For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Works
Civil And Construction
Road Construction
Opening Date6 Oct 2023
Closing Date13 Oct 2023
Tender Amount₹ 6,21,46,339 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Suryapet Road;Providing and laying Cement Concrete corresponding to M-20 grade Design mix using 40mm , 20 mm &10mm sizewell graded machine crushed hard granite chips (coarse aggregate) fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } including cost and conveyance of all materials like cement, & fine aggregate { River Sand (Natural Sand) & manufactured Sand/Crushed stone sand/Rock sand }, coarse aggregate, water etc., to site but including all charges for machine mixing, laying concrete in foundations, complete for finished item of work as per MORTH specification 1500, 1700 & 2100. Excluding GST & Seigniorage charges

76

6461

491102.12

... More
Suryapet Road;Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT&H specification including cost and conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge. Except GST & Seigniorage charges.

103.6

3930

407179.08

... More
Suryapet Road;Earth work excavation for culverts & drains by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., except GST, complete for finished item of work etc., complete as per MORTH (5th Revision) specification 304. Except GST.

6760

127

860210

... More
Suryapet Road;Providing gravel berms to the required thickness including spreading in layers of 150 mm thick with side slope of 2:1(2H:1V),sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to10 tonnes capacity to achieve desired density at OMC including cost conveyance of gravel, water etc., to site, labour charges for all operations, hire and operational charges of vibratory roller and other T&P diversion of traffic, etc., complete for finished item of work,as per MORT&H (5th Revision) Spc.No.401. excluding GST & Seignoriage Charges

3800

366

1393574

... More
Suryapet Road;Providing and laying 30 mm thick bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4% percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials to site, labour charges for all operations, diversion of traffic, etc., complete for finished item of work as per MORTH specification clause No. 507 complete in all respects.(except GST & Seiniorage charges)

560

10307

5772468.8

... More
Suryapet Road;Providing and applying Tack coat with bitumen emulsion (Rapid Setting) over the prepared surface before laying BC @ 2.0 kg/10 Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T & P necessary to complete the finished item of work, except GST, as direced by the Engineer-in-Charge as per MORTH (5th Revision) specification 503.

21000

12

267120

... More
Suryapet Road;Providing and laying 50mm thick dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading (grade-II), premixed with bituminous binder with VG-30 grade @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials, seigniorage charges, labour charges for all operations, diversion of traffic, etc., complete,except GST & Seigniorage charges, for finished item of work as per MoRTH (5th Revision) specification clause No. 505 complete in all respects.

920

9091

8364483.6

... More
Suryapet Road;Providing and applying tack coat with bitumen emulsion (Rapid Setting) over the prepared surface before laying DBM at the rate of 2.5kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge except GST as per MORTH (5th Revision) specification 503.

21000

15

317310

... More
Suryapet Road;Providing and applying Primer coat with bitumen emulsion (SS-1) (Slow Setting) over the prepared surface of granular base as WMM surface at the rate of 6.00 kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work, except GST as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 502.

21000

61

1285200

... More
Suryapet Road;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, seigniorage charges, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of traffic, etc., complete for finished item of work, except GST& Seigniorage charges, as per table 400.13 of technical specification clause 406 MORTH(5th Revision).

4700

2151

10112144

... More
Suryapet Road;Providing Granular Sub Base using HBG crushed close graded material confirming to grading -VI of MoRTH table - 400.1 & 400-2 (35% of 53 to 9.5mm and 47.5% of 9.5 to 4.75mm and 17.5% of 2.36mmm below)including spreading the HBG material in layers of uniform thickness not exceeding 200mm thick with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density complete as per technical specification as directed by the Engineer-in-charge etc, including cost and conveyance of HBG material, water etc to site, labour charges for all operations, all incidentals hire & operational charges of roller and other T&P etc, (except GST & Seiniorage charges) complete for finished item of work as per MoRT&H (5th Revision) Specification 401.(except GST & Seiniorage charges)

2900

1887

5472677

... More
Suryapet Road;Construction of embankment with good gravel brought from outside and spreading in layers of not more than 200mm thick each or as directed by the Engineer-in-Charge during execution, watering, dozing, grading and compacting each layer to required proctors density with OMC compaction with vibratory roller of 8 Tonnes capacity, maintaining the required camber in the formation including cost and conveyance of good gravel,all labour charges, hire and operational charges of dozer, power roller,mortar grader,water tanker,all water leads, etc complete as per requirement of table 300.2 as per Technical Specification clause 305 MORTH (5th Revision). (payment will be based on levels for finished item of work).Excluding GST & Seignoriage charges.

10345.75

393

4070431.88

... More
Suryapet Road;Formation of embankment / subbase with useful excavated soils obtained from Road, drains and Culverts by mechanical means and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P, all water leads duly maintaining the required camber in the formation etc., excluding GST, complete for finished item of work as per MORTH Specification clause 305 (5th Revision) (Payment will be made based on level for finished item of work). Excluding GST

51000

142

7242000

... More
Suryapet Road;Construction of rock fill embankment with broken hard rock fragments of size not exceeding 300mm laid in layers not exceeding 500mm thick including filling of surface voids with stone spalls, blinding top layers with granular material rolled with vibratory roller,all complete MORTH Specification clause 313 (5th Revision) including maintaining the required camber in the formation,labour charges for all operations and hire charges of equipment all water leads,cost of water, etc.,complete but excluding the cost of rock fragments and granular material(payment will be made on level basis).Excluding GST .

10125

87

881887.5

... More
Suryapet Road;Excavation for roadway in Hard Rock (requiring Blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading including stacking the excavated material for road formation, and desposal of unused rock in low lying areas or as directed by the Engineer - in - Charge with all lifts and leads upto 1 km including all operations, incidental,and labour charges setting out,construction of bracing and shoring, removal oof stumps and other deleterious material, sheeting, planking, strutting, all other taxes except GST etc., complete for finished item of work etc., complete as per MoRTH Specification Clause 301.

13650

299

4092133.5

... More
Suryapet Road;Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections., excluding GST complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge (based on level payment).

9100

174

1587404

... More
Suryapet Road;Earthwork excavation for road way in soil up to SDR with Hydraulic Excavator of 0.9cum bucket capacity by mechanical means including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., and transporting to the embankment location within all lifts and leads upto 1000m complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge, except GST.

57250

136

7812335



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.