Building

-

-

-

... More
Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in R.B. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR) Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova / L&T-Englaze.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 6 Points

-

1515

-

... More
Labour for 1 Point

-

216

-

... More
b) Material

-

-

-

... More
Cost of Material for 7 Points

-

3112

-

... More
Cost of Material Rate per 1 Point

-

444

-

... More
Total Cost of Material + Labour Charges

-

661

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

661

-

... More
Stair case point wiring Point wiring in Residential Building

-

-

-

... More
Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for staircase light points in R.B. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR) Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T.

-

-

-

... More
Rate per Each

-

992

-

... More
Common Socket

-

-

-

... More
Supply and fixing of 6A/10A ISI Mark 3/2 pin Modular socket with 6A/10A 1way Modular switch, 3 Module box with cover frame a Common switch board including cost and conveyance of all materials and all labour charges etc., complete in N.R.B. / R.B. Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 1 Point

-

76

-

... More
b) Material

-

-

-

... More
Cost of Material Rate per 1 Point

-

428

-

... More
Total Cost of Material + Labour Charges

-

504

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

504

-

... More
Separate Socket

-

-

-

... More
Wiring with 3 of 22/0.3mm ( 1.5 Sq.mm) FRLS / HFFR P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and MS boxes with cover plate and GI switch box fixing on separate board including all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR). Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 15 Points

-

2475

-

... More
Labour for 1 Point

-

165

-

... More
b) Material

-

-

-

... More
Cost of Material for 15 Points

-

9247

-

... More
Cost of Material Rate per 1 Point

-

616

-

... More
Total Cost of Material + Labour Charges

-

781

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

781

-

... More
6A Switches - 3 Nos & 6A Sockets - 3 Nos

-

-

-

... More
Supply and fixing of 3 Nos 6A ISI mark Modular type switch with 3 Nos 6A 3/2 pin wall plug socket on suitable size Modular box with required cover frame including cost and coveyance of all material and all labour charges etc., complete for Computers in N.R.B. / R.B. Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 1 No

-

193

-

... More
b) Material

-

-

-

... More
Cost of Material for 1 No

-

1138

-

... More
Total Cost of Material + Labour Charges

-

1331

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

1331

-

... More
16 A Socket

-

-

-

... More
Supply and fixing of ISI mark 16A 3pin / 6A 3 Pin Modular combi socket with 16 Amps Modular switch fixed on suitable size Modular box with required cover frame including with connections, cost and conveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 1 No

-

165

-

... More
b) Material

-

-

-

... More
Cost of Material for 1 No

-

524

-

... More
Total Cost of Material + Labour Charges

-

689

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

689

-

... More
Run of Mains

-

-

-

... More
Supply and Run of 1 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper of in existing pipe for earth continuity inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR).

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtr

-

746

-

... More
Labour for 1 Mtr

-

7

-

... More
b) Material

-

-

-

... More
Cost of Material for 100 Metres

-

1885

-

... More
Cost of Material Rate per Mtr= C/100

-

18

-

... More
Total Cost of Material + Labour Charges

-

26

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

26

-

... More
Supply and Run of 3 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper of Makes : Khanthi / Vimal / Stanjo / Rajnigandha / Orbit in existing pipe for earth continuity inlcuding all labour charges etc., complete.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtr

-

2422

-

... More
Labour for 1 Mtr

-

24

-

... More
b) Material

-

-

-

... More
Cost of Material for 100 Metres

-

5655

-

... More
Cost of Material Rate per Mtr= C/100

-

56

-

... More
Total Cost of Material + Labour Charges

-

80

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

81

-

... More
Supply and Run of 3 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable of in existing pipe for run of mains inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR).

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtr

-

2422

-

... More
Labour for 1 Mtr

-

24

-

... More
b) Material

-

-

-

... More
Cost of Material for 100 Metres

-

9141

-

... More
Cost of Material Rate per Mtr= C/100

-

91

-

... More
Total Cost of Material + Labour Charges

-

115

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

116

-

... More
Supply and Run of 3 of 56/0.3mm (4.00 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable of in existing pipe for run of mains inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR).

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtr

-

2680

-

... More
Labour for 1 Mtr

-

26

-

... More
b) Material

-

-

-

... More
Cost of Material for 100 Metres

-

13956

-

... More
Cost of Material Rate per Mtr= C/100

-

139

-

... More
Total Cost of Material + Labour Charges

-

166

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

166

-

... More
Supply and Run of 3 of 84/0.3mm (6.00 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable of in existing pipe for run of mains inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR).

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtr

-

2680

-

... More
Labour for 1 Mtr

-

26

-

... More
b) Material

-

-

-

... More
Cost of Material for 100 Metres

-

21348

-

... More
Cost of Material Rate per Mtr= C/100

-

213

-

... More
Total Cost of Material + Labour Charges

-

240

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

240

-

... More
Supply and Run of 5 of 84/0.3mm (6.0 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable of in existing pipe for run of mains inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR).

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtr

-

5102

-

... More
Labour for 1 Mtr

-

51

-

... More
b) Material

-

-

-

... More
Cost of Material for 100 Metres

-

35580

-

... More
Cost of Material Rate per Mtr= C/100

-

355

-

... More
Total Cost of Material + Labour Charges

-

406

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

407

-

... More
Supply and Run of 5 of 140/0.3mm (10.0 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable of in existing pipe for run of mains inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR).

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtr

-

6003

-

... More
Labour for 1 Mtr

-

60

-

... More
b) Material

-

-

-

... More
Cost of Material for 100 Metres

-

54935

-

... More
Cost of Material Rate per Mtr= C/100

-

549

-

... More
Total Cost of Material + Labour Charges

-

609

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

609

-

... More
Distribution Boards

-

-

-

... More
Supply and fixing of DP/FP Metal Enclosure with IP 20 Protection DB Make with 1 No 20A, 10 KA DP MCB including internal connection and labour charges for Flush Mounting etc.,complete. Makes : Legrand / Schneider / Siemens / L&T / Crabtree Xpro / ABB / C&S

-

-

-

... More
LABOUR

-

-

-

... More
COST OF LABOUR FOR FULSH MOUNTING

-

365

-

... More
MATERIAL

-

-

-

... More
COST OF MATERIAL FOR FULSH MOUNTING

-

1296

-

... More
TOTAL COST OF MATERIAL + LABOUR FOR FULSH MOUNTING

-

1661

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1662

-

... More
8 Way SPNDB

-

-

-

... More
Supply and fixing of 8 Way SPN DB with IP 43 Protection as per IS:13032 and suitable for 8Nos S.P out goings with 1 No 40A DP Isolator as Incommer, and 6nos of 6-32A SP 10KA MCBs as out goings, concealing in wall etc complete. Makes : Legrand / Schneider / Siemens / L&T / Crabtree Xpro / ABB / C&S

-

-

-

... More
LABOUR

-

-

-

... More
MATERIAL

-

-

-

... More
TOTAL COST OF MATERIAL + LABOUR FOR FLUSH MOUNTING

-

4596

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

4596

-

... More
4 Way TPNDB (LDB)

-

-

-

... More
Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and Supply and Fixing of 1 No., of 40A FP Isolator as incomer and 12 Nos 6-32 A 10kA SP MCBs as out goings including internal connections and labour charges for FLUSH Mounting etc., complete. (For Lighting DBs) Makes : Legrand / Schneider / Siemens / L&T / Crabtree Xpro / ABB / C&S

-

-

-

... More
MATERIAL

-

-

-

... More
LABOUR

-

-

-

... More
TOTAL COST OF MATERIAL + LABOUR FOR FLUSH MOUNTING

-

9413

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

9414

-

... More
4 Way TPNDB (PDB)

-

-

-

... More
Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 and Supply and Fixing of 1 No., of 63A FP Isolator as incomer and 12 Nos 6-32 A 10kA SP MCBs as out goings including internal connections and labour charges for FLUSH Mounting etc., complete for DBs. Makes : Legrand / Schneider / Siemens / L&T / Crabtree Xpro / ABB / C&S

-

-

-

... More
LABOUR

-

-

-

... More
MATERIAL

-

-

-

... More
TOTAL COST OF MATERIAL + LABOUR FOR FLUSH MOUNTING

-

9510

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

9511

-

... More
8 Way VTPN DB

-

-

-

... More
Supply and fixing of 8 Way VTPN DB with IP 43 Protection as per IS:13032 Mand Supply and Fixing of 1 No., of 125A TPN MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted as incomer with 8 Nos of 63A, 10KA, TP MCBs C Curve ISI Mark as Out goings including internal connections and labour charges for FLUSH Mounting etc., complete. Makes : Legrand / Schneider / Siemens / L&T / Crabtree Xpro / ABB / C&S

-

-

-

... More
LABOUR

-

-

-

... More
COST OF LABOUR FOR SURFACE MOUNTING

-

2320

-

... More
MATERIAL

-

-

-

... More
Supply of 125A 4P MCCB,

-

-

-

... More
COST OF MATERIAL FOR SURFACE MOUNTING

-

39528

-

... More
TOTAL COST OF MATERIAL + LABOUR FOR SURFACE MOUNTING

-

41848

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

41848

-

... More
Approved in Vemulawada BOQ

-

-

-

... More
Earthings

-

-

-

... More
Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

4863

-

... More
Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 19mm dia 'B' Class G.I Pipe of 2.5Mtr lengthwith funnel as per National Electric Code and earth connection from electrode GI strip of 40mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mmX450mmX400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II).

