For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Civil And Construction
Drainage Work
Opening Date31 Mar 2022
Closing Date8 Apr 2022
Tender Amount₹ 13,42,183 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
pipe;RR masonry in CM(1:6) prop. using hard granite stone from approved quarry including cost and conveyance of all materials to site, all labour charges for dressing stones to required size and shape, mixing of cement mortor, stone wall construction, curing, etc. complete for finished item of work,as per MORTH Specification 1400 & 2200 (5th revision) Excluding GST & Seigniorage charges,

33.47

-

189487.06

... More
pipe;Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT&H specification including cost and conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge. for open foundations. Except GST & Seigniorage charges,

5.06

-

21021.92

... More
pipe;Providing laying Reinforced cement concrete Hume Pipe of NP-3 class 600.00mm dia lR.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes pipe including cost and conveyance of pipe, etc, except GST & Seigniorage charges,, complete and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge for finished item of work for Pipe culvert .

300

-

1299336

... More
pipe;Refilling foundations and basement /pipe line trenches with useful excavated soils (other than black cotton soils and other expansive soils) with initial lead and lifts spreading in layers not exceeding 150mm thick, consolidating each deposited layer by watering and ramming, compaction by earth masters to achieve density control of not less than 95 percent including cost and conveyance of water to work site and all operational, incidental, labour charges, all taxes, hire charges of T&P etc., complete for finished item of work. (APSS No. 309 & 310). Excluding GST.

481.8

-

19416.54

... More
pipe;Conveyance of excavated soils with machinery per 5km for transportation of materials by tipper and truck including loading un loading the following lead and dumpiing on the road alignment wherever required as directed by Engineer -in- charge. Excluding GST and Seigniorage Charges

205.2

-

22120.56

... More
pipe;Earth work in excavation for culverts & drains by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., complete for finished item of work etc., complete as per MORTH (5th Revision) specification 304. Excluding GST

687

-

83601.03



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.