Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Agriculture or Forestry Works
Opening Date21 Aug 2019
Closing Date26 Aug 2019
Tender Amount₹ 5,02,466 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Digging of pits in June-July, of 60cm3 size (0.216 cum) in hard gravelly and moram soil

1500

69375

46.25

... More
Transportation of Planting Stock (including loading and unloading) up to distance of 5 km (a) 20 X 30 cm (8"X12") bag plants

1500

2955

1.97

... More
Transportation of Planting Stock (including loading and unloading) more than 5 km distance and upto 25 km distance(a) 20 X 30 cm (8"X12") bag plants

1500

2295

1.53

... More
Internal transportation within the linear distance of plantation site (a) 20 X 30 cm (8"X12") bag plants

1500

2985

1.99

... More
Application of 100 gm of superphosphate and 100 gm of chloridine dust per pit at the time of planting

1500

1500

1

... More
Cost of superphosphate and chloridine dust

1500

4500

3

... More
Cost of supporting stake of 2.5 mtr long, sturdy and straight and minimum 10 cm girth at the base

3700

58275

15.75

... More
Refilling the pits with dug-up soil, planting, forming saucer with a radius of 0.50 m radius around the plant and provide support to the plants which should go 18" inside pit along with plant at the time of planting (planting without HDPE self supporting tree gurad).

1500

22935

15.29

... More
Cost and application of 1/2 cft FYM per plant - 1 month after planting

1500

28350

18.9

... More
WATERING - To be done through tractor-fitted water tanker and average incremental growth of 1.0 m by end of raising year - Minimum of 10 liter per plant with a Water Tanker - 23 waterings a) Watering the plants - Main Rows

14700

98490

6.7

... More
c) Watering the plants - Block Plantation

63000

158760

2.52

... More
Application of inorganic fertilizers like 25 gms of urea (2 month after planting, i.e. in August) and 50 gms of DAP (4 months after planting, i.e. in October). Fertilizer application shall be made by making 3 holes of 10 cm depth with crow bar at a distance of 20 cm away from plant and putting ferilizer and closing.

3700

7770

2.1

... More
Cost of above inorganic fertilizers (LMR)

3700

11470

3.1

... More
Weeding and forming of saucer (two times - 1st in July & 2nd in September)

3700

32264

8.72

... More
Replacement of causalities (10% - since watering provision is provided) including opening of pit, internal transportation, planting and refixing the fence.

370

8628

23.32

... More
Pruning of lower branch initials upto 1/3 rd height (to be done during October).

3700

4366

1.18

... More
Clearing unwanted growth to a width of 3 m on both sides parallel to the road (to be done during Nov - Dec) which will create a fireline preventing spread of ground fire from adjacent agricultural field.

12

14272

1189.4

... More
Cutting of coppice growth flush to the ground to reduce the competition over the entire area duly retaining useful species after planting and placing the cut material in between planting Rows. For low rain fall zone less tha 800mm

0.8

743

929

... More
Cost of Protection: One Plantation Watcher from July, 2019 to March, 2020.

8

70056

8757

... More
Cycle Allowance per Plantation Watcher from date of planting

240

1204

5.02

... More
(Rupees Nineteen Lakhs Thirty Two Thousand Five hundred Sixty Five and paise Sixty only)

-

-

-

... More
Note : 1) The rates mentioned in schedule 'A' are including overhead charges & Contractors Profit. The overhead charges includes Labour Amenitites and Labour Importation / Insurance / Compensation / Site Supervision / Quality Control Charges and Bankers Charges, etc. Hence the contractros quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made. The Rates given in schedule 'A' are inclusive of Excise Duty and Seigniorage Charges. 2)The above rates for furnished items of work including cost and convenyance of all requisite materials to site, Seigniorage Charges, Labour Charges for all operationas, all taxes, curing wherever needed, all Incidentals, Hire and Operational charges of all T&P barricading, Diversion of traffic etc. 3. The rates are exclusive GST.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.