For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender
Civil And Construction
Road Construction
Opening Date23 Oct 2024
Closing Date6 Nov 2024
Tender Amount₹ 1,07,22,198
Costs
EMD
₹ 1,08,000Document Cost
Refer DocumentsTender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
553037Tender No
21/CE-I/TGIIC/2024-25 Date:16.10.2024Tender Authority
Telangana State Industrial Infrastructure Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Road work Medchal;Providing and laying 30 mm thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.0 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials to site, labour charges for all operations, diversion of traffic, etc., complete for finished item of work as per MORTH specification clause No. 509 complete in all respects.(except GST & Seiniorage charges)
405.1
10572
4283012.92
... More
Road work Medchal;Providing and applying Tack coat with bitumen emulsion (Rapid Setting) over the prepared surface before laying BC @ 2.0 kg/10 Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T & P necessary to complete the finished item of work, except GST, as direced by the Engineer-in-Charge as per MORTH (5th Revision) specification 503.
13503
11
148938.09
... More
Road work Medchal;Providing and laying 50mm thick dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading (grade-II), premixed with bituminous binder with VG-10 grade @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials, seigniorage charges, labour charges for all operations, diversion of traffic, etc., complete,except GST & Seigniorage charges, for finished item of work as per MoRTH (5th Revision) specification clause No. 507 complete in all respects.
170.1
9340
1588766.32
... More
Road work Medchal;Providing and applying tack coat with bitumen emulsion (Rapid Setting) over the prepared surface before laying DBM at the rate of 2.5kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge except GST as per MORTH (5th Revision) specification 503.
3402
13
45280.62
... More
Road work Medchal;Providing and applying Primer coat with bitumen emulsion (SS-1) (Slow Setting) over the prepared surface of granular base as WMM surface at the rate of 6.00 kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work, except GST as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 502.
3402
58
199051.02
... More
Road work Medchal;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, seigniorage charges, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of traffic, etc., complete for finished item of work, except GST& Seigniorage charges, as per table 400.13 of technical specification clause 406 MORTH(5th Revision).
874.76
2262
1979503.15
... More
Road work Medchal;Providing Granular Sub Base using HBG crushed close graded material confirming to grading -I of MoRTH table - 400.1 (50% of 53mm to 9.5mm , 20% of 9,5 to 2.36mm and 30% of 2.36mmm below)including spreading the HBG material in layers of uniform thickness not exceeding 150mm thick with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density complete as per technical specification as directed by the Engineer-in-charge etc, including cost and conveyance of HBG material, water etc to site, seigniorage charges, labour charges for all operations, all incidentals hire & operational charges of roller and other T&P etc, except GST& Seigniorage charges, complete for finished item of work as per MoRT&H (5th Revision) Specification 401.
456.7
1980
904302.54
... More
Road work Medchal;Conveyance of excavated soils with machinery per 5km for transportation of materials by tipper and truck including loading un loading the following lead and dumpiing on the road alignment wherever required as directed by Engineer -in- charge. Excluding GST and Seigniorage Charges
1193
116
138984.5
... More
Road work Medchal;Excavation for roadwork /highberms/Debris of roads in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m, all taxes except GST as per MORTH - 301
1193
72
86695.31