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

13892

-

... More
Supply and Run of 25mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete. (1.18Kgs/1Mtr)

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtrs

-

1135

-

... More
Labour for 1 Mtr

-

11

-

... More
b) Material

-

-

-

... More
Sundries.

-

-

-

... More
Cost of Material for 100 Metres

-

9440

-

... More
Cost of Material Rate per Mtr= C/100

-

94

-

... More
Total Cost of Material + Labour Charges

-

105

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

106

-

... More
Supply and Run of 50mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete. (2.36 Kg / Mtr)

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtrs

-

2270

-

... More
Labour for 1 Mtr

-

22

-

... More
b) Material

-

-

-

... More
Sundries.

-

200

-

... More
Cost of Material for 100 Metres

-

19080

-

... More
Cost of Material Rate per Mtr= C/100

-

190

-

... More
Total Cost of Material + Labour Charges

-

213

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

214

-

... More
Supply and Run of 25mm x 3mm copper strip (Cuurrent Carrying Capacity 270A) including cost of all accessories and labour charges etc., complete. (0.663Kgs/1Mtr)

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtrs

-

1392

-

... More
Labour for 1 Mtr

-

13

-

... More
b) Material

-

-

-

... More
Sundries.

-

-

-

... More
Cost of Material for 100 Metres

-

56819

-

... More
Cost of Material Rate per Mtr= C/100

-

568

-

... More
Total Cost of Material + Labour Charges

-

582

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

582

-

... More
Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete. (0.104Kgs/1Mtr)

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 100 Mtrs

-

1030

-

... More
Labour for 1 Mtr

-

10

-

... More
b) Material

-

-

-

... More
Sundries.

-

-

-

... More
Cost of Material for 100 Metres

-

889

-

... More
Cost of Material Rate per Mtr= C/100

-

8

-

... More
Total Cost of Material + Labour Charges

-

19

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

19

-

... More
FIXTURES

-

-

-

... More
Supply, transportation and fixing of of 22W +/ 10%, / 2300 lumens, 1200mm length LED light housing made with aluminum anodised body, wide operating voltage with PF≥0.9, Surge protection: 2KV, THD10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI≥80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. MAKES: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix/HPL/Gold Medal.

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

113

-

... More
b) Material

-

-

-

... More
Supply of 23 / 0060 twin core twisted / flat heavy Copper wire.

-

-

-

... More
Cost of Material for fixing luminaire

-

24

-

... More
Cost of Material

-

824

-

... More
Total Cost of Material + Labour Charges

-

938

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

938

-

... More
36W, 2' x2' (600mm x 600mm) Recessed / Surface mounted LED luminaire

-

-

-

... More
Supply, transportation and fixing 36W, 2' x2' (600mm x 600mm) slim panel LED luminaire Square Housing Made of Aluminum alloy with corrosion resistant powder coat, with acrylic diffuser, Constant current out put of Driver operating voltage range of 150 to 265 Volts AC, Power factor ≥ 0.9 high power LEDs having efficacy of ≥ 100 lumens/watt, junction temperature less than 85 degrees centigrade and THD is less than 12% etc., complete. MAKES: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix/HPL/Gold Medal.

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

95

-

... More
b) Material

-

-

-

... More
Alluminium Flat (As per requirement)

-

50

-

... More
Cost of Material for fixing luminaire

-

73

-

... More
Cost of Material

-

3693

-

... More
Total Cost of Material + Labour Charges

-

3788

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

3788

-

... More
12W Down lighter Recessed / Surface Mounting

-

-

-

... More
Supply, transportation and fixing 12W Down lighter back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor 0.9, Surge protection: 2KV, System efficacy of 100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI 80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. MAKES: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix/HPL/Gold Medal.

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

92

-

... More
b) Material

-

-

-

... More
Cost of Material

-

1604

-

... More
Total Cost of Material + Labour Charges

-

1697

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

1697

-

... More
18W Down lighter Recessed / Surface Mounting

-

-

-

... More
Supply, transportation and fixing 18W Down lighter back lit LED Down Light Recessed / Surface mounting round / square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor 0.9, Surge protection: 2KV, System efficacy of 100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI 80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. MAKES: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix/HPL/Gold Medal.

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

92

-

... More
b) Material

-

-

-

... More
Cost of Material

-

1974

-

... More
Total Cost of Material + Labour Charges

-

2067

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

2067

-

... More
Supply, Transportation and fixing of 60W LED LED High Bay Luminaire with high power COB LED made of pressure diecast aluminum housing with powder coated, Supply Input voltage 120 - 270 V AC, P.F 0.90, high power LED's, System efficacy 100 lm / W and junction temperature 70°C, with Ingress protection IP65, IK05, Driver surge protection 4KV, external Surge protection ≥ 5KV with wide/ Narrow beam optics, THD10% at 110 Volts AC, driver efficiency 90%, CCT: 3000K -5700K, minimum CRI70, etc., complete with BIS certification with warranty 5 years warranty. The contractor must furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. MAKES: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix/HPL/Gold Medal.

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

227

-

... More
b) Material

-

-

-

... More
Supply of 36/0.3mm (2.5 Sqmm) FRLS / HFFR PVC insulated 1100V grade as per IS:694/1990 specification for Copper cable.

-

-

-

... More
Spl. MS Clamps with required fixing arrangements as directed.

-

154

-

... More
M.S flat and welding charges

-

100

-

... More
Cost of Material for fixing luminaire

-

314

-

... More
Cost of Material for 1 No

-

8864

-

... More
Total Cost of Material + Labour Charges

-

9180

-

... More
Add Contractors Profit

-

-

-

... More
Rate per each

-

9180

-

... More
BH/SBH

-

-

-

... More
Supply, transportation and fixing ISI mark batten holder / slanting holder Makes : Anchor / Gold Medal Olive / Million Zoom in lieu of ceiling rose of light point complete with all connections and all labour charges with 5W LED Lamp MAKES: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 1 No

-

34

-

... More
b) Material

-

-

-

... More
Cost of Material

-

119

-

... More
Total Cost of Material + Labour Charges

-

153

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

153

-

... More
Ceiling Fans

-

-

-

... More
Transportation

0.02

56

-

... More
Sub total

-

2881

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

2882

-

... More
Transportation

0.02

60

-

... More
Sub total

-

3060

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

3060

-

... More
Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 1200mm / 1400mm complete with connections. Makes : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T Englaze.

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

25

-

... More
b) Material

-

-

-

... More
Cost of Material for 1 No

-

515

-

... More
Total Cost of Material + Labour Charges

-

540

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

540

-

... More
Labour charges for fixing of ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / HPL / RPG.

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

141

-

... More
b) Material

-

-

-

... More
Cost of Material for fixing fan

-

11

-

... More
Total Cost of Material + Labour Charges

-

153

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

153

-

... More
Supply and erecting 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan complete

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

51

-

... More
b) Material

-

-

-

... More
Cost of Material for fixing fan

-

100

-

... More
Total Cost of Material + Labour Charges

-

151

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

128

-

... More
Transportation

0.02

31

-

... More
Sub total

-

1614

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

1615

-

... More
Supply,Transportation of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades wiremesh with all accessories etc complete Makes : Crompton / Almonard / Havells Turbo Force SP.

-

-

-

... More
Transportation

0.02

62

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

3183

-

... More
Labour charges for fixing the exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG / Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal / Suncab

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

420

-

... More
Cost of Material for fixing fan

-

226

-

... More
Total Cost of Material + Labour Charges

-

646

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

646

-

... More
Supply and fixing of GI louver shutter including GI mesh to avoid birds entry with necessary materials suitable for 300mm(12 inches) Exhaust fan.

