Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Opening Date14 Jun 2021
Closing Date21 Jun 2021
Tender Amount₹ 4,36,380 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ugd;Providing and laying Plain Cement Concrete (1:2.5:5) corresponding to M-15 grade using 6-12mm nominal size well graded machine crushed hard granite chips (coarse aggregate), fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } from approved quarry including cost, conveyance of all materials and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for coping except GST & Seigniorage charges, as per MORTH specification 2100.

3

-

15229.77

... More
ugd;Flush pointing to R.R.masonry in CM(1:3) including cost and conveyance of all materials to site, labour charges for all operations, curing, scaffolding, all taxes etc.,complete for finished item of work. excluding GST & Seignoriage Charges

30

-

2975.1

... More
ugd;RR masonry in CM(1:3) prop. using hard granite stone from approved quarry including cost and conveyance of all materials to site, all labour charges for dressing stones to required size and shape, mixing of cement mortor, stone wall construction, curing, etc. complete for finished item of work, excluding GST & Seignoriage Charges, as per MORTH Specification 1400 & 2200 (5th revision)

15

-

74102.1

... More
ugd;Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate conforming to table 1000-2 of MORT&H specification including cost, conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge , excluding GST & Seignoriage Charges, for foundations.

6.22

-

24294.64

... More
ugd;Providing laying Reinforced cement concrete Hume Pipe of NP-3 class 450.00mm dia lR.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes pipe including cost and conveyance of pipe, etc, except GST & Seigniorage charges,, complete and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge for finished item of work for Pipe culvert

70

-

184989.7

... More
ugd;Refilling foundations and basement /pipe line trenches with useful excavated soils (other than black cotton soils and other expansive soils) with initial lead and lifts spreading in layers not exceeding 150mm thick, consolidating each deposited layer by watering and ramming, compaction by earth masters to achieve density control of not less than 95 percent including cost and conveyance of water to work site and all operational, incidental, labour charges, all taxes, hire charges of T&P etc., complete for finished item of work. (APSS No. 309 & 310). Excluding GST.

27.6

-

1054.87

... More
ugd;Conveyance of excavated soils with machinery per 5km for transportation of materials by tipper and truck including loading un loading the following lead and dumpiing on the road alignment wherever required as directed by Engineer -in- charge. Excluding GST and Seigniorage Charges

102.6

-

9654.66

... More
ugd;Earth work in excavation for culverts & drains by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., complete for finished item of work etc., complete as per MORTH (5th Revision) specification 304. Excluding GST

75

-

8175

... More
ugd;Dismantling of existing Brick Masonry structures, retaining walls and other structure comprising of masonary, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000m as per Technical Specification Clause 202 MORD / MORTH. RBR-STCL-5(ii) / PG.No-283

7

-

2970.17



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.