Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Civil And Construction
Opening Date7 Sep 2022
Closing Date22 Sep 2022
Tender Amount₹ 4,92,43,842 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Water supply Raviryala;Supply and fixing H.D -20 with 560mm dia clear opening C.I. Manhole frame and cover for 914.4 mm dia chamber (20 Kg- light weight) in the roof of the Sump as shown in the detail drawing with a clear opening of 760 mm dia including cost and conveyance of all materials to site, all labour charges and all other taxes except GST ect., complete as directed by Engineer-in-Charge for finished item work.

2

-

6171.56

... More
Water supply Raviryala;Re filling foundation/ basement /pipe line trenches with useful excavated soils (other than black cotton soils and other expansive soils) with initial lead and lifts spreading in layers not exceeding 150mm thick, consolidating each deposited layer by watering and ramming, compacting by earth mover to achieve optimum moiture content including cost and conveyance of water to work site and all operational, incidental, and all other taxes except GST , all labour charges, hire charges of T&P etc., complete for finished item of work, as directed by Engineer-in-charge (APSS No. 309 & 310)

51

-

11183.28

... More
Water supply Raviryala;Providing impervious / weather proof coarse over RCC roof slabs with CM (1:3) with an average thickness of 20mm thick, premixed with water proofing compound like ACCO proof or any other ISI make at one KG per bag of cement as prescribed by the manufacturer and laid over the roof slab to required slopes as directed by the Engineer-in-charge when slab is in green including cost and conveyance of all materials to site, seigniorage charges, all other taxes except GST & Seigniorage Charges, all labour charges for all operations, maintaining necessary slopes, finishing smooth and lininig, curing etc., complete as directed by Engineer-in-Charge for finished item of work.

560

-

380122.4

... More
Water supply Raviryala;Supply and fixing PVC Water bars (stopper) in position of ISI specification of 310 mm width including cost and conveyance to work site, including all other taxes except GST , all labour charges for fixing in position etc., complete as directed by the Engineer-in-charge for finished item of work.

60

-

35802.6

... More
Water supply Raviryala;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415 grade as per IS 1786-1979) upto 36mm dia for RCC and RCM works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, seigniorage charges, all other taxes except GST & Seigniorage Charges, all labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work, as directed by Engineer-in-Charge (APSS No.126).

26

-

2543562.58

... More
Water supply Raviryala;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30grade Design Mix Concrete corresponding to IS 456 using weigh batcher with fine aggregate { 50% of River Sand confirming to table 1000-2 of MORT&H (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } and 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, seigniorage charges of all materials, all other taxes except GST & Seigniorage Charges, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work. Side wall

330

-

1903393.8

... More
Water supply Raviryala;Roof Slab 150 mm thick

216.1

-

437336.7

... More
Water supply Raviryala;Beams below roof slab

10

-

150328.8

... More
Water supply Raviryala;Columns in the sump

10

-

163876.74

... More
Water supply Raviryala;Providing and laying of Vibrated Reinforced Cement Concrete corresponding to M-30grade Design Mix Concrete corresponding to IS 456 using weigh batcher with fine aggregate { 50% of River Sand confirming to table 1000-2 of MORT&H (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } and 20mm size well graded machine crushed hard granite chips (Coarse aggregate) from approved quarry with a minimum cement content of 400 kg/CuM including cost and conveyance of all materials like cement, Coarse aggregate, Fine aggregate, water etc., to site, seigniorage charges of all materials, all other taxes except GST & Seigniorage Charges, including centering & shuttering using steel scaffolding pipes, jack props, wallers, foot plates, brackets, steel centering plates weigh batcher etc machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, pumping to work spot, lifting of material with mechanical equipment like winch, etc., all other incidental and operational charges, all labour charges, etc., but excluding cost of steel and its fabrication charges etc., complete as directed by Engineer-in-Charge for the following finished items of work. Bottom raft

180

-

2209987.8

... More
Water supply Raviryala;Plain Cement Concrete (1:4:8) prop. using fine aggregate { 50% of River Sand confirming to table 1000-2 of MORT&H (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } and 40mm nominal size well graded hard broken granite metal from approved quarry including cost and conveyance of all material, except GST & Seigniorage Charges & seignirage charges, and all labour charges for machine mixing of concrete, laying concrete, compacting by vibration including curing, finishing top surface to required levels neatly etc., complete as derected by Engineer-in-charge for finished item of work in foundations.