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

166

-

... More
Supply and fixing of buzzer Makes : GM / Million / Gold Medal on 4"x4" decolam block including giving connections, cost of all accessories and labour charges etc., complete.

-

-

-

... More
Labour for 1 No

-

56

-

... More
b) Material

-

-

-

... More
Supply of Buzzer.

-

-

-

... More
Cost of Material

-

65

-

... More
Total Cost of Material + Labour Charges

-

121

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

121

-

... More
Supply and fixing of Calling Bell of Makes : GM / Million / Gold Medal on 4"x7" decolam block including giving connections, cost of all accessories and labour charges etc., complete.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 1 No

-

56

-

... More
b) Material

-

-

-

... More
Supply of Calling Bell.

-

-

-

... More
Cost of Material

-

76

-

... More
Total Cost of Material + Labour Charges

-

132

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

132

-

... More
Supply and fixing of Ding Dong Bell Makes : GM / Million / Gold Medal on 4"x7" decolam block including giving connections, cost of all accessories and labour charges etc., complete.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 1 No

-

57

-

... More
b) Material

-

-

-

... More
Supply of Ding Dong Bell.

-

-

-

... More
Cost of Material

-

131

-

... More
Total Cost of Material + Labour Charges

-

188

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

188

-

... More
Supply and fixing of Electronic Musical bell Makes : GM / Million / Gold Medal on 4"x7" decolam block including giving connections, cost of all accessories and labour charges etc., complete.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 1 No

-

59

-

... More
b) Material

-

-

-

... More
Supply of Electronic Musical Bell.

-

-

-

... More
Cost of Material

-

268

-

... More
Total Cost of Material + Labour Charges

-

327

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

327

-

... More
Mirror Lights

-

-

-

... More
Supply, transportation and fixing Supply of 1 x 11W Mirror light with all standard accessories diffuser in lieu of ceiling rose of light point complete with all connections and all labour charges Makes:G.E. Venture / Phillips / Crompton / Bajaj.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 1 No

-

56

-

... More
b) Material

-

-

-

... More
Cost of Material

-

523

-

... More
Total Cost of Material + Labour Charges

-

579

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

579

-

... More
2 feet Tube Lights

-

-

-

... More
Supply, transportation and fixing of 10W, 1000 lumens, 600mm length LED batten tube light, housing made with PC body, wide operating voltage with Single / double side connection, PF≥0.9, Surge protection: 2KV, THD15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI≥80,.etc complete with 5 years warranty with BIS Certification. with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj .

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

113

-

... More
b) Material

-

-

-

... More
Supply of 23 / 0060 twin core twisted / flat heavy Copper wire.

-

-

-

... More
Cost of Material for fixing luminaire

-

24

-

... More
Cost of Material

-

524

-

... More
Total Cost of Material + Labour Charges

-

638

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

638

-

... More
MPCC IN sub-station

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

68.6

... More
Add extra 10 % for wastage

-

-

6.86

... More
Total

-

-

75.45

... More
Incomer & Bus coupler

-

-

-

... More
Out goings

-

-

-

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

94522

-

... More
Hard ware such as base channel etc.

0.02

37809

-

... More
Transportation

0.02

37809

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

94522

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

2155114

-

... More
APFCR panel for 165KVAR in sub-station

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

24.57

... More
Add extra 10 % for wastage

-

-

2.46

... More
Total

-

-

27.03

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

16306

-

... More
Hard ware such as base channel etc.

0.02

6522

-

... More
Transportation

0.02

6522

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

16306

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

371790

-

... More
MC Power panel

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

20.92

... More
Add extra 10 % for wastage

-

-

2.09

... More
Total

-

-

23.01

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

30061

-

... More
Hard ware such as base channel etc.

0.02

12024

-

... More
Transportation

0.02

12024

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

30061

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

685409

-

... More
MC Lighting panel

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

20.92

... More
Add extra 10 % for wastage

-

-

2.09

... More
Total

-

-

23.01

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

30980

-

... More
Hard ware such as base channel etc.

0.02

12392

-

... More
Transportation

0.02

12392

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

30980

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

706345

-

... More
Library HVAC panel

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

20.92

... More
Add extra 10 % for wastage

-

-

2.09

... More
Total

-

-

23.01

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

12005

-

... More
Hard ware such as base channel etc.

0.02

4802

-

... More
Transportation

0.02

4802

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

12005

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

273732

-

... More
Utility Panel

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

20.92

... More
Add extra 10 % for wastage

-

-

2.09

... More
Total

-

-

23.01

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

10634

-

... More
Hard ware such as base channel etc.

0.02

4253

-

... More
Transportation

0.02

4253

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

10634

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

242465

-

... More
Lecture Theater HVAC Panel

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

20.92

... More
Add extra 10 % for wastage

-

-

2.09

... More
Total

-

-

23.01

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

11249

-

... More
Hard ware such as base channel etc.

0.02

4499

-

... More
Transportation

0.02

4499

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

11249

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

256487

-

... More
Boys & Girls Hostel Power Panel

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

20.92

... More
Add extra 10 % for wastage

-

-

2.09

... More
Total

-

-

23.01

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

11471

-

... More
Hard ware such as base channel etc.

0.02

4588

-

... More
Transportation

0.02

4588

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

11471

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

261539

-

... More
Boys & Girls Hostel Lighting Panel

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

20.92

... More
Add extra 10 % for wastage

-

-

2.09

... More
Total

-

-

23.01

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

11134

-

... More
Hard ware such as base channel etc.

0.02

4453

-

... More
Transportation

0.02

4453

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

11134

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

253874

-

... More
Metering Sub-Panel - 1 (TSQ)

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

15.38

... More
Add extra 10 % for wastage

-

-

1.54

... More
Total

-

-

16.92

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

8128

-

... More
Hard ware such as base channel etc.

0.02

3251

-

... More
Transportation

0.02

3251

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

8128

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

185324

-

... More
Metering Sub-Panel - 1 (NTSQ)

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

15.38

... More
Add extra 10 % for wastage

-

-

1.54

... More
Total

-

-

16.92

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

7736

-

... More
Hard ware such as base channel etc.

0.02

3094

-

... More
Transportation

0.02

3094

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

7736

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

176390

-

... More
Metering Sub-Panel - 2 (NTSQ)

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free standing floor mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of suitable rating TPN Aluminium bus bar ( with rating of 0.8A/ Sqmm)supported with DMC /SMC barriers and colour coaded with heat shrinkable sleeves, flexibility to accept the up four out going cables and necessary cable chamber . The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges.

-

-

-

... More
Fabrication:

-

-

-

... More
Horizontal sheets

-

6

-

... More
Sub total

-

-

15.38

... More
Add extra 10 % for wastage

-

-

1.54

... More
Total

-

-

16.92

... More
Metering

-

-

-

... More
Bus bar arrangement with insulators

0.05

6709

-

... More
Hard ware such as base channel etc.

0.02

2683

-

... More
Transportation

0.02

2683

-

... More
Control wiring with flexible wires and MCBs including commissioning and testing etc

0.05

6709

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

152969

-

... More
63A MCCB Switch

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of 63A 4P 25 KA MCCB Switch. The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges. Makes : L&T- D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3VL / Hager-h3/C&S -Winbreak.

-

-

-

... More
Fabrication:

-

-

-

... More
Front and back faces

-

-

2

... More
Sub total

-

-

-

... More
Add extra 10 % for wastage

-

-

-

... More
Total

-

-

-

... More
Incomer & Out goings

-

-

-

... More
Bus bar arrangement with insulators

-

-

-

... More
Hard ware such as base channel etc.

-

-

-

... More
Transportation

0.01

132

-

... More
Control wiring with flexible wires and connections to MCBs with required lugs including commissioning and testing etc

0.01

66

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

13450

-

... More
125A MCCB Switch

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of 125A 4P MCCB Switch. The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges. Makes : L&T- D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3VL / Hager-h3/C&S -Winbreak.

-

-

-

... More
Fabrication:

-

-

-

... More
Front and back faces

-

-

2

... More
Sub total

-

-

-

... More
Add extra 10 % for wastage

-

-

-

... More
Total

-

-

-

... More
Incomer & Out goings

-

-

-

... More
Bus bar arrangement with insulators

-

-

-

... More
Hard ware such as base channel etc.

-

-

-

... More
Transportation

0.01

188

-

... More
Control wiring with flexible wires and connections to MCBs with required lugs including commissioning and testing etc

0.01

94

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

19150

-

... More
250A 4Pole MCCB

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of 250 A 4P MCCB Switch. The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges. Makes : L&T- D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3VL / Hager-h3/C&S -Winbreak.

