Telangana State Medical Services And Infrastructure Development Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Medical Services And Infrastructure Development Corporation - TSMSIDC Tender

Works
Civil And Construction
Opening Date13 Nov 2024
Closing Date21 Nov 2024
Tender Amount₹ 28,44,196 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Manufacture, supply, & delivery of High Density Polyethylene pipes (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, but excluding GST and specials etc., complete. (Supply upto 90 mm dia in coil & above 90 mm dia stright length in6 M.) 10.0 kg/sqcm (SDR 13.6) OD 40 mm

320

65

20800

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply and Transportation of star rated 7.50 HP 12-16 Stage Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Texmo / CRI / KSB / Aryenvarsha / Lubi / Falcon

1

55000

55000

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and Fixing (inserting) of 7" casing pipe into the borewell including charges for transportation and labour charges etc.,

60

570

34200

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 1101 to 1200 feet ,

100

485

48500

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 1001 to 1100 feet ,

100

440

44000

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 901 to 1000 feet ,

100

410

41000

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 801 to 900 feet ,

100

375

37500

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 701 to 800 feet ,

100

330

33000

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 601 to 700 feet ,

100

285

28500

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 501 to 600 feet ,

100

240

24000

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 401 to 500 feet ,

100

195

19500

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 301 to 400 feet ,

100

165

16500

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 201 to 300 feet ,

100

130

13000

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 101 to 200 feet ,

100

110

11000

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Drilling of Bore Well Drilling of 6 1/2" dia borewells with power rig to a finished dia in all formations to the bore to required depth and dia to suit lowering of 61/2" internal dia casing pipe with coping fixing of pipe, flushing borewell at an High pressure rig unit including all charges etc., complete Depth 0 to 100 feet ,

100

100

10000

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Plain Cement Concrete M 20 nominal mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 300 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403).

13.5

6103

82391

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and complete for finished item of work. (APSS No. 402).

13.5

4913

66326

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing ,etc., complete for finished item of work as per Standard specification.

16

4610

73760

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , etc., complete for finished item of work as per Standard specification.

15

14208

213120

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , etc., complete for finished item of work as per Standard specification.

16

8766

140256

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges, etc., complete for finished item of work 300mm dia upto 1524mm (5') depth

225

2174

489150

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;External Drainage Line Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges, etc., complete for finished item of work (APSS NO 1301 & 1318). 203.20mm dia upto 1524mm (5') depth

300

1194

358200

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and fixing 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , complete for finished item of work in all floors.

6

303

1818

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , etc., complete for finished item of work as per Standard specification.

2

4610

9220

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , etc., complete for finished item of work as per Standard specification.

2

8766

17532

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges, etc., complete for finished item of work (APSS NO 1301 & 1318).152.40mm dia upto 1524.0mm (5') depth

25

881

22025

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 110mm dia

32

346

11072

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 75mm dia

28

255

7140

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing,complete for finished item of work at all floor levels. 28.60mm OD pipe

24

235

5640

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 13.5 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing,complete for finished item of work at all floor levels. 22.20mm OD pipe

50

178

8900

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved make , 30mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges , complete for finished item of work for all floors.

2

1647

3294

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 7 - 10 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges, complete for finished item of work in all floors.

3

3556

10668

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make heavy duty complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty, 30mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , for finished item of work.

4

2992

11968

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap, ISI marked and providing masonry seat, CC squatting plate and 10 litres capacity single flush PVC low level cistern with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge, 15 mm nominal size CP finish brass angled stop valve screw type with internal /external threaded conforming to IS 8931, 12.70mm PVC connection with brass union nuts CP coated , 31.75mm brass plumber union, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges,etc., complete for finished item of work.

1

5275

5275

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, 15 mm nominal size CP finish brass angled stop valve screw type with internal /external threaded conforming to IS 8931, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, etc., complete for finished item of work for all floors.

2

5926

11852

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , etc., complete for finished item of work.

6

171

1026

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and complete for finished item of work. (APSS No. 901 & 903).

21.76

610

13274

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin). Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site etc., complete for finished item of work.

1.44

6407

9226

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Providing Plinth protection with a bed of 100mm thick PCC(1:5:10) using screened sand ,40mm size HB Granite metal and on top of PCC, 20mm thick granolithic concrete flooring with CC(1:1:2) prop.using 6mm to 12mm size graded hard granite machine crushed metal laid monolithically already laid, in alternate panels of size not exceeding 1.5 x 1.5 Mts. and providing 5mm thick glass strips between the pannels and finishing the top surface to required smoothness and slopes including grooves, thread lining as directed by the Engineer - in - charge including cost and conveyance of all materials to site and operational & incidental and labour charges like mixing of cement concrete, laying, curing, lift charges etc., and complete including cost of CC bed for finished item of work. (APSS No.701 & 710).

19.6

960

18816

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Painting to new wood work and flush shutters with lappam finish, over a primary coat and painting two coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc., and complete in all floors (APSS No.1200, 1207 & 1211).

17.72

228

4040

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less than 10mm) (750mm x 2100mm).

7.88

5107

40243

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and complete for finished item of work in all floors.

70.56

290

20462

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint premium grade having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and complete for finished item of work in all floors.

196

212

41552

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Providing dadooing to walls with glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work.First Floor

110.88

1433

158891

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and complete for finished item of work. (APSS No.701 & 707) First Floor

21.76

951

20694

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and complete for finished item of work. (APSS No. 402).

2.18

4913

10710

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and complete for finished item of work. (SS 901,903 & 904). First Floor

68.64

578

39674

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and complete for finished item of work.(SS 901,903 & 904) First Floor

110.88

210

23285

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Ornamental ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in- harge etc., and complete for finished item of work. (SS 901,903 & 904) First Floor

21.76

595

12947

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and complete for finished item of work. (APSS No.126). First Floor

0.82

69483

56976

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Weight Batcher / Mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials,centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Steel Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). Roof Slabs 125mm thick : un supported height up to 3.66 m in First Floor

21.76

1410

30682

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Weight Batcher / Mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials,centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Steel Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). BEAMS :un supported height up to 3.66 m in First Floor

3.26

11712

38181

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Weight Batcher / Mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials,centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Steel Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). LINTELS : First Floor

1.01

13721

13858

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509). First Floor

36.58

900

32922

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504). First Floor

13.67

8109

110850

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Weight Batcher / Mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). Plinth Beam

3.26

14302

46625

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and complete for finished item of work in foundation and basement. (APSS No. 601 & 615)

5.3

4643

24608

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and complete for finished item of work. (APSS No. 402).

0.96

5075

4872

... More
Drilling of 165 mm dia Bore well, Laying of new External new drainage system and Construction of New;New Toilet Blocks Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

11.52

293

3375



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.