Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Opening Date23 Jul 2021
Closing Date30 Jul 2021
Tender Amount₹ 6,95,950 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Land scape;Bed preparation: Dressing the surface to the desired shape, laying of 150 mm. (6?) thick of fine red soil, covered with a thin layer of 10 mm thick sand, watering, rolling (compacting to 5" thickness by hand roller), including the cost of red earth, sand and labour charges etc., for complete bed preparation and laying and ramming of lawn mats / rolls in proper position on existing made bed by internal transportation from dumped place, including cost of labour for laying, ramming by hand roller / demish, internal transportation and watering etc., complete for finished item of work excluding cost of grass, fertilizers and chemicals etc.

200

-

75838

... More
Land scape;Supply and delivery of korean capet grass including trasportion, loading , un loading labour chrges and all incidental charges etc., Complete (grown on red soil)

200

-

24000

... More
Land scape;Maintenance of lawns: Lawn mowing with electric motor / portable cutter machine and edging & weeding of the lawns (once in 15 days from June - Nov and once in 30 days from Dec - May) with watering 10 to 15 ltrs /per Sqmt/per day basing on season and weather conditions (30 watering is required in a month to maintain sub-soil moisture continuously), application of fertilizers, insecticides, Fungicides (once in a month) by manual excluding cost of fertilizers & water.(Total Maintance for 6 months =200 sqm X 6months)

1200

-

11940

... More
Land scape;Hedge / shrub planting: Digging the trench in ordinary soils of size 0.30 mtrs. depth, refilling with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants, planting etc., including the application of fertilizers and pesticides etc.,(@ 20 gms/pit/sqmt) complete for item of work, but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material etc., - unit 1 Sqmt of work. (*10 No's/Sqm of plants & bag size shall be arrived based on the spacing as per the design.)

140

-

151590.6

... More
Land scape;Maintenance of hedge/shrub planting: Trimming of hedges/shrubs once in 15 days and watering once in a day @ 5 Lts/per sqmt/per day (sub soil moisture shall be maintained continuously). Edge cutting 1 ft. away from the edges and applicaion of fertilizers, insecticides, Fungicides ( @ 20 gms/pit/sqmt) etc., once in 30 days including area allowances for 6 months

840

-

27972

... More
Land scape;Topiary/Palms/garden Tree planting Digging in ordinary soils size of 0.60x0.60x0.60 mtrs. pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit), internal transportation of plants and planting the plants etc., for complete item of work (excluding cost of plant material, fertilizers and chemicals (@ 20 gms / pit)

100

-

43817

... More
Land scape;Maintenance of Palms/Tree planting: Trimming once in month watering once in a day @ 5 Lts/per sqmt/per day /(sub soil moisture shall be maintained continuously). Formation of basins 1 ft. away from the edges and applicaion of fertilizers, insecticides, Fungicides( @ 20 gms/pit/sqmt) with manual watering etc., for 1 year maintenance

600

-

12660

... More
Land scape;Supply & delivery of specified plants as per directions of officer in charge at site including cost of plants and transportion Charges with loading $ unloading etc., Complete Conocurpus (18"x18")

100

-

50000

... More
Land scape;Supply & delivery of specified plants as per directions of officer in charge at site including cost of plants and transportion Charges with loading $ unloading etc., Complete Gulphamea (7'x8")

700

-

21000

... More
Land scape;Supply & delivery of specified plants as per directions of officer in charge at site including cost of plants and transportion Charges with loading $ unloading etc., Complete Emilia patents (7'x8")

700

-

21000

... More
Land scape;Painting to New kerb stones/Central Verge with two coats of synthetic enamel paint of 1st grade of approved brand and shade over a primary coat of exterior grade cement paint work done during night hours, including cost and concveyance of all materials to site, cost of primer coat and all labour charges, all incidental and operational charges, etc., complete for finished item of work

100

-

29186



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.