Telangana State Industrial Infrastructure Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Industrial Infrastructure Corporation Limited - TSIIC Tender

Opening Date27 Apr 2021
Closing Date12 May 2021
Tender Amount₹ 42,87,71,108 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Pharmacity Road Phase I;Providing and laying Plain Cement Concrete (1:3:6) corresponding to M-10 grade using 40mm nominal size well graded machine crushed hard granite chips (coarse aggregate), fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } from approved quarry including cost, conveyance and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for Leveling except GST & Seigniorage charges,, as per MORTH specification 2100.

496.24

-

1866021.2

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 1200

45

-

44901.45

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 1000

90

-

59747.4

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 900

90

-

50465.7

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 500

2009

-

552675.9

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 300

1550

-

278101

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 1200

45

-

650171.7

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 1000

90

-

967840.2

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 900

90

-

819964.8

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 500

2009

-

6415420.06

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 300

1550

-

2637573

... More
Pharmacity Road Phase I;Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesf approved shades on new concrete surfaces including cost and conveyance of all materials like water etc to site, including all materials,curing etc complete as per drawing and Technical specifications and as directed by the Engineer-in-charge. Excluding GST. Kerbs

2006.77

-

171819.65

... More
Pharmacity Road Phase I;Construction of Cast in Situ Cement Concrete M20 Kerb with channel with top and bottom width 115 and 165mm respectively,250mm high in M20 grade PCC on M10 grade foundation 150mm thick, foundation having 50mm projection beyond kerb stone, kerb stone laid with kerb laying machine,foundation concrete laid manually,all complete from approved quarry including cost and conveyance of all materials like cement,sand,coarse aggregate,water etc.to site, sales on all materials and including all charges for machine mixing,laying concrete in foundations and under flooring bed,ramming in layers finishing top surface to the required level,curing etc.,complete for finished item of work as per clause 408 MORTH Excluding GST & Seignoriage Charges

5498

-

2926695.36

... More
Pharmacity Road Phase I;Providing and laying Filter material underneath pitching in slopes including cost and conveyance of all materials and other taxes,curing,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST. complete as per drawing and Technical specification

166.61

-

374809.19

... More
Pharmacity Road Phase I;Providing and construction of stone pitching on slopes laid over prepared prepeared filter media including boulders apron laid dry in front of toe of embankment with useful excavated soils to requred levels and slopes using grinate for revetment 225mm of not less then 40 kg and stone spalls of minimum 25mm size(Field picked metal unbroken 25 mm size) including cost and conveyance of all materials, all incidental and operational charges etc., ramming, curing, all labour charges, overhead & contractor profit complete for finished item of work as per MoRTH specification 2505 as directed by the Engineer-in-charge. Excluding GST & seigniorage charges etc.,

333.22

-

374472.64

... More
Pharmacity Road Phase I;Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade ,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST.

10

-

314.2

... More
Pharmacity Road Phase I;Providing Weep Holes in Brick masoNo.sy/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. including cost and conveyance of all materials to site including , all labour charges. complete as per Technical specifications clause 2706 and as directed by the Engineer-in-charge.Excluding GST

20

-

5191.2

... More
Pharmacity Road Phase I;Supplying fitting and placing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of all diametres using primary producers like TATA, SAIL, VSP, Jindal, Shyam Steel etc., of bar reinforcements for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes except GST on all materials etc, including overheads & contractors profit etc., complete for finished item of work. For Superstructure

34.97

-

2531296.46

... More
Pharmacity Road Phase I;Supplying fitting and placing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of all diametres using primary producers like TATA, SAIL, VSP, Jindal, Shyam Steel etc., of bar reinforcements for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes except GST on all materials etc, including overheads & contractors profit etc., complete for finished item of work. For Substructure

18.23

-

1290961.28

... More
Pharmacity Road Phase I;Supplying fitting and placing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of all diametres using primary producers like TATA, SAIL, VSP, Jindal, Shyam Steel etc., of bar reinforcements for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes except GST on all materials etc, including overheads & contractors profit etc., complete for finished item of work. For Foundation

