Telangana State Industrial Infrastructure Corporation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
139438Bid Award Id
ViewTender No
22/ZM/TSIIC/MDCL-SDPT/2019-20 Dt. 14.08.2019Tender Authority
Telangana State Industrial Infrastructure Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Digging of pits in June-July, of 60cm3 size (0.216 cum) in hard gravelly and moram soil
1500
69375
46.25
... More
Transportation of Planting Stock (including loading and unloading) up to distance of 5 km (a) 20 X 30 cm (8"X12") bag plants
1500
2955
1.97
... More
Transportation of Planting Stock (including loading and unloading) more than 5 km distance and upto 25 km distance(a) 20 X 30 cm (8"X12") bag plants
1500
2295
1.53
... More
Internal transportation within the linear distance of plantation site (a) 20 X 30 cm (8"X12") bag plants
1500
2985
1.99
... More
Application of 100 gm of superphosphate and 100 gm of chloridine dust per pit at the time of planting
1500
1500
1
... More
Cost of superphosphate and chloridine dust
1500
4500
3
... More
Cost of supporting stake of 2.5 mtr long, sturdy and straight and minimum 10 cm girth at the base
3700
58275
15.75
... More
Refilling the pits with dug-up soil, planting, forming saucer with a radius of 0.50 m radius around the plant and provide support to the plants which should go 18" inside pit along with plant at the time of planting (planting without HDPE self supporting tree gurad).
1500
22935
15.29
... More
Cost and application of 1/2 cft FYM per plant - 1 month after planting
1500
28350
18.9
... More
WATERING - To be done through tractor-fitted water tanker and average incremental growth of 1.0 m by end of raising year - Minimum of 10 liter per plant with a Water Tanker - 23 waterings a) Watering the plants - Main Rows
14700
98490
6.7
... More
c) Watering the plants - Block Plantation
63000
158760
2.52
... More
Application of inorganic fertilizers like 25 gms of urea (2 month after planting, i.e. in August) and 50 gms of DAP (4 months after planting, i.e. in October). Fertilizer application shall be made by making 3 holes of 10 cm depth with crow bar at a distance of 20 cm away from plant and putting ferilizer and closing.
3700
7770
2.1
... More
Cost of above inorganic fertilizers (LMR)
3700
11470
3.1
... More
Weeding and forming of saucer (two times - 1st in July & 2nd in September)
3700
32264
8.72
... More
Replacement of causalities (10% - since watering provision is provided) including opening of pit, internal transportation, planting and refixing the fence.
370
8628
23.32
... More
Pruning of lower branch initials upto 1/3 rd height (to be done during October).
3700
4366
1.18
... More
Clearing unwanted growth to a width of 3 m on both sides parallel to the road (to be done during Nov - Dec) which will create a fireline preventing spread of ground fire from adjacent agricultural field.
12
14272
1189.4
... More
Cutting of coppice growth flush to the ground to reduce the competition over the entire area duly retaining useful species after planting and placing the cut material in between planting Rows. For low rain fall zone less tha 800mm
0.8
743
929
... More
Cost of Protection: One Plantation Watcher from July, 2019 to March, 2020.
8
70056
8757
... More
Cycle Allowance per Plantation Watcher from date of planting
240
1204
5.02
... More
(Rupees Nineteen Lakhs Thirty Two Thousand Five hundred Sixty Five and paise Sixty only)
-
-
-
... More
Note : 1) The rates mentioned in schedule 'A' are including overhead charges & Contractors Profit. The overhead charges includes Labour Amenitites and Labour Importation / Insurance / Compensation / Site Supervision / Quality Control Charges and Bankers Charges, etc. Hence the contractros quoted percentage is inclusive of all the above including Technical persons and work insurance and no reimbursement for these will be made. The Rates given in schedule 'A' are inclusive of Excise Duty and Seigniorage Charges.
2)The above rates for furnished items of work including cost and convenyance of all requisite materials to site, Seigniorage Charges, Labour Charges for all operationas, all taxes, curing wherever needed, all Incidentals, Hire and Operational charges of all T&P barricading, Diversion of traffic etc. 3. The rates are exclusive GST.
-
-
-