25

-

130824.75

... More
Water supply Raviryala;Earth work excavation by Mechanical means for Sump/OHT/Pump Room & Pipe Line trenches and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious matter, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etc including all other taxes except GST etc., complete for finished item of work as per SS 20 B (APSS 308).

870

-

111507.9

... More
Water supply Raviryala;Providing impervious / weather proof coarse over RCC roof slabs with CM (1:3) with an average thickness of 20mm thick, premixed with water proofing compound like ACCO proof or any other ISI make at one KG per bag of cement as prescribed by the manufacturer and laid over the roof slab to required slopes as directed by the Engineer-in-charge when slab is in green including cost and conveyance of all materials to site, seigniorage charges, all other taxes except GST & Seigniorage Charges, all labour charges for all operations, maintaining necessary slopes, finishing smooth and lininig, curing etc., complete as directed by Engineer-in-Charge for finished item of work.

13.38

-

9003.13

... More
Water supply Raviryala;Supply and fixing of pre-painted steel casement/open able windows base steel as per IS 513 of -0.58 mm thick 'D quality, galvanized as per IS 277, finish painted with a polyester paint, section for outer frame of 46 x 52 mm section for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading 18 x 25 mm panelled with 5 mm thick plain float glass fitted with EPDM gaskets, handle made of high grade aluminium powder coated frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars @ 150 mm pitch for Windows: Double shutter for sizes 2'0 x 4'0 (609.6 x 1219.2 mm ) 3'-0 x 4'-0 (914.4mm x 1219.2 mm) without mullion section including cost and conveyance of all materials to site, all other taxes except GST , all labour charges, all incidental and operational charges etc., complete as directed by Engineer-in-Charge for finished item of work.

4

-

36863.76

... More
Water supply Raviryala;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108, including overheads and contractor's profit complete for finished item of work.

4.2

-

21143.98

... More
Water supply Raviryala;Gronolithic Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, and fine aggregate { 50% of River Sand confirming to table 1000-2 of MORT&H (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } and water including seigniorage charges and all other taxes except GST & Seigniorage Charges etc., complete as directed by Engineer-in-Charge for finished item of work.

13.38

-

6545.76

... More
Water supply Raviryala;Painting to new iron works with 2 coats of Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound) content less than 50 grams/ litre of approved brand and shade over 1 coat of Red Oxide Primer Paint for iron works of Grade -1 of approved brand to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site including cost of primer coat and all operational, incidental, labour charges etc. complete etc., complete including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.

10.8

-

2325.46

... More
Water supply Raviryala;Internal Plastering

36.1

-

10140.85

... More
Water supply Raviryala;Ceiling Plastering

107.08

-

32218.23

... More
Water supply Raviryala;Painting to new walls with two or more coats of Water proof cement paint of approved make, shade and colour to give uniform shade to all plastered surfaces of walls over a base coat of approved cement, primary grade making 3 coats of white cement (total 3 or more coats) in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powedered materials including cost and conveyance of all materials to work site, all other taxes except GST and all labour charges such as preparation of the wall surface, applying priming coat, applying water proof cement paint two or more coats, curing, scaffolding etc., complete as directed by Engineer-in-Charge for finished item of work as per SS 912. External Plastering

65.08

-

18281.62

... More
Water supply Raviryala;Internal Plastering

36.1

-

22014.86

... More
Water supply Raviryala;Plastering 12mm thick for brick masonry walls/ concrete surfaces in two coats with a base coat of 8 mm thick in CM (1:6) and 4 mm thick top coat in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site,seigniorage charges, and all other taxes except GST & Seigniorage Charges, all labour charges, all operational and incidental charges, mixing mortar, finishing, scaffolding, curing, providing architectural groves at junction of Concrete and Masonry, etc., complete as directed by Engineer-in-Charge for finished item of work for internal walls. Ceiling Plastering

