Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Opening Date21 Aug 2019
Closing Date26 Aug 2019
Tender Amount₹ 2,51,517 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, seigniorage charges, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, excluding GST as per table 400.13 of technical specification clause 406 MORTH(5th Revision)

25

49887

1995.5

... More
Providing, laying, spreading and compacting Robo Sand specification including cost and conveyance of all material, seigniorage charges, all taxes, hire and operational charges of T&P, labour charges for all operations,carriage of material by tipper to site, laying in uniform layers on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of traffic, etc., complete for finished item

6

10323

1720.6

... More
Supply and laying of precast concrete blocks for paving of M-30 grade and thickness not less than 50 mm for Non traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including cost and conveyance of all material, seigniorage charges, all taxes, hire and operational charges of T&P, labour charges for all operations complete for finished item of work.

40

25906

647.65

... More
Supply of precast concrete blocks for paving of M-50 grade and thickness not less than 100 mm for Heavy traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including cost and conveyance of all material, seigniorage charges, all taxes, hire and operational charges of T&P, labour charges for all operations complete for finished item of work.

60

53448

890.8

... More
Providing gravel berms to the required thickness including spreading in layers side slope of 2:1(2H:1V),sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to10 tonnes capacity to achieve desired density at OMC including cost conveyance of gravel, water etc., to site, seigniorage charges, labour charges for all operations, hire and operational charges of vibratory roller and other T&P diversion of traffic, etc., complete for finished item of work, excluding GST, as per MORT&H (5th Revision) Spc.No.401.

200

80400

402

... More
Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT&H specification including cost, seigniorage conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge , except GST & Seigniorage charges,T, for open foundations

2.5

9758

3903.3

... More
Providing and laying Plain Cement Concrete (1:2.5:5) corresponding to M-15 grade using 6-12mm nominal size well graded machine crushed hard granite chips (coarse aggregate), fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } from approved quarry including cost, conveyance and seigniorage charges of all materials and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for coping except GST & Seigniorage charges,, as per MORTH specification 2100

5

24251

4850.2

... More
(Rupees Fifteen Lakhs Eighty Two Thousand Five hundred Five and paise Fifty Six only)

-

-

-

... More
Note : 1) The rates mentioned in schedule 'A' are including overhead charges & Contractors Profit. The overhead charges includes Labour Amenitites and Labour Importation / Insurance / Compensation / Site Supervision / Quality Control Charges and Bankers Charges, etc. Hence the contractros quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made. The Rates given in schedule 'A' are inclusive of Excise Duty and Seigniorage Charges. 2)The above rates for furnished items of work including cost and convenyance of all requisite materials to site, Seigniorage Charges, Labour Charges for all operationas, all taxes, curing wherever needed, all Incidentals, Hire and Operational charges of all T&P barricading, Diversion of traffic etc. 3. The rates are exclusive GST.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.