Telangana State Medical Services And Infrastructure Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Medical Services And Infrastructure Development Corporation - TSMSIDC Tender

Civil And Construction
Building Construction
Opening Date14 Mar 2022
Closing Date24 Mar 2022
Tender Amount₹ 3,77,779 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairs and construction of yoga shed;Supply and erecting 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan complete

1

-

128

... More
Repairs and construction of yoga shed;Labour charges for fixing of ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / HPL / RPG.

1

-

153

... More
Repairs and construction of yoga shed;Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 1200mm / 1400mm complete with connections. Makes : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T Englaze.

1

-

540

... More
Repairs and construction of yoga shed;Supply of 48" (1200mm) 5 star rated Sweep Ceiling Fan with all accessories etc., complete. Makes : Crompton HS Plus / Havells ES NEO / Orient Energy Star

1

-

2137

... More
Repairs and construction of yoga shed;Supply, transportation and fixing ISI mark batten holder / slanting holder Makes : Anchor / Gold Medal Olive / Million Zoom in lieu of ceiling rose of light point complete with all connections and all labour charges with 5W LED Lamp MAKES: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix.

4

-

612

... More
Repairs and construction of yoga shed;Supply, transportation and fixing of of 20 W +/ 10%, >/ 2000 lumens, 1200mm length LED light housing made with PC body wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with connections and all labour charges etc. Makes: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Gold Medal.

4

-

2548

... More
Repairs and construction of yoga shed;Supply and Run of 3 of 56/0.3mm (4.00 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable of in existing pipe for run of mains inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR)

10

-

1660

... More
Repairs and construction of yoga shed;Supply and Run of 3 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable of in existing pipe for run of mains inlcuding all labour charges etc., complete. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR)

10

-

1160

... More
Repairs and construction of yoga shed;Supply and Run of 1 of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper of in existing pipe for earth continuity inlcuding all labour charges etc., complete. Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR)

15

-

420

... More
Repairs and construction of yoga shed;Supply & fixing of 16A/6A, 2 in one socket - 2 Nos with 16A switch control - 2 Nos modular type with and GI switch box with front cover plate including all labour charges etc., complete. Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.

2

-

2310

... More
Repairs and construction of yoga shed;Supply and fixing of 6A/10A ISI Mark 3/2 pin Modular socket with 6A/10A 1way Modular switch, 3 Module box with cover frame a Common switch board including cost and conveyance of all materials and all labour charges etc., complete in N.R.B. / R.B. Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.

2

-

1008

... More
Repairs and construction of yoga shed;Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in N.R.B. Makes of wires : Finolex / RR kabel / Havells / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / DEC(HFFR) Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Crabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.

3

-

1983

... More
Repairs and construction of yoga shed;Supply and fixing of Anchor fastner with fan hook / Providing MS Fan hook with grouting and cement plastering.

2

-

232

... More
Repairs and construction of yoga shed;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe concealed in wall with all required PVC / Metallic Junction Boxes including masonary work and labour charges etc., Makes:- Sudhakar / Finolex / Modi / VIP / Precision / Universal / Polycab / DEC.

10

-

540

... More
Repairs and construction of yoga shed;Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work.

500

-

4000

... More
Repairs and construction of yoga shed;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work. 25mm Nominal bore

1

-

1254

... More
Repairs and construction of yoga shed;Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 7 - 10 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges, overheads & contractor profit complete for finished item of work in all floors.

1

-

3266

... More
Repairs and construction of yoga shed;Supplying and fixing 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , overheads & contractors profit complete for finished item of work in all floors.

2

-

524

... More
Repairs and construction of yoga shed;110mm dia

5

-

1225

... More
Repairs and construction of yoga shed;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 75mm dia

5

-

945

... More
Repairs and construction of yoga shed;Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make heavy duty complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty, 30mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work.

1

-

2594

... More
Repairs and construction of yoga shed;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

3

-

474

... More
Repairs and construction of yoga shed;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318). 152.40mm dia upto 914.40mm (3') depth

5

-

3535

... More
Repairs and construction of yoga shed;Supplying and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (up to a pitch of 600) etc., complete, excluding the cost of purlins, rafters, trusses including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work in all floors.

