Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Works
Civil And Construction
Opening Date5 Jul 2024
Closing Date19 Jul 2024
Tender Amount₹ 1,46,89,031 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
substation CETP;Loading of RS.Joists (150x150mm)

6

93

558

... More
substation CETP;Labour for Supply and spreading of 20mm nominal size chips with a band of 75mm thickness uniformly throughout the switchyard of area 32m x 22m

10

164

1640

... More
substation CETP;Laying of earth mat including excavation of trenches welding and fixing of trenches welding and fixing of lugs,connecting to equipment and including connecting cast iron pipes with the size of MS flat, 50x 6mm MS Flat (Raisers)

150

107

16050

... More
substation CETP;Assembly and erection of Four pole D.P Structure as per specification which includes fixing of top channels and cross bracings,transport of all Materials from road side to the location,earthing,back filling with earth ramming etc.,excluding pit excavation,concreting,erection of poles and cost of earthing Material for 33KV DP Structure with 150x75mm RS Joist

2

10726

21452

... More
substation CETP;Concreting 11.0M pole 2'.6"x2'.6"x6'.0"

6

1379

8274

... More
substation CETP;ERECTION OF POLES IN 33KV LINES:, Erection of pole in position,aligning and setting to work,fixing of cross arms and top clamps,fixing of Insulators/Discs,earthing to supports,back filling with earth and stones property ramming including transport of Materials from road side to location excluding pit excavation RS Joist 150 x 150mm

6

2145

12870

... More
substation CETP;Excavation of pit in Hard Gravel or Hard Morum for line poles as well as Strut poles not requiring blasting , 2'6"x2'6"x7'0" (0.75M x0.75M x 2.10M) (for 12.0M and above length R.S-Joist Poles)

6

1416

8496

... More
substation CETP;Laying of earth mat including excavation of trenches welding and fixing of trenches welding and fixing of lugs,connecting to equipment and including connecting cast iron pipes with the size of MS flat, 75 x 8mm MS Flat (Earth Mat)

60

107

6420

... More
substation CETP;Coil earthing

2

108

216

... More
substation CETP;Jumpering with conductor

24

155

3720

... More
substation CETP;Fixing of Trivector meter

1

381

381

... More
substation CETP;Fabrication of DP Structures,required Clamps,Drilling,Cutting etc.,Complete item of work

7

1669

11683

... More
substation CETP;Earthing including cost of bentonate powder and excavation of Pit (0.6M x 0.6M x 2.4M) (G.I Pipe and G.I wire/G.I flat 25x3mm will be supplied by the department), CI pipe earthing including providing and fixing without cement collers of size 2'dia

12

1132

13584

... More
substation CETP;Construction of plinth by using brick,sand and Cement for HT meter box equipment

1

6200

6200

... More
substation CETP;Cutting charges for MS Channel 100 x 50mm inclusive of stacking, counting weighing, handling charges and consumables

1500

12

18000

... More
substation CETP;Laying of Control Cable in cable ducts (this includes running cables in control room,switch yard,road crossing and yard lighting etc.), 10 core 2.5sqmm outdoor type copper control cable

100

35

3500

... More
substation CETP;Laying of Control Cable in cable ducts (this includes running cables in control room,switch yard,road crossing and yard lighting etc.), 4 core 2.5sqmm outdoor type copper control cable

100

32

3200

... More
substation CETP;Laying of Control Cable in cable ducts (this includes running cables in control room,switch yard,road crossing and yard lighting etc.), 2 core 2.5sqmm cable

100

26

2600

... More
substation CETP;Erection and fixing of LA's including necessary jumpering,earthing etc.,complete item of work., 33KV Line Type Complete including jumpering and earth connection

3

465

1395

... More
substation CETP;Erection of 33KV HG fuse set including earthing connection

1

1371

1371

... More
substation CETP;Erection of 33KV,800Amps double break AB Switch including alignment and rated size of flat earthing connection

3

6367

19101

... More
substation CETP;Erection of 33KV Potential Transfor mer (PT) including Jumpering and Earth Connection

3

697

2091

... More
substation CETP;Erection of 33KV Current Transfor mer (CT) including Jumpering and Earth Connection

3

697

2091

... More
substation CETP;Testing of HT TVR Meter at Site

1

3575

3575

... More
substation CETP;Labour and transport of Trivector meter

1

477

477

... More
substation CETP;Supply and fixing of Test terminal block (TTB) specially designed for HT Meters

