Telangana State Irrigation Development Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Irrigation Development Corporation Limited Tender

Opening Date19 Jul 2019
Closing Date26 Jul 2019
Tender Amount₹ 84,84,900 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for foundation in hard rock of all toughness by blasting including boulders above 0.6m anad upto 1.2 m dia. for intake structure and other appurtenant works and placing the excavated rock neatly in dump area or stack yard including levelling as directed etc., complete with initial lead upto 50m

23.35

-

424.1

... More
Cement Concrete in (1:4:8) proportion using 40mm size hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, dewatering , all leads and lifts and labour charges for machine mixing, laying, ramming, curing etc. complete

2.41

-

3800.25

... More
R.C.C. grade M20 (Design mix) corresponding IS 456 using weigh batcher/ mixer with 20mm size graded machine crushed hard granite metal from approved quarry including cost & conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc. to site including all operational incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc for Raft

2.41

-

5598.48

... More
Do----------- for Well Steining

8.05

-

5922.52

... More
Do---------- for precast slab

0.53

-

5599.48

... More
Providing High Yeild Strength Deformed steel bars/ TMT from prime producers (TATA/SAIL/VSP/Jindal) (Fe 500 grade as per IS 1786-2008 of different diameters, including labour charges for cutting, bending to required sizes and shapes, placing in position with cover blocks of approved size and tying with binding wire of 20 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars and binding wire from approved sources to site of work, cover blocks and all incidental, operational labour charges cutting,bending,placing in position, tying etc., complete for finished item of work for Raft, well steining & Slab

600

-

66.46

... More
Bailingout water for Earth work Excavation / concrete below LWL at places required as per water levels during actual execution 2.0m to 3.0 m

45.79

-

421.51

... More
Formation of ring bund with gunny bags with sand including cost of refilling, guny bags, stitching labour charges etc., complete

6619

-

30

... More
Supply and Fixing of MS Shutter in Intake well of size 0.90 x 0.90 M with frame made of 75 x 40 x 6 mm MS Channels with necessary gear box channal 50mm dia 1m long screw gear rod including shutter frame with ISA 50 x 50 x 6 duly welded with 6mm thick MS sheet on both sides, gear box with handle and locking arrangement including cost & conveyance of all materials to site, labour charges for fabrication etc., complete

1

-

22000

... More
Intake Pipe Line: Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 60cm upto to 120cm diameter for intake structure and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1km and all lifts.

260

-

262.1

... More
Excavation for foundation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for intake structure and other appurtenant works and placing the excavated rock neatly in dump area or stack yard including levelling as directed etc., complete with initial lead upto 1 km and all lifts.

130

-

464.9

... More
Cement Concrete in (1:4:8) proportion using 40mm size hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, dewatering , all leads and lifts and labour charges for machine mixing, laying, ramming, curing etc. complete

12.75

-

3800.25

... More
Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost & conveyance of all materials, all operational, incidental labour charges etc complete

8.5

-

724.25

... More
Bailingout water for Earth work Excavation / concrete below LWL at places required as per water levels during actual execution.2.0m to 3.0 m

132.75

-

421.51

... More
Supply, transportation, initial testing of 900 mm dia RCC NP3 class S/S pipes, laying in position in the trench as directed and jointing the pipes with jointing materials, line testing cost and conveyance of all materials, jointing materials, labour charges and other incidental charges and final testing etc., complete for finished item of work as per I.S. Specifications .

25

-

11626.17

... More
PRESSURE MAIN: EEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH by mechanical means in ordinary soils upto 3 m depth

900

-

101.3

... More
Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost & conveyance of all materials, all operational, incidental labour charges etc complete

90

-

724.25

... More
Supply, transportation, initial testing of 280 mm dia PVC 6 Kg/sq.cm laying in position in the trench as directed and jointing the pipes with jointing materials, line testing, cost and conveyance of all materials, jointing materials labour charges and other incidental charges and final testing etc. complete for finished item of work as per I.S.Specifications

600

-

1864

... More
Disposal of excess excavated earth and deposited at a distance upto 1 KM lead including all operational & incidental labour charges, hire charges of T&P etc., complete for finished item of work as per standard specifications..