-

-

-

... More
Fabrication:

-

-

-

... More
Front and back faces

-

-

2

... More
Sub total

-

-

-

... More
Add extra 10 % for wastage

-

-

-

... More
Total

-

-

-

... More
Bus bar arrangement with insulators

-

-

-

... More
Hard ware such as base channel etc.

-

-

-

... More
Transportation

0.01

372

-

... More
Control wiring with flexible wires and connections to MCBs with required lugs including commissioning and testing etc

0.01

186

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

37813

-

... More
400A 4Pole MCCB

-

-

-

... More
Supply installation testing and commissioning of 3 phase and neutral 415V free mounted indoor LT panel made out of No.16/14 gauge CRCA sheet steel after 7 tank process and painting with powder coating. The panel shall consists of 400 A 4P MCCB Switch. The panel shall have comprised of following switch gear . Including supply and fixing the same and painting with powder coating including internal connections cost and conveyance of all materials & labour charges. Makes : L&T- D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3VL / Hager-h3/C&S -Winbreak.

-

-

-

... More
Fabrication:

-

-

-

... More
Front and back faces

-

-

2

... More
Sub total

-

-

-

... More
Add extra 10 % for wastage

-

-

-

... More
Total

-

-

-

... More
Bus bar arrangement with insulators

-

-

-

... More
Hard ware such as base channel etc.

-

-

-

... More
Transportation

0.01

467

-

... More
Control wiring with flexible wires and connections to MCBs with required lugs including commissioning and testing etc

0.01

233

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

47498

-

... More
Supply, Installation, Testing and commissioning of indoor type floor mounted metal clad VCB panel with 3 Nos VCBs, totally enclosed and fully inter locked horizantal draw out , horizantal isolated type breaker as per IS 13118 Specifications and as amended upto date and additional specifications, having capacities mentioned below, single break, trip free mechanism, motorised operated spring / manually charged and auto/manually closed breaker suitable for use on 11KV, 3 Phase, 50 HZ AC supply with short circuit fault level of 350 MVA, complete with self contained, fully inter locked rack in and rack out mechanism, air insulated but encapsulated copper bus bars of 630A capacity, breaker featured with mechanical ON/OFF indicator with hand trip device, spring charging motor, 110V DC closing and tripping coil, safety shutter assembly, shunt trip coil and auxilary switch of 4 NO + 4 NC and equipped with the following switchgears and accessories including connections suitable for XLPE 11 KV cable, cable entry from bottom, end termination with heat shrinkable jointing material etc as required including construction of suitable CC works for VCB's etc complete. Makes:Kirloskar / Schneider / Siemens / ABB INCOMER - 1 No Vaccum circuit breaker electrical drawout type TP 11 KV 630 A not less than 18 KA rated short circuit rating current -1No POTENTIAL TRANSFORMER:1 No. 11000 / 110 Volts PT, Class 1 accuracy, 100 VA burden with HT/LT fuses. CURRENT TRANSFORMER: 3 Nos epoxy resin cast CTs of ratio 100-300/5A, 15VA burden and accuracy class 1.0 for metering and

-

-

-

... More
class 5P10 for protection METERING 1No Digital type Ammeter and selector switch of makes CONZERV/EQVT 1 No digital type Voltmeter with 0-15KV range, slector switch for Voltmeter of makes CONZERV/EQVT 1No Digital Multifunction meter of makes CONZERV/EQVT Heater ON/OFF switch with space heater and thermostat, single phase switch with socket cubical lamp for panel illunmination with door limit switch ,MCB's for AC & DC control. LED indication lamps for breaker on, breaker off, spring charge indication, trip ciruit healthy with push button, Auto trip indication meter, Auxilary contact for service test position (4No + 4 NC) service and test positions and R/Y/B indication lamps. PROTECTION: 1 Nos. Microprocessor based IDMTL 3 over current and 1 earth fault relay with Over current, earth fault and short circuit protection. High speed tripping relay ANNUNCIATION: 8 Window annunciation panel with push buttons and hooters. POWER PACK: Supply, Installation, testing and commissioning of Power pack with 230V input and 110V DC continuous output suitable for closing / tripping / indication of 3 Nos VCBs with 2.5sqmm FRLS copper cable etc as required. OUTGOINGS - 2 Nos 630A VCBs draw out type TP 11 KV 630 A not less than 16 KA rated short circuit rating current. Each breaker shall consist the following. CURRENT TRANSFORMER: Epoxy resin cast CTs of ratio 300/5A, 15VA burden and accuracy class 1.0 for metering and class 5P10 for protection - 3 Nos Digital type Ammeter and selector switch - 1 NoMakes : CONZERV / EQVT Digital Multifunction meter - 1 No Makes: CONZERV / EQVT PROTECTION : Microprocessor based IDMTL

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1397550

-

... More
Transformer

-

-

-

... More
Supply, Transportation, Erection and Comissioning of 500 KVA 3 Phase, 50 Hz, oil immersed and naturally cooled, outdoor type copper wound transformer designed and manufactured as per IS 1180 (Part 1):2014 and 1st filling of oil, connected delta on primary side and Star on secondary side with additional neutral brought out on load side, 1100V / (433V / 415V) with HV tapping + or - 2.5% contineously rated for full load and temporature rise not exceeding 50°C in oil and 55°C rise by the resistance of the winding after contineous run on full load rating complete with the following standard mountings.

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1273388

-

... More
Supply, Transportation, erection and commissioning (Excluding Foundation) of 500KVA, 3 Phase, 415, 50Hz, 580BHP, water cooled multi cylinder diesel generator set with alternator of 500KVA out put continous rating at 0.8 p.f, and Batteries with alternator of 400 KW out put continuous rating directly coupled Engine and Alternator with guard and mounted on a common base plate of Robust construction and complete with AMF panel having IP-52 protection, Acoustic Enclosure as per CPCB norms , sound absorbing material to restrict sound level up to 75 dB up to 1 Mtr distance and as per CPCB norms etc as per following specifications mentioned below.

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

4305263

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

130000

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

4600

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

7000

-

... More
HT Cable

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1258

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

10225

-

... More
Supply, Fabrication, Transportation and erection of DP structure made with 2 Nos 175mm x 85mm ( ISMB Modified ) or equivalent about 30'-0 length / 9.1 Mtrs length RS joist pole erection of the same Including excavation of pit in all kinds of soil including breaking stones, concreting with (1:3:6) mixture base plate, coil earthing back filling, 1:2:4 for coping including red oxide primary painting and two coats of aluminium painting etc., complete as required with following as per CEIG norms.

-

-

-

... More
a). 400A AB Switch-1No b) HG Fuse sets-1No c). LAS-1set. d) Required Number of 11KV pin and disc insulators. e) Required length of 100X50mm and 75X40 mm ISMC channel iron including two coats of red oxide and two coats of enamel paint etc for finished item of work. f) 11KV pin insulators and disc insulators. g) AB switch operating pipe with handle and lock and key arrangements. h). "0" SWG or 8.25 mm dia hard drawn bare copper wire including copper binding wire etc., complete as required including connections. i) 40X6mm GI strip for the DP structure earthing. j) 25X6mm copper strip for lightning arrestors earthing. k) 600X600mmX3,15mm thick copperplate earthing as per NEC with brick masonry chambers - 2 Nos l) GI pipe earthing for the Double pole structure with brick masonry chambers as per IS - 2 Nos

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

139755

-

... More
Rate per Meter

-

1779

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1779

-

... More
U.G Cables

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

214

-

... More
Rate per Meter

-

214

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

326

-

... More
Rate per Meter

-

326

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

431

-

... More
Rate per Meter

-

431

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

556

-

... More
Rate per Meter

-

556

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

888

-

... More
Rate per Meter

-

888

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1235

-

... More
Rate per Meter

-

1235

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1567

-

... More
Rate per Meter

-

1567

-

... More
Add Contractors Profit

-

-

282

... More
Hence Rate allowed

-

1914

-

... More
Rate per Meter

-

1914

-

... More
Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables from 95 Sqmm up to 400 sqmm covering the cable with bricks and back filling of Trench duly providing route indicator at every 8 Mtrs distance embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for 100 Mtrs

-

4945

-

... More
Labour Charges for 1 Mtr

-

49

-

... More
a) Material

-

-

-

... More
Cost of Material for laying of cable in trench for

100

17470

-

... More
Cost of Material for laying of cable in trench for

1

174

-

... More
Total Cost of Material + Labour Charges

-

224

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

224

-

... More
Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables up to 70 sqmm covering the cable with back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for 100 Mtrs