1

2562

2562

... More
substation CETP;Erection of HT metering PP box

1

298

298

... More
substation CETP;Supply of Red Oxide Primer Paint for iron works of Grade -1

40

162

6480

... More
substation CETP;Supply of 33KV Lightning Arrestors Line Type

6

468

2808

... More
substation CETP;Base concreting with CC 1:3:6 (Cement:Sand:Metal) (including cement,sand and 40mm HBGMetal) -For dimensions 0.90 X 0.90 X 0.15M (3' X 3' X 6") Volume of Concrete =0.1215 Cum

6

433

2598

... More
substation CETP;Supply of 33KV Stretch material for Hoisting of Insulators (11KV Discs B&S-18 Nos)and Hard ware(33KV Metal Parts-6Nos),Stretching the conductor and stringing tensioning and clamping of 33KV Bus comprising of three (3)conductors, with single 200 sqmm AAA Conductor, GI Eye bolts (6Nos), GI Bolts & Nuts(3 Kgs).Excluding cost of 200Sqmm Panther Conductor

2

7987

15974

... More
substation CETP;Supply of RS Joist 150x150mm

2700

82

221400

... More
substation CETP;Supply and spreading of 20mm nominal size chips with a band of 75mm thickness uniformly throughout the switchyard of area 32m x 22m

10

2161

21610

... More
substation CETP;Supply of G.I. Earth Flat 25x4mm

100

38

3800

... More
substation CETP;Concreting to a size of 2'6"x 2'6"' x 6'0" (0.75M x0.75M x 1.8M) to line poles as well as strut pole with C.C (1:3:6) using 40mm HBGMetal -For 11.0M / 365 Kg PSCC Pole (Volume of pole for height of 1.80M from bottom of pole = 0.11 Cum) Volume of Concrete= 0.903 Cum

6

3217

19302

... More
substation CETP;Supply of MS Flat 50x6mm

360

82

29520

... More
substation CETP;Supply of 33 KV CTs 100/1A

3

17155

51465

... More
substation CETP;Supply of Pad Clamp for Panther Conductor

30

321

9630

... More
substation CETP;Supply of T Clamps for Panther to Panther Conductor

24

335

8040

... More
substation CETP;Supply of ACSR Conductor Panther 200sq.mm

150

179

26850

... More
substation CETP;Supply of CI Earth Pipe 80 mm Dia

12

5359

64308

... More
substation CETP;Supply of MS Channel -100 X 50mm

2000

82

164000

... More
substation CETP;Supply of MS Flat -75 x 8 mm :75x8 mm ISA Flat conforming to IS:2062 grade "A" Modified upto date or its equivalent international standard

300

82

24600

... More
substation CETP;Supply of 33KV HG Fuse set

1

7120

7120

... More
substation CETP;Supply of MS BOLTS & NUTS 16 x 75mm(5/8 x 3")

50

106

5300

... More
substation CETP;Supply of LT PVC Cu Contr Cable 2 Core 2.5 Sq. mm

100

41

4100

... More
substation CETP;Supply of LT PVC Cu Contr Cable 10 Core 2.5 Sq. mm

100

209

20900

... More
substation CETP;Supply of LT PVC Cu Contr Cable 4 Core 2.5 Sq. mm

100

81

8100

... More
substation CETP;Supply of 1-Ph,33KV/ 110V PTs, 0.2 Class

3

27500

82500

... More
substation CETP;Supply of HT Trivector 33KV/110V ,100/1A meters, class:02s, DLMS, CAT C

1

6600

6600

... More
substation CETP;Supply of 33KV Lightning ArrestorStn.Type-30KV,10KA

3

3580

10740

... More
substation CETP;Supply of 33KV 800A D/B AB SWITCH WITH INSULATORS

3

48026

144078

... More
substation CETP;Fixing of 11KV Polymer Pin Insulators with G.I Pins on already existing poles

51

24

1224

... More
substation CETP;Erection of 11KV Side arm with strut on already existing poles

17

542

9214

... More
substation CETP;Paving out conductor,providing temporary stays,tensioning,sagging correctly,fixing strain points,transferring to pin points binding,keeping stifner,rectification of poles,guys and jumpering etc.,final tensioning and loading with tractor including transport of Material from road side to location, 100sqmm Single Circuit (6 Conductors)

1.6

28603

45764.8

... More
substation CETP;Cutting and removing trees including stacking of girth above 200 cm