126.93

-

34.2

... More
Supply, fixing and testing of Zero Velocity Valve with MS fabricated body of 300 mm dia 10 Kg/cm2 as per AWWA including cost and conveyance to site etc., including , transportation charges transit insurance etc., complete

1

-

105647

... More
Construction of Z.V Chamber as per Annexure-I

1

-

70744.16

... More
MAIN DELIVERY CISTERN: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH by mechanical means in ordinary soils upto 3 m depth

13.22

-

101.3

... More
Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost & conveyance of all materials, all operational, incidental labour charges etc complete

1.98

-

724.25

... More
Cement Concrete in (1:4:8) proportion using 40mm size hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, dewatering , all leads and lifts and labour charges for machine mixing, laying, ramming, curing etc. complete

1.98

-

3899.78

... More
R.C.C. grade M20 (Design mix) corresponding IS 456 using weigh batcher/ mixer with 20mm size graded machine crushed hard granite metal from approved quarry including cost & conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc. to site including all operational incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc for Mat

1.98

-

5699.01

... More
Do---------- for Well Steining

15.16

-

6022.05

... More
Providing High Yeild Strength Deformed steel bars/ TMT from prime producers (TATA/SAIL/VSP/Jindal) (Fe 500 grade as per IS 1786-2008 of different diameters, including labour charges for cutting, bending to required sizes and shapes, placing in position with cover blocks of approved size and tying with binding wire of 20 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars and binding wire from approved sources to site of work, cover blocks and all incidental, operational labour charges cutting,bending,placing in position, tying etc., complete for finished item of work for Raft & steining

1430

-

66.46

... More
Supply, erection of PN-10 100 mm dia DI D/F Sluice valves (soft seated) Resilient seated Sluice Valve confirming to IS:14846/2000 including cost and conveyance to site etc., including transportation charges, transit conveyance etc., complete

3

-

14970.76

... More
Manufacturing, supply, erection and testing of M.S.Pipes and pipe specials as required including cost of M.S.Sheet for pipes, M.S.Plate for flanges as per ISI, cutting bending, rolling, welding fabrication including transportation to site laying in position aligning, jointing, welding if necessary at site including cost of jointing materials like bolts and nuts rubber packing, painting with one coat of red oxide and two coats of anticorrisive bitumen paint including cost and conveyance of all materials, labour charges etc., complete for fixing of Air valves.

76.72

-

106.2

... More
GRAVITY MIANS & SUB-GRAVITY MAINS: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

2379.95

-

101.3

... More
Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH including cost & conveyance of all materials, all operational, incidental labour charges etc complete

267.23

-

724.25

... More
Supply, transportation, initial testing of 160 mm dia PVC 4 Kg/sq.cm laying in position in the trench as directed and jointing the pipes with jointing materials, line testing, cost and conveyance of all materials, jointing materials labour charges and other incidental charges and final testing etc. complete for finished item of work as per I.S.Specifications

790

-

417

... More
Supply, transportation, initial testing of 200 mm dia PVC 4 Kg/sq.cm laying in position in the trench as directed and jointing the pipes with jointing materials, line testing, cost and conveyance of all materials, jointing materials labour charges and other incidental charges and final testing etc. complete for finished item of work as per I.S.Specifications

610

-

640

... More
Supply, transportation, initial testing of 250 mm dia PVC 4 Kg/sq.cm laying in position in the trench as directed and jointing the pipes with jointing materials, line testing, cost and conveyance of all materials, jointing materials labour charges and other incidental charges and final testing etc. complete for finished item of work as per I.S.Specifications

640

-

984

... More
Supply, erection of PN-10 150 mm dia DI D/F Sluice valves (soft seated) Resilient seated Sluice Valve confirming to IS:14846/2000 including cost and conveyance to site etc., including transportation charges, transit conveyance etc., complete

1

-

23587.63

... More
Supply, erection of PN-10 200 mm dia DI D/F Sluice valves (soft seated) Resilient seated Sluice Valve confirming to IS:14846/2000 including cost and conveyance to site etc., including transportation charges, transit conveyance etc., complete

2

-

39193.84

... More
Supply, erection of PN-10 250 mm dia DI D/F Sluice valves (soft seated) Resilient seated Sluice Valve confirming to IS:14846/2000 including cost and conveyance to site etc., including transportation charges, transit conveyance etc., complete

1

-

54298.77

... More
Construction of Sluice Valve Chamber: As per Annexure - II

4

-

31471.04

... More
Manufacturing, supply, erection and testing of M.S.Pipes and pipe specials as required including cost of M.S.Sheet for pipes, M.S.Plate for flanges as per ISI, cutting bending, rolling, welding fabrication including transportation to site laying in position aligning, jointing, welding if necessary at site including cost of jointing materials like bolts and nuts rubber packing, painting with one coat of red oxide and two coats of anticorrisive bitumen paint including cost and conveyance of all materials, labour charges etc., complete for fixing of Air valves.