33.78

-

2384342.72

... More
Pharmacity Road Phase I;Providing and laying Viberated Reinforced Cement Concrete corresponding M25 grade using 10 to 20mm with cement and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT & H specification including cost and conveyance of all materials (Viz) cement, stone aggregate, sand water to site, centering, shuttering, machine mixing, laying concrete, vibrating, finishing smooth to required level, curing, all other incidental and operational charges, labour charges etc., complete for side walls of drains as per Morth specification 1500, 1600 & 1700 (C)- Head wall - Excluding GST & Seignoriage charges

13.33

-

74843.28

... More
Pharmacity Road Phase I;Providing and laying Viberated Reinforced Cement Concrete corresponding M30 grade using 10 to 20mm with cement and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT & H specification including cost and conveyance of all materials (Viz) cement, stone aggregate, sand water to site, centering, shuttering, machine mixing, laying concrete, vibrating, finishing smooth to required level, curing, all other incidental and operational charges, labour charges etc., as per Morth specification 1500, 1600 & 1700 (C) - (For Drains - Bed/Side walls/Top Slab) Excluding GST & Seignoriage charges

818.76

-

4894039.65

... More
Pharmacity Road Phase I;Providing and laying Plain Cement Concrete (1:2.5:5) corresponding to M-15 grade using 6-12mm nominal size well graded machine crushed hard granite chips (coarse aggregate), fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } from approved quarry including cost, conveyance and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for Leveling except GST & Seigniorage charges,, as per MORTH specification 2100. PCC Grade M15 (Curtain wall)

368.77

-

1626629.72

... More
Pharmacity Road Phase I;Providing and laying Plain Cement Concrete (1:2.5:5) corresponding to M-15 grade using 6-12mm nominal size well graded machine crushed hard granite chips (coarse aggregate), fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } from approved quarry including cost, conveyance and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for Leveling except GST & Seigniorage charges,, as per MORTH specification 2100. PCC Grade M15

253.62

-

1118707.68

... More
Pharmacity Road Phase I;Earth Work Excavation for Road way in hard rock(Controlled Blasting) by mechanical means including breaking rock and depositing on bank for all lifts and with an initial lead including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST

2986.69

-

776629

... More
Pharmacity Road Phase I;CROSS DRAINAGE WORKS Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all hire and operational charges of T&P, all labour charges, complete for finished item of work as per MORTH(5th Revision) Spec No.301 (payment will be based on levels for finished item of work).excluding GST.

9139.07

-

1013522.86

... More
Pharmacity Road Phase I;Providing gravel berms to the required thickness including spreading in layers of 150 mm thick with side slope of 2:1(2H:1V),sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to10 tonnes capacity to achieve desired density at OMC including cost conveyance of gravel, water etc., to site, labour charges for all operations, hire and operational charges of vibratory roller and other T&P diversion of traffic, etc., complete for finished item of work, as per MORT&H (5th Revision) Spc.No.401. Excluding GST & Seignoriage charges.

40126.8

-

19668151.02

... More
Pharmacity Road Phase I;Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface,including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work excluding GST & seigniorage charges. as per clause 515.

7707

-

4490714.76

... More
Pharmacity Road Phase I;Providing, laying bituminous concrete of thickness 40mm on prepared surface with specified graded crushed aggregate grade II and VG-30 grade bitumen binder @ 5.5% of weight of mix conforming to MORTH (5th Revision) 508 for wearing course including loading aggregates with F.E. loader, heating & mixing the aggregate and binder in 100 - 120 TPH Capacity batch type hot mix plant, transporting the mixed material with tipper and laying with 100TPH capacity Paver Finisher Hydrostatic with sensor control to the required grade, level & alignment and rolling with vibratory roller of 8 - 10T static weight, power roller of 8 to 10 Tones capacity and tandem roller to achieve the desired density including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work excluding GST & seigniorage charges.