-

3904

-

... More
Labour Charges for 1 Mtr

-

39

-

... More
a) Material

-

-

-

... More
Cost of Material for laying of cable in trench for

100

17470

-

... More
Cost of Material for laying of cable in trench for

1

174

-

... More
Total Cost of Material + Labour Charges

-

213

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

213

-

... More
Laying of PVC armoured under ground cable from 95 Sq.mm to 400 Sqmm fixing on chromium plated metallic base saddles on wall as per IS 1255 and as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for 100 Mtrs

-

2114

-

... More
Labour Charges for 1 Mtr

-

21

-

... More
a) Material

-

-

-

... More
Total Cost of Material + Labour Charges

-

41

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

41

-

... More
Laying of PVC armoured under ground cable up to 70 Sqmm fixing on chromium plated metallic base saddles on wall as per IS 1255 and as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for 100 Mtrs

-

2114

-

... More
Labour Charges for 1 Mtr

-

21

-

... More
a) Material

-

-

-

... More
Cost of Material for Laying on wall for

1

18

-

... More
Total Cost of Material + Labour Charges

-

40

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Meter

-

40

-

... More
Cable Terminations:

-

-

-

... More
Termination of UG cables of 4 core 10 sq.mm & 4 core 16 sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for each

-

37

-

... More
a) Material

-

-

-

... More
Total Cost of Material + Labour Charges

-

217

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

217

-

... More
Termination of UG cables of 3.5 core 35 Sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for each

-

37

-

... More
a) Material

-

-

-

... More
Total Cost of Material + Labour Charges

-

288

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

288

-

... More
Termination of UG cables of 3.5 core 50 Sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for each

-

116

-

... More
a) Material

-

-

-

... More
Total Cost of Material + Labour Charges

-

376

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

376

-

... More
Termination of UG cables of 3.5 core 70 Sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for each

-

38

-

... More
a) Material

-

-

-

... More
Total Cost of Material + Labour Charges

-

412

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

412

-

... More
Termination of UG cables of 3.5 core 120 Sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for each

-

54

-

... More
a) Material

-

-

-

... More
Total Cost of Material + Labour Charges

-

659

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

659

-

... More
Termination of UG cables of 3.5 core 185 Sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for each

-

105

-

... More
a) Material

-

-

-

... More
Total Cost of Material + Labour Charges

-

898

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

898

-

... More
Termination of UG cables of 3.5 core 240 Sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for each

-

105

-

... More
a) Material

-

-

-

... More
Total Cost of Material + Labour Charges

-

1090

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

1090

-

... More
Termination of UG cables of 3.5 core 300 Sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for each

-

105

-

... More
a) Material

-

-

-

... More
Total Cost of Material + Labour Charges

-

1360

-

... More
Add Contractors Profit

-

-

-

... More
Rate per Each

-

1360

-

... More
Add 30% Extra for Perforated cable tray with cover on below rates.

0.3

83

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

361

-

... More
Add 30% Extra for Perforated cable tray with cover on below rates.

0.3

142

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

619

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

852

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1008

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

972

-

... More
Supply, instalation, testing and commisioning of ........Amp, KA breaking capacity (100% Neutral busbar) air insulated compact Raising mains/Bus Duct system made of CRCA sheet/Hot Galvanized steel encloser of thickness not less than 0.8 mm having degree of protection of IP 55 as per IEC/EN 61439-6, PVC/Plastic insulated reinforced with glass fibre four strip ALUMINIUM busbar in convinent sections including necessary end cover units suitable for 415 volts 3 phase, 4 wire, 50 Hz A.C. System,etc.,with necessary joints Fire barrrier at each floor Provision of tapping at each floor/every meter,continuous earthing with 2 nos alluminium strip of suitable size (one on each side0 including GI clamping brackets,angle iron brackets,steel fastners,connecting to earth system as required . Makes: Legrand (Zucchini) / C&S

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

9261

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

10920

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

5250

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

10500

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

11970

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

12390

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

32705

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

25981

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

8978

-

... More
Supply , fabrication and transportation of MS channel iron/ angle iron /flats including two coats of alluminium paint and one coat of red oxide paint including all labour charges etc complete.

-

-

-

... More
TOTAL

-

104

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

104

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

245

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

4095

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

499

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

247

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1155

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

284

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1309

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

40000

-

... More
Supply and Transportation of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II etc., complete by making trench in all soils up to 0.90Mtr deep and back filling the exacavated earth without stones and making the surface proper with 15cm crown on the top and as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

-

-

-

... More
Makes:DURA LINE (Dura Guard) or its equivalent

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour Charges for 60 Mtrs

-

3544

-

... More
Labour Charges for 1 Mtr

-

59

-

... More
a) Material

-

-

-

... More
Cost of Material for 100 Mtrs

-

10914

-

... More
Cost of Material for 1 Mtr

-

109

-

... More
Supply and Transportation of Outer dia 63mm and Inner dia 51mm double walled corrugated HDPE duct made as per specification BSEN - 500 86/IS 14930 Part-II with all accessories like couplers, bends, end caps, Ts etc., complete.

-

-

-

... More
Cost of Material for 1 Mtr

-

226

-

... More
Total Cost of Material + Labour Charges

-

285

-

... More
Add Contractors Profit

-

38

-

... More
Hence Rate allowed

-

324

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

472

-

... More
Telephone

-

-

-

... More
Supply and fixing of Modular telephone Jack with connector on modular box with cover frame Makes : Legrand Myrius / Million Tap-Wood / Gold Medal Curve / Anchor Roma viola / GM Four-Five / Havells Fabio / C&S Prime / CPL Vysma / Benlo Vesta / Polycab Levana in existing consealed pipe wiring including cost and coveyance of all material and all labour charges etc., complete in N.R.B. / R.B.

-

-

-

... More
a) Labour charges :

-

-

-

... More
Labour for 1 No

-

28

-

... More
b) Material

-

-

-

... More
Supply of 1 or 2 Modular Cover Frame

-

-

-

... More
Supply of Modular socket type Telephone jack with Connector.

-

-

-

... More
Cost of Material

-

195

-

... More
Total Cost of Material + Labour Charges

-

223

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

223

-

... More
Supply, Transportation and Run of 1 of 2 Pair, 0.5mm telephone copper wire Makes : Finolex / Delton / Surabi / Polycab in the existing cable tray/ conduit pipe and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 100 Mtrs

-

1082

-

... More
Labour for 1 Mtr

-

10

-

... More
a) Material

-

-

-

... More
Supply of 2 Pair, 0.5mm telephone copper

-

-

-

... More
Cost of Material for 100 Mtrs

-

910

-

... More
Cost of Material for 1 Mtrs

-

9

-

... More
Total Cost of Material + Labour Charges

-

19

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

20

-

... More
Supply, Transportation and Run of 5 Pair telephone copper wire Makes :Finolex / Delton / Surabi / Polycab in the existing cable tray/ conduit pipe and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 100 Mtrs

-

1082

-

... More
Labour for 1 Mtr

-

10

-

... More
a) Material

-

-

-

... More
Supply of 5 Pair telephone copper wire

-

-

-

... More
Cost of Material for 100 Mtrs

-

2540

-

... More
Cost of Material for 1 Mtrs

-

25

-

... More
Total Cost of Material + Labour Charges

-

36

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

36

-

... More
Supply, Transportation and Run of 1 of 10 Pair, 0.5mm telephone copper wire Makes :Finolex / Delton / Surabi / Polycab in the existing cable tray/ conduit pipe and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 100 Mtrs

-

1340

-

... More
Labour for 1 Mtr

-

13

-

... More
a) Material

-

-

-

... More
Supply of 10 Pair telephone Copper wire. (ELEC.-8.1.15)

-

-

-

... More
Cost of Material for 1 Mtrs

-

36

-

... More
Total Cost of Material + Labour Charges

-

49

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

49

-

... More
Supply, Transportation and Run of 1 of 20 Pair, 0.5mm telephone copper wire Makes :Finolex / Delton / Surabi / Polycab in the existing cable tray/ conduit pipe and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 100 Mtrs

-

1464

-

... More
Labour for 1 Mtr

-

14

-

... More
a) Material

-

-

-

... More
Supply of 20 Pair telephone Copper wire .(ELEC-8.1.16)

-

-

-

... More
Cost of Material for 1 Mtrs

-

70

-

... More
Total Cost of Material + Labour Charges

-

84

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

85

-

... More
Supply, Transportation and Run of 1 of 50 Pair, 0.5mm telephone copper wireMakes :Finolex / Delton / Surabi / Polycab in the existing cable tray/ conduit pipe and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 100 Mtrs

-

1650

-

... More
Labour for 1 Mtr

-

16

-

... More
a) Material

-

-

-

... More
Supply of 50 Pair telephone Copper wire .

