For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Civil And Construction
Electrical and Electronics
Electrical Works
Opening Date16 Mar 2023
Closing Date23 Mar 2023
Tender Amount₹ 2,19,21,149 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Power lines;Formation of end termination with double jumper (3 Disc Point), formation of End Cut point for LT line on pole.

1

406

406

... More
Power lines;Dismantling of existing Lines including Loading,Transport and Un-Loading and devolution to District Stores, 55sqmm Single Circuit (3 Conductors).

2.45

6093

14927.85

... More
Power lines;Dismantling of existing Lines including Loading,Transport and Un-Loading and devolution to District Stores, 34sqmm Single Circuit (3 Conductors).

0.95

6093

5788.35

... More
Power lines;Dismantling of 8.0M PSCC poles which cannot be re used-LT lines

68

203

13804

... More
Power lines;Dismantling of 3-Ph 63 KVA Distribution Transformer.

1

677

677

... More
Power lines;Dismantle of 3-Ph 25KVA Distribution Transformer.

2

485

970

... More
Power lines;ERECTION OF POLES IN 11KV LINES:, Erection of pole in position,aIigning and setting to work,fixing of cross arms and top clamps,fixlng of insulators/Discs,earthing to supports,back filling with earth and stones property ramming including transport of Materials from road side to location excluding pit excavation, 9.1M Iona PSCC Pole.

1

3250

3250

... More
Power lines;Excavation of pits (PER PIT)in all soils (except hard gravel,hard Morrum,disinte grated rock and hard rock requirlng blasting)for line poles as well as Strut poles , 2?6"x2?6"x6?0" (0.75M x 0.75M x 1.80M) or 20" dia and 6?0? depth (0.6M dia 1.80M depth) with Augur Machine for 9.1M PSCC Poles or 11.0M PSCC Poles or R.S-Joist Potes of above 8M and below 12M length.

1

948

948

... More
Power lines;Formation of Cut-Point on tower with double jumper (6 Disc point) , formation cut point on Tower for 11KV line.

5

2112

10560

... More
Power lines;11 KV and LT Labour Paving out conductor,providing temporary stays,tensioning,sagging correctIy,fixing strain points,transferring to pin points binding,keeping stifner,rectification of poIes,guys and jumpering etc.,final tensioning and loading with tractor including transport of Material from road side to location, 55sqmm Single Circuit (3 Conductors).

2.4

11510

27624

... More
Power lines;Fabrication of DP Structures,required Clamps,Drill ing,Cutting etc.,Complete item of work.

3

1896

5688

... More
Power lines;Concreting of Stay Pits to a size of 1'6" x 1?6" x 4?6" (0.45M x 0.45M x 1.35M) to stays with C.C.(1:3:6) using 20Mm HBGMetal (Volume of Concrete = 0.273 Cum).             

9

1740

15660

... More
Power lines;Transponati on of material from stores to section office

1

2524

2524

... More
Power lines;Transport of Materials through Bullock Cart Per 2 Poles.

6

883

5298

... More
Power lines;Earthing including cost of bentonate powder and excavation of Pit (0.6M XD,6M x 2.4M) (G.I Pipe and G.I wire/G.I flat 25x3mm will be supplied by the department), GI Pipe earthing incl providing and fixing of Cement callers of bize 2? dia.

3

1489

4467

... More
Power lines;Formation of Single Pole D.P Cut Point with double Channel X-arms and double jumper (6 Disc point) , formation of D.P Cut point for 33KV line on Pole.

3

2336

7008

... More
Power lines;Excavation of pits (PER PIT) in all soils (except hard gravel,hard Morrum,disintegrated rock and hard rock requiring blasting) for line poles as well as Strut poles , 2?0"x2'6?x5?0" (0.6M x 0.75M x 1.50M) or 18" dia and 5'0" depth (0.45M dia 1.50M depth) with Augur Machine for 8.0 or 8.0M length R.S-Joist poles.

6

812

4872

... More
Power lines;Erection of 8Mtrs Stud Pole including fixing clamps and back filling with earth and stones property ramming including transport of Materials from road side to location excluding pit excavation - 33KV Line.

6

1927

11562

... More
Power lines;Fixing base plates,alignment of anchor rod,fixing of clamps,guy nsuIators,trunckle etc.,on the poIe,fixing of stay wire,binding securely on either side and tensioning including transport of Material from road side to location and back filling with earth ramming as per standards (excluding cost of excavation pit and all aboveMaterial), 33KV Stay sets.