107.08

-

68338.46

... More
Water supply Raviryala;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site including all operational incidental charges, including all other taxes except GST & Seigniorage Charges, all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves wherever necessary etc., complete for finished item of work , for Pump Room external walls

65.08

-

42135.4

... More
Water supply Raviryala;Masonry work in CM(1:6) prop with flyash Cement / lime solid blocks of size 290mm x 225mm x 140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs , Gypsum of 5kgs and stone dust including cost and conveyance of all materials, labour charges, seigniorage charges, scaffolding and curing etc., and Overheads & Contractors profit complete with a compressive strength not less than 50 kg/sq.cm for super structure wall (APSS No. 501 & 504).

9.82

-

81309.6

... More
Water supply Raviryala;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) steel bars (Fe 415 grade as per IS 1786-1979) upto 36mm dia for RCC and RCM works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of steel bars including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, seigniorage charges, all other taxes except GST & Seigniorage Charges, all labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work, as directed by Engineer-in-Charge (APSS No.126).

1.26

-

123264.96

... More
Water supply Raviryala;RR masonry in CM(1:6) prop. using hard granite stone from approved quarry and fine aggregate { 50% of River Sand confirming to table 1000-2 of MORT&H (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 },including cost and conveyance of all materials to site, seigniorage charges, all other taxes except GST & Seigniorage Charges, all labour charges for dressing stones to required size and shape, cost of bond stone mixing of cement mortor, stone wall construction, curing, etc. complete as directed by Engineer-in-charge for finished item of work.

2.96

-

16571.23

... More
Water supply Raviryala;Slab 125mm thick

13.38

-

22568.85

... More
Water supply Raviryala;Roof Beam

1.51

-

21261.99

... More
Water supply Raviryala;Lintels

0.3

-

4729.98

... More
Water supply Raviryala;Plinth Beam

1.51

-

22161.95

... More
Water supply Raviryala;Coloumns

1.84

-

29369.71

... More
Water supply Raviryala;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Footing

3.15

-

38165.87

... More
Water supply Raviryala;Providing Antitermite treatment as per BIS - IS 6313 (Part 2) 2013 code specification (Pre-constructional chemical tretament measures) & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry lmidacloprid 30.5% SC ((IS63131) dissolve 2.1 Ml/1 litre of water and apply emulsion / solution @ 7.5 litres /sqm of internal and external verticle surface of the columns, plinth beams (back filling) walls and floor junction, external perimeters along retaining wall @ 5 litres / sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (plinth) and @ 2.0 litres / line metre at expansion joints. The substructure of a depth of 500 mm around columns & 300 mm deep around plinth beams, basement & floor filling area including excavation channel along the wall & rodding, etc., cost and conveyance of all materials to the Site, cost of labour for spraying, rodding, etc., complete for finished item of work as per the approval of the Engineer-in-Charge (plinth area measurements will be taken for measurements).

13.38

-

2114.04

... More
Water supply Raviryala;Plain Cement Concrete (1:4:8) prop. using fine aggregate { 50% of River Sand confirming to table 1000-2 of MORT&H (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } and 40mm nominal size well graded hard broken granite metal from approved quarry including cost and conveyance of all material, except GST & Seigniorage Charges & seignirage charges, and all labour charges for machine mixing of concrete, laying concrete, compacting by vibration including curing, finishing top surface to required levels neatly etc., complete as derected by Engineer-in-charge for finished item of work in foundations.