-

-

-

... More
Cost of Material for 1 Mtrs

-

175

-

... More
Total Cost of Material + Labour Charges

-

191

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

192

-

... More
Supply, Transportation and Run of 1 of 100 Pair, 0.5mm telephone copper wireMakes : Finolex / Delton / Surabi / Polycab. in the existing cable tray/ conduit pipe and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 100 Mtrs

-

1774

-

... More
Labour for 1 Mtr

-

17

-

... More
a) Material

-

-

-

... More
Cost of Material for 1 Mtrs

-

350

-

... More
Total Cost of Material + Labour Charges

-

367

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

368

-

... More
Supply, Transportation and Fixing of 10 pair MDF/ Telephone distribution box with back mount frame, krone connector, powder coated metal body of best quality and make as directed with lock and key arrangement including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

121

-

... More
a) Material

-

-

-

... More
Cost of Material for 1 Mtrs

-

639

-

... More
Total Cost of Material + Labour Charges

-

760

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

760

-

... More
Supply, Transportation and Fixing of 20 pair Telephone distribution box with back mount frame, krone connector, powder coated metal body with lock and key arrangement including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

124

-

... More
a) Material

-

-

-

... More
Cost of Material for 1 Mtrs

-

970

-

... More
Total Cost of Material + Labour Charges

-

1094

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

1094

-

... More
Supply, Transportation and Fixing of 50 pair Telephone distribution box with back mount frame, krone connector, powder coated metal body with lock and key arrangement including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

124

-

... More
a) Material

-

-

-

... More
Cost of Material for 1 Mtrs

-

2041

-

... More
Total Cost of Material + Labour Charges

-

2165

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

2165

-

... More
Supply, Transportation and Fixing of 100 pair Telephone distribution box with back mount frame, krone connector, powder coated metal body with lock and key arrangement including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

170

-

... More
a) Material

-

-

-

... More
Supply of 100 pair MDF loaded with 2/10 Modular.

-

-

-

... More
sundries

-

30

-

... More
Cost of Material for 1 Mtrs

-

3330

-

... More
Total Cost of Material + Labour Charges

-

3500

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

3500

-

... More
Supply, Transportation and Fixing of 200 pair Telephone distribution box with back mount frame, krone connector, powder coated metal body with lock and key arrangement including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

392

-

... More
a) Material

-

-

-

... More
sundries

-

23

-

... More
Cost of Material for 1 Mtrs

-

7023

-

... More
Total Cost of Material + Labour Charges

-

7415

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

7415

-

... More
Large (EPABX) System

-

-

-

... More
Supply, Installation, Testing and Commissioning of IP Based digtal Telephone (EPABX) system--complied with following specifications: IP @ Core, PCM/TDM switching, Non blocking, Must Support PRI, E1, Analog Junctions Must Support PC Console, Must support Mobile SIP (Android and I O.S) Must support Voice Mail Must support Card based GSM Inbuilt Call Details Software with search engine software 8 Analog Trunks 8 Digital Extensions 96 Analog Extensions 1 Digital Key Phone with minimum 16 Keys (Must work only on 2 wires) Expandable to 220 Ports wired or more at extra cost Approved Brands: NEC/ Alcatel/ Karel/ Unify

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

238665

-

... More
Supply installation testing and commissioning of Push Button type Telephone Instruments of makes: Panasonic: Mofel:TS500.

-

-

-

... More
Installation and commissioning charges @ 5 % on basic price

0.05

25

-

... More
Transportation charges @ 2 % on basic price

0.02

10

-

... More
TOTAL:

-

535

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

535

-

... More
LAN Networking System

-

-

-

... More
Supply, Transportation and Run of 1 of LAN Cable cat - 6 UTP cable Makes : D Link / AMP / Molex / Legrand / Krone.in the existing cable tray/ conduit pipe and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 100 Mtrs

-

1211

-

... More
Labour for 1 Mtr

-

12

-

... More
a) Material

-

-

-

... More
Supply of LAN Cable cat - 6 UTP cable.

-

-

-

... More
Cost of Material for 100 Mtrs

-

2100

-

... More
Cost of Material for 1 Mtrs

-

21

-

... More
Total Cost of Material + Labour Charges

-

33

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

33

-

... More
Supply, Transportation and Fixing of Cat 6 RJ-45 information outlets Makes : D Link / AMP / Molex / Legrand / Krone.including duel face plate including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

110

-

... More
a) Material

-

-

-

... More
Supply of Cat 6 RJ-45 information outlets including duel face plate.

-

-

-

... More
Cost of Material for 1 Mtrs

-

305

-

... More
Total Cost of Material + Labour Charges

-

415

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

416

-

... More
Supply of 7 feet length moulded patch cord Makes : D Link / AMP / Molex / Legrand / Krone.

-

-

-

... More
Cost of Material for 1

-

200

-

... More
Total Cost of Material + Labour Charges

-

200

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

202

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

202

-

... More
Supply of 3 feet length moulded patch cord Makes : D Link / AMP / Molex / Legrand / Krone.

-

-

-

... More
Cost of Material for 1

-

180

-

... More
Total Cost of Material + Labour Charges

-

180

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

181

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

181

-

... More
Supply, Transportation and Fixing of 24 Port manageble switches Makes : CISCO / Net Gear / HP / D link. including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

406

-

... More
a) Material

-

-

-

... More
Supply of 24 Port manageble switches.

-

-

-

... More
Cost of Material for 1

-

6000

-

... More
Total Cost of Material + Labour Charges

-

6406

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

6406

-

... More
Supply, Transportation and Fixing of 19" 6U floor / Wall mounting net work rack Makes : HCL / Vall with power spike including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

389

-

... More
a) Material

-

-

-

... More
Supply of 6U floor / Wall mounting net work rack with power spike including all accessories.

-

-

-

... More
Cost of Material for 1

-

5555

-

... More
Total Cost of Material + Labour Charges

-

5944

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

5945

-

... More
Supply, Transportation and Fixing of 19" 12U floor / Wall mounting net work rack Makes : HCL / Vall with power spike including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

408

-

... More
a) Material

-

-

-

... More
Supply of 12U floor / Wall mounting net work rack with power spike including all accessories.

-

-

-

... More
Cost of Material for 1

-

7671

-

... More
Total Cost of Material + Labour Charges

-

8079

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

8079

-

... More
Supply, Transportation and Fixing of 19" 42U floor / Wall mounting net work rack Makes : HCL / Vall with power spike including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

479

-

... More
a) Material

-

-

-

... More
Supply of 42U floor / Wall mounting net work rack with power spike including all accessories.

-

-

-

... More
Cost of Material for 1

-

63360

-

... More
Total Cost of Material + Labour Charges

-

63839

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

63840

-

... More
Supply, Transportation and Fixing of 24 port patch panels Makes : D Link / AMP / Molex / Legrand / Krone. including all accessories and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 1 Mtr

-

392

-

... More
a) Material

-

-

-

... More
Supply of 24 port patch panels.

-

-

-

... More
sundries

-

12

-

... More
Cost of Material for 1 Mtrs

-

5812

-

... More
Total Cost of Material + Labour Charges

-

6204

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

6205

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

6205

-

... More
Certificate, Testing and Documentation etc., of each LAN Point complete.

-

-

-

... More
Supply, Transportation and Run of 1 of RG6 Co-axial Cable Makes : Finolex / Delton / Surabi / Polycab for TVs in the existing cable tray/ conduit pipe and labour charges etc., complete.

-

-

-

... More
b) Labour charges

-

-

-

... More
Labour for 100 Mtrs

-

1340

-

... More
Labour for 1 Mtr

-

13

-

... More
a) Material

-

-

-

... More
Supply of RG6 Co-axial Cable for TVs . (MR)

-

-

-

... More
Cost of Material for 1 Mtrs

-

17

-

... More
Total Cost of Material + Labour Charges

-

30

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

30

-

... More
Supply,Installation,Testing & Commissioining of IP IR Dome Camera (2 MP Series), 2MP Network IR Dome Camera Max. 2megapixel (1920 x 1080) resolution,0.095Lux (Color), 0Lux (B/W, IR LED on), 3.2 ~ 10mm (3.1x) varifocal lens,Max. 30fps@2M all resolutions (H.265/H.264)H.265, H.264, MJPEG codec supported, Multiple streaming,Motion detection, Tampering, Defocus detection,Hallway view (90˚/270˚), LDC support,Micro SD/SDHC/SDXC memory slot (Max. 128GB),IR viewable length 20m,PoE/12VDC UL Certified Dome Camera. Make Sumsung Model:QND-6072D or its equivalent Specification of Makes Honeywell / Sony /Panasonic.