9

779

7011

... More
Power lines;Dismantling of 33KV,800Amps double break AB Switch

1

3047

3047

... More
Power lines;Dismantling of existing Lines including Loading,Transport and Un-Loading and devolution to District Stores, 100sqmm Single Circuit (3 Conductors).

4.3

8801

37844.3

... More
Power lines;Dismantling of 9.1M PSCC pole which cannot be Rei-Used - 33KV Lines.

86

271

23306

... More
Power lines;Formation of single pole cut point with double channel X-arms and double jumper(6 Disc Point), formation of cut point for 33 KV line on pole

3

2336

7008

... More
Power lines;ERECTION OF POLES IN 33KV LINES., Erection of pole In position,aligning and setting to work,fixing of cross arms and top clamps,fixing of insulators/Discs,earthing supports,back filling with earth and stones property ramming including transport of Materials from road side to location excluding pit excavation, 9.1M long PSCC Pole.

6

3250

19500

... More
Power lines;Excavation of pits (PER PlT)in all soils (except hard gravel,hardMorrum,disinte grated rock and hard rock requiring blasting for line poles as well as Strut poles , 2?6"x2?6"x6'0" (0.75M x 0.75M x 1.80M) or 20" dia and 6'0" depth (0.6M dia 1.80M depth)with Augur Machine for 9.1M PSCC Poles or 11.0M PSCC Poles or R.S-Joist Poles of above 8M and below 12M length.

6

948

5688

... More
Power lines;Detailed survey including angle points and peg marking preparation of pole schedules and detailed routeMap.

5.4

1036

5594.4

... More
Power lines;Erection of 33KV,800Amps double break AB Switch including alignment and rated size of flat earthing connection.

3

6093

18279

... More
Power lines;Assembly and erection of Jouble pole D.P Structure as per specification which ncludes fixino of top channels and cross bracings,transport of all Materials from road side to the Iocation,earthing,back filling with earth ramming etc.,excluding pit excavation,concreting,erection of poles and cost of earthing material for 33KV DP structure with 9.1Mtr length PSCC poles

3

4198

12594

... More
Power lines;Formation of end termination with double umper (3 Disc Point), Ormation of End Cut polnt on Tower for 33KV line.

2

1304

2608

... More
Power lines;Formation of Vertical formation on Tower with double jumper (6 Disc point) , Vertical formation on Tower for 33KV line.

11

2609

28699

... More
Power lines;Paving out conductor,providing temporary stays,tensionìng,sagging coorectly, fixing strain points,transferring to pin points bìnding,keeping stifner,rectification of poles,guys and jumpering etc.,final tensioning and loading with tractor including transport of material from road side to location, 100sqmm Single rcuit (3 Conductors).

2.45

16249

39810.05

... More
Power lines;Paving out conductor,providing temporary stays,tensionìng,sagging coorectly, fixing strain points,transferring to pin points bìnding,keeping stifner,rectification of poles,guys and jumpering etc.,final tensioning and loading with tractor including transport of material from road side to location, 100sqmm Single rcuit (6 Conductors).

2.9

32498

94244.2

... More
Power lines;Construction of M+3 Type Tower: Fabrication of M+3 type tower with 2 section with 1 coat of redoxide paint, Excavation of pit including dewatering,planking,showering and shuttering(wherever necessary) and leveling in all types of soils such as BC,red earth,hard ravel etc.,(size 1.6 x 1.6 x3.5 mts.) i.e 8.96 cum, Erection of tower parts completely as per specifications including erection of insulators with all accessories,jumpering,transport of material and painting of tower with two coats of alluminimum paint and bolts and nuts etc., Setting of stubs in position for laying of foundation of towers with 1:3:6 CC mix using 40mm HBG metal including cost of all concreting materials and cement and curing for 14 days (40mm HBG metal for pyramid portion and 20mm HBG metal for chimney portion) i.e 9.98 cum , Tack welding bolt and nuts upto 20feet from ground (144Nos bolts to be welded), Pipe earthing of towers with 50 mm dla Cl earth pipe,including cost of pipe,bentonite powder and GI Flat etc.

38

128736

4891968

... More
Power lines;Construction of M+6 Type Tower: Fabrication of M+6 type tower with 2 section with 1 coat of redoxide paint, Excavation of pit including dewatering,planking,showering and shuttering(wherever necessary) and leveling in all types of soils such as BC,red earth,hard ravel etc.,(size 1.6 x 1.6 x3.5 mts.) i.e 8.96 cum, Erection of tower parts completely as per specifications including erection of insulators with all accessories,jumpering,transport of material and painting of tower with two coats of alluminimum paint and bolts and nuts etc., Setting of stubs in position for laying of foundation of towers with 1:3:6 CC mix using 40mm HBG metal ncluding cost of all concreting materials and cement and curing for 14 days (40mm HBG metal for pyramid portion and 20mm HBG metal for chimney portion) i.e 9.98 cum , Tack welding bolt and nuts upto 20feet from ground (144Nos bolts to be welded), Pipe earthing of towers with 50 mm dla Cl earth pipe,including cost of pipe,bentonite powder and GI Flat etc.