150

85

12750

... More
substation CETP;GUARDING : Providing Box type guarding for 33KV Lines at road crossings with width of 3-5M including fabricationof guarding crossarms,(bolts) back clamps,stays clamps,providing of Per Span of 2 Nos stays per guarding running of G.I wire,locing fixing to the pole, Guarding and tightening complete for 65mtr span

2

5959

11918

... More
substation CETP;Formation of Cut-Point on Tower with double jumper (6 Disc point) , formation of Cut point on Tower for 33KV line

18

2297

41346

... More
substation CETP;Paving out conductor,providing temporary stays,tensioning,sagging correctly,fixing strain points,transferring to pin points binding,keeping stifner,rectification of poles,guys and jumpering etc.,final tensioning and loading with tractor including transport of Material from road side to location, 100sqmm Single Circuit (3 Conductors)

0.83

15017

12464.11

... More
substation CETP;Construction of M+6 Type Tower: Fabrication of M+6 type tower with 2 section with 1 coat of redoxide paint, Excavation of pit including dewatering,planking,showering and shuttering(wherever necessary) and leveling in all types of soils such as BC,red earth,hard gravel etc.,(size 1.6 x 1.6 x3 .5 mts.) i.e 8.96 cum, Erection of tower parts completely as per specifications including erection of insulators with all accessories,jumpering,transport of material and painting of tower with two coats of alluminimum paint and bolts and nuts etc.,Setting of stubs in position for laying of foundation of towers with 1:3:6 CC mix using 40mm HBG metal including cost of all concreting materials and cement and curing for 14 days(40mm HBG metal for pyramid portion and 20mm HBG metal for chimney portion) i.e 9.98 cum, Tack welding bolt and nuts upto 20feet from ground (144Nos bolts to be welded), Pipe earthing of towers with 50 mm dia Cl earth pipe,including cost of pipe,bentonite power and running of GI flat etc

29

107705

3123445

... More
substation CETP;Construction of M+9 Type Tower: Fabrication of M+9 type tower with 2 section with 1 coat of redoxide paint, Excavation of pit including dewatering,planking,showering and shuttering(wherever necessary) and leveling in all types of soils such as BC,red earth,hard gravel etc.,(size 1.6 x 1.6 x3 .5 mts.) i.e 8.96 cum, Erection of tower parts completely as per specifications including erection of insulators with all accessories,jumpering,transport of material and painting of tower with two coats of alluminimum paint and bolts and nuts etc.,Setting of stubs in position for laying of foundation of towers with 1:3:6 CC mix using 40mm HBG metal including cost of all concreting materials and cement and curing for 14 days(40mm HBG metal for pyramid portion and 20mm HBG metal for chimney portion) i.e 9.98 cum, Tack welding bolt and nuts upto 20feet from ground (144Nos bolts to be welded), Pipe earthing of towers with 50 mm dia Cl earth pipe,including cost of pipe,bentonite power and running of GI flat etc

9

111767

1005903

... More
substation CETP;Detailed survey including angle points and peg marking preparation of pole schedules and detailed routeMap

2.43

912

2216.16

... More
substation CETP;Supply of 11KV Tower Side arm set

17

1630

27710

... More
substation CETP;Supply of 11KV Polymer Pin Insulators with Pin

51

414

21114

... More
substation CETP;Supply of MS BOLTS & NUTS 16x100 mm(5/8X4")

100

106

10600

... More
substation CETP;Supply of suitable cradle type guarding of standard size per span wherever necessary using channels of size 50x50x6 mm, no.8 GI wire etc (As per sketch) including 2Nos. Danger boards, 2 Nos. stay sets complete, 2 Nos. GI pipes, 2 Nos. back clamps, with pipe earthing and bolts, nuts & washers with transportation

2

9700

19400

... More
substation CETP;Supply of 33KV GI Pins

198

173

34254

... More
substation CETP;Supply of 33KV Pin Insulators

198

302

59796

... More
substation CETP;Supply of 33KV Metal parts(B&S)

111

236

26196

... More
substation CETP;Supply of 33KV Polymer String Insulators (B&S)

123

308

37884

... More
substation CETP;Supply of M+6 GI Tower-1.951 MT, 19.5 Mts

29

228942

6639318

... More
substation CETP;Supply of M+9 GI Tower -2.287 MT, 22.9 Mts

9

266562

2399058



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.