3.45

-

18053.82

... More
Water supply Raviryala;Filling in foundations with sand including seignorage cost and conveyance of all materials to site, Spreading watering and tamping to standard specifications including all other taxes except GST & Seigniorage Charges, all labour charges etc., complete beneath screed concrete as per MORTH specification 304

3.35

-

12844.47

... More
Water supply Raviryala;Re filling foundation/ basement /pipe line trenches with useful excavated soils (other than black cotton soils and other expansive soils) with initial lead and lifts spreading in layers not exceeding 150mm thick, consolidating each deposited layer by watering and ramming, compacting by earth mover to achieve optimum moiture content including cost and conveyance of water to work site and all operational, incidental, and all other taxes except GST , all labour charges, hire charges of T&P etc., complete for finished item of work, as directed by Engineer-in-charge (APSS No. 309 & 310)

42.09

-

9650.4

... More
Water supply Raviryala;PUMP ROOM Earth work excavation by Mechanical means for Sump/OHT/Pump Room & Pipe Line trenches and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious matter, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etc including all other taxes except GST etc., complete for finished item of work as per SS 20 B (APSS 308).

52.38

-

6713.54

... More
Water supply Raviryala;Construction of Over Head Service Reservoir with staging of 15.00 m with VRCC M30 grade design mix with Raft Foundation inclusive of three coats of food grade epoxy paint to inner surface of the reservoir including roof dome and for a finished work including 2 coats of weather proof emulsion painting for external surfaces over one coat of primer of approved make, lettering, all required fixtures, Pipes, Pipe specials, valves of DI material, Valve chambers etc., for pipe connections including cost of pipes, specials and valves as per departmental directions and drawings. .. for Zone-II seismic, including all Fixtures as per SSR 21-22

500000

-

10911000

... More
Water supply Raviryala;Manufacture, Supply and Delivery of CI/ MS Dismantling joints with both side flange end siutable for installations in between flange end pipes excluding transportation charges etc., including all other taxes except GST as directed by Engineer-in-Charge, complete for finished item of work. 250mm Dia PN.16 class

2

-

39467.58

... More
Water supply Raviryala;Manufacture,supply and delivery of standard make with ISI mark cenrifugally cast(spun) Ductile Iron pressure pipes with flanged (welded)ends for working lengths of 1,2,3,4,5 meters for classification K9 with cement morter lining inside the pipes with outside zink coating includingloading, unloading forwarding, packing, testing & Transportation and cost of sepcials ,inspection and local conveyance to work site including labour charges for laying the same vertically and laying them true to alignment and gradient including all sundries and other taxes except GST etc., complete as directed by engineer incharge for finished item of work as per BUS No. 3114/85 complete as directed by Engineer-in-Charge for finished item of work. 250mm DI K9 pipe

50

-

309360

... More
Water supply Raviryala;Manufacture,supply and delivery of standard make with ISI mark Centrifugally cast (Spun) Ductile Iron pressure pipes for water,gas and sewage with Socket Spigot ends conforming to IS.:8329/2000 in standard working lengths of 4, 5 5.5 & 6 meter for classification K9 suitable for push-on-joint (rubber gasket adjointing) with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, including loading, unloading forwarding, packing, testing , Transportation and cost of specials includuding labour charges for laying and jointing except GST etc., complete as directed by engineer incharge for finished item of work. 250mm DI K9 pipe

1500

-

6978510

... More
Water supply Raviryala;Carting of surplus earth including loading, unloading and conveyance upto 5kms including all labour charges and all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work. 50% of rock Qty

2222.2

-

252441.92

... More
Water supply Raviryala;For 80mm dia Air Valve

1

-

9783.39

... More
Water supply Raviryala;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification, including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work as per Standard specification. For 50mm dia Air Valve

15

-

146750.85

... More
Water supply Raviryala;80mm dia air value

2

-

439.08

... More
Water supply Raviryala;Jointing DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete, including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work. 50mm dia Air Value

17

-

2805

... More
Water supply Raviryala;80mm dia air value

2

-

973.46

... More
Water supply Raviryala;Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/Air cushion valve excluding cost of jointing material such as bolts, nuts and rubber insertions, including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work 50mm dia Air Value