6

135637

813822

... More
Power lines;33 KV Labour Construction of M+12 Type Tower., Fabrication of M+12 type tower with 2 section with 1 coat of redoxide, paint Excavation of pit including dewatering,planking,showring and shuttering(where ever necessary) and leveling in aII types of soils such as BC,red earth,hard gravel etc.,(size 1.6 x 1.6 x 3.5 mts.) i.e. 8.96 cum, Erection of tower parts completely as per specifications including erection of insulators with all accessories, jumpering, transport of material and painting of tower with two coats of alluminimum paint and bolts and nuts etc., Setting of stubs in position for laying of foundation of towers with 1:3:6 CC mix using 4Omm HBG metal including cost of all concreting materials and cement and curing for 14 days (40mm HBG metal for pyramid portion and 20mm HBG metal for chimney portion) i.e 9.98 cum, Tack welding bolts and nuts upto 20 feet from ground (144Nos bolts to be welded), Pipe earthing of towers with 50 mm dia CI earth pipe,including cost of pipe,bentonite power and running of GI flat etc.

4

149434

597736

... More
Power lines;MS BOLTS & NUTS 16 X100mm (5/8X4")

100

107

10700

... More
Power lines;M.S.Back Clamps for 9.1 M PSCC Pole

1

219

219

... More
Power lines;11KV or LT Top Fitting with clamp-0.300M

1

421

421

... More
Power lines;11KV V-X Arms with MSAngle 65x65x6

1

557

557

... More
Power lines;9.1M PSCC Pole-280Kg WL

1

4337

4337

... More
Power lines;LT Metal parts/Hardware Fittlngs

3

68

204

... More
Power lines;LT Shackle Insulator

3

31

93

... More
Power lines;Back Clamp with MSFIat 50 X6mm-0.395 M

25

67

1675

... More
Power lines;11KV Tapping Cross Arms

25

1057

26425

... More
Power lines;11KV Polymer Pin Insulators with Pin

54

187

10098

... More
Power lines;11KV Polymer insulators (C&T)

30

177

5310

... More
Power lines;11KV Material AAA conductor 55 Sq.mm

7200

66

475200

... More
Power lines;MS Flat 75x8

150

93

13950

... More
Power lines;MS Angle 50x50x6

225

93

20925

... More
Power lines;MS Channel l00x50mm

450

93

41850

... More
Power lines;M+12 GI Tower - 2.623MT, 25.9 Mts

4

345596

1382384

... More
Power lines;M+3 Gl Tower - 1.615 MT,16.5 Mts

38

217370

8260060

... More
Power lines;M+6 Gl Tower - 1.951 MT,19.5 Mts

6

260113

1560678

... More
Power lines;MS BOLTS & NUTS 16X100 mm{5/8X4")

100

107

10700

... More
Power lines;CI Earth Pipe 80 mm Dia

102

5764

587928

... More
Power lines;G.I.Stay Wire 7/2. 5mm(12SWG)

90

99

8910

... More
Power lines;33KV MS Stay Sels without BasePlate

9

1852

16668

... More
Power lines;33KV Stay clamp with MS Flat 75X8 mm-0.880 M

36

474

17064

... More
Power lines;33KV Guy lnsulalor

9

62

558

... More
Power lines;8M PSCC Pole-140Kgs

6

2177

13062

... More
Power lines;33KV Honzontal Cross Arms with clamp

6

1137

6822

... More
Power lines;33KV Back clamp with MSFtat75x8mm-0.58M

20

343

6860

... More
Power lines;33KV Top Fitting with Clamp-0.5M

3

712

2136

... More
Power lines;33KV 'V'X-arm-MSChanneI 100x50mm-2.152M

3

1618

4854

... More
Power lines;33KV 800A O/B AB SWITCH with insulators

3

54018

162054

... More
Power lines;33KV Polymer String Insulators (B&S)

105

350

36750

... More
Power lines;33KV Polímer Pin Insulators with pin

207

504

104328

... More
Power lines;AAA Conductor 100 Sq.mm

24750

95

2351250

... More
Power lines;9.1M PSCC PoIe-280Kg WL

6

4337

26022



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.