2713.16

-

24580117.2

... More
Pharmacity Road Phase I;Providing and applying Tack coat with bitumen emulsion RS-1 (Rapid Setting) over the prepared surface before laying SDBC @ 2kg/ 10Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T & P necessary to complete the finished item of work, excluding GST, as direced by the Engineer-in-Charge as per MORTH (5th Revision) specification 503

67866.31

-

662375.19

... More
Pharmacity Road Phase I;Providing and laying 50mm/70mm thick dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading (grade-II), premixed with bituminous binder with VG-30 grade @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work as per MoRTH (5th Revision) specification clause No. 507 complete in all respects. Excluding GST & Seignoriage Charges

3392.83

-

26661523.57

... More
Pharmacity Road Phase I;Providing and applying Tack coat with bitumen emulsion (RS-1)(Rapid Setting) over the prepared surface before laying DBM at the rate of 2.5kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 503. excluding GST

67866.31

-

796071.82

... More
Pharmacity Road Phase I;Providing and applying Primer coat with bitumen emulsion (SS-1) (Slow Setting) over the prepared surface of granular base as WMM surface at the rate of 6Kg/10sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 502. Excluding GST

67866.31

-

3313911.92

... More
Pharmacity Road Phase I;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). excluding GST & Seignoriage Charges

18042.88

-

32101711.67

... More
Pharmacity Road Phase I;Providing Granular Sub Base using HBG crushed close graded material confirming to grading -I of MoRTH table - 400.1 (50% of 53mm to 9.5mm , 20% of 9.5 to 2.36mm and 30% of 2.36mmm below)including spreading the HBG material in layers of uniform thickness not exceeding 150mm thick with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density complete as per technical specification as directed by the Engineer-in-charge etc, including cost and conveyance of HBG material, water etc to site, , labour charges for all operations, all incidentals hire & operational charges of roller and other T&P etc, complete for finished item of work as per MoRT&H (5th Revision) Specification 401. Excluding GST & Seignoriage Charges.

11172.11

-

16946526.77

... More
Pharmacity Road Phase I;Filling with available soil at median (Construction of Median and Island) above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures,spreaded,graded and compacted with plate compactor to achieve the desired density,including cost and conveyance of all material,labour charges for all operations,hire and operational charges all T & P,diversion of traffic etc complete for finished item of work as per clause 407 MORTH Specification. Excluding GST.

5814.14

-

1235911.74

... More
Pharmacity Road Phase I;Formation of embankment / subbase with useful excavated soils obtained from Road, drains and Culverts by mechanical means and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P, all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per MORTH Specification clause 305 (5th Revision) (Payment will be made based on level for finished item of work). Excluding GST

14699

-

1809152.92

... More
Pharmacity Road Phase I;Earth Work Excavation for Road way in hard rock(Blasting Prohibited) by mechanical means including breaking rock and depositing on bank for all lifts and with an initial lead including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST

23586.14

-

18838014.16

... More
Pharmacity Road Phase I;Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST

38482.66

-

10006646.08

... More
Pharmacity Road Phase I;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all hire and operational charges of T&P, all labour charges, complete for finished item of work as per MORTH(5th Revision) Spec No.301 (payment will be based on levels for finished item of work).excluding GST.

144827.2

-

16061336.48

... More
Pharmacity Road Phase I;Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit, including all taxes etc., Complete as directed by the enginer - in - charge. Excluding GST Girth above 1800 mm

39

-

98247.24

... More
Pharmacity Road Phase I;Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit, including all taxes etc., Complete as directed by the enginer - in - charge. Excluding GST Girth from 900 mm to 1800 mm

84.75

-

111225.05

... More
Pharmacity Road Phase I;Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit, including all taxes etc., Complete as directed by the enginer - in - charge. Excluding GST Girth from 600 mm to 900 mm

123.75

-

81201.04

... More
Pharmacity Road Phase I;Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit, including all taxes etc., Complete as directed by the enginer - in - charge. Excluding GST Girth from 300 mm to 600 mm

167.25

-

63710.54

... More
Pharmacity Road Phase I;PART B -ARTERIAL ROADS Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. including all taxes etc., Complete as directed by the Engineer - in - charge. Excluding GST

13.14

-

433541.42

... More
Pharmacity Road Phase I;Stripping of top soil from borrow areas located in agriculture fields, storing at a suitable place, spreading and re-laying after taking the borrow earth to maintain fertility of the agricultural field, finishing it to the required levels and satisfaction of the farmer. including cost and conveyance of all materials, all incidental and operational charges etc., hire charges all labour charges, overhead & contractor profit. as per Technical Specification Clause 302.3.2 MORD / 305 MORTH. Excluding GST

