Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Works
Civil And Construction
Road Construction
Construction Material
Opening Date21 Sep 2023
Closing Date7 Oct 2023
Tender Amount₹ 30,29,18,121 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road Siddapur;Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT&H specification including cost, seigniorage conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge , except GST & Seigniorage charges,T, all work up to plinth level

250

4187

1046757.5

... More
Road Siddapur;Earth work in excavation for culverts & drains by using Hydraulic excavator and depositing the earth on road side or as directed by the Engineer-in-Charge with an initial lead of 50mts in all soils upto SDR in all conditions including all operational, incidental and labour charges such as dry, wet, slushy, setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom, sheeting, planking, strutting, etc., except GST, complete for finished item of work etc., complete as per MORTH (5th Revision) specification 304.

6850

122

842207.5

... More
Road Siddapur;Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from HIPS(HI-Impact Polysterene) or ABS or ASA ( Acrylic Strene Acrylonitrite and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 ? DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer?s recommendation and complete as directed by the engineer, including all charges,complete for finished item of work, excluding GST.

6450

361

2328450

... More
Road Siddapur;Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per IRC: 35, the material should be of BERGER Company/ BERGER Equivalent and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel. In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-1997, including all charges,complete for finished item of work, excluding GST.

3900

663

2585700

... More
Road Siddapur;Providing gravel berms with good gravel obtained from outside to the required thickness including spreading in layers of 150 mm thick with side slope of 2:1(2H:1V),sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to10 tonnes capacity to achieve desired density at OMC including cost conveyance of gravel, water etc., to site, labour charges for all operations, hire and operational charges of vibratory roller and other T&P diversion of traffic, etc., complete for finished item of work, as per MORT&H (5th Revision) Spc.No.401. Excluding GST & Seignoriage charges.

35000

362

12682600

... More
Road Siddapur;Providing and laying bituminous concrete of 40mm thick with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading-II, premixed with bituminous binder VG-30@ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH (5TH REVISION) specification clause No. 507complete in all respects excluding GST,.and seigniorage charges

3100

10060

31188418

... More
Road Siddapur;Providing and applying Tack coat with bitumen emulsion (RS-1)(Rapid Setting) over the prepared surface before laying BC at the rate of 2.0kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 503. excluding GST

76000

11

883120

... More
Road Siddapur;Providing and laying 50mm thick dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder with VG-30 grade @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work as per MoRTH (5th Revision) specification clause No. 505 complete in all respects. Excluding GST & Seignoriage Charges

3850

8833

34009437

... More
Road Siddapur;Providing and applying Tack coat with bitumen emulsion (RS-1)(Rapid Setting) over the prepared surface before laying DBM at the rate of 2.5kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 503. excluding GST

76000

14

1064000

... More
Road Siddapur;Providing and applying Primer coat with bitumen emulsion (Bulk-Slow Setting-1) over the prepared surface of granular base as WMM surface at the rate of 6Kg/10sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 502. Excluding GST

76000

60

4560000

... More
Road Siddapur;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). excluding GST & Seignoriage Charges

20000

2121

42438200

... More
Road Siddapur;Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401(5th revision) and as directed by the Engineer-in-charge. (Payment Based on Levels)

17500

1900

33254200

... More
Road Siddapur;Disposal of unuseful earth/Rock with a lead of 5.0 KM including loading, unloading, all labour charges, hire charges of T&P, complete excluding GST..

38290

116

4449298

... More
Road Siddapur;Conveyance of useful excavated earth to site of embankment with a lead upto 1.0 KM including loading, unloading, all labour charges, hire charges of T&P, complete excluding GST.

62000

43

2703200

... More
Road Siddapur;Construction of rock fill embankment with broken hard rock fragments of size not exceeding 300mm laid in layers not exceeding 500mm thick including filling of surface voids with stone spalls, blinding top layers with granular material rolled with vibratory roller,all complete MORTH Specification clause 313 (5th Revision) including maintaining the required camber in the formation,labour charges for all operations and hire charges of equipment all water leads,cost of water, etc.,complete but excluding the cost of rock fragments and granular material(payment will be made on level basis).Excluding GST .

25600

85

2180864

... More
Road Siddapur;Formation of embankment / subbase with useful available excavated earth and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P, all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per MORTH Specification clause 305 (5th Revision) (Payment will be made based on level for finished item of work). Excluding GST

36600

141

5173410

... More
Road Siddapur;Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections., complete for finished item of work as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge

67200

984

66175872

... More
Road Siddapur;Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST

45750

465

21305775

... More
Road Siddapur;Excavation in ordinary rock upto SDR for with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. complete for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge

56000

173

9708160

... More
Road Siddapur;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all hire and operational charges of T&P, all labour charges, complete for finished item of work as per MORTH(5th Revision) Spec No.301 (payment will be based on levels for finished item of work).excluding GST,

56000

135

7601440

... More
Road Siddapur;Clearing and grubbing of road land by mechanical means in area of light jungle including uprooting rank vegetation, grass, bushes ,shrubs, sapling and trees girth up to 300mm, removal of stumps of trees cut earlier, and disposal of unserviceble material and stacking of serviceble material to be used for auctioned, up to a lead 1000m including removing disposal of top organic soil not exceeding 150mm in thickness.

186005

3

729139.6



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.