-

-

-

... More
Installation and commissioning charges @ 5 % on basic price

0.05

855

-

... More
Transportation charges @ 2 % on basic price

0.02

342

-

... More
Supply,Installation,Testing & Commissioining of IP IR Bullet Camera (2 MP Series), 2MP Network IR Bullet Camera 2megapixel (1920 x 1080) resolution,0.1Lux (Color), 0Lux (B/W, IR LED on),2.8mm fixed lens Max. 30fps@2M all resolutions (H.265/H.264) H.265, H.264, MJPEG codec supported, Multiple streaming,Motion detection, Tampering, Defocus detection, Hallway view (90˚/270˚), LDC support Micro SD/SDHC/SDXC memory slot (Max. 128GB) IR viewable length 20m/25m/ 30m,IP66, IK10, PoE, 12VDC UL Listed Bullet Camera Make: Samsung Model QNO-6012R or its equivalent Specification of makes Honeywell / Sony /Panasonic.

-

-

-

... More
Installation and commissioning charges @ 5 % on basic price

0.05

855

-

... More
Transportation charges @ 2 % on basic price

0.02

342

-

... More
Supply,Installation,Testing & Commissioining of IP IR PTZ Camera- 12M 32x Network PTZ Dome Camera Max. 2megapixel (1920 x 1080) resolution,4.44 ~ 142.6mm (Optical 32x) lens,Max. IR viewable length : 200m (656ft),Day & Night (ICR), WDR (150dB), DIS (Built-in gyro sensor),Intelligent Video / Audio Analytics, Shock detection,Azimuth display (Cardinal & intermediate directions),Multiple streaming, WiseStream II support H.265, H.264, MJPEG codec support MicroSD / SDHC / SDXC memory 2 slots (Up to 512 GB) IP66, IK10 UL Certifed PTZ Camera along with pole/wallmount bracket. Make: Samsung Model:XNP6320H orits equivalent Specification of makes Honeywell / Sony /Panasonic.

-

-

-

... More
Installation and commissioning charges @ 5 % on basic price

0.05

855

-

... More
Transportation charges @ 2 % on basic price

0.02

342

-

... More
Supply, installation,Testing and Comissioning of 32 channel NVR (Network Video Recorder) Max. 12MP Camera supported,256Mbps network camera recording,Support 4K video out on HDMI monitor,Support Dual monitor video out,Support H.265, H.264, MJPEG compression, Wise Stream support, Max. 8 internal HDDs (48TB), e-SATA / iSCSI storage support, Support RAID 5 Easy installation with front swap hard disks ARB & Failover (N+1) support, UL Cerfified NVR. Make:Samsung Model:XRN-2010 or its equivalent Specification of makes Honeywell / Sony /Panasonic.

-

-

-

... More
Installation and commissioning charges @ 5 % on basic price

0.05

9025

-

... More
Transportation charges @ 2 % on basic price

0.02

3610

-

... More
Supply and fixing of Surveillance HDD-4 TB Make-Sea gate/Hitachi/TOSHIBA

-

-

-

... More
Installation and commissioning charges @ 5 % on basic price

0.05

855

-

... More
Transportation charges @ 2 % on basic price

0.02

342

-

... More
Supply and installation of 4K UHD , 55” LED Display complete Make- Samsung QB55R with following Specifications : a) Diagonal Size 55" b)Type Edge LED BLU. c) Resolution 3840*2160 (4K UHD) d) Pixel Pitch(mm)0.105 x 0.315. e) Active Display Area(mm)1209.6(H) x 680.4(V) f) Brightness(Typ.) 350 nit. g) Contrast Ratio 4000:1.

-

-

-

... More
Installation and commissioning charges @ 5 % on basic price

0.05

4450

-

... More
Transportation charges @ 2 % on basic price

0.02

1780

-

... More
Supply and fixing of 8 PoE 10/100/1000 ports + 4 Gigabit SFP ports Web Smart Switch- Make-D-Link Model No.DGS1210-8P or its Equivalent make

-

-

-

... More
Installation and commissioning charges @ 5 % on basic price

0.05

1140

-

... More
Transportation charges @ 2 % on basic price

0.02

456

-

... More
Street Lights

-

-

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

12600

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

111300

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

4305

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

5618

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

4967

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

29505

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

23891

-

... More
Supply and fixing of suitable out door feeder piller box of size 3' x 2' x 1' made with 14 SWG CRCA sheet with double door arrangement, making powder coating after processing of 7 Tank process, lock and key, hinges, rubber gasket, danger board,suitable angle iron stand for mounting the feeder pillar with cement concrete, including Supply and fixing of Legrand / Schnieder make 63A, 4 Pole isolator as incomer, 6 Nos 6-32A SP MCBs as out goings. indication lamps, din channel, 6 Sqmm 3 core copper cable for invidual light control, connectors, gland plates and provision for 3 phase energy meter etc., complete for finished item of work and suitable wiring provision for connecting the nature switch with following.(for street light control) (ELEC-7.5.1 b (ii))

-

-

-

... More
Fabrication:

-

-

-

... More
Front and back faces

-

-

2

... More
Sub total

-

-

-

... More
Add extra 10 % for wastage

-

-

-

... More
Total

-

-

-

... More
Incomer.

-

-

-

... More
Out goings

-

-

-

... More
Bus bar arrangement with insulators

0.05

821

-

... More
Hard ware such as base channel etc.

0.08

1281

-

... More
Transportation

0.01

164

-

... More
Control wiring with flexible wires and connections to MCBs with required lugs including commissioning and testing etc

0.05

821

-

... More
TOTAL COST OF MATERIAL AND LABOUR

-

19513

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

14175

-

... More
Supply and transportation & Fixing of 65W LED Street light Body made of high grade pressure die – cast Aluminum alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, universal Voltage 100 - 270 V AC, P.F, ≥ 0.90, high power LED's having efficacy ≥120 lumens/watt, and junction temperature 75°C, with Ingress protection IP66, Driver surge protection 4KV, with optics distribution Type II medium, THD10% at 110 Volts AC, driver efficiency ≥90%, CCT: 5600K, minimum CRI≥80, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, Intelligent pole mounting option provides flexibility of vertical or horizontal pole mounting option complete, with Top Openable Maintenance and Manufacture has to submit LM79,LM80 & Photobiological Safety Report. Luminaire Performance Complies to IS10322 (Part 5/Sec 3) & IEC 60598-1,IEC 60529 and ISO certified company fixed on the bracket of the pole complete with required 3 runs 2.50 Sq.mm round/flat copper cable wire leads complete with connections as directed. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA /

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

412

-

... More
b) Material

-

-

-

... More
Cost of Material for fixing luminaire

-

1092

-

... More
LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA /

-

-

-

... More
Cost of Material for 1 No

-

6792

-

... More
Total Cost of Material + Labour Charges

-

7204

-

... More
Hence Rate allowed

-

8249

-

... More
Supply and transportation & Fixing of 120W LED Flood light Luminaire made of pressure die cast aluminum housing with powder coated, having toughened glass cover,IP 65/66 (Silicon gasket ensures Optical & Electrical compartments are IP 66 )protected, input voltage range of 100 to 270 volts AC,power factor ≥ 0.90, high power LED's having efficacy 120 lumens/watt and junction temperature 85 degree centigrade of IP65 with optics, total harmonic distortion less than 10% at 110 Volts AC, driver efficiency ≥90% etc complete with 5 years warranty fixed on the existing bracket complete with required 3 runs 2.50 Sq.mm round/flat copper cable wire leads complete with connections as directed. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA. MAKE : PHILIPS LUMILEDS / CREE / NICHIA /

-

-

-

... More
a) Labour charges

-

-

-

... More
Labour for 1 No

-

825

-

... More
b) Material

-

-

-

... More
Cost of Material for fixing luminaire

-

2730

-

... More
LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA. MAKE : PHILIPS LUMILEDS / CREE / NICHIA /

-

-

-

... More
Cost of Material for 1 No

-

12674

-

... More
Total Cost of Material + Labour Charges

-

16229

-

... More
Add Contractors Profit

-

2353

-

... More
Hence Rate allowed

-

18582

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

10364

-

... More
Airconditioners

-

-

-

... More
Supply and Transportation of INVERTER Model Cool type split AC unit with high wall mounted Single Split 100% copper indoor and outdoor condensing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with warranty of compressor for 5 years including servicing.