33.55

-

21875

... More
Repairs and construction of yoga shed;Supplying and fixing 49.5mm x 49.5mm x 3.6mm nominal bore Medium Grade properties & weight as per IS 1239 ISI mark MS Tube for fixing of GI Sheet including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit for finished item of work.etc., complete for finished item of work in all floors for shed roof

30.5

-

15494

... More
Repairs and construction of yoga shed;Supplying and fabricating, erecting and fixing in position tabular trusses of approved design with M.S tube conforming to I.S-1161 specifications including roof frame work consisting of rafters,ties struts and purlins including cost of foundations bolts, cleats, bearings plates,etc.,complete as per the sketch enclosed and including cost of primary coat with red oxide paint including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position, labour charges for fabrication, all incidental charges, overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge

367.37

-

43350

... More
Repairs and construction of yoga shed;Painting two coats with synthetic enamel paint using Cement primer water base Interior Grade-I including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work for Wall Painting.

1

-

3500

... More
Repairs and construction of yoga shed;Painting of 6 Nos logos as per Type A branding of Sub Center building.

1

-

9000

... More
Repairs and construction of yoga shed;Labour charges for removing and refixing with complete servicing of the Windows

10

-

4780

... More
Repairs and construction of yoga shed;Providing 110 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328)

4

-

1044

... More
Repairs and construction of yoga shed;Manufacturing,supplying and erection of MS Ladder using 49.5x49.5x3.6mm thick MS square pipe-2Nos for vertical posts & 32x32x3.2mm thick for horizontal posts for every 0.30Mtrs & 0.60 Mtrs wide including painting with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges,overheads and contractors profit etc., complete for finished item of work.

5

-

2860

... More
Repairs and construction of yoga shed;Painting two coats with synthetic enamel paint Gr-I having VOC (Volatile Organic Compound) content less than 50 grams/litre to old iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges and overheads & contractors profit etc., complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

15

-

1260

... More
Repairs and construction of yoga shed;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.

57.86

-

11398

... More
Repairs and construction of yoga shed;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509)

26.4

-

17213

... More
Repairs and construction of yoga shed;Flooring with polished shahabad / Tandur stone slabs of 15mm to 18mm thick set over a base coat of CM (1:8) , 12mm thick using screened sand over already laid CC bed / RCC roof slab including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm and jointed with neat cement to full depth including cost and conveyance of all materials like cement, sand, water, flooring stones etc. complete including sales & other taxes on all materials including all labour charges like dressing of flooring stones to the required size, mixing of cement mortar, laying, lift charges , cost of base coat, water charges etc., and overheads & contractors profit complete for finished item of work. (APSS No.703 & 701)

33.55

-

21036

... More
Repairs and construction of yoga shed;Painting to old wood work and flush shutters with two coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre of approved brand and shade including cost and conveyance of all materials to site and all labour charges etc. complete, sales & other taxes on cost of all materials etc.and overheads & contractors profit complete in all floors (APSS No.1200, 1207 & 1211) .

30

-

2640

... More
Repairs and construction of yoga shed;Supply & application of two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. OLD WALLS

220

-

30580

... More
Repairs and construction of yoga shed;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126).

0.3

-

22203

... More
Repairs and construction of yoga shed;Supply & application of two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. OLD WALLS

260

-

21320

... More
Repairs and construction of yoga shed;Supplying & Fixing of Galvanized Steel Barbed wire conforming to IS 278 - 1978 : Type B - Glidden Type Designation as per standard specification

29.7

-

2970

... More
Repairs and construction of yoga shed;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904).

57.86

-

20425

... More
Repairs and construction of yoga shed;Columns

2.15

-

21403

... More
Repairs and construction of yoga shed;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Concrete Batching Plant with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and sales & other taxes on all materials, centering using Steel scaffolding pipes, jack props, wallers, Foot plates, brackets, steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). Footings

1.49

-

12374

... More
Repairs and construction of yoga shed;Plain Cement Concrete M 20 nominal mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 300 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work

3.89

-

18252

... More
Repairs and construction of yoga shed;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)

8.67

-

24579

... More
Repairs and construction of yoga shed;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402).

5.26

-

17100

... More
Repairs and construction of yoga shed;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

14.57

-

2593



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.