17

-

6192.25

... More
Water supply Raviryala;80mm dia air value

2

-

97860.68

... More
Water supply Raviryala;Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per requirement of the dept, including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work. 50mm dia Air Value

17

-

623517.16

... More
Water supply Raviryala;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames inclding excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc.,complete for finished item of work as per Standard specification. including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work as per Standard specification. For up to 200mm dia to 350mm Sluice valves and for revamping pipe lines

4

-

63401.72

... More
Water supply Raviryala;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification, including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work as per Standard specification. For up to 200mm dia Sluice valves and for revamping pipe lines

23

-

225017.97

... More
Water supply Raviryala;350mm dia Sluice Valves

1

-

1201.02

... More
Water supply Raviryala;300mm dia Sluice Valves

1

-

836.33

... More
Water supply Raviryala;200mm dia Sluice Valves (including pumping main)

2

-

1131.46

... More
Water supply Raviryala;Jointing DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete, including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work. 100mm dia Sluice Valves ( including100mm dia Scour valves)

20

-

6863.4

... More
Water supply Raviryala;350mm dia Sluice Valves

1

-

2254.69

... More
Water supply Raviryala;300mm dia Sluice Valves

1

-

1335.08

... More
Water supply Raviryala;200mm dia Sluice Valves (including pumping main)

2

-

1319.76

... More
Water supply Raviryala;Lowering, keeping in position and fixing D.I. sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces, including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work. PHE-CISP-15 100mm dia Sluice Valves ( including100mm dia Scour valves)

20

-

4719.8

... More
Water supply Raviryala;100mm dia Scour valves

10

-

148332.3

... More
Water supply Raviryala;350mm dia Sluice Valves

1

-

245962.78

... More
Water supply Raviryala;300mm dia Sluice Valves

1

-

81238.02

... More
Water supply Raviryala;250mm dia Sluice Valves

1

-

53752.28

... More
Water supply Raviryala;200mm dia Sluice Valves (including pumping main)

1

-

38809.29

... More
Water supply Raviryala;160mm dia Sluice Valves

2

-

46709.06

... More
Water supply Raviryala;100mm dia Sluice Valves

4

-

59332.92

... More
Water supply Raviryala;Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft, sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG-40/ SG-400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department including cost and conveyance of material to work site and all other taxes except GST as directed by Engineer-in-Charge for finished item of work. 80mm dia Sluice Valves

6

-

67468.92

... More
Water supply Raviryala;355mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

2

-

29962.54

... More
Water supply Raviryala;315mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

10505.98

... More
Water supply Raviryala;225mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

3847

... More
Water supply Raviryala;200mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

2709.72

... More
Water supply Raviryala;160mm dia HDPE 6Kg/Cm2 pipe

1

-

1450.86

... More
Water supply Raviryala;140 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

1

-

840.75

... More
Water supply Raviryala;125 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

4

-

2440.44

... More
Water supply Raviryala;90 mm dia HDPE 6Kg/Cm2 pipe

6

-

2051.88

... More
Water supply Raviryala;75 mm dia HDPE 6Kg/Cm2 pipe

4

-

781.68

... More
Water supply Raviryala;Supplying and laying in position polythylene pipes as per IS 4984, PE100, PN6 6.0 kg/ sqcm (SDR 21) including cost and conveyance of all material to work site, laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure, rectifying all leakages, including provision of flanges as and where required especially near to the valves as directed by Engineer-in-Charge etc., all complete for finished item of work including overhead & contractors Tees for 63 mm dia HDPE 6Kg/Cm2 pipe

21

-

3411.87

... More
Water supply Raviryala;355mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

2

-

5776.18

... More
Water supply Raviryala;315mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

1704.23

... More
Water supply Raviryala;225mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

1081.61

... More
Water supply Raviryala;200mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

865.75

... More
Water supply Raviryala;160mm dia HDPE 6Kg/Cm2 pipe

1

-

473.77

... More
Water supply Raviryala;140 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