-

-

-

... More
( 1.5 TR 3 STAR)

-

-

-

... More
a) 1.5 Ton ( 3 STAR) Make: Carrier / Daikin / Blue Star / Hitachi

-

-

-

... More
Transportation @ 2%

-

796

-

... More
LS for Hard ware etc.,

-

-

-

... More
Rate per each

-

42243

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

42244

-

... More
( 1.8 / 2.0 TR 3 STAR)

-

-

-

... More
a) 1.8 / 2.0 Ton (2-3 STAR) makes Daikin / Thoshiba / O General / Carrier / Blue Star / Hitachi

-

-

-

... More
Transportation @ 2%

-

1190

-

... More
LS for Hard ware etc.,

-

-

-

... More
Rate per each

-

62325

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

62326

-

... More
Rate per Each

-

62326

-

... More
Stabilizers

-

-

-

... More
Supply and erecting fully automatic line voltage stabilizer for operation on input voltage 200 to 250V. rated for 4 KVA maximum load and time delay model with Volt meter, selector switch, 6A / 16A flush type, 5 pin socket for out put and with 3 core flexible chord and 3 pin 6/16A plug top suitable for refrigerator for continuous operation including cost and conveyance of all mateials and all labour charges etc., complete. Makes : V-Guard / Real Guard / Uni Stab / ITL.

-

-

-

... More
a) Material

-

-

-

... More
b) Labour Charges

-

-

-

... More
Transportation Charges on Unit Cost

0.02

50

-

... More
Rate per Each

-

2658

-

... More
Add Contractors Profit

0.14

361

-

... More
Hence Rate allowed

-

3020

-

... More
Supply and erecting fully automatic line voltage stabilizer for operation on input voltage 200 to 250V. rated for 5 KVA maximum load and time delay model with Volt meter, selector switch, 6A / 16A flush type, 5 pin socket for out put and with 3 core flexible chord and 3 pin 6/16A plug top suitable for refrigerator for continuous operation including cost and conveyance of all mateials and all labour charges etc., complete. Makes : V-Guard / Real Guard / Uni Stab / ITL.

-

-

-

... More
a) Material

-

-

-

... More
b) Labour Charges

-

-

-

... More
Transportation Charges on Unit Cost

0.02

60

-

... More
Rate per Each

-

3168

-

... More
Add Contractors Profit

-

-

-

... More
Hence Rate allowed

-

3168

-

... More
Ductable HVAC

-

-

-

... More
Supply, Errection, Testing and Commissioning of Ductable Split Airconditioners with scroll compressor (multiple numbers) including electrical panel with scanner for phase sequence under voltage, over and single phase preventor ON / OFF indicators for compressor and initial charges of Refrigerant gas and oil as required and MS structural work for supporting air cooled condensors. on wall / flooring.and PVC drain piping for the units . Make : Daikin/ Blue Star / Mitsubhishi/Carrier/ Hitachi.

-

-

-

... More
Errection, Testing and Commissioning of Ductable Split Air Conditioners with intial charging of refrigerant for filling in pipe line Gas and MS structural work for supporting air cooled condensors. on wall / flooring.and PVC drain piping for the units .

-

-

-

... More
Providing 2 runs of Copper tubes for suction and liquid between indoor and outdoor unit for split/Casseete Air- Conditioner including foaming etc., complete.

-

-

-

... More
Add Contractors Profit

0.14

216

-

... More
Hence Rate allowed

-

1806

-

... More
Fresh air intake GI louvers with bird screen.

-

-

-

... More
Supply, Factory fabrication, Transportation and errection of guage GI sheet Rectangular ducting complete with neoprene rubber gaskets, Elbows, sheet metal / Angle iron / C-cleats as required, G.I.fasteners, bolts, nuts and washers, guide vanes as required, supports shall be galvanised threaded rods etc complete.Makes : Tata / Zindal

-

-

-

... More
Add Contractors Profit

0.14

127

-

... More
Hence Rate allowed

-

1064

-

... More
Supply, Factory fabrication, Transportation and errection of guage GI sheet Rectangular ducting complete with neoprene rubber gaskets, Elbows, sheet metal / Angle iron / C-cleats as required, G.I.fasteners, bolts, nuts and washers, guide vanes as required, supports shall be galvanised threaded rods etc complete.Makes : Tata / Zindal

-

-

-

... More
Add Contractors Profit

0.14

153

-

... More
Hence Rate allowed

-

1284

-

... More
Supply, installation and testing of Canvas connection for the Treated Fresh Air units to the duct & Indoor unit to Ducts

-

-

-

... More
Supply and fixing of 25mm thickness closed cell nitrile rubber (Class O) insulation on existing duct after applying 2 coats of cold setting adhesive (CPRX Compound). The joints shall be sealed with 50mm wide and 3mm thick self adhesive nitrile rubber tape insulation complete as per specifications.

-

-

-

... More
Add Contractors Profit

0.14

168

-

... More
Hence Rate allowed

-

1407

-

... More
Supply and fixing of 25 mm thickness closed cell nitrile rubber (Class O) insulation on existing duct after applying 2 coats of cold setting adhesive (CPRX Compound). The joints shall be sealed with 50mm wide and 3mm thick self adhesive nitrile rubber tape insulation complete with star bond coating and covered with 24 guage alluminium cladding as per specifications for out door applications.

-

-

-

... More
Add Contractors Profit

0.14

198

-

... More
Hence Rate allowed

-

1655

-

... More
Supply and fixing of alluminium powder coated supply air grill with volume control dampers.

-

-

-

... More
Add Contractors Profit

0.14

936

-

... More
Hence Rate allowed

-

7815

-

... More
Supply and fixing of collar dampers

-

-

-

... More
Hence Rate allowed

-

3540

-

... More
Supply and fixing of fire dampers

-

-

-

... More
Hence Rate allowed

-

6750

-

... More
Supply and Fixing of Condenser stand for Ductable machines etc., complete.

-

-

-

... More
Supplying, installation, commissioning, testing, putting into operation and handing over of 20 Persons Passenger Lift (1360 Kgs) with following specifications. Make : Kone / OTIS / Johnson / Schindler / MITSUBISHI.

-

-

-

... More
LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille Code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings Lift controller based on microprocessor/ PLC with VVVF Drive having closed loop control system, with IBMS compatible having necessary port, control panel duly wired with proper size & strength copper wire for power & control circuit, with provision for addition of floor/ control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class • CCTV surveillance system comprises of 2nos minimum 2.0MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on Lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for 60 days with 18" FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge • ARD complete with necessary SMF VRLA batteries • Fireman controller having fireman switch at fire Landing, • Lift Machine of Gearless PMSM of suitable kW with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength.

-

-

-

... More
Rate per each Lift for Ground + 3 Floors. 4 Stops

1

2589285

2589285

... More
Rate per each

-

2589285

-

... More
Supplying, installation, commissioning, testing, putting into operation and handing over of 15 Persons Passenger Lift (1020 Kgs) with following specifications. Make : Kone / OTIS / Johnson / Schindler / MITSUBISHI.

-

-

-

... More
LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille Code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings Lift controller based on microprocessor/ PLC with VVVF Drive having closed loop control system, with IBMS compatible having necessary port, control panel duly wired with proper size & strength copper wire for power & control circuit, with provision for addition of floor/ control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class • CCTV surveillance system comprises of 2nos minimum 2.0MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on Lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for 60 days with 18" FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge • ARD complete with necessary SMF VRLA batteries • Fireman controller having fireman switch at fire Landing, • Lift Machine of Gearless PMSM of suitable kW with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength.

-

-

-

... More
Rate per each Lift for Ground + 5 Floors (6 stops)

1

1803571

1803571

... More
Rate per each

-

1803571

-

... More
Supplying, installation, commissioning, testing, putting into operation and handing over of 13 Persons Passenger Lift (884 Kgs) with following specifications. Make : Kone / OTIS / Johnson / Schindler / MITSUBISHI.

-

-

-

... More
LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille Code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings Lift controller based on microprocessor/ PLC with VVVF Drive having closed loop control system, with IBMS compatible having necessary port, control panel duly wired with proper size & strength copper wire for power & control circuit, with provision for addition of floor/ control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class • CCTV surveillance system comprises of 2nos minimum 2.0MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on Lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for 60 days with 18" FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge • ARD complete with necessary SMF VRLA batteries • Fireman controller having fireman switch at fire Landing, • Lift Machine of Gearless PMSM of suitable kW with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength.

-

-

-

... More
Rate per each Lift for Ground + 5 Floors (6 stops)

1

1767857

1767857

... More
Rate per each

-

1767857

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.