4447.89

-

1360120.28

... More
Pharmacity Road Phase I;Providing and construction of stone pitching on slopes laid over prepared prepeared filter media including boulders apron laid dry in front of toe of embankment with useful excavated soils to requred levels and slopes using grinate for revetment 225mm of not less then 40 kg and stone spalls of minimum 25mm size(Field picked metal unbroken 25 mmsize) including cost and conveyance of all materials, all incidental and operational charges etc., ramming, curing, all labour charges, overhead & contractor profit complete for finished item of work as per MoRTH specification 2505 as directed by the Engineer-in-charge. Excluding GST & seigniorage charges etc.,

1482.63

-

1666179.59

... More
Pharmacity Road Phase I;BIOSWALE Providing and laying filter media over prepared surface underneath boulder apron laid in bottom and side slope of Bioswale including cost and conveyance of all materials to site, all incidental and operational charges etc.,all labour charges, overhead & contractor profit. Complete as per drawing and technical specification. Excluding GST

741.32

-

1667688.3

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 1400

60

-

66831

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 1100

60

-

49086.6

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 900

60

-

33643.8

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 700

60

-

23813.4

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 600

120

-

40618.8

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 500

2240

-

616224

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 400

60

-

13560.6

... More
Pharmacity Road Phase I;Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST 300

1080

-

193773.6

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 1400

60

-

1211922.6

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 1100

60

-

744766.2

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 900

60

-

546643.2

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 700

60

-

344080.8

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 600

120

-

516620.4

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 500

2240

-

7153081.6

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 400

60

-

142880.4

... More
Pharmacity Road Phase I;Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges 300

1080

-

1837792.8

... More
Pharmacity Road Phase I;Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfacesf approved shades on new concrete surfaces including cost and conveyance of all materials like water etc to site, including all materials,curing etc complete as per drawing and Technical specifications and as directed by the Engineer-in-charge. Excluding GST. Kerbs

7262.04

-

621775.86

... More
Pharmacity Road Phase I;Construction of Cast in Situ Cement Concrete M20 Kerb with channel with top and bottom width 115 and 165mm respectively,250mm high in M20 grade PCC on M10 grade foundation 150mm thick, foundation having 50mm projection beyond kerb stone, kerb stone laid with kerb laying machine,foundation concrete laid manually,all complete from approved quarry including cost and conveyance of all materials like cement,sand,coarse aggregate,water etc.to site, sales on all materials and including all charges for machine mixing,laying concrete in foundations and under flooring bed,ramming in layers finishing top surface to the required level,curing etc.,complete for finished item of work as per clause 408 MORTH Excluding GST & Seignoriage Charges

19896

-

10591038.72

... More
Pharmacity Road Phase I;Providing and laying Filter material underneath pitching in slopes including cost and conveyance of all materials and other taxes,curing,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST. complete as per drawing and Technical specification

49.98

-

112436.01

... More
Pharmacity Road Phase I;Providing and construction of stone pitching on slopes laid over prepared prepeared filter media including boulders apron laid dry in front of toe of embankment with useful excavated soils to requred levels and slopes using granite for revetment 225mm of not less then 40 kg and stone spalls of minimum 25mm size(Field picked metal unbroken 25 mm size) including cost and conveyance of all materials, all incidental and operational charges etc., ramming, curing, all labour charges, overhead & contractor profit complete for finished item of work as per MoRTH specification 2505 as directed by the Engineer-in-charge. Excluding GST & seigniorage charges etc.,

99.96

-

112335.05

... More
Pharmacity Road Phase I;Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade ,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST.

3

-

94.26

... More
Pharmacity Road Phase I;Providing Weep Holes in Brick masoNo.sy/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. including cost and conveyance of all materials to site including , all labour charges. complete as per Technical specifications clause 2706 and as directed by the Engineer-in-charge.Excluding GST

25.74

-

6681.07

... More
Pharmacity Road Phase I;Supplying fitting and placing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of all diametres using primary producers like TATA, SAIL, VSP, Jindal, Shyam Steel etc., of bar reinforcements for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes except GST on all materials etc, including overheads & contractors profit etc., complete for finished item of work. For Superstructure

25.5

-

1845812.4

... More
Pharmacity Road Phase I;Supplying fitting and placing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of all diametres using primary producers like TATA, SAIL, VSP, Jindal, Shyam Steel etc., of bar reinforcements for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes except GST on all materials etc, including overheads & contractors profit etc., complete for finished item of work. For Substructure