570.17

-

106.2

... More
Construction Intermediate Delivery Cistern (As per Annexure-III)

7

-

91718.23

... More
Construction Intermediate Delivery Cistern (As per Annexure-IV)

4

-

120366.45

... More
APPROACH ROAD : Earthwork in excavation for formation of approach road as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material as per Technical Specification 305 MORD / 304 MORTH by mechanical means in ordinary soils including consolidation with 2 T roller etc. complete

3936

-

101.3

... More
Supply and spreading of gravel for newly formed road including cost and conveyance of all materials, labour charges, hire charges of T & P etc. complete for finished item of work

1300

-

768.09

... More
ELECTRICAL & MECHANICAL WORKS: - Supply of brand new Submersible pumpset of 15HP to operate on 3 phase 415 V electrical supply, capable of discharging 0.95cusecs / 26.90LPS at a total head of 62.32ft/19.00mt.due to all causes as per specifications furnished in the tender schedule and Squirrel cage induction motors of TEWC type for 415V, 3-phase, AC power supply,1460RPM, 15HP as per specifications. The pump should be Provided With stainless steel (CF8M) impellers & Vertical Stand PMU and all required accessories etc Complete for fixing of the pumpset to the existing pipe line are to be provided. The Submersible cable for the pumpset shall be provided along with it for 20mts length of requiredspecifications as per manufacturers design along with CPRI Certification of pumpset and cables. The details of Levels and Technical specifications are shown in Annexure V

2

-

109741.5

... More
Supply and Fixing of XLPE PVC insulated armoured sheathed Aluminium LT Cable from Transformer to panel board 3.5 core 95 Sq.mm No. of runs : One Run

60

-

602.35

... More
Supply and Fixing of PVC insulated armoured,flat copper cable for Submersible Motors from Panel to Motor 3 core 10 Sq.mm No. of runs : Two Runs

60

-

374.29

... More
Supply of XLPE PVC insulated armoured sheathed Aluminium LT Cable from Panel to Capacitor : 4 core 10Sq.mm No. of runs : One run.

40

-

161.86

... More
Manufacturing , supply and erection of control panel board. The panel board should be metal clad, dust and vermin proof, floor mounted industrial type, indore type for controlling 2 Nos. 15 HP/11KW Vertical shaft squirrel cage induction motors coupled to Submersible pumps in submerged condition- Note:- Any alterations suggested by electrical inspector during inspection are to be attended by the tenderer/ contractor as a supplemental item.pump sets. The panel board with accessories should internally wired neccessary earthing terminal shall be provided. The electrical system shall comply as per IE rules and relevant ISS. The thickness of sheets to be used for fabrication of panel board should be 16 guage. the cable boxes wherever necessary with adequate cabling space for termination of cable is to be provided. The components of Panel Board/Technical details are shown in Annexure VI Incomer: 100Amps,MCCB,TP fixed 25KA .

1

-

55868.4

... More
The Starter Panel shall be enclosed in a metal clad SS enclosure floor mounted with Star / Delta Starters for 15 HP motors-1no, Type - Air break fully automatic / Oil immersed, Coil voltage - 415 V, Contactors rating - 28 Amps,AC3 duty long life, MNX 32 of L&T or above and Suitable Over Load Relay, With equivalent in other approved makes

2

-

18622.8

... More
Erection, wiring, commissioning as per the specifications details furnished in Tender Schedule for errection of 15HP Submersible pumpsets including erection tools and safety equipments complete.

2

-

9976.5

... More
HYDRO - MECHANICAL WORKS: Manufacturing, supply, erection and testing of M.S.Pipes and pipe specials as required including M.S.Sheet for pipes, M.S.Plate for flanges as per ISI, cutting bending, rolling,welding fabrication including transportation to site laying in position aligning, jointing, welding if necessary at site including cost of jointing materials like bolts and nuts rubber packing, painting with one coat of red oxide and 2 coats of anti corisive bitumen paint both inside and out side including cost and conveyance of all materials, labour charges etc. complete for Connections of Manifold barrel to Presuure main and end connections on Main D.C

900

-

106.2

... More
Supply, erection of PN-16 150 mm dia DI D/F Sluice valves (soft seated) Resilient seated Sluice Valve confirming to IS:14846/2000 including cost and conveyance to site etc., including transportation charges, transit conveyance etc., complete

2

-

23587.63

... More
Supply and fixing of 150 mm dia Cast Carbon Steel Bolted cover double flanged reflux valve / non return valve heavy duty round body PN-20 conforming to IS 5312 Part-I latest edition including amendments and revisions from time to time bearing ISI mark including cost, conveyance and erection at site

2

-

27180.34

... More
Supply erection of 100 mm dia 10 KG/cm2 Air Cushion Valve/Quick Released damped Air Valve (QRDA) including cost and conveyance of all materials labour charges and other incidental charges etc., complete as directed by the Engineer in charge for finished item of work.

1

-

73183.4

... More
Supply, erection of PN-10 100 mm dia DI D/F Sluice valves (soft seated) Resilient seated Sluice Valve confirming to IS:14846/2000 including cost and conveyance to site etc., including transportation charges, transit conveyance etc., complete

2

-

14970.76

... More
Supply, fixing and testing of Zero Velocity Valve with MS fabricated body of 300 mm dia 10 Kg/cm2 as per AWWA including cost and conveyance to site etc., including , transportation charges transit insurance etc., complete

1

-

105647.12



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.