For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Civil Works Roads
Opening Date19 Aug 2021
Closing Date25 Aug 2021
Tender Amount₹ 39,89,70,566 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Forming, Laying Of Roads With Wmm,

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of embankment with good gravel brought from outside and spreading in layers of not more than 200mm thick each or as directed by the Engineer-in-Charge during execution, watering, dozing, grading and compacting each layer to required proctors density with OMC compaction with vibratory roller of 8 Tonnes capacity, maintaining the required camber in the formation including cost and conveyance of good gravel, all labour charges, hire and operational charges of dozer, power roller, mortar grader, water tanker, all water leads, etc complete excluding GST and seigniorage charges as per requirement of table 300.2 as per Technical Specification clause 305 MORTH (5th Revision). (payment will be based on levels for finished item of work).

95500

-

462.6

... More
Providing Granular Sub Base using HBG crushed close graded material confirming to grading -I of MoRTH table - 400.1 (50% of 53mm to 9.5mm , 20% of 9,5 to 2.36mm and 30% of 2.36mmm below) including spreading the HBG material in layers of uniform thickness not exceeding 150mm thick with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density complete as per technical specification as directed by the Engineer-in-charge etc, including cost and conveyance of HBG material, water etc to site, labour charges for all operations, all incidentals hire & operational charges of roller and other T&P etc, excluding GST &seigniorage charges complete for finished item of work as per MoRT&H (5th Revision) Specification 401.

36000

-

1776.02

... More
Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, excluding GST and seigniorage charges, as per table 400.13 of technical specification clause 406 MORTH(5th Revision).

43000

-

2046.72

... More
Providing and applying Primer coat with bitumen emulsion (SS-1) (Slow Setting) over the prepared surface of granular base as WMM surface at the rate of 7.00 kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work, excluding GST as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 502.

165000

-

50.78

... More
Providing and applying tack coat with bitumen emulsion (RS-1)(Rapid Setting) over the prepared surface before laying DBM at the rate of 2.5kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge excluding GST as per MORTH (5th Revision) specification 503.

165000

-

11.87

... More
Providing and laying 50mm thick dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading (grade-II), premixed with bituminous binder with VG-10 grade @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete, excluding GST and seigniorage charges for finished item of work as per MoRTH (5th Revision) specification clause No. 507 complete in all respects.

9000

-

8043.22

... More
Providing and applying Tack coat with bitumen emulsion RS-1 (Rapid Setting) over the prepared surface before laying SDBC @ 2.0 kg/10 Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T & P necessary to complete the finished item of work, excluding GST, as direced by the Engineer-in-Charge as per MORTH (5th Revision) specification 503.

165000

-

9.9

... More
Providing and laying bituminous concrete of 40mm thick with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respectsexcluding GST,.and seigniorage charges

7000

-

8523.09

... More
Providing and Laying gravel shoulders including sectioning to have proper crossfall, spreading by approved means,compaction with vibretory roller of 8 to 10 tonnes capacity to achieve the desired density, including cost, conveyance of all material, watering, labour charges for all operations, hire and operational charges all T&P, diversion of traffic etc, complete for finished item of work excluding GST and seigniorage as per MORTH specification 401.

42200

-

438.45

... More
Supply and fixing of M20 Grade Pre Cast Kerb Stone of Size 600x115x400 including cost and conveyance of all materials like pre cast kerb stone, cement sand etc to site, loading, unloading, kerb stone transportation charges, labour charges for fixing kerb stone true to alignment, mixing charges, jointing to a full depth and width with CM(1:4) Proportion, curing, all incidental and operational charges and all other taxes except GSTetc., complete for finished item of work.

9000

-

641.67

... More
Painting to Kerb with 2 or more coats of Synthetic Enamel paint grade-I of approved brand (Asian/Berger/Nippon) and shade over a base coat of appropriate primer of approved brand, making 3 coats or more in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work, excluding GST

2700

-

169.55

... More
Filling with good gravel brought from outside in Central Verge upto Kerb Stone top level and filling in not more than 200mm thick in each layer with approved material spreaded, graded and compacted with plate compactor to achieve the desired density, including cost and conveyance of all material, labour charges for all operations, hire and operational charges all T&P, diversion of traffic ect complete for finished item of work as per clause 407 MORTH.except GST & Seigniorage charges.

4200

-

557.1

... More
No. of Items : 15 (Fifteen only)

-

-

-

... More
(Rupees Thirty Eight Crores Eight Lakhs Six Thousand One Hundred Fifteen Only)

-

-

-

... More
Part-I

-

-

-

... More
Part-II - Seigniorage Charges payable as per actuals

-

-

-

... More
Note :

-

-

-

... More
1) The rates mentioned in schedule 'A' are including overhead charges & Contractors Profit. The overhead charges includes Labour Amenitites and Labour Importation / Compensation / Site Supervision / Quality Control Charges and Bankers Charges, etc. Hence the contractros quoted percentage is inclusive of all the above including Technical persons labour welfare cess, District mineral fund and work insurance and no reimbursement for these will be made. 2)The above rates for finished items of work including cost and convenyance of all requisite materials to site, Labour Charges for all operationas, curing wherever needed, all Incidental, Hire and Operational charges of all T&P barricading, Diversion of traffic etc., including all taxes except GST & Seigniorage Charges .

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.