22.2

-

1572097.66

... More
Pharmacity Road Phase I;Supplying fitting and placing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of all diametres using primary producers like TATA, SAIL, VSP, Jindal, Shyam Steel etc., of bar reinforcements for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes except GST on all materials etc, including overheads & contractors profit etc., complete for finished item of work. For Foundation

25.74

-

1816843.74

... More
Pharmacity Road Phase I;Providing and laying Viberated Reinforced Cement Concrete corresponding M25 grade using 10 to 20mm with cement and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT & H specification including cost and conveyance of all materials (Viz) cement, stone aggregate, sand water to site, centering, shuttering, machine mixing, laying concrete, vibrating, finishing smooth to required level, curing, all other incidental and operational charges, labour charges etc., complete for side walls of drains as per Morth specification 1500, 1600 & 1700 (C)- Head wall - Excluding GST & Seignoriage charges

7.34

-

41211.53

... More
Pharmacity Road Phase I;Providing and laying Viberated Reinforced Cement Concrete corresponding M30 grade using 10 to 20mm with cement and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT & H specification including cost and conveyance of all materials (Viz) cement, stone aggregate, sand water to site, centering, shuttering, machine mixing, laying concrete, vibrating, finishing smooth to required level, curing, all other incidental and operational charges, labour charges etc., as per Morth specification 1500, 1600 & 1700 (C) - (For Drains - Bed/Side walls/Top Slab) Excluding GST & Seignoriage charges

704.93

-

4213634.48

... More
Pharmacity Road Phase I;Providing and laying Plain Cement Concrete (1:2.5:5) corresponding to M-15 grade using 6-12mm nominal size well graded machine crushed hard granite chips (coarse aggregate), fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } from approved quarry including cost, conveyance and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for Leveling except GST & Seigniorage charges,, as per MORTH specification 2100. PCC Grade M15 (Curtain wall)

121.56

-

536196.3

... More
Pharmacity Road Phase I;Providing and laying Plain Cement Concrete (1:2.5:5) corresponding to M-15 grade using 6-12mm nominal size well graded machine crushed hard granite chips (coarse aggregate), fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } from approved quarry including cost, conveyance and all labour charges, machine mixing, laying concrete, vibrating, finishing smooth to required levels, curing, all incidental and operational charges,complete for finished item of work for Leveling except GST & Seigniorage charges,, as per MORTH specification 2100. PCC Grade M15

124.4

-

548723.42

... More
Pharmacity Road Phase I;Earth Work Excavation for Road way in hard rock(Controlled Blasting) by mechanical means including breaking rock and depositing on bank for all lifts and with an initial lead including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST

3209.01

-

834438.87

... More
Pharmacity Road Phase I;CROSS DRAINAGE WORKS Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all hire and operational charges of T&P, all labour charges, complete for finished item of work as per MORTH(5th Revision) Spec No.301 (payment will be based on levels for finished item of work).excluding GST,

9758.03

-

1082165.53

... More
Pharmacity Road Phase I;Providing gravel berms to the required thickness including spreading in layers of 150 mm thick with side slope of 2:1(2H:1V),sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to10 tonnes capacity to achieve desired density at OMC including cost conveyance of gravel, water etc., to site, labour charges for all operations, hire and operational charges of vibratory roller and other T&P diversion of traffic, etc., complete for finished item of work, as per MORT&H (5th Revision) Spc.No.401. Excluding GST & Seignoriage charges.

54431.48

-

26679589.92

... More
Pharmacity Road Phase I;Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface,including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work excluding GST & seigniorage charges. as per clause 515.

21608.01

-

12590555.27

... More
Pharmacity Road Phase I;Providing, laying bituminous concrete of thickness 40mm on prepared surface with specified graded crushed aggregate grade II and VG-30 grade bitumen binder @ 5.5% of weight of mix conforming to MORTH (5th Revision) 508 for wearing course including loading aggregates with F.E. loader, heating & mixing the aggregate and binder in 100 - 120 TPH Capacity batch type hot mix plant, transporting the mixed material with tipper and laying with 100TPH capacity Paver Finisher Hydrostatic with sensor control to the required grade, level & alignment and rolling with vibratory roller of 8 - 10T static weight, power roller of 8 to 10 Tones capacity and tandem roller to achieve the desired density including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work excluding GST & seigniorage charges.

