For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Pipes and Pipe Related Activities
Opening Date4 Oct 2021
Closing Date14 Oct 2021
Tender Amount₹ 7,85,88,773 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Narmala Road;Providing and laying 50mm thick dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading (grade-II), premixed with bituminous binder with VG-10 grade @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete, excluding GST and seigniorage charges for finished item of work as per MoRTH (5th Revision) specification clause No. 507 complete in all respects.

1288.25

-

9916922.73

... More
Narmala Road;Providing and applying tack coat with bitumen emulsion (RS-1)(Rapid Setting) over the prepared surface before laying DBM at the rate of 2.5kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge excluding GST as per MORTH (5th Revision) specification 503.

25590

-

309127.2

... More
Narmala Road;Providing and applying Primer coat with bitumen emulsion (SS-1) (Slow Setting) over the prepared surface of granular base as WMM surface at the rate of 7.00 kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work, excluding GST as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 502.

25590

-

1314814.2

... More
Narmala Road;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, excluding GST and seigniorage charges, as per table 400.13 of technical specification clause 406 MORTH(5th Revision).

6723.5

-

12326528.72

... More
Narmala Road;Providing Granular Sub Base using HBG crushed close graded material confirming to grading -I of MoRTH table - 400.1 (50% of 53mm to 9.5mm , 20% of 9,5 to 2.36mm and 30% of 2.36mmm below) including spreading the HBG material in layers of uniform thickness not exceeding 150mm thick with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density complete as per technical specification as directed by the Engineer-in-charge etc, including cost and conveyance of HBG material, water etc to site, labour charges for all operations, all incidentals hire & operational charges of roller and other T&P etc, excluding GST &seigniorage charges complete for finished item of work as per MoRT&H (5th Revision) Specification 401.

9636

-

15124183.8

... More
Narmala Road;Construction of embankment with good gravel brought from outside and spreading in layers of not more than 200mm thick each or as directed by the Engineer-in-Charge during execution, watering, dozing, grading and compacting each layer to required proctors density with OMC compaction with vibratory roller of 8 Tonnes capacity, maintaining the required camber in the formation including cost and conveyance of good gravel, all labour charges, hire and operational charges of dozer, power roller, mortar grader, water tanker, all water leads, etc complete excluding GST and seigniorage charges as per requirement of table 300.2 as per Technical Specification clause 305 MORTH (5th Revision). (payment will be based on levels for finished item of work).

58000

-

26830800

... More
Narmala Road;Formation of embankment / subbase with useful excavated soils obtained from Road, drains and Culverts by mechanical means and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P, all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per Tecchnical specificatiom MORTH Specification clause 301.5 MORD/305, excluding GST (Payment will be made based on level for finished item of work).

12300

-

1629996

... More
Narmala Road;Conveyance of unuseful excavated earth/rock to out side with a lead upto 5.0 KM including loading, unloading, all labour charges, hire charges of T&P, complete excluding GST.

7000

-

754600

... More
Narmala Road;Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections., excluding GST complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge (based on level payment).

3860

-

626092

... More
Narmala Road;Earthwork excavation for road way in soil up to SDR with Hydraulic Excavator of 0.9cum bucket capacity by mechanical means including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., and transporting to the embankment location within all lifts and leads upto 1000m complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge, excluding GST.

15400

-

1953490



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.