1

-

360.16

... More
Water supply Raviryala;125 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

4

-

1345.2

... More
Water supply Raviryala;90 mm dia HDPE 6Kg/Cm2 pipe

6

-

1397.46

... More
Water supply Raviryala;75 mm dia HDPE 6Kg/Cm2 pipe

4

-

858.92

... More
Water supply Raviryala;Supplying and laying in position polythylene pipes as per IS 4984, PE100, PN6 6.0 kg/ sqcm (SDR 21) including cost and conveyance of all material to work site, laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure, rectifying all leakages, including provision of flanges as and where required especially near to the valves as directed by Engineer-in-Charge etc., all complete for finished item of work including overhead & contractors MS flanges to suit HDPE pipes for 63 mm dia HDPE 6Kg/Cm2 pipe

21

-

3578.82

... More
Water supply Raviryala;355mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

6

-

21316.44

... More
Water supply Raviryala;315mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

2

-

3401.64

... More
Water supply Raviryala;280mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

1473.59

... More
Water supply Raviryala;250mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

1319.07

... More
Water supply Raviryala;225mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

1124.79

... More
Water supply Raviryala;200mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

2

-

1965.54

... More
Water supply Raviryala;160mm dia HDPE 6Kg/Cm2 pipe

2

-

1077.08

... More
Water supply Raviryala;140 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

2

-

772.58

... More
Water supply Raviryala;125 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

10

-

3828.8

... More
Water supply Raviryala;90 mm dia HDPE 6Kg/Cm2 pipe

14

-

2147.32

... More
Water supply Raviryala;75 mm dia HDPE 6Kg/Cm2 pipe

9

-

1073.7

... More
Water supply Raviryala;Supplying and laying in position polythylene pipes as per IS 4984, PE100, PN6 6.0 kg/ sqcm (SDR 21) including cost and conveyance of all material to work site, laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure, rectifying all leakages, including provision of flanges as and where required especially near to the valves as directed by Engineer-in-Charge etc., all complete for finished item of work including overhead & contractors Long neck pipe ends for 63 mm dia HDPE 6Kg/Cm2 pipe

49

-

4843.65

... More
Water supply Raviryala;355mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

6

-

10150.38

... More
Water supply Raviryala;315mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

2

-

2195.04

... More
Water supply Raviryala;280mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

803.26

... More
Water supply Raviryala;250mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

785.08

... More
Water supply Raviryala;225mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

551.03

... More
Water supply Raviryala;200mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

2

-

1056.62

... More
Water supply Raviryala;160mm dia HDPE 6Kg/Cm2 pipe

2

-

595.34

... More
Water supply Raviryala;140 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

2

-

390.84

... More
Water supply Raviryala;125 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

10

-

1658.8

... More
Water supply Raviryala;90 mm dia HDPE 6Kg/Cm2 pipe

14

-

1495.2

... More
Water supply Raviryala;75 mm dia HDPE 6Kg/Cm2 pipe

9

-

715.77

... More
Water supply Raviryala;Supplying and laying in position polythylene pipes as per IS 4984, PE100, PN6 6.0 kg/ sqcm (SDR 21) including cost and conveyance of all material to work site, laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure, rectifying all leakages, including provision of flanges as and where required especially near to the valves as directed by Engineer-in-Charge etc., all complete for finished item of work including overhead & contractors profit End caps for 63 mm dia HDPE 6Kg/Cm2 pipe

49

-

3173.24

... More
Water supply Raviryala;355mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

3

-

37823.58

... More
Water supply Raviryala;315mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

9094.88

... More
Water supply Raviryala;280mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

6577.17

... More
Water supply Raviryala;250mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

4560.51

... More
Water supply Raviryala;225mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

3326.65

... More
Water supply Raviryala;200mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

1

-

2346.15

... More
Water supply Raviryala;160mm dia HDPE 6Kg/Cm2 pipe

1

-

1204.32

... More
Water supply Raviryala;140 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

1

-

808.94

... More
Water supply Raviryala;125 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