3824.23

-

34645955.87

... More
Pharmacity Road Phase I;Providing and applying Tack coat with bitumen emulsion RS-1 (Rapid Setting) over the prepared surface before laying SDBC @ 2kg/ 10Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T & P necessary to complete the finished item of work, excluding GST, as direced by the Engineer-in-Charge as per MORTH (5th Revision) specification 503

95605.63

-

933110.95

... More
Pharmacity Road Phase I;Providing and laying 50mm/70mm thick dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading (grade-II), premixed with bituminous binder with VG-30 grade @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work as per MoRTH (5th Revision) specification clause No. 507 complete in all respects. Excluding GST & Seignoriage Charges

6042.5

-

47483113.07

... More
Pharmacity Road Phase I;Providing and applying Tack coat with bitumen emulsion (RS-1)(Rapid Setting) over the prepared surface before laying DBM at the rate of 2.5kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 503. excluding GST

95605.63

-

1121454.04

... More
Pharmacity Road Phase I;Providing and applying Primer coat with bitumen emulsion (SS-1) (Slow Setting) over the prepared surface of granular base as WMM surface at the rate of 6Kg/10sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 502. Excluding GST

95605.63

-

4668422.91

... More
Pharmacity Road Phase I;Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). excluding GST & Seignoriage Charges

25387.8

-

45169719.88

... More
Pharmacity Road Phase I;Providing Granular Sub Base using HBG crushed close graded material confirming to grading -I of MoRTH table - 400.1 (50% of 53mm to 9.5mm , 20% of 9.5 to 2.36mm and 30% of 2.36mmm below)including spreading the HBG material in layers of uniform thickness not exceeding 150mm thick with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density complete as per technical specification as directed by the Engineer-in-charge etc, including cost and conveyance of HBG material, water etc to site, , labour charges for all operations, all incidentals hire & operational charges of roller and other T&P etc, complete for finished item of work as per MoRT&H (5th Revision) Specification 401. Excluding GST & Seignoriage Charges.

18769.54

-

28470764.44

... More
Pharmacity Road Phase I;Filling with available soil at median (Construction of Median and Island) above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures,spreaded,graded and compacted with plate compactor to achieve the desired density,including cost and conveyance of all material,labour charges for all operations,hire and operational charges all T & P,diversion of traffic etc complete for finished item of work as per clause 407 MORTH Specification. Excluding GST.

10818.45

-

2299677.92

... More
Pharmacity Road Phase I;Formation of embankment / subbase with useful excavated soils obtained from Road, drains and Culverts by mechanical means and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P, all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per MORTH Specification clause 305 (5th Revision) (Payment will be made based on level for finished item of work). Excluding GST

54558.5

-

6715060.18

... More
Pharmacity Road Phase I;Earth Work Excavation for Road way in hard rock(Blasting Prohibited) by mechanical means including breaking rock and depositing on bank for all lifts and with an initial lead including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST

36678.18

-

29294495.58

... More
Pharmacity Road Phase I;Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST

6472.62

-

1683075.38

... More
Pharmacity Road Phase I;Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all hire and operational charges of T&P, all labour charges, complete for finished item of work as per MORTH(5th Revision) Spec No.301 (payment will be based on levels for finished item of work).excluding GST,

100685.2

-

11165988.68

... More
Pharmacity Road Phase I;Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit, including all taxes etc., Complete as directed by the enginer - in - charge. Excluding GST Girth above 1800 mm

39

-

98247.24

... More
Pharmacity Road Phase I;Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit, including all taxes etc., Complete as directed by the enginer - in - charge. Excluding GST Girth from 900 mm to 1800 mm

84.75

-

111225.05

... More
Pharmacity Road Phase I;Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit, including all taxes etc., Complete as directed by the enginer - in - charge. Excluding GST Girth from 600 mm to 900 mm

123.75

-

81201.04

... More
Pharmacity Road Phase I;Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit, including all taxes etc., Complete as directed by the enginer - in - charge. Excluding GST Girth from 300 mm to 600 mm

167.25

-

63710.54

... More
Pharmacity Road Phase I;EASTERN FREE WAY ROAD Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. including all taxes etc., Complete as directed by the enginer - in - charge. Excluding GST

17.08

-

563537.86



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.