6

-

3687.96

... More
Water supply Raviryala;90 mm dia HDPE 6Kg/Cm2 pipe

9

-

2842.65

... More
Water supply Raviryala;75 mm dia HDPE 6Kg/Cm2 pipe

6

-

1111.14

... More
Water supply Raviryala;Supplying and laying in position polythylene pipes as per IS 4984, PE100, PN6 6.0 kg/ sqcm (SDR 21) including cost and conveyance of all material to work site, laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure, rectifying all leakages, including provision of flanges as and where required especially near to the valves as directed by Engineer-in-Charge etc., all complete for finished item of work including overhead & contractors profit Bends for 63 mm dia HDPE 6Kg/Cm2 pipe

29

-

4118.58

... More
Water supply Raviryala;355mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

846

-

4067728.74

... More
Water supply Raviryala;315mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

280

-

1080979.2

... More
Water supply Raviryala;280mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

166

-

498849.92

... More
Water supply Raviryala;250mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

174

-

423214.98

... More
Water supply Raviryala;225mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

214

-

427676.86

... More
Water supply Raviryala;200mm dia HDPE 6Kg/Cm2 pipe)(J8-T5)

330

-

522951

... More
Water supply Raviryala;160mm dia HDPE 6Kg/Cm2 pipe

322

-

338621.64

... More
Water supply Raviryala;140 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

291

-

239964.42

... More
Water supply Raviryala;125 mm dia HDPE 6Kg/Cm2 pipe (S1-S2)

1435

-

976273.55

... More
Water supply Raviryala;90 mm dia HDPE 6Kg/Cm2 pipe

2170

-

802249

... More
Water supply Raviryala;75 mm dia HDPE 6Kg/Cm2 pipe

1423

-

388336.7

... More
Water supply Raviryala;Supplying and laying in position polythylene pipes as per IS 4984, PE100, PN6 6.0 kg/ sqcm (SDR 21) including cost and conveyance of all material to work site, laying and jointing of HDPE pipes in ready made trench by butt fusion welding as per IS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure, rectifying all leakages, including provision of flanges as and where required especially near to the valves as directed by Engineer-in-Charge etc., all complete for finished item of work including overhead & contractors profit 63 mm dia HDPE 6Kg/Cm2 pipe

7349

-

1541305.77

... More
Water supply Raviryala;Supply and filling with quarry dust in pipe line network from approved quarry as shown in the approved drawing including cost and conveyance, watering, tamping including all labour charges, all other taxes except GST & seigniorage charges, as directed by Engineer-in-Charge etc., complete for finished item of work at rock Portion.

750

-

472515

... More
Water supply Raviryala;Barricading, hoarding, lighting and watching etc., for water supply works for trenches of depths upto 6?-0? (2 Meter) below Ground Level, including all other taxes except GS etc., complete for finished item of work for main roads in habitation area.

150.55

-

102846.73

... More
Water supply Raviryala;Earth work excavation in hard rock by Mechanical means upto 3 mt depth (blasting prohibited) for Pipe Line trenches and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious material, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etc including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work as per SS 20 B (APSS 308).

2777.75

-

4501454.99

... More
Water supply Raviryala;Earth work excavation by Manual Means upto 3 mt depth for Pipe Line trenches and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious material, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etc including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work as per SS 20 B (APSS 308).

6666.6

-

2007179.93

... More
Water supply Raviryala;Earth work excavation in ordinary rock by Mechanical means upto 3 mt (Not requiring blasting) depth for Pipe Line trenches and depositing on bank in all types of soils like morum, red earth, gravely soils, ordinary soils upto SDR in all conditions including hire & operational charges of machinery, labour charges for setting out, construction of shoring and bracing, removal of stumps and all other deletarious material, dressing on sides & bottom of trench in all conditions viz dry, wet and slushy etc including all other taxes except GST as directed by Engineer-in-Charge etc., complete for finished item of work as per SS 20 B (APSS 308).

1666.65

-

268880.64



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.